PROVINCIAL ELECTRICITY AUTHORITY
Substation Preventive Maintenance
DR.URAIRAT FUANGSOONGNERN : PEA
1
Presentation Contents
1) A kind of substation
2) Electrical equipment details of AIS substation
3) Electrical equipment details of GIS substation
4) Preliminary operation before preventive maintenance
5) Preventive maintenance operation details of AIS substation and GIS substation
2
DR.URAIRAT FUANGSOONGNERN : PEA
A kind of substation
1) AIS Outdoor substation
2) GIS Indoor substation
3
DR.URAIRAT FUANGSOONGNERN : PEA
Electrical Equipment Details of AIS substation
1) 115 kV Switchyard1) Gas Circuit Breaker
2) Disconnecting & Earthing Switch
3) Current Transformer
4) Voltage Transformer
5) Lightning Arrester
6) Protection Relay
7) Digital Multimeter
2) 115/22 kV Power Transformer
3) Station Service Transformer
4) Distribution Board4
5) 22 kV Switchgear1) Vacuum Circuit Breaker
2) Load Break Switch
3) Current Transformer
4) Voltage Transformer
5) Protection Relay
6) Digital Multimeter
7) Bus Bar
8) Power Cable
6) Battery & Battery Charger
7) Grounding
DR.URAIRAT FUANGSOONGNERN : PEA
Electrical Equipment Details of GIS substation
1) 115 kV Gas Insulated Switchgear
2) 115/22 kV Power Transformer
3) Protection & Control Board
4) Lightening Arrester/Surge Counter
5) Station Service Transformer
6) Distribution Board
7) Battery & Battery Charger
8) Grounding
5
9) 22 kV Switchgear1) Vacuum Circuit Breaker
2) Load Break Switch
3) Current Transformer
4) Voltage Transformer
5) Protection Relay
6) Digital Multimeter
7) Bus Bar
8) Power Cable
DR.URAIRAT FUANGSOONGNERN : PEA
Preliminary operation before Preventive Maintenance
1) Visual inspection of electrical equipment inside substation
2) Thermo-scan an electrical equipment inside substation before and after preventive maintenance
6
DR.URAIRAT FUANGSOONGNERN : PEA
7
Preliminary operation before Preventive Maintenance
DR.URAIRAT FUANGSOONGNERN : PEA
8
Preliminary operation before Preventive Maintenance
DR.URAIRAT FUANGSOONGNERN : PEA
Thermoscan (Before – After)
Description : Probably poor connection
Classification : Minor. - > Normal
Recommendation : Should be checked and cleaned the indicated connection point.Criteria of temperature- Temperature normal : less than 40 ºC- Temperature dangerous : more than 40 ºC
9
Before Visible Image After
DR.URAIRAT FUANGSOONGNERN : PEA
Before Visible Image After
10
Thermoscan (Before – After)
DR.URAIRAT FUANGSOONGNERN : PEA
Preventive Maintenance operations details of AIS substation and GIS substation
11
DR.URAIRAT FUANGSOONGNERN : PEA
115 kV Disconnecting & Earthing Switch
Electrical Test- Insulation Resistance Test
Insulation resistance test of each pole to ground by energize voltage 2500 Vdc for 1 min with switch open, shall be exceed than 100,000 MΩ- Contact Resistance Test
It will be made across the main contact with switch close by energize 100 Adc, and value compare by factory test should be very less.- Operating Interlocking Check
When ground bar is closed, It should not operate to close with mechanic interlocking.
12
DR.URAIRAT FUANGSOONGNERN : PEA
96 kV , 108 kV Lightning Arrester
Visual Inspection- Support Structure - Seal and Body- Grounding System- Cleaning
Electrical Test- Insulation Resistance Test
Energize 5,000 Vdc for 1 min on each arrester, phase to ground. The value shall be exceed more than 100,000 MΩ- Counter Operation Test
Verify correct operation of surge counter by input about 100 Vdc (by capacitor 300mF) at top and bottom of surge counter and counter should count up- (Optional) DC Hi-Pot Test
Power frequency voltage test on the main circuit for 1 min at lease 62% of maximum test voltage, should have a few difference leakage current of each phases 13
DR.URAIRAT FUANGSOONGNERN : PEA
115 kV Voltage Transformer & Current Transformer
Electrical Test- Insulation Resistance Test
Insulation resistance test of primary winding and secondary winding with respect to ground at voltage 2,500 Vdc for 1 min. The value shall be exceed more than 1,000 MΩ- Turn Ratio Test
Verification check by voltage method, measure a turn ratio of each phase and each tap by energize current following nameplate (such as 1000 A for CT, 150 A for VT) between HV and LV in every core Then, read the ratio value from a test instrument in A. analyze the value of turn ratio in the every core, the different value should be very less comparing by nameplate shall not deviate more than 0.5%
14
DR.URAIRAT FUANGSOONGNERN : PEA
115 kV Voltage Transformer & Current Transformer
Electrical Test- Winding Resistance Test
Measure a secondary winding resistance of each phase by energize DC current ( 1 A or 5 A follows its nameplate) between HV and ground in every core at full tap. Receive the value of V and calculate to R from a test instrument in Ω and analyze the value, the different value should be very less and/or comparing by factory test
15
DR.URAIRAT FUANGSOONGNERN : PEA
115 kV Gas Circuit Breaker (SF6)
Electrical Test- Insulation Resistance Test
Insulation resistance test at 5000 Vdcbetween top and middle, and between middle and case for 1 min, shall be exceed than 100,000 MΩ- Contact Resistance Test
It will be made between the upper fixed contact through the GCB to the lower contact points (top to middle) with GCB close at 100 Adc, the different value should be very less comparing by factory test- Operating Timing Test
Energize 125 Vdc at coil for operate GCB to change position to close and open and catch that time in use for compare with factory test.
16
DR.URAIRAT FUANGSOONGNERN : PEA
115 kV Gas Insulated Switchgear (115kV GIS)
Visual Inspection- Support Structure - Seal and Body- Motor Charging- Cleaning
Electrical Test- SF6 Pressure System Test
to measure pressure of each compartments by instrument (IR zero waste SF6 analyzer), compare with its nameplate and gauge (green zone)- SF6 Moisture (Dew-Point) and leakage
to measure dew point by analyzer and refer to moisture inside compartments, shall be less than -30ºC
17
DR.URAIRAT FUANGSOONGNERN : PEA
Standard H2O SO2 SF6 HF
IEC60480-1 750 ppm 12.0 ppm 97 % 25 ppm
115 kV Gas Insulated Switchgear (115 kV GIS)
Electrical Test- Contact Resistance Test
It will be made between the upper fixed contact through the CB at 100 Adc (at the terminal box), the different value in µΩ should be very less comparing by factory test- Operating Timing Test
Energize 125 Vdc at coil (in the terminal box) for operate CB to change position to close and open and catch that time in use for compare with factory test.- Insulation Resistance Test
It test between current transformer secondary and ground usually checked by use of megger test at 1000 Vdc (500 Vdc if required) for 1 min shall be exceed than 100,000 MΩ- Winding Resistance Test
Test with multi-meter, measure in Ω.- Alarm Circuit Check 18
DR.URAIRAT FUANGSOONGNERN : PEA
115/22 kV Power Transformer
Visual Inspection- Bushing, Tank and associated device- Load Tap-changer- Oil Level Check- Replace Silica Gel- Cleaning
Electrical Test- Polarization Index Test
Perform polarization index on each winding (primary and secondary shorting 3 phases) to ground. Energize voltage at 2,500 Vdc (about 0.5 ampare) for 1 min and 10 mins. PI should be more than 2.0
PI=MΩ at 10 minsMΩ at 1 min
19
DR.URAIRAT FUANGSOONGNERN : PEA
Electrical Test- Winding Resistance Test
Measure a winding resistance of each phase by energize current 10 Adc between each phase in every primary taps and secondary tap in V and calculate to Ω. Analyze the value with each phases in the same tap, the different value should be very less comparing by factory test
20
- Turn Ratio TestMeasure a turn ratio of each phase and each tap by
energize voltage 10 Vac (or auto mode) between HV and LV in every tap in V. Analyze the value of turn ratio in the every tap, the different value should be very less comparing by nameplate (including phase angle difference in degree)
DR.URAIRAT FUANGSOONGNERN : PEA
115/22 kV Power Transformer
115/22 kV Power Transformer
Electrical Test- Oil Transformer Test
By IEC 60156 (ASTM if any) including Dielectric Breakdown Test at both main tank and OLTC.
- Water Content TestBy ASTM D1533, to sampling transformer
oil to test in the laboratory, shall be less than 25 ppm on main tank and less than 40 ppm on OLTC.
21
Standard Type Gap No. of Test Acceptable
IEC 60156 Spherical 2.5 mm 6 > 60 kV
ASTM D877 Plate 2.5 mm 5 > 30 kV
ASTM D1816 Spherical 2.0 mm 5 > 50 kV
DR.URAIRAT FUANGSOONGNERN : PEA
115/22 kV Power Transformer
Electrical Test- Dissolved Gas Analysis (DGA)
By ASTM D3612, to analyze key gas in transformer oil such as O2 N2 H2 CH4 CO CO2 C2H4 C2H6 C2H2 C3H6 C3H8 of main tank and OLTC.
- Oil/Winding Temp.See a winding temperature at a gauge, shall be in
the length of setting* Normally Setting Fan : 70 C | Alarm : 95 C | Trip : 105 C- Tr. Fan (Motor/Fan)
See fan working by simulate all functions refer by temperature (on/off/work at high temp.), shall work by its setting 22
O2 N2 H2 CH4 CO
N/A N/A <100 <120 <350
CO2/CO CO2 C2H4 C2H6 C2H2
>3 <2500 <50 <65 <1
DR.URAIRAT FUANGSOONGNERN : PEA
115 kV Protection & Control Board115 kV Protection Relay
Visual Inspection- Seal and Body- Setting Relay Recording- Cleaning
- Relay Feature (Operation) Check- Digital Multi-meter Check
Relay in testing27/59 – Under/Over Voltage Relay50/51G – Instantaneous/Inverse Time Overcurrent Relay21 – Distance Relay87 – Differential Relay
23
DR.URAIRAT FUANGSOONGNERN : PEA
22 kV Switchgear & Bus Bar
Visual Inspection- Support Structure- Seal and Body- Bus Bar Connection- Cleaning- Motor Charging (VCB)- Terminator (Power Cable)- Record Setting Relay (Relay)
24
Item- Vacuum Circuit Breaker- Current Transformer- Voltage Transformer- Protection Relay- Metering- Power Cable
DR.URAIRAT FUANGSOONGNERN : PEA
22 kV Switchgear & Bus Bar
Electrical Test (VCB)- Contact Resistance Test- Insulation Resistance Test- Operation Timing Test- Operation Test
Electrical Test (CT&PT)- Winding Resistance Test- Insulation Resistance Test- Turn Ratio- Contact Resistance Test
Electrical Test (Power Cable)- Insulation Resistance Test
Electrical Test (Protection Relay)- Secondary Injection Test 25
DR.URAIRAT FUANGSOONGNERN : PEA
Station Service Transformer
Visual Inspection- Bushing, Tank and associated device- Oil Level Check- Cleaning
Electrical Test- Winding Insulation Resistance Test
Perform insulation resistance and/or polarization index on each winding to ground. Recommended minimum DC test voltage at 2500 Vdcfor primary and 500 Vdc for secondary.- Oil Transformer Test
By IEC 60156 (ASTM if any) including Dielectric Breakdown Test.
26
DR.URAIRAT FUANGSOONGNERN : PEA
Computerized Substation Control System (CSCS)
- Visual Inspection- Cleaning- Communication System Test
27
DR.URAIRAT FUANGSOONGNERN : PEA
AC/DC Distribution Board
- Visual Inspection- Cleaning- Insulation Resistance Test (Panel)
Test for 1 min on each bus, phase to ground and phase to phase with input/output off.
28
DR.URAIRAT FUANGSOONGNERN : PEA
Battery & Battery Charger
Visual Inspection- Seal and Body- Cleaning
Electrical Test- Insulation Resistance Test- Charger Operating- System Function Check- Voltage Battery Cell Check
Measure cell voltage compare by its nameplate and analyze its defect.- Impedance Test
Measure cell resistance (impedance) between pole + and pole - in Ω compare by nearby cell and analyze its defect.
29
DR.URAIRAT FUANGSOONGNERN : PEA
Grounding Systems
Visual Inspection- Grounding System Connection Check- Torque at joint
Electrical Test- Grounding Resistance Test
Performed the test by fall of potential method. The resistance of grounding point should less than 5 ohm.- Grounding Continuity Test
Performed the test by two points method. The resistance of ground and another ground should be very less
30
DR.URAIRAT FUANGSOONGNERN : PEA
Insulation Resistance and Polarity Index Test
1. Prepare a test instrument (such as Megger/MIT515) 2. Measure an insulation resistance of each core by
energize 5,000 Vdc between core and ground for 1 min and 10 mins with switch open
3. Read the value from a test instrument in MΩ4. Measure in every phases and cores, then analyze
the value compare by each phase in the same core, the different value should be very less but shall be exceed than 100,000 MΩ
5. PI (Polarization Index) is the value of Insulation Resistance at 10 mins divided by at 1 min, shall be above 2.00
31
DR.URAIRAT FUANGSOONGNERN : PEA
Contact Resistance Test
1. Prepare a test instrument (such as Megger/MOM200A) 2. Measure a contact resistance of each coil (status close
and open) by energize current 100 Adc in every phases3. Read the value from a test instrument in µΩ4. analyze the value with each phases, the different
value should be very less comparing by factory test
32
DR.URAIRAT FUANGSOONGNERN : PEA