Sunesis Construction bid read at Bid Opening was $6,963,245.00 John R. Jurgensen Co. bid read at Bid Opening was $7,722,897.99 Bid Sale Start Date: 9/25/2014 Bid Opening Date: 10/09/2014 Engineer’s Estimate of Cost: $7,664,200.00
Summary of Bids Received For
MSD ID: 11242843_R
CSO 12 Sewer Separation Phase A.4a (Re-bid)
GeneralTrade:
Firm Name Bid Total $Sunesis Construction 6,951,117.00
Kokosing Construction Company, Inc. 7,593,951.49
John R. Jurgensen Company 7,722,305.14
MAC Construction & Excavating Inc. 8,448,637.60
Page 1 of 33"UP" = Unit Price10/9/2014
4:08 PM
Bid Item Total $Firm Labor (UP) $ Materials (UP) $ Combined Unit $Bid Item Quantity Unit Bidders
Maintaining Traffic 1 LS1 John R. Jurgensen Company 476,403.99 142,921.20 333,482.79 476,403.99Kokosing Construction Company, Inc.
200,000.00 90,809.00 109,191.00 200,000.00
MAC Construction & Excavating Inc.
80,000.00 70,000.00 10,000.00 80,000.00
Sunesis Construction 40,000.00 15,898.00 24,102.00 40,000.00
Pavement for Maintaining Traffic, As per Plan
835 SY2
John R. Jurgensen Company 60,362.15 21.19 51.10 72.29Kokosing Construction Company, Inc.
50,100.00 41.00 19.00 60.00
MAC Construction & Excavating Inc.
33,400.00 25.50 14.50 40.00
Sunesis Construction 35,905.00 9.00 34.00 43.00
Dust Control 50 M GAL3 John R. Jurgensen Company 4,150.00 24.90 58.10 83.00Kokosing Construction Company, Inc.
3,500.00 62.00 8.00 70.00
MAC Construction & Excavating Inc.
2,500.00 50.00 0.00 50.00
Sunesis Construction 1,075.00 21.50 0.00 21.50
Construction Layout Stakes
1 LS4
John R. Jurgensen Company 103,374.00 31,012.20 72,361.80 103,374.00Kokosing Construction Company, Inc.
35,000.00 23,450.00 11,550.00 35,000.00
MAC Construction & Excavating Inc.
30,000.00 30,000.00 0.00 30,000.00
Sunesis Construction 1,420.00 0.00 1,420.00 1,420.00
Page 2 of 33"UP" = Unit Price10/9/2014
4:08 PM
Mobilization 1 LS5 John R. Jurgensen Company 200,000.00 60,000.00 140,000.00 200,000.00Kokosing Construction Company, Inc.
200,000.00 134,000.00 66,000.00 200,000.00
MAC Construction & Excavating Inc.
180,000.00 180,000.00 0.00 180,000.00
Sunesis Construction 113,774.00 51,876.00 61,898.00 113,774.00
Geotechnical Instrumentation
15 MO6
John R. Jurgensen Company 45,000.00 900.00 2,100.00 3,000.00Kokosing Construction Company, Inc.
15,000.00 963.00 37.00 1,000.00
MAC Construction & Excavating Inc.
105,000.00 7,000.00 0.00 7,000.00
Sunesis Construction 129,420.00 628.00 8,000.00 8,628.00
Project Sign 1 LS7 John R. Jurgensen Company 1,100.00 330.00 770.00 1,100.00Kokosing Construction Company, Inc.
2,500.00 1,119.00 1,381.00 2,500.00
MAC Construction & Excavating Inc.
1,500.00 1,000.00 500.00 1,500.00
Sunesis Construction 575.00 0.00 575.00 575.00
Stormwater Pollution Prevention Plan (SWPPP, NOI & NOT)
1 LS8
John R. Jurgensen Company 10,330.00 3,099.00 7,231.00 10,330.00Kokosing Construction Company, Inc.
24,312.99 18,202.99 6,110.00 24,312.99
MAC Construction & Excavating Inc.
25,000.00 20,000.00 5,000.00 25,000.00
Sunesis Construction 4,675.00 0.00 4,675.00 4,675.00
Clearing and Grubbing 1 LS9 John R. Jurgensen Company 30,196.00 9,058.80 21,137.20 30,196.00
Page 3 of 33"UP" = Unit Price10/9/2014
4:08 PM
Kokosing Construction Company, Inc.
20,000.00 12,170.00 7,830.00 20,000.00
MAC Construction & Excavating Inc.
15,000.00 15,000.00 0.00 15,000.00
Sunesis Construction 7,990.00 0.00 7,990.00 7,990.00
Walk Removed 7,740 SF10 John R. Jurgensen Company 6,192.00 0.24 0.56 0.80Kokosing Construction Company, Inc.
14,319.00 1.85 0.00 1.85
MAC Construction & Excavating Inc.
12,384.00 1.45 0.15 1.60
Sunesis Construction 7,740.00 0.72 0.28 1.00
Concrete Driveway Removed
240 SY11
John R. Jurgensen Company 4,320.00 5.40 12.60 18.00Kokosing Construction Company, Inc.
6,000.00 24.00 1.00 25.00
MAC Construction & Excavating Inc.
5,520.00 20.00 3.00 23.00
Sunesis Construction 2,280.00 5.36 4.14 9.50
Curb Removed 1,212 LF12 John R. Jurgensen Company 4,242.00 1.05 2.45 3.50Kokosing Construction Company, Inc.
6,060.00 5.00 0.00 5.00
MAC Construction & Excavating Inc.
7,878.00 6.25 0.25 6.50
Sunesis Construction 4,848.00 3.00 1.00 4.00
Inlet Removed 12 EA13 John R. Jurgensen Company 5,928.00 148.20 345.80 494.00Kokosing Construction Company, Inc.
4,320.00 302.00 58.00 360.00
MAC Construction & Excavating Inc.
7,920.00 560.00 100.00 660.00
Sunesis Construction 4,080.00 256.00 84.00 340.00
Page 4 of 33"UP" = Unit Price10/9/2014
4:08 PM
Pavement Removed 659 SY14 John R. Jurgensen Company 13,180.00 6.00 14.00 20.00Kokosing Construction Company, Inc.
29,655.00 42.00 3.00 45.00
MAC Construction & Excavating Inc.
9,226.00 13.00 1.00 14.00
Sunesis Construction 5,931.00 6.00 3.00 9.00
Pipe Removed, 24" and Under
76 LF15
John R. Jurgensen Company 4,484.00 17.70 41.30 59.00Kokosing Construction Company, Inc.
1,900.00 15.00 10.00 25.00
MAC Construction & Excavating Inc.
21,280.00 190.00 90.00 280.00
Sunesis Construction 1,292.00 14.00 3.00 17.00
Seal and Abandoned (12" and Under)
1 LS16
John R. Jurgensen Company 12,177.00 3,653.10 8,523.90 12,177.00Kokosing Construction Company, Inc.
1,200.00 860.00 340.00 1,200.00
MAC Construction & Excavating Inc.
10,000.00 9,000.00 1,000.00 10,000.00
Sunesis Construction 2,350.00 1,335.00 1,015.00 2,350.00
Fill, Seal, and Abandon (Greater than 12")
5 CY17
John R. Jurgensen Company 6,140.00 368.40 859.60 1,228.00Kokosing Construction Company, Inc.
4,500.00 663.00 237.00 900.00
MAC Construction & Excavating Inc.
2,500.00 450.00 50.00 500.00
Sunesis Construction 650.00 17.00 113.00 130.00
Manhole Removed 5 EA18
Page 5 of 33"UP" = Unit Price10/9/2014
4:08 PM
John R. Jurgensen Company 3,830.00 229.80 536.20 766.00Kokosing Construction Company, Inc.
1,500.00 289.00 11.00 300.00
MAC Construction & Excavating Inc.
6,000.00 950.00 250.00 1,200.00
Sunesis Construction 3,250.00 486.00 164.00 650.00
Fence Removed 1,319 LF19 John R. Jurgensen Company 2,638.00 0.60 1.40 2.00Kokosing Construction Company, Inc.
6,595.00 3.00 2.00 5.00
MAC Construction & Excavating Inc.
2,638.00 2.00 0.00 2.00
Sunesis Construction 2,638.00 0.00 2.00 2.00
Removal, Misc.: Remove, Store and Replace Existing Fence
186 LF20
John R. Jurgensen Company 8,184.00 13.20 30.80 44.00Kokosing Construction Company, Inc.
7,440.00 22.00 18.00 40.00
MAC Construction & Excavating Inc.
8,137.50 35.00 8.75 43.75
Sunesis Construction 8,137.50 0.00 43.75 43.75
Removal, Misc.: Building Demolished
1 LS21
John R. Jurgensen Company 47,838.00 14,351.40 33,486.60 47,838.00Kokosing Construction Company, Inc.
49,500.00 27,720.00 21,780.00 49,500.00
MAC Construction & Excavating Inc.
50,000.00 48,000.00 2,000.00 50,000.00
Sunesis Construction 40,000.00 0.00 40,000.00 40,000.00
Removal, Misc.: Remove and Store Signage
1 LS22
John R. Jurgensen Company 1,500.00 450.00 1,050.00 1,500.00
Page 6 of 33"UP" = Unit Price10/9/2014
4:08 PM
Kokosing Construction Company, Inc.
2,000.00 1,926.00 74.00 2,000.00
MAC Construction & Excavating Inc.
2,000.00 2,000.00 0.00 2,000.00
Sunesis Construction 2,500.00 0.00 2,500.00 2,500.00
Removal, Misc.: Remove and Replace Power Pole (ALLOWANCE)
1 94000.23
John R. Jurgensen Company 94,000.00 0.00 94,000.00 94,000.00Kokosing Construction Company, Inc.
94,000.00 0.00 94,000.00 94,000.00
MAC Construction & Excavating Inc.
94,000.00 0.00 94,000.00 94,000.00
Sunesis Construction 94,000.00 0.00 94,000.00 94,000.00
Removal, Misc.: Gas Line Removed
335 LF24
John R. Jurgensen Company 21,775.00 19.50 45.50 65.00Kokosing Construction Company, Inc.
2,680.00 8.00 0.00 8.00
MAC Construction & Excavating Inc.
10,385.00 21.00 10.00 31.00
Sunesis Construction 3,015.00 7.00 2.00 9.00
Removal, Misc.: Commuter Rail Tracks Removed
210 LF25
John R. Jurgensen Company 6,510.00 9.30 21.70 31.00Kokosing Construction Company, Inc.
10,500.00 48.00 2.00 50.00
MAC Construction & Excavating Inc.
36,750.00 168.00 7.00 175.00
Sunesis Construction 6,405.00 12.50 18.00 30.50
Page 7 of 33"UP" = Unit Price10/9/2014
4:08 PM
Removal, Misc.: Remove, Store and Replace Existing Light Pole
4 EA26
John R. Jurgensen Company 3,000.00 225.00 525.00 750.00Kokosing Construction Company, Inc.
12,700.00 1,778.00 1,397.00 3,175.00
MAC Construction & Excavating Inc.
6,000.00 1,500.00 0.00 1,500.00
Sunesis Construction 10,000.00 0.00 2,500.00 2,500.00
Full Depth Pavement Sawing
272 LF27
John R. Jurgensen Company 816.00 0.90 2.10 3.00Kokosing Construction Company, Inc.
2,040.00 6.50 1.00 7.50
MAC Construction & Excavating Inc.
272.00 1.00 0.00 1.00
Sunesis Construction 680.00 0.59 1.91 2.50
Fence, Type CL 982 LF28 John R. Jurgensen Company 24,550.00 7.50 17.50 25.00Kokosing Construction Company, Inc.
19,640.00 11.00 9.00 20.00
MAC Construction & Excavating Inc.
24,304.50 12.00 12.75 24.75
Sunesis Construction 24,550.00 0.00 25.00 25.00
Gate, Type CL, Overhead Sliding
1 EA29
John R. Jurgensen Company 11,270.00 3,381.00 7,889.00 11,270.00Kokosing Construction Company, Inc.
10,000.00 5,600.00 4,400.00 10,000.00
MAC Construction & Excavating Inc.
11,270.00 4,770.00 6,500.00 11,270.00
Sunesis Construction 11,300.00 0.00 11,300.00 11,300.00
Gate, Type CL, Sliding 2 EA30
Page 8 of 33"UP" = Unit Price10/9/2014
4:08 PM
John R. Jurgensen Company 5,670.00 850.50 1,984.50 2,835.00Kokosing Construction Company, Inc.
10,000.00 2,800.00 2,200.00 5,000.00
MAC Construction & Excavating Inc.
5,670.00 1,035.00 1,800.00 2,835.00
Sunesis Construction 5,700.00 0.00 2,850.00 2,850.00
Gate, Type CLT, Swinging 1 EA31
John R. Jurgensen Company 1,485.00 445.50 1,039.50 1,485.00Kokosing Construction Company, Inc.
1,500.00 840.00 660.00 1,500.00
MAC Construction & Excavating Inc.
1,485.00 685.00 800.00 1,485.00
Sunesis Construction 1,500.00 0.00 1,500.00 1,500.00
Drinking Fountain & Hose Bibb
1 EA32
John R. Jurgensen Company 5,500.00 1,650.00 3,850.00 5,500.00Kokosing Construction Company, Inc.
6,100.00 1,640.00 4,460.00 6,100.00
MAC Construction & Excavating Inc.
5,500.00 2,300.00 3,200.00 5,500.00
Sunesis Construction 6,150.00 1,496.00 4,654.00 6,150.00
Topsoil Furnished & Placed
972 CY33
John R. Jurgensen Company 28,188.00 8.70 20.30 29.00Kokosing Construction Company, Inc.
48,600.00 13.00 37.00 50.00
MAC Construction & Excavating Inc.
36,936.00 22.00 16.00 38.00
Sunesis Construction 44,712.00 21.00 25.00 46.00
Seeding & Mulching, Class 1
8,504 SY34
John R. Jurgensen Company 8,504.00 0.30 0.70 1.00
Page 9 of 33"UP" = Unit Price10/9/2014
4:08 PM
Kokosing Construction Company, Inc.
9,779.60 0.65 0.50 1.15
MAC Construction & Excavating Inc.
9,779.60 0.65 0.50 1.15
Sunesis Construction 10,630.00 0.00 1.25 1.25
Commercial Fertilizer 800 LB35 John R. Jurgensen Company 400.00 0.15 0.35 0.50Kokosing Construction Company, Inc.
400.00 0.30 0.20 0.50
MAC Construction & Excavating Inc.
400.00 0.25 0.25 0.50
Sunesis Construction 400.00 0.00 0.50 0.50
Bio-Retention Area 1, As Per Plan
1 LS36
John R. Jurgensen Company 115,000.00 34,500.00 80,500.00 115,000.00Kokosing Construction Company, Inc.
95,000.00 41,986.00 53,014.00 95,000.00
MAC Construction & Excavating Inc.
130,000.00 80,000.00 50,000.00 130,000.00
Sunesis Construction 70,000.00 16,327.00 53,673.00 70,000.00
Bio-Retention Area 2, As Per Plan
1 LS37
John R. Jurgensen Company 80,000.00 24,000.00 56,000.00 80,000.00Kokosing Construction Company, Inc.
70,000.00 32,144.00 37,856.00 70,000.00
MAC Construction & Excavating Inc.
80,000.00 50,000.00 30,000.00 80,000.00
Sunesis Construction 56,600.00 12,196.00 44,404.00 56,600.00
Establishment 1 LS38 John R. Jurgensen Company 5,000.00 1,500.00 3,500.00 5,000.00Kokosing Construction Company, Inc.
5,000.00 2,800.00 2,200.00 5,000.00
MAC Construction & Excavating Inc.
5,000.00 5,000.00 0.00 5,000.00
Page 10 of 33"UP" = Unit Price10/9/2014
4:08 PM
Sunesis Construction 12,000.00 0.00 12,000.00 12,000.00
Low Visibility Paving System, As Per Plan
254 SY39
John R. Jurgensen Company 25,908.00 30.60 71.40 102.00Kokosing Construction Company, Inc.
15,240.00 33.00 27.00 60.00
MAC Construction & Excavating Inc.
25,400.00 60.00 40.00 100.00
Sunesis Construction 14,478.00 10.00 47.00 57.00
Concrete Pipe Encasement, 24" DIP Sanitary
30 LF40
John R. Jurgensen Company 3,900.00 39.00 91.00 130.00Kokosing Construction Company, Inc.
4,800.00 85.00 75.00 160.00
MAC Construction & Excavating Inc.
3,750.00 75.00 50.00 125.00
Sunesis Construction 2,070.00 17.00 52.00 69.00
Concrete Pipe Encasement, 8" PVC Sanitary
10 LF41
John R. Jurgensen Company 5,000.00 150.00 350.00 500.00Kokosing Construction Company, Inc.
1,800.00 128.00 52.00 180.00
MAC Construction & Excavating Inc.
1,200.00 70.00 50.00 120.00
Sunesis Construction 680.00 16.00 52.00 68.00
12' x 12' Conduit, Type A, 706.05 as Per Plan B
8 LF42
John R. Jurgensen Company 34,992.00 1,312.20 3,061.80 4,374.00Kokosing Construction Company, Inc.
32,000.00 1,638.00 2,362.00 4,000.00
MAC Construction & Excavating Inc.
40,000.00 3,800.00 1,200.00 5,000.00
Page 11 of 33"UP" = Unit Price10/9/2014
4:08 PM
Sunesis Construction 34,560.00 2,267.00 2,053.00 4,320.00
12' x 10' Conduit, Type A 706.05 as Per Plan B
735 LF43
John R. Jurgensen Company 3,013,500.00 1,230.00 2,870.00 4,100.00Kokosing Construction Company, Inc.
2,793,000.00 2,003.00 1,797.00 3,800.00
MAC Construction & Excavating Inc.
3,528,000.00 3,300.00 1,500.00 4,800.00
Sunesis Construction 2,940,000.00 2,125.00 1,875.00 4,000.00
12' x 10' Conduit, Type B 706.05 as Per Plan A
110 LF44
John R. Jurgensen Company 475,530.00 1,296.90 3,026.10 4,323.00Kokosing Construction Company, Inc.
440,000.00 2,156.00 1,844.00 4,000.00
MAC Construction & Excavating Inc.
660,000.00 3,300.00 2,700.00 6,000.00
Sunesis Construction 556,160.00 2,820.00 2,236.00 5,056.00
36" Storm Conduit, Type B
270 LF45
John R. Jurgensen Company 127,170.00 141.30 329.70 471.00Kokosing Construction Company, Inc.
159,300.00 329.00 261.00 590.00
MAC Construction & Excavating Inc.
91,800.00 190.00 150.00 340.00
Sunesis Construction 150,660.00 136.00 422.00 558.00
30" Storm Conduit, Type C
55 LF46
John R. Jurgensen Company 7,590.00 41.40 96.60 138.00Kokosing Construction Company, Inc.
13,750.00 112.00 138.00 250.00
MAC Construction & Excavating Inc.
12,375.00 125.00 100.00 225.00
Sunesis Construction 14,630.00 134.00 132.00 266.00
Page 12 of 33"UP" = Unit Price10/9/2014
4:08 PM
30" Storm Conduit, Type B
44 LF47
John R. Jurgensen Company 8,624.00 58.80 137.20 196.00Kokosing Construction Company, Inc.
13,200.00 141.00 159.00 300.00
MAC Construction & Excavating Inc.
11,440.00 140.00 120.00 260.00
Sunesis Construction 10,164.00 95.00 136.00 231.00
24" Storm Conduit, Type B
116 LF48
John R. Jurgensen Company 39,092.00 101.10 235.90 337.00Kokosing Construction Company, Inc.
33,640.00 107.00 183.00 290.00
MAC Construction & Excavating Inc.
46,400.00 285.00 115.00 400.00
Sunesis Construction 40,252.00 123.00 224.00 347.00
24" Storm Conduit, Type C
96 LF49
John R. Jurgensen Company 22,944.00 71.70 167.30 239.00Kokosing Construction Company, Inc.
26,880.00 205.00 75.00 280.00
MAC Construction & Excavating Inc.
115,200.00 1,100.00 100.00 1,200.00
Sunesis Construction 40,704.00 310.00 114.00 424.00
15" Storm Conduit, Type B
137 LF50
John R. Jurgensen Company 29,318.00 64.20 149.80 214.00Kokosing Construction Company, Inc.
30,140.00 69.00 151.00 220.00
MAC Construction & Excavating Inc.
26,030.00 100.00 90.00 190.00
Sunesis Construction 28,907.00 64.00 147.00 211.00
Page 13 of 33"UP" = Unit Price10/9/2014
4:08 PM
12" Storm Conduit, Type B
596 LF51
John R. Jurgensen Company 84,632.00 42.60 99.40 142.00Kokosing Construction Company, Inc.
89,400.00 72.00 78.00 150.00
MAC Construction & Excavating Inc.
83,440.00 80.00 60.00 140.00
Sunesis Construction 65,560.00 33.00 77.00 110.00
12" Storm Conduit, Type C
155 LF52
John R. Jurgensen Company 24,335.00 47.10 109.90 157.00Kokosing Construction Company, Inc.
10,850.00 45.00 25.00 70.00
MAC Construction & Excavating Inc.
10,385.00 42.00 25.00 67.00
Sunesis Construction 11,005.00 38.00 33.00 71.00
24" Sanitary Conduit, Type B, Ductile Iron Pipe
175 LF53
John R. Jurgensen Company 78,750.00 135.00 315.00 450.00Kokosing Construction Company, Inc.
70,000.00 123.00 277.00 400.00
MAC Construction & Excavating Inc.
84,000.00 220.00 260.00 480.00
Sunesis Construction 70,525.00 94.00 309.00 403.00
8" Sanitary Conduit, Type B
598 LF54
John R. Jurgensen Company 239,200.00 120.00 280.00 400.00Kokosing Construction Company, Inc.
221,260.00 144.00 226.00 370.00
MAC Construction & Excavating Inc.
158,470.00 145.00 120.00 265.00
Sunesis Construction 157,872.00 112.00 152.00 264.00
8" Sanitary Conduit, Type C
389 LF55
Page 14 of 33"UP" = Unit Price10/9/2014
4:08 PM
John R. Jurgensen Company 54,460.00 42.00 98.00 140.00Kokosing Construction Company, Inc.
50,570.00 82.00 48.00 130.00
MAC Construction & Excavating Inc.
33,065.00 65.00 20.00 85.00
Sunesis Construction 26,841.00 41.00 28.00 69.00
6" Sanitary Conduit, Type B, as Per Plan
254 LF56
John R. Jurgensen Company 81,280.00 96.00 224.00 320.00Kokosing Construction Company, Inc.
50,800.00 100.00 100.00 200.00
MAC Construction & Excavating Inc.
69,850.00 157.00 118.00 275.00
Sunesis Construction 66,802.00 103.00 160.00 263.00
6" Storm Conduit, Type C, as per Plan (Downspouts)
14 LF57
John R. Jurgensen Company 392.00 8.40 19.60 28.00Kokosing Construction Company, Inc.
700.00 22.00 28.00 50.00
MAC Construction & Excavating Inc.
1,750.00 95.00 30.00 125.00
Sunesis Construction 1,414.00 51.00 50.00 101.00
6" Storm Conduit, Unclassified Underdrains, as per Plan (Bio-Retention Areas)
215 LF58
John R. Jurgensen Company 6,020.00 8.40 19.60 28.00Kokosing Construction Company, Inc.
4,300.00 12.00 8.00 20.00
MAC Construction & Excavating Inc.
7,310.00 22.00 12.00 34.00
Sunesis Construction 2,042.50 4.50 5.00 9.50
Page 15 of 33"UP" = Unit Price10/9/2014
4:08 PM
Connect Prop. 36" Storm to Ex. 90" Brick, as Per Plan
1 LS59
John R. Jurgensen Company 7,909.00 2,372.70 5,536.30 7,909.00Kokosing Construction Company, Inc.
12,500.00 10,976.00 1,524.00 12,500.00
MAC Construction & Excavating Inc.
40,000.00 30,000.00 10,000.00 40,000.00
Sunesis Construction 10,230.00 5,692.00 4,538.00 10,230.00
Connect Prop. 8" Sanitary to Ex. 84" Brick, as Per Plan
1 LS60
John R. Jurgensen Company 2,500.00 750.00 1,750.00 2,500.00Kokosing Construction Company, Inc.
3,150.00 2,750.00 400.00 3,150.00
MAC Construction & Excavating Inc.
3,500.00 3,000.00 500.00 3,500.00
Sunesis Construction 2,500.00 1,762.00 738.00 2,500.00
24" Storm Plug 2 EA61 John R. Jurgensen Company 2,218.00 332.70 776.30 1,109.00Kokosing Construction Company, Inc.
900.00 302.00 148.00 450.00
MAC Construction & Excavating Inc.
2,000.00 500.00 500.00 1,000.00
Sunesis Construction 3,340.00 382.00 1,288.00 1,670.00
12" Storm Plug 1 EA62 John R. Jurgensen Company 1,108.00 332.40 775.60 1,108.00Kokosing Construction Company, Inc.
400.00 290.00 110.00 400.00
MAC Construction & Excavating Inc.
175.00 100.00 75.00 175.00
Sunesis Construction 330.00 245.00 85.00 330.00
Catch Basin, No. 2-2B 3 EA63 John R. Jurgensen Company 3,870.00 387.00 903.00 1,290.00
Page 16 of 33"UP" = Unit Price10/9/2014
4:08 PM
Kokosing Construction Company, Inc.
9,000.00 1,560.00 1,440.00 3,000.00
MAC Construction & Excavating Inc.
5,400.00 1,150.00 650.00 1,800.00
Sunesis Construction 3,435.00 540.00 605.00 1,145.00
Catch Basin, No. 2-3 1 EA64 John R. Jurgensen Company 1,889.00 566.70 1,322.30 1,889.00Kokosing Construction Company, Inc.
3,500.00 1,903.00 1,597.00 3,500.00
MAC Construction & Excavating Inc.
2,600.00 1,600.00 1,000.00 2,600.00
Sunesis Construction 2,280.00 971.00 1,309.00 2,280.00
Inlet, Misc.: Type DGI-MH 3 EA65
John R. Jurgensen Company 18,498.00 1,849.80 4,316.20 6,166.00Kokosing Construction Company, Inc.
16,500.00 1,923.00 3,577.00 5,500.00
MAC Construction & Excavating Inc.
10,800.00 1,600.00 2,000.00 3,600.00
Sunesis Construction 11,910.00 1,164.00 2,806.00 3,970.00
Inlet, Misc.: Type DGI 5 EA66 John R. Jurgensen Company 18,475.00 1,108.50 2,586.50 3,695.00Kokosing Construction Company, Inc.
22,500.00 1,927.00 2,573.00 4,500.00
MAC Construction & Excavating Inc.
16,000.00 1,600.00 1,600.00 3,200.00
Sunesis Construction 13,250.00 776.00 1,874.00 2,650.00
Inlet, Misc.: Type SGI 1 EA67 John R. Jurgensen Company 2,835.00 850.50 1,984.50 2,835.00Kokosing Construction Company, Inc.
3,900.00 1,990.00 1,910.00 3,900.00
MAC Construction & Excavating Inc.
2,500.00 1,300.00 1,200.00 2,500.00
Sunesis Construction 2,200.00 773.00 1,427.00 2,200.00
Page 17 of 33"UP" = Unit Price10/9/2014
4:08 PM
Manhole, Misc.: Type P, Storm
8 EA68
John R. Jurgensen Company 57,544.00 2,157.90 5,035.10 7,193.00Kokosing Construction Company, Inc.
68,000.00 5,446.00 3,054.00 8,500.00
MAC Construction & Excavating Inc.
52,000.00 4,000.00 2,500.00 6,500.00
Sunesis Construction 59,440.00 4,828.00 2,602.00 7,430.00
Manhole, MH No. 3, as Per Plan, Storm
5 EA69
John R. Jurgensen Company 38,410.00 2,304.60 5,377.40 7,682.00Kokosing Construction Company, Inc.
55,000.00 6,731.00 4,269.00 11,000.00
MAC Construction & Excavating Inc.
37,500.00 4,700.00 2,800.00 7,500.00
Sunesis Construction 44,250.00 6,216.00 2,634.00 8,850.00
Manhole, Misc.: Type S, Sanitary
8 EA70
John R. Jurgensen Company 64,000.00 2,400.00 5,600.00 8,000.00Kokosing Construction Company, Inc.
44,000.00 2,966.00 2,534.00 5,500.00
MAC Construction & Excavating Inc.
54,400.00 4,400.00 2,400.00 6,800.00
Sunesis Construction 33,440.00 2,310.00 1,870.00 4,180.00
Manhole, Misc.: Type S, Sanitary (Outside Drop)
1 EA71
John R. Jurgensen Company 30,000.00 9,000.00 21,000.00 30,000.00Kokosing Construction Company, Inc.
8,500.00 4,174.00 4,326.00 8,500.00
MAC Construction & Excavating Inc.
10,000.00 6,500.00 3,500.00 10,000.00
Sunesis Construction 8,000.00 4,500.00 3,500.00 8,000.00
Page 18 of 33"UP" = Unit Price10/9/2014
4:08 PM
Manhole, Misc.: Sanitary Remodel
2 EA72
John R. Jurgensen Company 10,000.00 1,500.00 3,500.00 5,000.00Kokosing Construction Company, Inc.
2,200.00 937.00 163.00 1,100.00
MAC Construction & Excavating Inc.
3,000.00 1,200.00 300.00 1,500.00
Sunesis Construction 6,260.00 2,324.00 806.00 3,130.00
Manhole, Misc., Box Risers
2 EA73
John R. Jurgensen Company 6,304.00 945.60 2,206.40 3,152.00Kokosing Construction Company, Inc.
2,800.00 400.00 1,000.00 1,400.00
MAC Construction & Excavating Inc.
18,000.00 5,300.00 3,700.00 9,000.00
Sunesis Construction 4,760.00 466.00 1,914.00 2,380.00
Curb Cut Drain Assembly, as Per Plan
5 EA74
John R. Jurgensen Company 9,680.00 580.80 1,355.20 1,936.00Kokosing Construction Company, Inc.
15,000.00 608.00 2,392.00 3,000.00
MAC Construction & Excavating Inc.
24,000.00 3,400.00 1,400.00 4,800.00
Sunesis Construction 54,850.00 4,322.00 6,648.00 10,970.00
Junction Chamber No. 4, as Per Plan
1 LS75
John R. Jurgensen Company 547,598.00 164,279.40 383,318.60 547,598.00Kokosing Construction Company, Inc.
1,026,350.00 486,350.00 540,000.00 1,026,350.00
MAC Construction & Excavating Inc.
815,000.00 465,000.00 350,000.00 815,000.00
Sunesis Construction 745,000.00 195,910.00 549,090.00 745,000.00
Sanitary Cleanout 2 EA76
Page 19 of 33"UP" = Unit Price10/9/2014
4:08 PM
John R. Jurgensen Company 1,600.00 240.00 560.00 800.00Kokosing Construction Company, Inc.
3,600.00 966.00 834.00 1,800.00
MAC Construction & Excavating Inc.
2,600.00 900.00 400.00 1,300.00
Sunesis Construction 1,650.00 446.00 379.00 825.00
Bypass Pumping 1 LS77 John R. Jurgensen Company 75,000.00 22,500.00 52,500.00 75,000.00Kokosing Construction Company, Inc.
20,000.00 11,200.00 8,800.00 20,000.00
MAC Construction & Excavating Inc.
80,000.00 80,000.00 0.00 80,000.00
Sunesis Construction 23,040.00 1,915.00 21,125.00 23,040.00
Temporary Bulkhead (12'x12')
1 Ea78
John R. Jurgensen Company 12,890.00 3,867.00 9,023.00 12,890.00Kokosing Construction Company, Inc.
20,000.00 5,018.00 14,982.00 20,000.00
MAC Construction & Excavating Inc.
25,000.00 9,000.00 16,000.00 25,000.00
Sunesis Construction 20,600.00 3,403.00 17,197.00 20,600.00
Remove Temporary Bulkhead (12'x10')
1 EA79
John R. Jurgensen Company 4,155.00 1,246.50 2,908.50 4,155.00Kokosing Construction Company, Inc.
2,000.00 1,670.00 330.00 2,000.00
MAC Construction & Excavating Inc.
8,000.00 8,000.00 0.00 8,000.00
Sunesis Construction 20,800.00 3,558.00 17,242.00 20,800.00
Excavation 2,010 CY80 John R. Jurgensen Company 98,490.00 14.70 34.30 49.00Kokosing Construction Company, Inc.
100,500.00 48.00 2.00 50.00
Page 20 of 33"UP" = Unit Price10/9/2014
4:08 PM
MAC Construction & Excavating Inc.
50,250.00 25.00 0.00 25.00
Sunesis Construction 64,320.00 15.00 17.00 32.00
Embankment 76 CY81 John R. Jurgensen Company 2,280.00 9.00 21.00 30.00Kokosing Construction Company, Inc.
5,700.00 72.00 3.00 75.00
MAC Construction & Excavating Inc.
3,800.00 50.00 0.00 50.00
Sunesis Construction 1,216.00 16.00 0.00 16.00
Asphalt Pavement Replacement
2,285 CY82
John R. Jurgensen Company 109,680.00 14.40 33.60 48.00Kokosing Construction Company, Inc.
95,832.90 25.94 16.00 41.94
MAC Construction & Excavating Inc.
95,970.00 22.00 20.00 42.00
Sunesis Construction 70,835.00 1.00 30.00 31.00
Subgrade Compaction 4,162 SY83 John R. Jurgensen Company 6,243.00 0.45 1.05 1.50Kokosing Construction Company, Inc.
35,377.00 8.50 0.00 8.50
MAC Construction & Excavating Inc.
16,648.00 4.00 0.00 4.00
Sunesis Construction 12,486.00 3.00 0.00 3.00
Asphalt Concrete Base 629 CY84 John R. Jurgensen Company 96,866.00 46.20 107.80 154.00Kokosing Construction Company, Inc.
97,495.00 87.00 68.00 155.00
MAC Construction & Excavating Inc.
95,608.00 42.00 110.00 152.00
Sunesis Construction 97,495.00 0.00 155.00 155.00
Page 21 of 33"UP" = Unit Price10/9/2014
4:08 PM
Aggregate Base 629 CY85 John R. Jurgensen Company 41,514.00 19.80 46.20 66.00Kokosing Construction Company, Inc.
59,755.00 54.00 41.00 95.00
MAC Construction & Excavating Inc.
50,320.00 38.00 42.00 80.00
Sunesis Construction 38,369.00 23.00 38.00 61.00
Tack Coat, 702.13 1,249 GAL86 John R. Jurgensen Company 7,494.00 1.80 4.20 6.00Kokosing Construction Company, Inc.
2,498.00 1.00 1.00 2.00
MAC Construction & Excavating Inc.
2,498.00 0.50 1.50 2.00
Sunesis Construction 2,498.00 0.00 2.00 2.00
Pavement Markings 1 LS87 John R. Jurgensen Company 1,883.00 564.90 1,318.10 1,883.00Kokosing Construction Company, Inc.
3,689.00 2,066.00 1,623.00 3,689.00
MAC Construction & Excavating Inc.
2,000.00 1,000.00 1,000.00 2,000.00
Sunesis Construction 1,883.00 0.00 1,883.00 1,883.00
Asphalt Concrete Surface Course, Type 1, Medium Traffic
175 CY88
John R. Jurgensen Company 40,950.00 70.20 163.80 234.00Kokosing Construction Company, Inc.
45,500.00 146.00 114.00 260.00
MAC Construction & Excavating Inc.
44,100.00 32.00 220.00 252.00
Sunesis Construction 43,750.00 0.00 250.00 250.00
Asphalt Concrete Surface Course, Type 1, Medium Traffic
39 CY89
Page 22 of 33"UP" = Unit Price10/9/2014
4:08 PM
John R. Jurgensen Company 14,313.00 110.10 256.90 367.00Kokosing Construction Company, Inc.
11,700.00 168.00 132.00 300.00
MAC Construction & Excavating Inc.
9,828.00 32.00 220.00 252.00
Sunesis Construction 11,700.00 0.00 300.00 300.00
Asphalt Concrete Intermediate Course, Type 2, Medium Traffic
175 CY90
John R. Jurgensen Company 39,200.00 67.20 156.80 224.00Kokosing Construction Company, Inc.
28,000.00 90.00 70.00 160.00
MAC Construction & Excavating Inc.
28,000.00 30.00 130.00 160.00
Sunesis Construction 28,000.00 0.00 160.00 160.00
7" Non-Reinforced Concrete Driveway, as Per Plan
297 SY91
John R. Jurgensen Company 14,553.00 14.70 34.30 49.00Kokosing Construction Company, Inc.
26,730.00 51.00 39.00 90.00
MAC Construction & Excavating Inc.
24,057.00 56.00 25.00 81.00
Sunesis Construction 16,038.00 4.00 50.00 54.00
9" Non-Reinforced Concrete Base, as Per Plan
690 SY92
John R. Jurgensen Company 43,470.00 18.90 44.10 63.00Kokosing Construction Company, Inc.
55,200.00 25.00 55.00 80.00
MAC Construction & Excavating Inc.
51,750.00 43.00 32.00 75.00
Sunesis Construction 46,920.00 4.00 64.00 68.00
5' Concrete Walk 9,262 SF93
Page 23 of 33"UP" = Unit Price10/9/2014
4:08 PM
John R. Jurgensen Company 46,310.00 1.50 3.50 5.00Kokosing Construction Company, Inc.
64,834.00 4.00 3.00 7.00
MAC Construction & Excavating Inc.
83,358.00 7.00 2.00 9.00
Sunesis Construction 53,256.50 1.17 4.58 5.75
ADA Curb Ramps, as Per Plan
11 EA94
John R. Jurgensen Company 3,685.00 100.50 234.50 335.00Kokosing Construction Company, Inc.
10,450.00 592.00 358.00 950.00
MAC Construction & Excavating Inc.
20,900.00 1,500.00 400.00 1,900.00
Sunesis Construction 6,523.00 216.00 377.00 593.00
Curb, Misc.: Concrete Curb, Type S-1
2,057 LF95
John R. Jurgensen Company 28,798.00 4.20 9.80 14.00Kokosing Construction Company, Inc.
55,539.00 19.00 8.00 27.00
MAC Construction & Excavating Inc.
61,710.00 25.00 5.00 30.00
Sunesis Construction 33,940.50 2.00 14.50 16.50
Curb, Misc.: Concrete Curb, Type P-5
32 LF96
John R. Jurgensen Company 1,120.00 10.50 24.50 35.00Kokosing Construction Company, Inc.
2,560.00 70.00 10.00 80.00
MAC Construction & Excavating Inc.
1,280.00 35.00 5.00 40.00
Sunesis Construction 1,280.00 3.50 36.50 40.00
Curb, Misc.: Concrete Curb/Wall, as Per Plan
75 LF97
John R. Jurgensen Company 6,900.00 27.60 64.40 92.00
Page 24 of 33"UP" = Unit Price10/9/2014
4:08 PM
Kokosing Construction Company, Inc.
9,000.00 107.00 13.00 120.00
MAC Construction & Excavating Inc.
8,625.00 65.00 50.00 115.00
Sunesis Construction 9,300.00 98.00 26.00 124.00
Furnishing & Laying 6" Ductile Iron Pipe and Fittings
46 LF98
John R. Jurgensen Company 13,800.00 90.00 210.00 300.00Kokosing Construction Company, Inc.
11,040.00 148.00 92.00 240.00
MAC Construction & Excavating Inc.
16,100.00 225.00 125.00 350.00
Sunesis Construction 14,720.00 151.00 169.00 320.00
Furnishing & Laying 8" Ductile Iron Pipe and Fittings
879 LF99
John R. Jurgensen Company 219,750.00 75.00 175.00 250.00Kokosing Construction Company, Inc.
158,220.00 84.00 96.00 180.00
MAC Construction & Excavating Inc.
219,750.00 145.00 105.00 250.00
Sunesis Construction 154,704.00 56.00 120.00 176.00
Furnishing & Laying 16" Ductile Iron Pipe and Fittings
90 LF100
John R. Jurgensen Company 27,000.00 90.00 210.00 300.00Kokosing Construction Company, Inc.
35,100.00 170.00 220.00 390.00
MAC Construction & Excavating Inc.
42,750.00 245.00 230.00 475.00
Sunesis Construction 34,380.00 88.00 294.00 382.00
Page 25 of 33"UP" = Unit Price10/9/2014
4:08 PM
Furnishing & Laying 20" Ductile Iron Pipe and Fittings
10 LF101
John R. Jurgensen Company 10,000.00 300.00 700.00 1,000.00Kokosing Construction Company, Inc.
26,000.00 1,360.00 1,240.00 2,600.00
MAC Construction & Excavating Inc.
18,000.00 1,200.00 600.00 1,800.00
Sunesis Construction 20,550.00 506.00 1,549.00 2,055.00
Hauling Water Work Material
1 TON102
John R. Jurgensen Company 500.00 150.00 350.00 500.00Kokosing Construction Company, Inc.
600.00 578.00 22.00 600.00
MAC Construction & Excavating Inc.
850.00 850.00 0.00 850.00
Sunesis Construction 374.00 186.00 188.00 374.00
Furnishing & Installing 18" Steel Casing
46 LF103
John R. Jurgensen Company 10,350.00 67.50 157.50 225.00Kokosing Construction Company, Inc.
6,900.00 38.00 112.00 150.00
MAC Construction & Excavating Inc.
11,500.00 200.00 50.00 250.00
Sunesis Construction 3,174.00 14.00 55.00 69.00
Furnishing & Installing 30" Steel Casing
37 LF104
John R. Jurgensen Company 12,025.00 97.50 227.50 325.00Kokosing Construction Company, Inc.
9,250.00 48.00 202.00 250.00
MAC Construction & Excavating Inc.
9,620.00 150.00 110.00 260.00
Sunesis Construction 5,994.00 26.00 136.00 162.00
Concrete, Class C 10 CY105
Page 26 of 33"UP" = Unit Price10/9/2014
4:08 PM
John R. Jurgensen Company 1,000.00 30.00 70.00 100.00Kokosing Construction Company, Inc.
6,000.00 465.00 135.00 600.00
MAC Construction & Excavating Inc.
5,000.00 400.00 100.00 500.00
Sunesis Construction 1,420.00 19.00 123.00 142.00
Hauling and Installing Fire Hydrant
3 EA106
John R. Jurgensen Company 7,500.00 750.00 1,750.00 2,500.00Kokosing Construction Company, Inc.
16,500.00 1,391.00 4,109.00 5,500.00
MAC Construction & Excavating Inc.
17,400.00 2,400.00 3,400.00 5,800.00
Sunesis Construction 9,900.00 812.00 2,488.00 3,300.00
Fire Hydrant Removed 3 EA107 John R. Jurgensen Company 1,500.00 150.00 350.00 500.00Kokosing Construction Company, Inc.
1,350.00 433.00 17.00 450.00
MAC Construction & Excavating Inc.
2,250.00 750.00 0.00 750.00
Sunesis Construction 975.00 325.00 0.00 325.00
Furnishing & Installing 6" Fire Hydrant Extension
3 EA108
John R. Jurgensen Company 2,100.00 210.00 490.00 700.00Kokosing Construction Company, Inc.
3,900.00 586.00 714.00 1,300.00
MAC Construction & Excavating Inc.
1,650.00 375.00 175.00 550.00
Sunesis Construction 1,875.00 298.00 327.00 625.00
Furnishing & Installing Valve Box, Complete
14 EA109
John R. Jurgensen Company 3,850.00 82.50 192.50 275.00
Page 27 of 33"UP" = Unit Price10/9/2014
4:08 PM
Kokosing Construction Company, Inc.
11,900.00 231.00 619.00 850.00
MAC Construction & Excavating Inc.
6,160.00 240.00 200.00 440.00
Sunesis Construction 4,900.00 95.00 255.00 350.00
Furnishing & Installing Valve Box w/1" Air Release Complete
4 EA110
John R. Jurgensen Company 3,000.00 225.00 525.00 750.00Kokosing Construction Company, Inc.
4,400.00 462.00 638.00 1,100.00
MAC Construction & Excavating Inc.
5,200.00 900.00 400.00 1,300.00
Sunesis Construction 4,300.00 628.00 447.00 1,075.00
Furnishing & Installing Valve Box w/2" Air Release Complete
2 EA111
John R. Jurgensen Company 5,400.00 810.00 1,890.00 2,700.00Kokosing Construction Company, Inc.
5,000.00 698.00 1,802.00 2,500.00
MAC Construction & Excavating Inc.
5,000.00 1,700.00 800.00 2,500.00
Sunesis Construction 5,200.00 876.00 1,724.00 2,600.00
Additional Excavation (Contingency Item)
10 CY112
John R. Jurgensen Company 250.00 7.50 17.50 25.00Kokosing Construction Company, Inc.
500.00 45.00 5.00 50.00
MAC Construction & Excavating Inc.
750.00 75.00 0.00 75.00
Sunesis Construction 480.00 32.00 16.00 48.00
Exploratory Excavation (Contingency Item)
10 CY113
John R. Jurgensen Company 250.00 7.50 17.50 25.00
Page 28 of 33"UP" = Unit Price10/9/2014
4:08 PM
Kokosing Construction Company, Inc.
600.00 55.00 5.00 60.00
MAC Construction & Excavating Inc.
1,000.00 100.00 0.00 100.00
Sunesis Construction 480.00 32.00 16.00 48.00
Removing Existing Manhole Curb & Cover
5 EA114
John R. Jurgensen Company 1,250.00 75.00 175.00 250.00Kokosing Construction Company, Inc.
1,750.00 242.00 108.00 350.00
MAC Construction & Excavating Inc.
2,500.00 500.00 0.00 500.00
Sunesis Construction 750.00 95.00 55.00 150.00
Removing Existing Valve Box
4 EA115
John R. Jurgensen Company 520.00 39.00 91.00 130.00Kokosing Construction Company, Inc.
280.00 67.00 3.00 70.00
MAC Construction & Excavating Inc.
600.00 150.00 0.00 150.00
Sunesis Construction 384.00 96.00 0.00 96.00
Changing 8" and Under Pipe Sewer (Contingency Item)
50 LF116
John R. Jurgensen Company 50.00 0.30 0.70 1.00Kokosing Construction Company, Inc.
2,000.00 32.00 8.00 40.00
MAC Construction & Excavating Inc.
7,500.00 100.00 50.00 150.00
Sunesis Construction 2,650.00 13.00 40.00 53.00
Changing 10" thru 24" Pipe Sewer (Contingency Item)
50 LF117
John R. Jurgensen Company 50.00 0.30 0.70 1.00
Page 29 of 33"UP" = Unit Price10/9/2014
4:08 PM
Kokosing Construction Company, Inc.
3,000.00 37.00 23.00 60.00
MAC Construction & Excavating Inc.
8,750.00 115.00 60.00 175.00
Sunesis Construction 6,400.00 13.00 115.00 128.00
Furnishing, Installing and Connecting 3/4" Copper Service Pipe, with Aqua-Shield
50 LF118
John R. Jurgensen Company 3,500.00 21.00 49.00 70.00Kokosing Construction Company, Inc.
4,500.00 56.00 34.00 90.00
MAC Construction & Excavating Inc.
2,500.00 35.00 15.00 50.00
Sunesis Construction 4,450.00 37.00 52.00 89.00
Furnishing, Installing and Connecting 2" Copper Service Pipe, with Aqua-Shield
56 LF119
John R. Jurgensen Company 7,280.00 39.00 91.00 130.00Kokosing Construction Company, Inc.
5,600.00 51.00 49.00 100.00
MAC Construction & Excavating Inc.
3,080.00 25.00 30.00 55.00
Sunesis Construction 6,216.00 36.00 75.00 111.00
Reconnecting Existing 3/4" Service Branch
1 EA120
John R. Jurgensen Company 800.00 240.00 560.00 800.00Kokosing Construction Company, Inc.
1,450.00 1,229.00 221.00 1,450.00
MAC Construction & Excavating Inc.
1,000.00 850.00 150.00 1,000.00
Sunesis Construction 1,030.00 609.00 421.00 1,030.00
Page 30 of 33"UP" = Unit Price10/9/2014
4:08 PM
Furnishing and Installing Curb and Roadway Box (Renew)
2 EA121
John R. Jurgensen Company 400.00 60.00 140.00 200.00Kokosing Construction Company, Inc.
600.00 151.00 149.00 300.00
MAC Construction & Excavating Inc.
1,800.00 500.00 400.00 900.00
Sunesis Construction 276.00 62.00 76.00 138.00
Relocating Existing 3/4" Frost-Proof Meter Setting
1 EA122
John R. Jurgensen Company 2,500.00 750.00 1,750.00 2,500.00Kokosing Construction Company, Inc.
1,400.00 1,194.00 206.00 1,400.00
MAC Construction & Excavating Inc.
900.00 800.00 100.00 900.00
Sunesis Construction 875.00 596.00 279.00 875.00
Relocating Existing 5/8" Frost-Proof Meter Setting
1 EA123
John R. Jurgensen Company 3,000.00 900.00 2,100.00 3,000.00Kokosing Construction Company, Inc.
1,350.00 1,175.00 175.00 1,350.00
MAC Construction & Excavating Inc.
900.00 800.00 100.00 900.00
Sunesis Construction 875.00 596.00 279.00 875.00
Relocating existing 2" Frost-Proof Meter Setting
1 EA124
John R. Jurgensen Company 4,000.00 1,200.00 2,800.00 4,000.00Kokosing Construction Company, Inc.
1,450.00 1,189.00 261.00 1,450.00
MAC Construction & Excavating Inc.
900.00 800.00 100.00 900.00
Sunesis Construction 1,750.00 1,192.00 558.00 1,750.00
Page 31 of 33"UP" = Unit Price10/9/2014
4:08 PM
Removing Curb and Roadway Box
1 EA125
John R. Jurgensen Company 120.00 36.00 84.00 120.00Kokosing Construction Company, Inc.
80.00 77.00 3.00 80.00
MAC Construction & Excavating Inc.
300.00 300.00 0.00 300.00
Sunesis Construction 96.00 96.00 0.00 96.00
Reinforcing Steel (Contingency Item)
500 LB126
John R. Jurgensen Company 1,000.00 0.60 1.40 2.00Kokosing Construction Company, Inc.
1,500.00 1.00 2.00 3.00
MAC Construction & Excavating Inc.
500.00 0.50 0.50 1.00
Sunesis Construction 750.00 1.00 0.50 1.50
Brick Masonry (Contingency Item)
1 CY127
John R. Jurgensen Company 50.00 15.00 35.00 50.00Kokosing Construction Company, Inc.
600.00 483.00 117.00 600.00
MAC Construction & Excavating Inc.
750.00 550.00 200.00 750.00
Sunesis Construction 314.00 57.00 257.00 314.00
Sheeting and Bracing Ordered Left in Place (Contingency Item)
1 MBF128
John R. Jurgensen Company 100.00 30.00 70.00 100.00Kokosing Construction Company, Inc.
10,000.00 1,000.00 9,000.00 10,000.00
MAC Construction & Excavating Inc.
40,000.00 2,000.00 38,000.00 40,000.00
Sunesis Construction 1.00 0.00 1.00 1.00
Page 32 of 33"UP" = Unit Price10/9/2014
4:08 PM
Performance Bond 1 LS129
John R. Jurgensen Company 33,304.00 9,991.20 23,312.80 33,304.00Kokosing Construction Company, Inc.
66,000.00 26,000.00 40,000.00 66,000.00
MAC Construction & Excavating Inc.
65,000.00 0.00 65,000.00 65,000.00
Sunesis Construction 36,000.00 0.00 36,000.00 36,000.00
Page 33 of 33"UP" = Unit Price10/9/2014