Inauguration
Suspension Bridge
Village Shahdam , UC Amazai, District Buner.
Programme For Economic Advancement and Community Empowerment (PEACE)
Funded by: European Union Implemented Agency: SRSP
Arrival of Mr. Khaista
Rehman Deputy
Commissioner District
Buner at the Site of
Suspension Bridge
Shahdam, Union Council
Amazai Tehsil Mandanr
on December 14, 2014 .
During this inauguration ceremony, Mr. Shahid Iqbal
DPM SRSP Buner was of the view that with the
financial support of European Union under PEACE,
this Bridge has been constructed within four months,
by the immense participation of Village Organization
Olasi Khegera, Shahdam UC Amazai and overall
implementation was made by SMT-3 SRSP district
Buner .
He also shared the total cost of this scheme as well.
Total Cost = 2246447 PKR, Donor share = 2056318
PKR, Community Share = 190129 PKR. Total Works
Cost = 1728672 PKR and Labour Services Cost =
327644 PKR .This bridge benefiting 180 HH and
above. The proposed Span of the Bridge = 110 Rft
and width of the Bridge = 5 ft.
View of pray by Deputy Commissioner along District DPM SRSP Buner and Community members after Inauguration of
Suspension Bridge Shahdam at UC Amazai,Tehsil Mandanr District Buner on Sunday 14 Dec,2014
The honorable Deputy Commissioner immensely
appreciated the splendid efforts being made by SRSP
team. He said the way SRSP mobilize, organized and
involve local people to participate in their area
developments is the best example to empower the
local stake of the district.
During his speech he announced PKR-500000 for the
entrance and exit of Suspension Bridge Shahdam and
advised district council engineer to survey the subject
soon.
He thanked SRSP team and congratulated VO for their
participation in the construction of Bridge, which was
the prioritize need of the people of the village
Shahdam.