T-76.115 Project ReviewT-76.115 Project Review
Agenda
Project status Used work practices Work results Demo
3
T-76.115 Project ReviewT-76.115 Project Review
Introduction to the project
We are developing an application called mGroup.
Full name: mGroup powered by DiMaS
mGroup is an application for mobile phones, lets groups of people chat with text and images, is intended to be used in festival-type events.
More about mGroup: It features a server, the mDiMaS server, which relays the messages between
mGroup applications. Information from mGroup is visible in the DiMaS peer network. Has more advanced features, such as group management and some support
for commercial content creators. (Won’t have time to implement.)
4
T-76.115 Project ReviewT-76.115 Project Review
Status of the iteration’s goals
A feature-complete product Partial/Fail Some must have requirements still not implemented Still a couple of features to implement in FD
Nightly builds continuously running OK One “service break” due to change of IP on build server, but otherwise ok.
User's Manual first draft written OK
5
T-76.115 Project ReviewT-76.115 Project Review
Status of the iteration’s deliverables
Project Plan OK
Requirements Specification OK
Technical Specification OK (at least better than before?)
QA Plan OK
Test cases, test report OK
SEPA diaries Diaries OK, SEPAs have not been that successful
6
T-76.115 Project ReviewT-76.115 Project Review
Evaluation
Christmas iteration didn’t happen Everybody was busy with exams
January Implementation proceeded ok Communication with customer was better than in I1 Not enough time to implement all planned items
Implementation on phones is slower than for desktop apps
7
T-76.115 Project ReviewT-76.115 Project Review
Realization of the tasks Iteration not quite complete
Two tasks were not started. Three tasks not yet completed. Short-range transmission was dropped.
Estimation errors 67% avg absolute estimation error (was 48%) 21% total estimation error (was 4%) Error increased with coarser task-division Iteration was also longer
8
T-76.115 Project ReviewT-76.115 Project Review
Planned Actions to Improve Task Planning
To include Documentation tasks to have them included in estimates Somehow we managed to avoid properly estimating the time gone into
documentation, and we also forgot to enter the documentation tasks into Bugzilla for the iteration plan.
To enter all tasks into Bugzilla This is going well
Trapoli tasks will not be as detailed as in the previous iteration This time it was perhaps the other way around: we had so general tasks it
made it somewhat difficult to close them.
9
T-76.115 Project ReviewT-76.115 Project Review
Working hours by person
Significantly less hours than planned, primarily due to christmas iteration not being executed.
Some hours are moved to final iteration…
Realized hours in this iteration
Real Plan Diff
Jouni 44 86 -42
Lauri 45 50 -5
Manne 40 30 7
Sam 58 95 -39
Sami 36 85 -49
Tommi 53 60 -7
Tuomas 44 78 -37
Total 320 484 -164
10
T-76.115 Project ReviewT-76.115 Project Review
Working hours by person
Due to the missing Christmas iteration, we have some working hours left for the FD iteration.
Lauri and Manne have almost used up their hours.
Jouni, Sam, and Sami have more hours to spend.
PP I1 Chr I2 FD Tot
Jouni 31 50 30 56 24 190
Lauri 56 72 20 30 12 190
Manne 88 49 15 15 23 190
Sam 19 44 33 62 33 190
Sami 54 26 30 55 25 190
Tommi 37 69 10 50 25 190
Tuomas 47 46 30 47 20 190
Total 330 355 168 315 162 132
PP I1 Chr I2 FD Tot
Jouni 31 50 0 44 66 190
Lauri 56 72 0 45 18 190
Manne 88 49 0 40 13 190
Sam 19 44 0 58 70 190
Sami 54 26 0 36 75 190
Tommi 37 69 0 53 32 190
Tuomas 47 46 0 44 54 190
Total 330 355 0 320 326 133
11
T-76.115 Project ReviewT-76.115 Project Review
Quality Metrics
System tests last run: 6.2.2005 Client revision 2.40 11 tests run, 3 failures, 1 skipped All unit tests pass for the server Bug status
44 open bugs Slightly unrealistic, since there is only
the division between server and client Most features are visible primarily in
client, while still requiring server work, putting additional entries on the client.
A better division would be per functional requirement, for example.
List includes also tasks.
Open bugs
Server 7
Client 22
Process 8
Resolved / Verified bugs in I2
Major Normal Minor Enh
Server 2 5 1
Client 7 10 8 7
Process 4
Total 9 19 9 7
12
T-76.115 Project ReviewT-76.115 Project Review
Software Size in Lines of Code
Client: 5758 lines (previously 2656 lines) Server: 8527 lines (previously 3744 lines) Rougly doubled in the iteration, which is reasonable.
13
T-76.115 Project ReviewT-76.115 Project Review
Risks
The situation with the risks is pretty much the same as in previous iterations.
Possibly realized risk 7.4.3: “Member(s) unable to devote sufficient amount of time to project ”
We need to make a spurt in the last iteration.
In last iteration, we identified risk 7.1.1: “Changing or misunderstood requirements” as worrying for the customer.
I think we now understand each other about what the requirements are
The concern at the moment is that we might not have time to implement the functionality required. 2 7 5 14
H 0 1 1 2
M 1 5 0 6
L 1 1 4 6
L M H
Severity
Pro
babili
ty
Risk matrix
I1 Risk matrix
2 7 5 14
H 0 1 1 2
M 1 5 0 6
L 1 1 4 6
L M H
14
T-76.115 Project ReviewT-76.115 Project Review
Used Work Practices
Time Reporting Version Control Coding Conventions Risk Management Meeting Memos Planning Game
Two planning games held: one in christmas, one in january Tasks in Forums (details) Scrum-style meetings
Not working too well, we’re going to drop these. We will go through the open tasks instead.
Work burndown graph (details) Continuous integration (details)
15
T-76.115 Project ReviewT-76.115 Project Review
Planning Game
XP-style planning game Used to select tasks for the current iteration
1. We start with a budget of X hours for the iteration.2. Development writes down a selection of most important use cases and
other tasks onto pieces of paper, based on the requirements spec We wrote the use cases on A4-papers, and broke them down into tasks on
post-it notes.
3. During the meeting the customer selects those use cases and other tasks he/she wishes to have implemented
4. Development estimates the time taken to complete each of the tasks the customer has selected
1. Customer can change her selection based on this information
5. The process is continued until the X hours have been filled.
The order of the use cases selected indicates their priority.
16
T-76.115 Project ReviewT-76.115 Project Review
Work Burndown Graph
Iteration time on the x-axis Estimated time left for this iteration on y-axis Generated directly from the Trapoli report ”Tasks, realization” Placed on the front page of the Wiki so it is visible to everyone Pros:
Very easy to maintain Communicates many variables: Time into iteration, Completion status, Working
velocity, Time Reporting activity Cons:
No automated tool for creating it. Does not tell you which tasks are being overlooked.
17
T-76.115 Project ReviewT-76.115 Project Review
Work Burndown Graph – I1
0
50
100
150
200
250
300
350
400
8.11. 13.11. 18.11. 23.11. 28.11.
Date
Wo
rk le
ft
18
T-76.115 Project ReviewT-76.115 Project Review
Work Burndown Graph – Christmas
Work burndown for Christmas iteration
0
20
40
60
80
100
120
6.12. 13.12. 20.12. 27.12. 3.1. 10.1.
Date
Wo
rk l
eft
19
T-76.115 Project ReviewT-76.115 Project Review
Work Burndown Graph – I2
Work burndown for I2
0
50
100
150
200
250
300
350
400
10.1.2005 17.1.2005 24.1.2005 31.1.2005 7.2.2005
Date
Es
tim
ate
20
T-76.115 Project ReviewT-76.115 Project Review
Scrum-style meetings
We have decided to drop this practice Instead go though presently open tasks with Bugzilla as a base Deal new tasks to those who have completed previous tasks
Everybody answers three questions: 1. What have I completed since the last meeting? 2. What will I do until the next meeting? 3. What hinders me from doing my work?
Pros: Fast and straightforward format for task distribution
Cons: Questions seem unnatural and hard to answer Executed over IRC, the meeting still takes a long time, even though it is
intended to be short.
21
T-76.115 Project ReviewT-76.115 Project Review
Bugzilla for Tasks
We have all tasks in Bugzilla We don’t want to have tasks in three places (Bugzilla, Trapoli, Forums) Bugzilla features discussions We can prioritize bugs together with tasks. Systematizes verification of task completion as well as feature completion.
This has been working well, and we will continue to use it.
Example: Verification of tasks Bugs / tasks are marked as RESOLVED FIXED when programmer is done. QA periodically checks the items in the RESOLVED FIXED list.
System tests are updated. Documentation is updated.
If everything is ok, the task is marked VERIFIED FIXED If something is wrong, comments are added and the task is marked REOPENED
22
T-76.115 Project ReviewT-76.115 Project Review
Continuous Integration
UPDATE in I2 Latest working build is automatically
deployed on a public URL to simplify testing of it.
Automatic version numbering.
Installed a tool called CruiseControl It monitors the code repository When there are changes in source
control, it builds the code and runs all the tests
If there are errors in build or tests, it emails the person who performed the check-in.
Pros: Developers get instant feedback if
they break something Easier to fix problems, since the
changes are fresh in memory No broken code in source control
Date: Thu, 25 Nov 2004 20:01:50 +0200 (EET)
From: [email protected]
Subject: FESTIVAL BUILD: mDimas Build Failed
View results here -> https://festivaal.dyndns.org:8443/cc/buildresults/mDimas?log=log20041125200106
BUILD FAILED
Ant Error Message: /home/cruisecontrol/builds/cc-build.xml:8: The following error occurred while executing this line:
/home/cruisecontrol/builds/checkout/mdimas/build.xml:106: Compile failed; see the compiler error output for details.
Date of build: 11/25/2004 20:01:06
Time to build: 32 seconds
Last changed: 11/25/2004 19:59:55
Last log entry: Added date-to-string conversions.
[…]
Date: Thu, 25 Nov 2004 20:08:07 +0200 (EET)
From: [email protected]
Subject: FESTIVAL BUILD: mDimas build.11 Build Fixed
View results here -> https://festivaal.dyndns.org:8443/cc/buildresults/mDimas?log=log20041125200714Lbuild.11
BUILD COMPLETE - build.11
Date of build: 11/25/2004 20:07:14
Time to build: 40 seconds
Last changed: 11/25/2004 20:06:38
Last log entry: Added option to start the client without networking (for testing purposes).
Unit Tests: (8)
All Tests Passed
[…]
23
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration
Project Plan and Requirements Specification updated Technical Specification updated
Diagrams for server and client and overall User Interface navigation map Body text updated
mGroup features Add Existing Pictures Multiple Story Support Threaded view for messages Media Show support (many pictures and text in same messages) First Launch / Installation Numerous small changes: 37 tasks/bugs resolved and verified
User’s Manual (draft)
24
T-76.115 Project ReviewT-76.115 Project Review
Project Plan Update
Small tuning to Work Practice documentation Remaining verification criteria documented
25
T-76.115 Project ReviewT-76.115 Project Review
Requirements Specification Update
Current situation regarding requirements
Implemented Approved Deleted Total
Functional
Must 5 2 7
Should 17 13 3 33
Nice to have 4 15 2 21
Total 26 30 5 61
Implemented Approved Deleted Total
Non-functional
Must 4 4
Should 3 2 5
Nice to have 1 6 7
Total 8 8 0 16
26
T-76.115 Project ReviewT-76.115 Project Review
UI Navigation Map
27
T-76.115 Project ReviewT-76.115 Project Review
QA Approach
Every implemented feature goes through a verification step when it moves from RESOLVED to VERIFIED
System-level tests Incrementally refined and improved 23 system tests New tests arise when verifying tasks / bugs
We have a few automated unit tests Run every time someone checks in code
28
T-76.115 Project ReviewT-76.115 Project Review
Demo (new features)
First Launch / Installation Show first launch questions
Add Existing Pictures Take a snapshot and include it in message.
Multiple Story Support Create a Story Join a Story
Threaded view for messages Show how threaded view groups messages
Media Show support (many pictures and text in same messages) Create a message containing multiple items Move items around Delete items Send and view items