Stabilization vs.Stabilization vs.Rip-Out-And-Replace/RemoveRip-Out-And-Replace/Remove

Project OptionsProject Options– Remove unstable towers to roof levelRemove unstable towers to roof level– Stabilize towersStabilize towers

ConsiderationsConsiderations– CostCost

Stabilization ½ cost of removalStabilization ½ cost of removal

– AestheticsAesthetics Stabilization maintains all aestheticsStabilization maintains all aesthetics

Page 2: Tale of Two Towers
Page 3: Tale of Two Towers
Page 4: Tale of Two Towers
Page 5: Tale of Two Towers

Previous attempts at both repair and safety stabilization

Page 6: Tale of Two Towers
Page 7: Tale of Two Towers

Mast Climber with pipe for best access

Page 8: Tale of Two Towers

Professional Drilling Contractor for almost 500 holes

Page 9: Tale of Two Towers

Coordinated Access

Page 10: Tale of Two Towers

Restoration Specialist

Page 11: Tale of Two Towers

Drilling continues with stabilization mesh in place

Page 12: Tale of Two Towers
Page 13: Tale of Two Towers

Installation of Cintec cement based anchors – lengths 19-36”

Page 14: Tale of Two Towers

Anchor location designations

Page 15: Tale of Two Towers

Anchor Inflation

Page 16: Tale of Two Towers

Completed Project