Tekla Global BIM Awards 2012
2
3
Tekla Global BIM Awards OverviewThe Tekla Global BIM Awards competition was arranged for the first time in 2009. Entries to the competition were the winners of regional Tekla model competitions held by Tekla area offices and resellers during the year.
The competition, presented on the Tekla Website, is divided into three categories: BIM projects, Steel projects, and Concrete and other projects. The winners of the Global BIM Awards are decided by a jury consisting of leading BIM experts inside and outside Tekla. In addition, there is a public vote over the Internet.
4
Tekla Global BIM Awards juryTekla Global BIM Awards jury consists of leading BIM experts in the world, both from inside and outside Tekla
Kim Inhan
Professor of Kyung-Hee University, KoreaChief Vice-President of buildingSMART Korea
Chris Sleight
Editor of International Construction magazine
John Moebes
Director of Construction at Crate&Barrel
Miklós Szövényi-Lux
Vice President of Business Development at Graphisoft
Risto Räty
Deputy CEO and Executive Vice President at Tekla
5
Tekla Global BIM Awards 2012: Winners
Derby Business Park, Finland Park & Ride De Uithof, The Netherlands
Icebergs - Louis Vuitton Foundation, France
The Capital Market Authority Office Tower, Saudi Arabia
Tekla Global BIM Awards 2012: Finalists
6
Manitoba Hydro Spillway Replacement, Canada
The Emirates Air Line London Cable Car, London
Leeds Arena, UK
National Museum of Qatar, Qatar
Music Palace Utrecht, The Netherlands
New Movable Pedestrian Bridge, Italy
Process & Utility Deck, North Sea (UK)
Karisto Shopping Center, Finland
7
Derby Business Park, Finland
8
Derby Business ParkModeled by: Insinööritoimisto Mäkeläinen Oy
Location: Espoo, Finland
Category: BIM Facts:
Three eight-story office buildings and a separate eight-story car park
Completed in phases during 2012 and 2013
Structural model used for installations, as a source of information for precast concrete manufacturing and for MEP as a reference.
9
Derby Business Park
“For me, BIM is about collaboration. This is why Derby Business Park was my favorite project this year.”– Kim Inhan, Professor at Kyung-Hee University, South Korea
Watch the video of the Project
10
Park & Ride De Uithof, The Netherlands
11
Park & Ride De UithofModeled by: Hurks Delphi Engineering
Location: Utrecht, The Netherlands
Category: Concrete and Others
Facts:
Total area of 50,000 square meters
A precast concrete climbing wall will be planned and used by the nearby sports center
Scheduled for completion in 2013
12
Park & Ride De Uithof
“At Park & Ride De Uithof, BIM was used troughout different processes. It clearly solved a lot problems and made things right before they were built.” -Chris Sleight, Editor of International Construction magazine
Watch the video of the Project
13
The Emirates Air Line London Cable Car, UK
14
The Emirates Air Line London Cable Car, UK
Modeled by: Watson Steel Structures Ltd.
Location: London, UK
Category: Steel
Facts:
Carrier up to 2,500 passengers per hour the River Thames. Span of one kilometer (0.62 miles). Two stations, a gondola store and three towers (two 80 meters and one 62 meters tall)
In operation since June 2012
15
The Emirates Air Line London Cable Car, UK
”I think the entire jury was quite excited about the Emirates Air Line London Cable Car. The makers had to have very good knowledge of how to combine modeling and positioning technologies”.-Risto Räty, Deputy CEO and Executive Vice President at Tekla
Watch the video of the Project
16
Icebergs- Louis Vuitton Foundation, France
17
Icebergs- Louis Vuitton Foundation, France
Modeled by: Pouma/ lemants
Location: Paris, France
Category: Concrete and otherFacts:
The façade is covered with 16,000 ceramic (Ductal) tiles supported by over 2,000 aluminum wall panels
Every element has unique geometry in order to follow the smooth lines and various facets of the façade
Scheduled for completion in 2013
18
Icebergs- Louis Vuitton Foundation, France
“Icebergs has 16,00 tiles, all with a different geometry. For projects like this, BIM clearly is a very big tool.”-Chris Sleight, Editor of International Construction magazine
19
The Capital Market Authority Office Tower, Saudi Arabia
20
The Capital Market Authority Office Tower, Saudi Arabia
Modeled by: Eversendai Corporation
Location: Riyadh, Saudi Arabi
Category: Steel Facts:
358 Meters, four meters higher than the Empire State Building
Three basements, 75 floors and roof features, and a three- story podium structure with a total area of about 183,950 square meters (1,980,00)
Scheduled for completion in 2013
21
The Capital Market Authority Office Tower, Saudi Arabia
“It is a fine design. Why? Because of the overall diagrid structure which transfers the load to ground trough diagrid columns and an inverted truss. From the erection point of view, it is very complicated and prestigious to achieve.”-Internet voter
Watch the video of the Project
22
Leeds Arena, UK
23
Leeds ArenaModeled by: Fisher Engineering
Location: Leeds, United Kingdom
Category: BIM
24
National Museum of Qatar
25
National Museum Of Qatar
Modeled by: Arup
Location: Doha, Qatar
Category: BIM
26
Music Palace Utrecht, The Netherlands
27
Music Palace UtrechtModeled by: CSM NV
Location: Utrecht, The Netherlands
Category: Steel
28
New Movable Pedestrian Bridge, Italy
29
New Movable Pedestrian Bridge
Modeled by: Exa Engineering SRL
Location: La Spezia, Italy
Category: Steel
30
Process & Utility Deck, North Sea, The UK Sector
31
Process & Utility DeckModeled by: Lamprell
Location: North Sea, The UK Sector
Category: Steel
32
Karisto Shopping Center, Finland
33
Karisto Shopping CenterModeled by: A-insinöörit Suunnittelu Oy
Location: Lahti, Finland
Category: Concrete and others
34
Manitoba Hydro Spillway Replacement, Canada
35
Manitoba Hydro Spillway ReplacementModeled by: KGS Group
Location: Manitoba, Canada
Category: Concrete and others
36
The Booklet also available as Apple iBook at iTunes
See all the projects and detailed information at competition website
Link to the website