Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Terminal Design Update
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Saltbox Roof - Site Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
ATM
LUGGAGE PICK-UP
EL 10' - 6"
EL 8' - 6"
EL 10' - 6"
JAN
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A101
Author
Checker
07/21/17
First Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
1
7
4
2 85
3
11
10
9
113’- 0”52’- 0”
UP
UP
UP UP
UP
UP
UP
12
13
14
16UP
WAITING ROOM 40’-0” x 50’-0”
1.
4.
7.
2.
5.
8.
3.
6.
9.
10.
11.
12.TICKETING 11’-0” x 22’-6”
CASH ROOM 15’-6” x 7’-6”
PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 24’-6” x 25’-0”
PUBLIC MEN’S RESTROOM 3 W.C. / 4 UR / 4 LAV 13’-0” x 16’-6”
MECHANICAL 4’-0” x 20’-0”
JANITOR CLOSET 4’-0” x 4’-0”
STAIR
ELEVATOR
13.
15.STORAGE 12’-0” X 10’-0”
VENDING 15’-6” x 8’-6”
STAIR
UNISEX RESTROOM 1 W.C. / 1 LAV 8’-6” x 8’-6”
14.
UP
TERMINAL MANAGER’S OFFICE 12’-0” X 10’-0”
TERMINAL AGENTS OFFICE 13’-6” X 16’-0”
15
16. TERRACE
ATM
LUGGAGE PICK-UP
EL 10' - 6"
EL 8' - 6"
EL 10' - 6"
JAN
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A101
Author
Checker
07/21/17
First Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
EL +13’-0”
6
Saltbox Roof - First Floor Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
MECHANICAL ROOM 15’-0” x 36’-6”
17.
20.
18.
19.
STAFF MEN’S RESTROOM 10’-0” x 8’-0”
STAFF WOMEN’S RESTROOM 10’-0” x 8’-0”
ELECTRICAL 7’-0” x 14’-6”
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A102
Author
Checker
07/21/17
Second Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
STORAGE 10’-0” x 7’-6”
21.
24.
22.
23.
ELEVATOR MACHINE ROOM 5’-0” x 6’-0”
ELEVATOR
LOCKERS 17’-0” x 24’-0”
BREAK ROOM 12’-0” x 31’-0”
25.
28.
26.
27.
JANITOR CLOSET 5’-0” x 4’-6”
TEL/DATA 11’-6” x 13’-0”
MULTI-PURPOSE ROOM 17’-6” x 21’-6”
17
24
25 26
18
23
19
20
21 22
28
27
67’- 0”52’- 0”
Saltbox Roof - Second Floor Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
EAST ELEVATION
WEST ELEVATION
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
30’- 6”
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
30’- 6”
Saltbox Roof
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
30’- 6”
SOUTH ELEVATIONNORTH ELEVATION
Saltbox Roof
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Gable Roof - Site Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
ATM
LUGGAGE PICK-UP
EL 10' - 6"
EL 8' - 6"
EL 10' - 6"
JAN
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A101
Author
Checker
07/21/17
First Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
1
7
4
2 85
3
11
10
9
6
113’- 0”52’- 0”
UP
UP
UP UP
UP
UP
UP
12
13
14
16UP
WAITING ROOM 40’-0” x 50’-0”
1.
4.
7.
2.
5.
8.
3.
6.
9.
10.
11.
12.TICKETING 11’-0” x 22’-6”
CASH ROOM 15’-6” x 7’-6”
PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 24’-6” x 25’-0”
PUBLIC MEN’S RESTROOM 3 W.C. / 4 UR / 4 LAV 13’-0” x 16’-6”
MECHANICAL 4’-0” x 20’-0”
JANITOR CLOSET 4’-0” x 4’-0”
STAIR
ELEVATOR
13.
15.STORAGE 12’-0” X 10’-0”
VENDING 15’-6” x 8’-6”
STAIR
UNISEX RESTROOM 1 W.C. / 1 LAV 8’-6” x 8’-6”
14.
UP
TERMINAL MANAGER’S OFFICE 12’-0” X 10’-0”
TERMINAL AGENTS OFFICE 13’-6” X 16’-0”
15
16. TERRACE
ATM
LUGGAGE PICK-UP
EL 10' - 6"
EL 8' - 6"
EL 10' - 6"
JAN
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A101
Author
Checker
07/21/17
First Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
EL +13’-0”
Gable Roof - First Floor Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
MECHANICAL ROOM 15’-0” x 36’-6”
17.
20.
18.
19.
STAFF MEN’S RESTROOM 10’-0” x 8’-0”
STAFF WOMEN’S RESTROOM 10’-0” x 8’-0”
ELECTRICAL 7’-0” x 14’-6”
STORAGE 10’-0” x 7’-6”
21.
24.
22.
23.
ELEVATOR MACHINE ROOM 5’-0” x 6’-0”
ELEVATOR
LOCKERS 17’-0” x 24’-0”
BREAK ROOM 12’-0” x 31’-0”
25.
28.
26.
27.
JANITOR CLOSET 5’-0” x 4’-6”
TEL/DATA 11’-6” x 13’-0”
MULTI-PURPOSE ROOM 17’-6” x 21’-6”
17
24
25 26
18
23
19
20
21 22
28
27
67’- 0”52’- 0”
Gable Roof - Second Floor Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
EAST ELEVATION
WEST ELEVATION
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
32’- 0”
23’- 6”
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
32’- 0”
23’- 6”
Gable Roof
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
SOUTH ELEVATION
312
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
32’- 0”
23’- 6”
NORTH ELEVATION
Gable Roof
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
ATM
LUGGAGE PICK-UP
EL 10' - 6"
EL 8' - 6"
EL 10' - 6"
JAN
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A101
Author
Checker
07/21/17
First Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
1
7
4
2 85
3
11
10
9
6
113’- 0”52’- 0”
UP
UP
UP UP
UP
UP
UP
12
13
14
16UP
WAITING ROOM 40’-0” x 50’-0”
1.
4.
7.
2.
5.
8.
3.
6.
9.
10.
11.
12.TICKETING 11’-0” x 22’-6”
CASH ROOM 15’-6” x 7’-6”
PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 24’-6” x 25’-0”
PUBLIC MEN’S RESTROOM 3 W.C. / 4 UR / 4 LAV 13’-0” x 16’-6”
MECHANICAL 4’-0” x 20’-0”
JANITOR CLOSET 4’-0” x 4’-0”
STAIR
ELEVATOR
13.
15.STORAGE 12’-0” X 10’-0”
VENDING 15’-6” x 8’-6”
STAIR
UNISEX RESTROOM 1 W.C. / 1 LAV 8’-6” x 8’-6”
14.
UP
TERMINAL MANAGER’S OFFICE 12’-0” X 10’-0”
TERMINAL AGENTS OFFICE 13’-6” X 16’-0”
15
16. TERRACE
ATM
LUGGAGE PICK-UP
EL 10' - 6"
EL 8' - 6"
EL 10' - 6"
JAN
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A101
Author
Checker
07/21/17
First Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
EL +13’-0”
Gable Roof (Alternate)- First Floor Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
MECHANICAL ROOM 15’-0” x 36’-6”
17.
20.
18.
19.
STAFF MEN’S RESTROOM 10’-0” x 8’-0”
STAFF WOMEN’S RESTROOM 10’-0” x 8’-0”
ELECTRICAL 7’-0” x 14’-6”
STORAGE 10’-0” x 7’-6”
21.
24.
22.
23.
ELEVATOR MACHINE ROOM 5’-0” x 6’-0”
ELEVATOR
LOCKERS 17’-0” x 24’-0”
BREAK ROOM 12’-0” x 31’-0”
25.
28.
26.
27.
JANITOR CLOSET 5’-0” x 4’-6”
TEL/DATA 11’-6” x 13’-0”
MULTI-PURPOSE ROOM 17’-6” x 21’-6”
17
24
25 26
18
23
19
20
21 22
28
27
67’- 0”52’- 0”
Gable Roof (Alternate) - Second Floor Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
EAST ELEVATION
WEST ELEVATION
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
32’- 0”
23’- 6”
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
32’- 0”
23’- 6”
Gable Roof (Alternate)
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
SOUTH ELEVATION
312
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
32’- 0”
23’- 6”
NORTH ELEVATION
Gable Roof (Alternate)
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Three-Story Crossing Gable Roof - Site Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
1
7
4
2
8
5
3
11
10
96
113’- 0”52’- 0”
WAITING ROOM 40’-0” x 50’-0”
1. 4. 7.
2. 5. 8.
3. 6. 9.
10.
11.
12.
TICKETING 12’-0” x 25’-0”
CASH ROOM 12’-0” x 8’-0”
PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 12’-0” x 45’-0”
PUBLIC MEN’S RESTROOM 3 W.C. / 5 UR / 4 LAV 12’-0” x 18’-0”
STORAGE 10’-0” x 10’-0”
MECHANICAL 9’-0” x 9’-0”
STAIR
ELEVATOR 13.
15. TERRACE
UP
UP
UP UP
UP UP
UP
STORAGE 12’-0” X 6’-0”
12
13
14
15UP
VENDING 15’-0” x 15’-0”
STAIR
UNISEX RESTROOM 1 W.C. / 1 LAV 10’-0” x 8’-0”
14. JANITOR CLOSET 12’-0” x 6’-0”
DN
ATM
LUGGAGE PICK-UP
EL 10' - 6"
EL 8' - 6"
EL 10' - 6"
JAN
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A101
Author
Checker
07/21/17
First Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
EL +13’-0”
Three-Story Crossing Gable Roof - First Floor Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Third Floor Plan
16UP DN UP DN
17
OPEN
18
19 20
21 22
23
24
25
26
TERMINAL AGENTS OFFICE 24’-0” x 9’-0”
16.
19.
17.
20.
18.
21.TEL/DATA 15’-0” x 9’-0”
TERMINAL MANAGER ‘S OFFICE 14’-0” x 9’-0”
JANITOR CLOSET 4’-11” x 9’-0”
BREAK ROOM 14’-0” X 15’-0”
22.
23.
24. LOCKERS 15’-0” x 18’-0”
ELEVATOR
ELECTRICAL 5’-0” X 11’-0”
MULTI-PURPOSE ROOM 16’-0” X 20’-0”
25. STAFF WOMEN’S RESTROOM 10’-0” X 8’-0”
26. STAFF MEN’S RESTROOM 10’-0” X 8’-0”
27
28
29
30 32
31
ELECTRICAL 11’-0” x 11’-0”
27.
30.
28.
29.
ELEVATOR
JANITOR CLOSET 4’-0” x 9’-0”
STORAGE 25’-0” X 9’-0”
ELEVATOR MACHINE ROOM 4’-0” x 6’-0”
31.
MECHANICAL ROOM 22’-0” x 22’-0”
32.
113’- 0”
52’- 0”
25’- 0”32’- 0”25’- 0”31’’- 0”
20’-0”16’-0”
16’-0”
32’- 0”
DN DN
Three-Story Crossing Gable Roof - Second Floor Plan
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
EAST ELEVATION
48’- 4”
WEST ELEVATION
32’- 4”
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
THIRD FLOOR - EL. 36’-0”
1012
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
THIRD FLOOR - EL. 36’-0”
1012
48’- 4”
32’- 4”
Three-Story Crossing Gable Roof
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
48’- 4”
32’- 4”
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
SECOND FLOOR - EL. 25’-0”
THIRD FLOOR - EL. 36’-0”10
12
SOUTH ELEVATIONNORTH ELEVATION
Three-Story Crossing Gable Roof
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Three-Story Crossing Gable Roof
Gable Roof
Saltbox Roof
Previous Option
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Gable roof alternate
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Three-Story Crossing Gable Roof
Gable Roof
Saltbox Roof
Previous Option
(alternate)
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
2.5’ thick concrete slab - to resist hydro-static uplift forces
12’ high concrete walls extend up to the second floor
First floor elev 13’ - eight feet above current grade at elev 5’
Second floor structure carried on exterior concrete bearing walls
Solid floodproof vertical concrete
walls - waterproofed to elev 17
Base Structural System
(a floodproof “boat” )
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Elev 17’ (12’ above current grade)
8” concrete wall
Rigid insulation (pink)
Exterior stone cladding
First floor elev 13’
Air space
24” concrete mat slab
3” concrete protection slab
Sidewalk elev 10.5
3” mud slab
Waterproofing
Concrete foundation wall
Rigid insulation
Concrete footing
Current grade today - elev 5’
Partial Wall Section
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Structural System - a “boat”
4’ high dry floodproofing panels at open-ings on terrace side
30” elevated terrace
6.5’ high dryfloodproofing panels on sidewalk side
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Saltbox massing
24” concrete mat slab
3” concrete protection slab
(+ 3” mud slab)
Sidewalk
8” concrete wall
6.5’ high dry floodproofing panel
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
Gable roof massing
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019
BIA .studio
3 story crossing gable roof massing