I I
1 1Chapor waterfall
eco-tourism area
Ma Lam Hamlet,
Phuoc Tan Commune,
Bac Ai District.
Exploting ecological potential
and Chapor waterfall system;
building Chapor eco-tourism
area as a sight of Ninh Thuan
to meet the needs of local and
international tourists
- Chapor Fall is located near Phuoc Binh National Park which contains a
primeval forest ecosystem characterized with rich and diverse
vegetational cover, beautiful landscapes, fresh air and temperate climate
in all year; this tourism area consists of many poetic waterfalls
complexes in which Chapor is the largest fall with the height of 50-60m;
water flows through the year.
- Chapor Tourism Area is located near 27A Highway route to Da Lat and
the South of Central Highlands so Chapor eco-tourism and Binh Phuoc
National Park can been connected to Raglay cultural tours, Bac Ai
traditional vestiges, Pi Nang Tac stone trap, Da Lat and Central
Highland tours.
- Transportation: Project Area far from Cam Ranh International Airport
about 50km so flights from Hanoi and Ho Chi Minh City to Ninh Thuan
can fly off and on in a day.
- Infrastructure: The province has currently built the route to project area.
- It is expected to
receive 50 - 60
thousand visitors
per year.
- Proposed land
area: approx. 40
ha;there includes:
the area of purpose
conversion of
forestry land
utilization for
buildings and
infrastructure will
not exceed 20% of
the total area in
line with Decree
No. 23/2006/NĐ-
CP of the
Government dated
March 03, 2006 on
implementing Law
of Forestry
Development and
Protection; the
remainder is the
forest area’s rental.
*The land rent:
- The project is exempted from the land rent during
the basic construction duration up to 03 years from
the date getting the decision to lease the land and
continues to be free of land rent for the next 11
years from the date of completion and operation
under the provisions of the Decree No.
46/2014/ND-CP of the Government stipulating on
the collection of the land rent and water surface
rent.
*Corporate Income Tax:
- Take the preferential tax rate of 10% within 15
years as stipulated in the Decree No. 218/2013/ND-
CP dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
- Tax exemption for 04 years, tax reduction of 50%
of the tax payable in the next 09 years for the
corporate income from investment projects under
the provisions of the Decree No. 218/2013/ND-CP
dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
200
Domestic, joint
venture or 100%
foreign capital.
PEOPLE'S COMMITTEE
OF NINH THUAN PROVINCE
LIST OF PROJECTS CALLING FOR INVESTMENT INTO NINH THUAN PROVINCE, PERIOD OF 2015 - 2020
THE SOCIALIST REPUBLIC OF VIETNAM
Independence – Freedom – Happiness
(Issued by the Decision No.102 /QD-UBND dated 11/3/2015 of Ninh Thuan Provincial People's Committee)
S
T
T
NOPROJECT
NAME
INVESTMENT
LOCATION/AREA
INVESTMENT
OBJECTIVESFAVORABLE CONDITIONS
INVESTMENT
SCALE/MAJOR
SPECIFICATIO
N
PROPOSED
INVESTMEN
T CAPITAL
(billion VND)
INVESTMENT INCENTIVE POLICIES
FIELDS OF TOURISM AND SERVICES: 11 projects
FORM OF
INVESTMENT
Total: 72 projects
2 2High-class tourism
spot of Nui Chua
The core of Nui Chua
adjoins subzones in
Vinh Hy hamlet, Vinh
Hai Commune, Ninh
Hai District.
Invest in advanced eco-tourism
obtained five-star standard
with the big and closed scale
for international groups in
order to develop kinds of
tourism charaterized and
valued the natural landscape,
connecting to other tourism
areas though traffic systems,
road, seaway and airway.
- Ninh Chu-Vinh Hy-Binh Tien Tour Areas are confirmed as key areas
of the province, which can connect to most of tourism areas: Eco-
tourism, cultural tourism, adventure sports tourism...
- Nui Chua advanced tourism area is located in core area of Nui Chua
National Park with primeval forest ecosystem covered by beautiful, wild
and poetic bay and seas with fresh air and temperate climate in the year;
the project position is under the plateau at an altitude of 500-700m
compared to the sea level, the terrain is relatively flat and separate from
surrounding areas so the whole tourism areas are overlooking to East
China Sea; it is expected to propose the construction of Casino with the
sufficient scale to serve the project area.
- Infrastructure: Coastal Road passes through the project area and
connects the other tourist areas finished to create a section considered as
the best section of Vietnam, and shorten the distance and time from Cam
Ranh airport to the project area; Besides the national electricity system
was fully connected across the whole route.
- Needs of development: .With the orientation of Ninh Thuan becoming
the energy center of the country in nuclear power, wind power, solar
electricity which are sector groups required to gather the large number of
foreign experts, along with the formation of large industrial zone in the
Northern and Southern provinces will create huge demands for pleasure
and entertainment of investors, professionals and tourists.
- To call for
investment of high-
class eco-tourism
projects.
- Proposed land
area: approx. 250
ha; there includes:
the area of purpose
conversion of
forestry land
utilization for
buildings and
infrastructure will
not exceed 15% of
the total area in
line with Decree
No. 23/2006/NĐ-
CP of the
Government dated
March 03, 2006 on
implementing Law
of Forestry
Development and
Protection; the
remainder is the
forest area’s rental.
as mentioned above 5.000 Domestic
3 3
Production of
mineral water
combining with
tourism and
mineral bath in
Nhi Ha commune.
Nhi Ha Commune,
Thuan Nam District.
Invest in plants for bottled
mineral water by automated
production lines; combined to
form resorts with mineral
water, mud, relaxation,
healing.
- Nhi Ha mineral water mine reserves of 80 million liters/year granted
the license by the Ministry of Natural Resources and Environment with
the mining capacity scale of 250m3 day; the degree of water heat
standardized high quality standards with quality criteria as follows: pH:
8.33; Fe: 0,072mg/l; NO3: 0,07mg/l; Chlorine: 24.09 mg/l, favorable to
the production of bottled water;
- Currently in the province there is only 01 mineral water plant in Tan
Son town, Ninh Son district with a capacity of 14 million liters/year
(currently in the investment phase).
- Favorable location forms spa resort combined with Tan Giang Lake
and Pôrômê Tower eco-tourism areas.
-Transport infrastructure: The traffic project area connects with the
National Highway 1A and the North-South Railway far from Cam Ranh
International Airport about 80 km.
- Building a bottled
mineral water
producing factory
with automatic
production line and
spa & mud bathing
service.
- Expected
productivity:
250m3 per day..
'- Proposed land
use area: approx.
5 ha.
as mentioned above150
Domestic, joint
venture or 100%
foreign capital.
4 4Kien Kien stream
eco-tourism area
Loi Hai Commune,
Thuan Bac District
Exploiting the ecological
potential and Kien Kien Fall
system, building Kien Kien
eco-tourism as one of the
attractions of Ninh Thuan
Province, to meet the needs of
local and foreign tourists.
- Located below Nui Chua National Park in which a biological variety of
dry characterized area is now being under preservation, and the 20m-
high waterwall chains are suitable for adventure tourism intergrated with
sea and eco-bio tourism.
- This is the area adjacent to National Highway No. 1A and near 02
cities of Phan Rang - Thap Cham on Ninh Thuan and Cam Ranh in
Khanh Hoa provinces, far from Cam Ranh International Airport about
30 km to the North so it is profitable in the development of service and
commercial industries; and now the district has a large number of
projects being implemented as Binh Tien Tourism Area (20 km to the
Northeast), Resort Ganesa - Phuoc Chien Eco-tourism area (20 km to the
Northwest), Du Long Industrial Park project (3 km to the South) and
some other small resorts. With the available potential, investing in Kien
Kien fall eco-tourism is very positive.
- A resort meeting
3-star standards
- Proposed land
area: approx. 100
ha.
as mentioned above150-200
Domestic, joint
venture or 100%
foreign capital
5 5Sung Trau stream
eco-tourism area
Phuoc Chien
Commune, Thuan
Bac District.
Exploiting the ecological
potential and Sung Trau stream
system, building Sung Trau
eco-tourism as one of the
attractions of Ninh Thuan
Province, to meet the needs of
local and foreign tourists.
- Project area unexploited should still remain unspoiled beauty with
meandering stream system, we can say this is a very ideal area for
investing in eco-tourism zone and organizing adventure sports activities
as well as combining the exploitation of the divesified and rich kinds of
cultural bringing Rắclây character.
- The project area has convenient transportation system: near Highway
1A, 27B, far from Cam Ranh airport about 40 km and Nha Trang about
80 km, with the potential to attract tourists from other provinces and
build combined tours combined.
- Exploiting the
ecological
potentials and the
system of Sung
Trau stream,
turning Sung Trau
eco-tourism area
into the beautiful
sight of Ninh
Thuan .
- Proposed land
area: approx. 50
ha.
as mentioned above 80-100
Domestic, joint
venture or 100%
foreign capital
6 6
Nam Cuong sand
dune eco-tourism
area
An Thanh Commune,
Ninh Phuoc District.
Exploiting the tourism
potential of coastal areas in
Ninh Phuoc district, building a
group of sports tourism and
marine leisure complex
combined to forms of
entertainment such as:
Bungalow pleasure house,
sports on the sand, sand
sliding, sand bath ...
- Nam Cuong sand hill far from the center of the city of Phan Rang in
Thap Cham about 8 km to the Southeast as a new tourist attraction in
Ninh Thuan. The unspoiled sand dunes located on the village of Cham
ethnic minority. The sand dunes area is located near the windy coast.Its
wild character and the amazing sand created by nature is attractive
tourist area with the full potential; with convenient transportation system
(located near the Highway 1A traffic route and provincial coastal road
coming into operation), the project area should be less inhabited so the
compensation for the clearance is less.
- Building a group
of sports tourism
and marine leisure
complex.
- Proposed land
area: Approx. 500
ha.
as mentioned above 200
Domestic, joint
venture or 100%
foreign capital
7 7Mui Dinh tourism
area
Phuoc Dinh
Commune, Thuan
Nam District.
Form tourism areas with
synthetic types of tourism such
as ecotourism sea, surfing,
climbing, motor racing on the
sand, conquer the lighthouse,
commercial urban, golf course,
... Building attrative and
unique tourism areas with the
national and international
scale.
- The project is located at the intersection of key areas of the national
tour of Dalat - Phan Rang - Nha Trang, was identified as one of the key
areas of tourism development strategy of the country. This area has many
large and beautiful sand hills characterized for dry regions with
beautiful, pristine, quiet and fresh beaches, longer than 3 km are suitable
for this kinds of adventure travel and marine eco-tourism with the
national and international scale.
- Infrastructure: Coastal Road passes through the project area, transport
links to Highway 1A, the North-South railway; far from Cam Ranh
International Airport about 75 km. The project area has the national grid
system passed being convenient for connection to put to use when
implementing the project.
- Building tourism
areas with the
national and
international scale
with kinds of
complex tour.
- Proposed land
area: Approx. 700
ha
as mentioned above2000
Domestic, joint
venture or 100%
foreign capital
8 8Phuoc Binh eco-
tourism area
Phuoc Binh National
Park, Bac Ai district.
Form a forest ecotourism
resort combined with high
levels to meet the increasing
demand of domestic and
international tourists
- The project area is adjacent to Da Lat, far from the city of Phan Rang -
Thap Cham about 70 km to the North-West, Phuoc Binh forestry has a
height of about 500 meters above sea level. Wonderful natural system of
Phuoc Binh forest associated with legency Pinang Tac rock trap to
contribute to the development of ecotourism combined with the
historical and cultural Raglay indigenous peoples.
- Form a forest
ecotourism resort
combined with
high levels to meet
the increasing
demand of
domestic and
international
tourists
as mentioned above50 Domestic
9 9
Building systems
of commercial
centers,
supermarkets in
the province.
In districts of Thuan
Bac, Ninh Son, Ninh
Phuoc, Thuan Nam
and Phan Rang-Thap
Cham city.
As a shopping center,
sightseeing, entertainment area
to serve the people of the
province. The trading activity
is under the modern model
with methods of service
civilization, convenient to meet
the growing shopping needs of
the population.
With the advantage of the project site is located in the center of the
district and the city of Phan Rang - Thap Cham, adjacent to the
populated planning area, the main roads, the lifeline of districts and
provinces should be very favorable transportation, exchange of goods
from distribution sites, contributing to the development of trade and
services of the neighborhood areas; Project site is clean soil
(compensated), convenient for investors in the project exploitation.
Proposed land
area: about 0,38 –
26,5 ha
* The land rent:
- The project is exempted from the land rent during
the basic construction duration up to 03 years from
the date getting the decision to lease the land and
continues to be free of land rent for the next 11
years from the date of completion and operation
(when the investment project is located on the scale
of districts) under the provisions of the Decree No.
46/2014 /ND-CP of the Government stipulating on
the collection of the land rent and water surface
rent.
* Corporate Income Tax:
- For the investment projects on the scale of
districts: Take the preferential tax rate of 10%
within 15 years as stipulated in the Decree No.
218/2013/ND-CP dated 26th December 2013 of the
Government detailing and guiding the
implementation of some articles of the Law on
Corporate income tax. - For the investment projects
on the scale of districts: Tax exemption for 04
years, tax reduction of 50% of the tax payable in
the next 09 years for the corporate income from
investment projects under the provisions of the
Decree No. 218/2013/ND-CP dated 26th December
2013 of the Government detailing and guiding the
implementation of some articles of the Law on
Corporate income tax.
* Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
Under the
Project's
subscription
Domestic, joint
venture or 100%
foreign capital
10Complex of office
and trading center
Nothern-East corner
of Street 16/4 and
D10, My Binh ward,
Phan Rang-Thap
Cham city.
For construction and sale of
trade centers and office
buildings.
- The area is near the downtown center of Phan Rang Thap Cham city,
Vị trí đầu tư dự án gần trung tâm Thành phố Phan Rang - Tháp Chàm,
adjacent to city’s major streets and also the infrastructure is fairly
completed with system of electricity, water supply, drainage,
communication which is convenient for connecting to the planned area
and for transporting and promotes developing the regional economy.
- The province hasn’t so far set up any standard office buildings for lease
to meet the needs of local entities. These are favorable conditions for the
project investment.
- Proposed land
area: approx. 0,12
ha
- High raise
building
*The land rent: The project is exempted from the
land rent during the basic construction duration up
to 03 years from the date getting the decision to
lease the land under the provisions of the Decree
No. 46/2014 / ND-CP of the Government
stipulating on the collection of the land rent and
water surface rent.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
45.00
Domestic, joint
venture or 100%
foreign capital
11
Luxury hotel,
tourism and
trading center.
Lot C, Khanh Hai
town,
Ninh Hai district,
Ninh Thuan province
Constructing luxury hotel,
tourism and trading center to
serve domestic and
international tourists.
- Khanh Hai town is eco-socio administration center of Ninh Hai
province as well as sea tourism key point of southern-east coastal chains
which is mentioned as Ninh Thuan’s tourism gateway. Dam Nai is 2 km
far away from Ninh Chu beach that is the most beautiful with big hotels
in Ninh Thuan province in line with Ninh Hai district’s general tourism
potential. This location is also of many charmingful natural scenes and
mountains like Nui Chua National Park, Vinh Hy Gulf... that attract
most of tourists coming into the province and become the provincial sea
tourism urban area in future.
- The project area is located in the center of Ninh Hai district where is
near Phan Rang-Thap Cham city, joining with National Highway No. 1A
and No. 27, also near Cam Ranh international airport, with a complete
basic infrastructure for implementing the project
- Transportation: The project location is adjacent to Yen Ninh street
where people can easily reach the city by other big Muoi sau thang tu
streets , Nguyen Thi Minh Khai, also connect to National Highway
No.1A through Yen Ninh street, provincial road 704 and Vinh Hy-Binh
Tien coastal road to Cam Ranh airport.
- The situation of water and electricity supplies, drainage and
communication sytems is ready for connection.
- Construction
items including:
Building high-class
hotel with 500
rooms; trade
centers and
conference;
outdoors
entertaiment area.
- Proposed land
area: approx. 2,0
ha
*The land rent:
- The project is exempted from the land rent during
the basic construction duration up to 03 years from
the date getting the decision to lease the land and
continues to be free of land rent for the next 11
years from the date of completion and operation
under the provisions of the Decree No. 46/2014 /
ND-CP of the Government stipulating on the
collection of the land rent and water surface rent.
*Corporate Income Tax:
- Take the preferential tax rate of 10% within 15
years as stipulated in the Decree No. 218/2013/ND-
CP dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
- Tax exemption for 04 years, tax reduction of 50%
of the tax payable in the next 09 years for the
corporate income from investment projects under
the provisions of the Decree No. 218/2013/ND-CP
dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
* Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
300
Domestic, joint
venture or 100%
foreign capital
IV. V
1 Wind Power Plant
Planned lot No. 3, Loi
Hai commune, Thuan
Bac district, Ninh
Thuan province.
Building an independent plant
for producing wind energy that
contributes to national
electrical supply
- Prime Ministrer granted Decision No. 55/2007/QĐ-TTg dated April 23,
2007 on Aproval of key prioritized industry list for the period 2007-
2010, and vision to 2020 including renewable energy (wind power)
mentioned as the key industry and benefits from the policies of
development promotion.
- Ninh Thuan province is located at southern end of Truong Son
mountainous chains and coverd by three mountains closely towards the
sea: 2 in the North and the South towards the sea, 1 in the west adjacent
to Lam Dong highland. According to WB case study, Ninh Thuan is one
of the provinces of Vietnam having the highest windspeed, the average
speed is 7.1m/s at the altitude of 65 meters and wind compact from 400-
500 W/m2 or above, the highest is in the southern area of the province,
where the speed can get from 18 to 20 m/s (at the altitude of 12 meters).
There are 14 areas of wind potential all over the province, approximately
8.000 ha, which mainly concentrates in 3 districts: Ninh Phuoc, Thuan
Nam and Thuan Bac. Especially, Ninh Thuan province is hardly been
affected by storms and of steady wind capacity during 10 months per
year with the speed from 6.4 to 9.6 m/s that will be stable for the wind
turbine generation. - Besides, investment on renewable energy in Ninh
Thuan province will be convenient and low-cost due to the close distance
and the ease of connection of national electricity network; furthermore,
its terrain and transportation are convenient for wind turbine installation
and operation. So, the project will contribute to locally increase the
electricity generation and to develop the provincial economy and
employment for better budget increase of the province..
Proposed area: 320
ha
30MW.
*The land rent: The project is exempted from the
land rent for the whole rental period under the
provisions of the Decree No. 46/2014 / ND-CP of
the Government stipulating on the collection of the
land rent and water surface rent.
*Corporate Income Tax:
- Take the preferential tax rate of 10% within 15
years as stipulated in the Decree No. 218/2013/ND-
CP dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
- Tax exemption for 04 years, tax reduction of 50%
of the tax payable in the next 09 years for the
corporate income from investment projects under
the provisions of the Decree No. 218/2013/ND-CP
dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
* Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
120
Domestic, joint
venture or 100%
foreign capital.
FIELDS OF CLEAN ENERGY: 2 projects
2Phuoc Dan wind
power plant.
Communes of Phuoc
Huu, Phuoc Thai,
Phuoc Hau, Phuoc
Dan town, Ninh
Phuoc district.
Building an independent plant
for producing wind energy that
contributes to national
electrical supply.
- Prime Ministrer granted Decision No. 55/2007/QĐ-TTg dated April 23,
2007 on Aproval of key prioritized industry list for the period 2007-
2010, and vision to 2020 including renewable energy (wind power)
mentioned as the key industry and benefits from the policies of
development promotion.
- Ninh Thuan province is located at southern end of Truong Son
mountaineous chains and coverd by three mountains closely towards the
sea: 2 in the North and the South towards the sea, 1 in the west adjacent
to Lam Dong highland. According to WB case study, Ninh Thuan is one
of the provinces of Vietnam having the highest windspeed, the average
speed is 7.1m/s at the altitude of 65 meters and wind compact from 400-
500 W/m2 or above, the highest is in the southern area of the province,
where the speed can get from 18 to 20 m/s (at the altitude of 12 meters).
There are 14 areas of wind potential all over the province, approximately
8.000 ha, which mainly concentrates in 3 districts: Ninh Phuoc, Thuan
Nam and Thuan Bac. Especially, Ninh Thuan province is hardly been
affected by storms and of steady wind capacity during 10 months per
year with the speed from 6.4 to 9.6 m/s that will be stable for the wind
turbine generation.
- Besides, investment on renewable energy in Ninh Thuan province will
be convenient and low-cost due to the close distance and the ease of
connection of national electricity network; furthermore, its terrain and
transportation are convenient for wind turbine installation and operation.
So, the project will contribute to locally increase the electricity
generation and to develop the provincial economy and employment for
better budget increase of the province.
- Proposed area:
approx. 7,88 ha
- Capacity:
Approx. 50MW
including cycle 1 is
of 12.5MW and
cycle 2 is of 37.5
MW.
*The land rent:The project is exempted from the
land rent for the whole rental period under the
provisions of the Decree No. 46/2014 / ND-CP of
the Government stipulating on the collection of the
land rent and water surface rent.
*Corporate Income Tax:
- Take the preferential tax rate of 10% within 15
years as stipulated in the Decree No. 218/2013/ND-
CP dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
- Tax exemption for 04 years, tax reduction of 50%
of the tax payable in the next 09 years for the
corporate income from investment projects under
the provisions of the Decree No. 218/2013/ND-CP
dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
1,300
Domestic, joint
venture or 100%
foreign capital.
IV. IV FIELD OF AGRICULTURE: 10 projects
1
Developing area
for speciality fruit
trees combining
with building fruit
processing plant
Tam Ngan 2 Hamlet,
Lam Son Commune,
Ninh Son District.
- Forming and developing area
of speciality fruit trees with
area of 600 ha, planting fruit
trees under farm scale at the
area where there is potentiality
making fresh, quality fruits,
ensuring food sanitation;
combining with building
products-processing plant at
province in form that Investor
cooperates with households,
instructing technique,
supporting capital and product
sales.
- Striving to 2018, it is
completed new planting of
282.23 ha, to 2020 it is
completed to upgrade complex
garden of 79.77 ha, increasing
total area of special fruit trees
up to 400 ha; to 2028, it takes
entire 400 ha in business,
achieving average productivity
of 8.1 tons of fruit/ ha,
reaching output of 3242 tons,
meeting demand of domestic
market and exporting in the
future, firstly at market in
province, especially in Phan
Rang - Thap Cham city and
industrial parks, tourist area.
- Ninh Son district area has climate and soil condition proper with
planting and developing special fruit-trees with large output which can
serve to process types of fruit-juice and products, candies, etc. Fruit
quality is good, less competitive with Southern East and West fruits due
to difference in season; labour source at project area is plentiful,
industrious, and hard to study; land fund for cultivation is still large,
favorable for project implementation.
- Convenient traffic system: Located in Highway 27A across Da Lat and
North Highlands, near North-South railway line convenient in
transporting, exchanging goods.
Developing area
of special fruit-
trees with area of
600 ha in form
that Investor
cooperates with
households,
instructing
technique,
supporting capital
and product sales,
combining with
building products-
processing plant at
province
*The land rent: The project is exempted from the
land rent for the whole rental period under the
provisions of the Decree No. 210/2013/ND-CP of
the Government dated December 19, 2013
stipulating on policies of promoting investors of
rural and agricultural development.
*Corporate Income Tax:
- Take the preferential tax rate of 10% within 15
years as stipulated in the Decree No. 218/2013/ND-
CP dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
- Tax exemption for 04 years, tax reduction of 50%
of the tax payable in the next 09 years for the
corporate income from investment projects under
the provisions of the Decree No. 218/2013/ND-CP
dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
200
Domestic, joint
venture or 100%
foreign capital.
2
Cultivating and
processing fresh
vegetables
- In Communes:
Thanh Hai, Nhon Hai,
Vinh Hai, Ho Hai và
Xuan Hai, Ninh Hai
District.
- In Communes:
Phuoc Hai, An Hai,
Phuoc Son, Phuoc
Vinh, Ninh Phuoc
District.
- In Communes:
Phuoc Ninh, Phuoc
Nam, Thuan Nam
District.
- In Communes: Lam
Son, Luong Son, Ninh
Son District.
- My Binh Ward, Van
Hai Ward, Phan Rang
- Thap Cham City.
- Forming fresh vegetables at
potential areas which meets
demand of fresh vegetables in
provincial area and
neighboring provinces through
cultivation model with
households; technical
instructions, capital aid and
product sales.
- Climate and soil condition of project implementation areas proper with
planting and developing types of vegetable; cultivation fund is also large,
convenient for implementing project; traffic system is convenient.
Forming fresh
vegetables at
potential areas of
1.640 ha through
cultivation model
with households;
technical
instructions,
capital aid and
product sales.
Proposed land
area: Approx. 10
ha – 50 ha/project
as mentioned above 10-50/project
Domestic, joint
venture or 100%
foreign capital.
3
Production and
processing of
originated neem
tree products
Phuoc Nam
commune. Thuan
Nam district.
In order to utilize the material
source of neem tree, which is a
typical tree in the province, for
processing bio-products,
insecticides, high-quality
beauty products for domestic
market and exports.
- Dry climate and soil in Ninh Thuan province are very suitable for
planting neem trees. The total area of neem trees is about 2,600 ha now,
and planned to increase up to 7,500 ha in 2015, together the area in Binh
Thuan province this area will be totally summed up 10,000 in the
following years. It is said to be fulfill the demands of raw material for
production such as insecticides, medicines, fertilizers beauty products
(branches, leaves and neem shells).
- The project area is passed through by North-South railway, near
National Highway No. 1A or No. 27, or Ca Na and Cam Ranh harbors
(40 - 60 km distance)... No factories of neem tree production have been
invested so far within Ninh Thuan province as well as the neighboring
provinces.
Approx. 10,000
tons of various
products/year.
'- Proposed land
area: approx.2,6
ha
as mentioned above 160
Domestic, joint
venture or 100%
foreign capital.
4
Raising high-tech
dairy and beef
cows combining
with building
slaughter houses
- In Phuoc Tien
Commune, Bac Ai
District.
- In Communes:
Quang Son, My
Son,Tan Son Town,
Ninh Son District
- In Phuoc Huu
Commune, Ninh
Phuoc District
- In Communes:
Phuoc Ninh, Nhi Ha,
Thuan Nam District.
- In Communes: Loi
Hai, Bac Phong,
Thuan Bac District.
- In My Dong Ward,
Phan Rang – Thap
Cham City.
- Forming and developing high
quality dairy and beef cows in
according to modern, high-tech
process, contributing to
improve value, productivity of
domestic animals; combining
with building concentrated
slaughterhouses applying green
technology, veterinary
sanitation to ensure food
hygiene, meeting fresh meat
supply to domestic market and
export.
- Project implemented areas has relative flat terrain, can develop large
grass field serve breeding; climate condition is suitable with breeding
cattle in general and dairy and food cattle in particular; Plentiful food
source meets a demand of breeding with large scale.
- Currently, in provincial area where there is no slaughtering and cattle
processing plant in large scale with modern technology, toward
processing of high quality products, sanitation, supplying to large
markets as Ho Chi Minh city, Hanoi and export.
- Project location near Highway 1A, 27A, 27B, North-South railway line,
Cam Ranh International airport convenient in transporting, circulating;
Besides, it is supported by initial investment: Road, power, water to
slaughtering base; the local supports and promotes land clearance
implementation, delivering fresh soil to investor when performing
project in the area of Phan Rang - Thap Cham city.
Proposed land
area: approx. 100-
300 ha
as mentioned above 500
Domestic, joint
venture or 100%
foreign capital.
5
Planting grass and
building
preliminary
treatment and
foodstuff
processing plant
In communes of Bac
Phong, Loi Hai,
Thuan Bac district
- Forming and developing
grass planting area, hybridized
maize and other agricultural
products to supply material
source for production,
preliminary treatment and
feedstuff processing plant; also
supplying nutifood to
livestocks sector inside and
outside the province;
enhancing stability in feedstuff
production for livestock,
poultry, dairy and fisheries .
- Project terrain is relatively smooth; ably improving into area
specializing in grass, hybridized maize and other agricultural products
with high output, meeting a demand of food processing to breeding
(maize output reaches about 6,500 tons/year, manioc output gets 2,000
tons/year and other agricultural by-products to serve in breeding, etc.;
having plentiful labour source, cheap labour.
- Traffic system is relatively convenient: Near Highway 1A, North-South
railway line, Cam Ranh International airport.
Proposed land
area: approx. 50-
300 ha, , under
the mode of
cooperation with
local households to
develop the
planting area and
to purchase the
raw material.
as mentioned above 50
Domestic, joint
venture or 100%
foreign capital.
6
Commercial
aquatic cultivation
in Son Hai, Phuoc
Dinh communes.
Son Hai Hamlet,
Phuoc Dinh
commune, Thuan
Nam district
Forming center for commercial
aquatic cultivation to supply
commercial aquatic products
meet domestic consumption
demand and export.
Project implemented location has proper climate condition, fresh sea
water enivironment, less pollution proper for breeding high quality
aquatic commercial products; traffic condition is convenient: Near sea
route of province, North - South railway line, etc.
Proposed land
area: approx. 50
ha
as mentioned above 100
Domestic, joint
venture or 100%
foreign capital.
7Investment in
seafood processing
industrial zone.
Phuoc Minh
Commune, Thuan
Nam District.
- Forming Seafood processing
zone of province, contributing
to improve value of goods, in
order to meet a demand of
market inside and outside the
province.
- Providing high quality
standard products, meeting a
demand of consumption
product, ensuring market
inside, outside the province
and toward export.
- Coast 105 km long, Ninh Thuan fishery can exploit all year round, as
one of 04 key fisheries of the whole country with total relatively large
fish, shrimp store, ably exploiting about 55,000 tons/year (in which fish:
52,972 tons, shrimp: 400 toms, cuttle: 1,700, other seafood: 828 tons),
total area of aquatic breeding over 1,600 ha, estimated harvested output
over 11,000 tons, many highly economic value can serve for processing
industry and export.
- Currently, in the provincial area where there are 04 export aquatic
processing plants operating, their capacity gets about 5,000 tons of
complete-product per year (equal to 10,000 tons of material), export
value about 20-25 million USD/year.
- With available material source, plant location near Highway 1A and
Highway 27, near Cam Ranh port (40-60km), these are convenient
conditions for project investment.
- Project location is near Ca Na fish port, so it is very convenient for
procurement of seafood; near Highway 1A, traffic system is favorable.
Proposed land
area: approx. 17
ha
as mentioned above 80
Domestic, joint
venture or 100%
foreign capital.
8
Investing in new
construction of
clue markets,
central market in
the area of
communes under
districts
In districts of Ninh
Phuoc, Ninh Hai and
Thuan Bac.
- Investing in new construction
of clue markets, central market
in the area of communes under
districts to form commercial
center with good
infrastructures, clean, civilized
business environment, meeting
a demand of sales business and
supplying vital living goods to
residents in the region; creating
jobs, increasing income to
local residents; contributing to
upgrade, improve local's
infrastructure, enhancing
stability of public order,
environment sanitation and
sustainable development to
resident community, enhancing
socio-economic development
of the region.
- Project location, market is bordered with crowded resident planning
areas, main roads of the district, province, so it is very favorable in
transporting, exchange goods from distribution places, contributing to
develop trading, service of neighboring areas.
- Ninh Phuoc
District: Hieu Le
Hamlet, Phuoc
Hau Commune;
Ruong Yen, Phuoc
Dan Town
(approx. 2,2 ha)
- Ninh Hai
District: salt –
producing area of
households in
Khanh Hai Town
(approx. 2 ha)
- Thuan Bac
District: Cluster of
Communes of Tan
Hai, Xuan Hai, Ho
Hai (approx. 3,3
ha); Loi Hai
Commune
(approx. 2 ha)
as mentioned above
Under the
Project's
subscription
Domestic, joint
venture or 100%
foreign capital.
9 Building supply
fresh water plant
Phuoc Dinh
Commune,
Thuan Nam District
- Supply fresh water source to
Industrial park, titan projects
located in district area as well
as whole Thuan Nam district.
- Currently, there is no fresh water supply plant to Phuoc Nam Industrial
park, titan projects located in district area as well as to whole Thuan
Nam district. Therefore, the project will bring high efficiency when
implementation deploy.
approx.12.000 m3
per day nightas mentioned above
Under the
Project's
subscription
Domestic, joint
venture or 100%
foreign capital.
10
Home waste
treatment and
micro-organic
fertilizer
production plant
Quang Son
Commune, Ninh Son
Disrict.
- Organizing, collecting and
treating sewage, minimizing
environmental pollution in the
district, producing micro-
organic fertilizer meeting the
demand of the district, the
province and the country in
term of agricultural
production.
- At present, in the provincial area, there is one domestic sewage
handling plant with its capacity about 250 tons of sewage/day, not
meeting province's demand of sewage. Therefore, investment in sewage
handling plant is extremely necessary.
- Medical sewage handling at present is not concentratively handled,
technology is not modern, so it does not ensure environmental sanitation.
- Convenient investment location, distant from Tan Son town center
about 7 km and as central point linked with communes in the area of
district, so it is favorable in collecting, transporting sewage to plant. In
Ninh Son district area, there is at present no sewage handling plant;
power, water supply, traffic infrastructure available, convenient for
project investment.
Proposed land
area: 1-2 ha;
Capacity of 40-60
tons per day
*The land rent:The project is exempted from the
land rent during the whole rental period under the
provisions of the Decree No. 46/2014 / ND-CP of
the Government stipulating on the collection of the
land rent and water surface rent.
* Corporate Income Tax:
- Take the preferential tax rate of 10% within 15
years; Tax exemption for 04 years, tax reduction of
50% of the tax payable in the next 09 years for the
corporate income from investment projects under
the provisions of the Decree No. 218/2013/ND-CP
dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
15-20
Domestic, joint
venture or 100%
foreign capital.
1
Diesel and
renewable energy
operated generator
manufacturing and
assembly factory
Kien Kien hamlet, Loi
Hai commune, Thuan
Bac district, Ninh
Thuan province.
Building the plant for
manufacturing and assembling
generators to fulfill the
domestic electrical needs and
exports.
- No big-scaled plants of manufacturing and assembling diesel-engine
and renewable energy generatorsneem have been invested so far within
Ninh Thuan province for the domestic and exported market.
- The project location is adjacent to National Highway No. 1A and near
Phan Rang-Thap Cham city in the province and Cam Ranh city in Khanh
Hoa province, 30 km away from Cam Ranh international airport in the
north, the infrastructure has been invested and convenient for project
implementation. The area is rather big for easily enlarging the scale of
investment.
- Proposed area:
approx, 2,5 ha
- Approx. 50-100
sets/months for
diesel-engine
generator; 50-150
sets/months for the
renewable enery
generator.
*Land rent: The project is exempted from the land
rent during the whole rental period under the
provisions of the Decree No. 46/2014 / ND-CP of
the Government stipulating on the collection of the
land rent and water surface rent.
* Corporate Income Tax:
- Take the preferential tax rate of 10% within 15
years; Tax exemption for 04 years, tax reduction of
50% of the tax payable in the next 09 years for the
corporate income from investment projects under
the provisions of the Decree No. 218/2013/ND-CP
dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
43
Domestic, joint
venture or 100%
foreign capital.
VI. FIELDS OF MANUFACTURING (CALLING IN INDUSTRIAL CLUSTERS, ZONES AND PLANNED): 25 projects
1 2
Wind turbine
blade and wind
turbine tower
manufacturing
plant
Phuoc Nam, Ca Na
or Du Long industrial
zones.
Producing wind turbine blades
and wind turbine towers for
wind power projects in the
province and neighboring
provinces
- As estimated by World Wind Electricity Association (WWEA) to 2015,
global wind electricity capacity gets 600,000 MW and to 2020 reaching
about 1.5 million MW. In Vietnam, wind electricity potentiality gets
about 513,360 MW; in which, Ninh Thuan's wind electricity potentiality
gets about 21,432 MW, therefore demand of using wind electricity
equipment to generate electricity serving demand of projects in the
province, neighboring provinces and toward export is rather large.
- At the area of neighboring provinces as Binh Thuan, Binh Dinh, Vung
Tau, Lam Dong, etc. wind electricity is developing very strongly,
namely:
+ At Binh Thuan: There is at present one wind electricity project at Binh
Thanh commune, Tuy Phong district run into operation with installation
capacity of 30 MW; besides, in the provincial area, there is potential
areas of wind electricity with total area of 23,549 ha, installation capacity
expected is 1,570 MW.
+ At Binh Dinh: Separately Nhon Hoi economic zone planned 283 ha in
the North to develop wind electricity. At present, there are two investors
deploying two projects with total capacity over 50MW.
- Investment in plant at the province will take advantage of plentiful
labour source, low carriage charge, reducing production price
remarkably compared to import.
- At present some Industrial parks have invested rather complete
infrastructure, having location located close to Highway 1A and North-
South railway, near Cam Ranh international airport, distant from Ba
Ngoi seaport 50 km and distant from Ca Na seaport 15 km according to
road, infrastructure is rather fully invested, very conveniently for investor
to implement the project.
Depend on market
demand in every
phase.
Proposed area:
Approx. 10 ha
*Corporate Income Tax: Corporate Income Tax:
Take the preferential tax rate of 10% within 15
years, from the date of starting business, tax
exemption for 4 years, from the date of taxed
income declaration and reduction of 50% of the tax
payable in the next 9 years for the corporate income
from investment projects under the provisions of
the Decree No. 218/2013/ND-CP dated 26th
December 2013 of the Government detailing and
guiding the implementation of some articles of the
Law on Corporate income tax.
* Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
1.200
Domestic, joint
venture or 100%
foreign capital.
2 3
Manufacturing of
solar energy
panels (the process
of assembling to
make the final
products)
Phuoc Nam or Du
Long industrial zone.
Applying high-tech solar
energy products; producing
cell panel serving households
and solar energy equipment;
contributing to national energy
security, enhancing socio-
economic development of the
province
- Developing re-creative energy (solar energy) is province's objective in
the next time, investing and constructing solar cell panel production
plant in Ninh Thuan province not only meets demand of using solar
energy cell panel for domestic civil, industrial purpose but also can tend
to foreign export.
- Investment in plant at the province will take advantage of plentiful
labour source, low labour cost, carriage charge, reducing production
price remarkably compared to import.
- Infrastructure at project location is rather complete, near Highway 1A,
North-South railway line, near goods port and Cam Ranh International
airport is favorable conditions for investor to implement the project.
20MW/year
Proposed area:
approx. 10 ha
as mentioned above 200
Domestic, joint
venture or 100%
foreign capital.
3 4
Solar energy
equipment and
spare parts
manufacturing
plant
Industrial zones of
Phuoc Nam, Ca Na,
Du Long
Producing equipment, spare
parts used solar energy to meet
a demand of domestic
consumption and export.
- As estimated by International Energy Agency (IEA), solar energy to
2050 can generate about 9,000 TW/hour, equal to 25% of required
energy for consumption of the whole planet. In Vietnam, Ninh Thuan
province's solar energy potentiality holds 5,960 MW/57,528 MW
compared to the region Vietnam Middle provinces, thus demand of using
battery for civil equipment is rather high and effective.
- At present, demand of using equipment friendly to environment as
solar energy for lighting, traffic lights, telecom product, etc. is very high
and is tend of the world.
Proposed area:
Khoảng 5 haas mentioned above 400-500
Domestic, joint
venture or 100%
foreign capital.
4 5
Mechanical
manufacturing
plant
Industrial zones, and
clusters in the
province
Producing high-quality
mechanical product serving
electrothermal production, ship-
building, wind electricity, solar
energy, hydroelectricity,
nuclear power equipment and
other mechanical equipment;
increasing interior rate,
attracting other industrial
manufacturers; raising export
value, creating foreign
currency income, contributing
to industrial sector
development.
- According to economic development orientation to 2020, Ninh Thuan
will develop over 06 key sector groups, in which it has priority to
develop 02 energy, industrial sectors. Moreover, building 02 nuclear
power plants at Ninh Thuan, setting up a demand of mechanical
industrial sector development to serve construction of 02 nuclear power
plants; producing, processing, repairing wind electricity, solar energy
equipment, etc. However, mechanical bases currently at Ninh Thuan is
only small, odd, surrounding Ninh Thuan there is no mechanical plant.
Therefore, demand and potentiality of mechanical production and
mechanical repair is very high.
- Currently, Phuoc Nam Industrial park has relatively fully invested
infrastructure, located close to Highway 1A and North-South railway
line; distant from Phan Rang - Thap Cham 15 km in the north, distant
from Cam Ranh International airport 70 km, distant from Ba Ngoi
seaport 50km and distant from Ca Na seaport 15 km along with road,
infrastructure is rather fully invested, very conveniently for investor to
implement the project.
Proposed area: 5
haas mentioned above 150
Domestic, joint
venture or 100%
foreign capital.
5 6
Manufacturing
plant of auxiliary
parts to serve car,
engine industrial
sector.
Phuoc Nam industrial
zone.
Producing products as high-
quality accessories and
auxiliary parts to serve car,
engine industrial sectors and
agricultural, forestry, industrial
sectors, contributing to
increase in interior rate,
attracting other industrial
manufacturers, raising export
value, creating foreign
currency income and
contributing to industrial sector
development.
- Demand set up for developing mechanical industrial sector,
manufacturing sector to create products as high-quality spare parts and
auxiliary parts serving car, engine industrial sectors and agricultural,
forestry, industrial sectors is very high. At the province where there is at
present no plant for these products, so domestic consumption demand
and export is very high.
- Currently, Phuoc Nam Industrial parks has invested infrastructure
relatively completely, located close to Highway 1A and North-South
railway line; distant from Phan rang - Thap cham 15 km in the north,
distant from Cam Ranh International airport 70 km, distant from Ba
Ngoi seaport 50 km and distant from Ca Na seaport 15 km along with
road, infrastructure is rather fully invested, very conveniently for investor
to implement the project.
Proposed area: 02
haas mentioned above 100-200
100% foreign
capital.
6 7
Agricultural,
forestry, industrial
machinery
manufacturing
plant
Phuoc Nam or Du
Long industrial zone.
Producing to make high
quality mechanical product,
machinery serving agricultural,
forestry, industrial sectors as:
thermoelectricity, ship-
building, wind electricity, solar
energy, hydroelectric power,
nuclear power equipment and
other mechanical electrical
equipment, contributing to
increase in domestic rate,
attracting other industrial
manufacturers, increase in
export value, creating foreign
currency and contributing to
develop industrial sector.
- Demand set forth for developing mechanical industrial sector, machine
manufacture to serve construction of 02 nuclear power plants; producing,
processing, repairing wind electricity, solar energy equipment; serving
agricultural, forestry production is very high, etc. However, mechanical,
machinery manufacture bases at Ninh Thuan are only small and odd,
surrounding Ninh Thuan province where there is no mechanical,
machinery manufacture plant. Therefore, demand and potentiality of
mechanical manufacture is very high.
- Currently, Phuoc Nam Industrial parks have invested relatively
complete infrastructure, located close to Highway 1A and North-South
railway line; distant from Phan Rang - Thap Cham city 15km in the
north, distant from Cam Ranh International airport 70 km, distant from
Ba Ngoi Seaport 50 km and distant from Ca Na Seaport 15 km along
with coast, infrastructure is rather fully invested, convenient for investor
to implement the project.
Proposed area: 02
haas mentioned above 100-200
Domestic or
100% foreign
capital.
7 8Ship-building and
repairing plantCa Na industrial zone.
To exploit potential factors,
material sources available at
the local to develop ship-
building sector with modern,
advanced equipment,
contributing to improve
product quality, improve labor
productivity, reduce price,
create jobs, enhance income to
laborers and eliminate hunger
and reduce poverty.
- Wood material source at the local meets relative demand of using ship-
building; located close to Highway 1A, North-South railway line with Ca
Na station, waterway distant from Cam Ranh port 40 ~ 60 km;
communication system, national electrical network is invested to the
project area. Land area can be extended according to investment scale.
- Currently, at the province where there is ship-building and repairing
plant in large size, modern technology, that can meet a demand of using
ship, off-shore fishing-board of fisherman inside and outside the
province.
Overhauling 1,000
ships/year. Ship-
building 500
ships/year.
Proposed area: 05-
07 ha
as mentioned above 30
Domestic, joint
venture or 100%
foreign capital.
8 9
Electronic, civil
electronic spare
part
manufacturing
plant
Thanh Hai Industrial
cluster
Building electronic, civil
electronic spare part plant with
advanced technology, less
impact to environment;
increasing domestic rate,
attracting other wood
manufacturers; raising export
value; creating foreign
currency income; contributing
to develop industrial sector.
- Currently, in Ninh Thuan provincial area, there is no electronic, civil
electronic spare part plant, in the future, a demand of using electronic
spare parts is very necessary for many projects in industrial fields as:
wind electricity, solar energy, auto production, etc. Thus, demand and
potentiality of producing electronic, civil electronic spare parts are very
high, serving domestic demand and export.
- Thanh Hai Industrial Complex is located in favorable traffic route, is
intersection point of key traffic route of provincial Highway 1A,
provincial Highway 704 and Highway 27; distant from Phan Rang -
Thap Cham city center 04 km; having complete, simultaneous
infrastructure system, meeting production demand of advanced
technology.
Proposed area: 02
ha
*The land rent: The project is exempted from the
land rent for the initial basic construction but not
exceed 3 years, and 3 years of free land rent from
the date of completion of the construction under the
provisions of the Decree No. 46/2014 / ND-CP of
the Government stipulating on the collection of the
land rent and water surface rent.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
100 - 200
Domestic or
100% foreign
capital.
9 10Production of
metal products Phuoc Nam and Du
Long industrial zones
Investing and constructing
production plant and providing
metal products serving
industrial, construction sectors
inside and outside the
province; Investing modern
technological equipment,
improving product and labour
productivity, reducing price,
creating jobs, improving
labourers' income, contributing
to socio-economic
development of the local.
- In Ninh Thuan province area, there is at present no metal product plant
serving for industrial and construction sectors.
- Currently, some Industrial parks have invested rather complete
infrastructure, located close to Highway 1A and North-South railway
line; near Cam Ranh International airport, distant from Ba Ngoi seaport
50 km and distant from Ca Na seaport 15 km along with coast,
infrastructure is rather fully invested, very conveniently for investor to
implement the project; Land area can be extended according to
investment scale.
Proposed area: 02
ha
*Corporate Income Tax: Take the preferential tax
rate of 10% within 15 years, from the date of
starting business, tax exemption for 4 years, from
the date of taxed income declaration and reduction
of 50% of the tax payable in the next 9 years. Thời
gian tính miễn, giảm thuế under the provisions of
the Decree No. 218/2013/ND-CP dated 26th
December 2013 of the Government detailing and
guiding the implementation of some articles of the
Law on Corporate income tax.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
Under the
Project's
subscription
Domestic
capital.
10 11Frame, steel truss
production plant
Industrial zones, and
clusters in the
province
Making investment in
building production plant and
supplying products such as
frame, steel truss to serve
industry and construction
sectors inside and outside the
province; investment in
modern technology equipment,
improving product quality and
labor productivity, reducing
costs, creating jobs and raising
incomes for workers,
contributing to socio-economic
development for localities.
- Currently,there are no frame and steel truss production plant in Ninh
Thuan province to serve industry and construction sectors.
- Currently, some industrial parks are invested in relatively complete
infrastructure, are next to National Highway 1A and the North-South
railway; near Cam Ranh International Airport, 50 km from Ba Ngoi
Seaport and 15 km from Ca Na Seaport by road; of which infrastructure
invested are relatively complete, which is very convenient for investors
to implement the project; Large land area facilitates to expand
investment scale.
20.000 tonnes/
year
Proposed area: 02-
05 ha
as mentioned above 120
Domestic, joint
venture or 100%
foreign capital.
11 12 Production of
building materials
Phuoc Nam and Du
Long industrial zone.
Exploiting raw materials
available at locality to make
investment in building material
factory in order to serve
construction works in Ninh
Thuan province and the
neighboring provinces.
Currently, some industrial parks are invested in relatively complete
infrastructure, are next to National Highway 1A and the North-South
railway; near Cam Ranh International Airport, 50 km from Ba Ngoi
Seaport and 15 km from Ca Na Seaport by road; of which infrastructure
invested is relatively complete, which is very convenient for investors to
implement the project; Large land area facilitates to expand investment
scale.
Proposed area: 03
haas mentioned above
400Domestic
capital.
12 13
Construction of
tile manufacturing
plant
Phuoc Nam and Du
Long industrial zone.
Exploiting raw materials
available at locality, building
facing brick factories to
diversify and add value to
products of stone; providing
facing brick meeting high
quality standards to serve the
domestic market and exports,
contributing to structure shift
of industry towards increasing
the proportion of exported
facing brick processing value.
Currently, Phuoc Nam Industrial park has been invested in relatively
complete infrastructure, is next to National Highway 1A and the North-
South railway; near Cam Ranh International Airport, 50 km from Ba
Ngoi Seaport and 15 km from Ca Na Seaport by road; of which
infrastructure invested is relatively complete, which is very convenient
for investors to implement the project; Large land area facilitates to
expand investment scale.
300.000 m2/year
Proposed area: 02
ha
as mentioned above 300
Domestic, joint
venture or 100%
foreign capital.
13 14
Construction of
coloring tile
manufacturing
plant
Industrial zones, and
clusters in the
province
Exploiting raw materials
available at locality, building
facing brick dyeing factories to
diversify and add value to
products of stone; providing
facing brick meeting high
quality standards to serve the
domestic market and exports,
contributing to structure shift
of industry towards increasing
the proportion of exported
facing brick processing value.
There is enough material to meet the needs of dyeing devitrified stones
with a capacity of over 100,000 m2/year.
- Currently, some industrial parks are invested in relatively complete
infrastructure, are next to National Highway 1A and the North-South
railway; near Cam Ranh International Airport, 50 km from Ba Ngoi
Seaport and 15 km from Ca Na Seaport by road; of which infrastructure
invested are relatively complete, which is very convenient for investors
to implement the project; Large land area facilitates to expand
investment scale.
100.000 m2/year
Proposed area: 03-
04 ha
as mentioned above 100
Domestic, joint
venture or 100%
foreign capital.
14 15
Production of
consumer goods,
garment and
footwear
Phuoc Nam and Du
Long industrial zone.
Making investment in modern
equipment and technology to
improve product quality,
develop domestic and
international consumption
markets of consumer goods,
garments and footwear,
creating jobs and contributing
to socio-economic
development of the province.
- Currently, there are no consumer product, garment and footwear
factory to serve domestic market and export in Ninh Thuan Province.
- Currently, some industrial parks are invested in relatively complete
infrastructure, are next to National Highway 1A and the North-South
railway; near Cam Ranh International Airport, 50 km from Ba Ngoi
Seaport and 15 km from Ca Na Seaport by road; of which infrastructure
invested are relatively complete, which is very convenient for investors
to implement the project; Large land area facilitates to expand
investment scale.
Proposed area: 02
haas mentioned above 200
Domestic or
100% foreign
capital.
15 16
Construction of
leather shoes
manufacturing
plant
Industrial zones, and
clusters in the
province
Making investment in modern
equipment and technology to
improve product quality,
develop domestic and
international consumption
markets of footwear, creating
jobs and contributing to socio-
economic development of the
province.
- Currently, there are no footwear factory to serve domestic market and
export in Ninh Thuan Province.
- Currently, some industrial parks are invested in relatively complete
infrastructure, are next to National Highway 1A and the North-South
railway; near Cam Ranh International Airport, 50 km from Ba Ngoi
Seaport and 15 km from Ca Na Seaport by road; of which infrastructure
invested are relatively complete, which is very convenient for investors
to implement the project; Large land area facilitates to expand
investment scale.
2 million pairs of
shoes per years
Proposed area: 03-
04 ha
as mentioned above 30
Domestic, joint
venture or 100%
foreign capital.
16 17
Construction of
wood processing
factory and
originated wood
products
Phuoc Nam industrial
zone.
Exploiting raw materials
available at locality, creating
timber materials and civil
products, art objects to serve
the market inside and outside
the province
Currently, Phuoc Nam Industrial park has been invested in relatively
complete infrastructure, is next to National Highway 1A and the North-
South railway; near Cam Ranh International Airport, 50 km from Ba
Ngoi Seaport and 15 km from Ca Na Seaport by road; of which
infrastructure invested is relatively complete, which is very convenient
for investors to implement the project.
Proposed area: 02
haas mentioned above
Under the
Project's
subscription
Domestic
capital.
17 18
Manufacturing
plant of materials
supplying for
wood processing
industry
Industrial zones, and
clusters in the
province
Building raw material factory
to serve wood processing
sector in order to exploit
potentials, raw materials
available locally to develop
industry, make investment in
modern equipment and
technology, improve product
quality, improve labor
productivity, reduce costs and
develop consumption market
in the country, create jobs and
raise incomes for workers,
contributing to socio-economic
development at locality.
Large forest land area, ability to take advantage of raw materials at
locality, particularly imported raw materials for production development
are very favorable thanks to being near Cam Ranh port (about 40 ~ 60
km), the North-South railway, National Highway1A or Highway 27, the
North-South railway, Ca Na and Thap Cham stations; Infrastructure
investment is relatively complete, which is very convenient for investors
to implement the project.
10-15 thounsand
tonnes/year
Proposed area: 01
ha
as mentioned above 10
Domestic, joint
venture or 100%
foreign capital.
18 19 Agro product
processing plant.
Phuoc Nam and Du
Long industrial zones.
Enhancing the value of
agricultural products of the
province, serving the needs of
domestic consumption and
export-orientation
Industrial parks are invested in relatively complete infrastructure, are
next to National Highway 1A and the North-South railway; near Cam
Ranh International Airport, 50 km from Ba Ngoi Seaport and 15 km
from Ca Na Seaport by road; of which infrastructure invested are
relatively complete, which is very convenient for investors to implement
the project
Proposed area:
over 02 haas mentioned above
Under the
Project's
subscription
Domestic
capital.
19 20Production of
beverage plantPhuoc Nam and Du
Long industrial zones.
Serving the consumption needs
in the province and the
neighboring provinces.
-Currently, Ninh Thuan province has 01 beer factory and some bottled
pure water facilities; no beverage factory to serve markets in the
province and the neighboring provinces.
-Currently, some industrial parks are invested in relatively complete
infrastructure, are next to National Highway 1A and the North-South
railway; near Cam Ranh International Airport, 50 km from Ba Ngoi
Seaport and 15 km from Ca Na Seaport by road; of which infrastructure
invested are relatively complete, which is very convenient for investors
to implement the project
100 million liters
per year
Proposed area: 1-2
ha
as mentioned above500
(25 triệu USD)
Domestic, joint
venture or 100%
foreign capital.
20 21
Adobe brick
manufacturing
plant
Phuoc Tien industrial
cluster.
Utilizing raw materials
available at locality, building
adobe brick factory to meet the
increasing consumption
demand for building material
inside and outside the
province, contributing to
creating jobs and increasing
budget revenue.
- The project site is near Highway 27A to Dalat and Southern
Highlands, Highway 27B to Cam Ranh, North-South railway; Ba Ngoi
cargo harbor, which is one of 10 major seaports of the country, about 70
km from Cam Ranh International Airport, facilitating the circulation of
goods.
-Project land is clean; compensation and land clearance is not required
when the project is implemented; therefore, it is very convenient when
allocating land to the investor.
Proposed area: 70
haas mentioned above 50
Domestic
capital.
21 22
Packaging
manufacturing
plant
Industrial zones, and
clusters in the
province
Exploiting the advantages of
raw materials available in the
province to produce
packaging types to serve
markets inside and outside the
province.
- Demand of packaging for industrial, agricultural, aquaculture
production and for industrial clusters is quite huge. Currently, Ninh
Thuan province has only one enterprise producing carton packages with
capacity of 4,800 tons products per year; The demand for other package
products supplying for the province and surrounding provinces is not
satisfied.
- The infrastructure system in industrial zones is fully invested; The
project site is located near National Highway 1A, North-South Railway,
near Cam Ranh International Airport, 50 km away from Ba Ngoi sea
port, 15km away from Ca Na sea port by road. These are very favorable
conditions for investors to build factories.
Proposed
capacity:50 million
tons of products
per year.
Proposed area: 3 -
4 ha
as mentioned above 140 - 150
Domestic, joint
venture or 100%
foreign capital.
22 23Cattle, poultry
processing plant
Industrial zones, and
clusters in the
province
Efficient exploitation of cattle
and poultry available at locality
with modern and advanced
technology, ensuring food
safety and hygiene, catering for
the domestic market and
export-orientation.
- Ninh Thuan province has relatively large cattle and poultry yields,
especially goats and sheep with the highest yields compared to other
provinces in the region such as Khanh Hoa, Binh Thuan and Lam Dong
to the total quantity: cow: near 110,000; goats, sheep: 150,000; chickens,
ducks, geese: 1.5 million; pigs: 71,000.
- Currently, Ninh Thuan province has only small sized cattle and poultry
slaughters, no large-sized factory of slaughtering and processing poultry
and cattle meat; modern technology, oriented to processing the relevant
hygienic products of high quality to serve big markets such as Ho Chi
Minh City, Hanoi and export.
At least 5-10 ton
products per day.
as mentioned above 80-100
Domestic, joint
venture or 100%
foreign capital.
23 24
Manufacturing
and processing
plants for seafood,
canned food and
feedstuffs.
Industrial zones, and
clusters in the
province
Contributing to increasing the
value of commodities,
stabilizing food production for
cattle and poultry and
aquaculture at locality;
providing products which meet
high quality standards, meeting
the needs of consumer food,
ensuring hygiene and food
safety, serving markets inside
and outside the province.
- With coastline of 105 km length, Ninh Thuan fishing grounds can be
exploited around the year. Ninh Thuan is one of four key fishing grounds
of the country with total relatively large reserves of fish, shrimp;
exploitation capacity of approximately 55,000 tons/year (including fish:
52, 972 tons; shrimp: 400 tons; octopus: 1,700 tons; other seafood: 828
tons); the total aquaculture area is over 1,600 hectares; estimated yields
is over 11,000 tons; many types of seafood of high economic value may
serve export and processing industry.
- Currently, Ninh Thuan province has four exported seafood processing
factories with a capacity of 5,000 tons/year (equivalent to 10,000 tons of
materials), export value of about U.S.$ 20-25 million/year.
- With available raw materials, the factory's construction is near
Highway 1A and Highway 27, near Cam Ranh port (40-60km), which
are very favorable conditions for investment in the project.
Production of
10,000 ton
products per year.
as mentioned above 300
Domestic or
100% foreign
capital.
25Medical waste
treatment plant.
Thuan Bac districtBuild medical waste collection
and disposal to protect
enviroment
- The province includes 97 medical stations in which consists of 18
provincial stations, 14 district stations, 65 ward and commune stations
with 1,380 beds. While there is only a Nam Thanh waste treatment plant
with the capacity of 250 tons/day, not meeting the needs of waste
treatment of the province.
- Medical waste treatment has not currently implemented in
concentration with the poor technology so environmental sanitation has
not ensured.
- Industrial park and complex such as Phuoc Nam, Thanh Hai, Thap
Cham was put into use; Du Long, Doc Ham, Tri Hai and Hieu Thien are
expected to put into use in the coming time. It is forecasted the total
amount of hazardous waste generated from daily operations of the
production area, plus daily hazardous waste arising from medical sector,
power and 07 existing industrial production plants is about 47 tons/day
in the province. Therefore, the construction of waste treatment plants in
general and medical wastes is essential.
- Building medical
waste treatment
and collection
factory for the
purpose of
protecting the
environment.
Proposed capacity:
approx. 50 tons per
day
- Proposed land
area: approx. 05 ha
*The Land rent: The project is exempted from the
land rent cho during the whole rental period under
the provisions of the Decree No. 46/2014 / ND-CP
of the Government stipulating on the collection of
the land rent and water surface rent.
* Corporate Income Tax:
- Take the preferential tax rate of 10% within 15
years; Tax exemption for 04 years, tax reduction of
50% of the tax payable in the next 09 years for the
corporate income from investment projects under
the provisions of the Decree No. 218/2013/ND-CP
dated 26th December 2013 of the Government
detailing and guiding the implementation of some
articles of the Law on Corporate income tax.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
20
Domestic, joint
venture or 100%
foreign capital
II II TRAINING AND EDUCATION, PUBLIC HEALTH: 04 projects
2 1
International
Standard
University
Phan Rang – Thap
Cham City
Building international
university with the modern
scale, including many majors
and training high-quality
human resources for the South
Central and Central Highlands.
- There are branches of universities and not any university in the
province. The neighboring provinces in the region have not any
international standardized university. The development of industrial
zones, construction areas of two nuclear power plant and renewable
energy plant in the province in the future will be an important driving
force for the establishment and development of the Training Center with
high quality human resources to meet the learning needs for people in
the provinces, the provinces in the region and the country.
- The project position is located in an planning area with other training
institutions such as the International Vocational School, Vocational
College, The project area is located in the center of the city with
convenient transportation,appropriate environmental for education and
training.
- To fulfill the
bachelor training
need within the
province and for
the others and
serving children of
foreign experts and
senior engineers
when they go to
Ninh Thuan to
build nuclear
power plant.
- Proposed land
area: approx. 6 ha
*The land rent: The project is exempted from the
land rent during the basic construction duration up
to 03 years from the date getting the decision to
lease the land under the provisions of the Decree
No. 46/2014 / ND-CP of the Government
stipulating on the collection of the land rent and
water surface rent; After the basic construction
duration: The project is exempted from the land
rent under the provisions of the Decree No.
59/2014 / ND-CP of the Government.
*Corporate Income Tax:
- Take the preferential tax rate of 10% during the
whole project operational period; Tax exemption
for 04 years, tax reduction of 50% of the tax
payable in the next 05 years for the corporate
income from investment projects as stipulated in
the Decree No. 218/2013/ND-CP dated 26th
December 2013 of the Government detailing and
guiding the implementation of some articles of the
Law on Corporate income tax;
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
250100% foreign
capital
3 2
International
Standard Schools
for all Levels
In all districts and
Phan Rang-Thap
Cham City
- Develop high-quality schools
with many levels of
international standards to serve
the people of the province and
foreign experts living and
working in the province.
- There isn't currently any high-quality high school with the international
standards.
- The development of industrial parks and construction areas of two
nuclear power plant and renewable energy plan in the province in the
coming time will attract a large number of foreign experts to live and
work in Ninh Thuan, so the construction of schools at all levels with
high quality international standards to serve the learning needs of people
in and outside the province; children of experts and foreign laborers is
necessary in Ninh Thuan.
- The project area is located in the center of the city and the district;
planning areas and training institutions such as the International
University, the Vocational College,...
- To fulfill the
bachelor training
need within the
province and for
the others and
serving children of
foreign experts,
supervisor
engineers coming
to Ninh Thuan to
build nuclear
power plants in the
province.
- Proposed land
area: approx. 4-6
ha
*The land rent: The project is exempted from the
land rent during the basic construction duration up
to 03 years from the date getting the decision to
lease the land under the provisions of the Decree
No. 46/2014 / ND-CP of the Government
stipulating on the collection of the land rent and
water surface rent; After the basic construction
duration: The project is totally exempted from the
land rent for the projects in the districts, and the
others in Phan Rang-Thap Cham city applied as
provisions of the Decree No. 59/2014 / ND-CP of
the Government.
*Corporate Income Tax:
- Take the preferential tax rate of 10% during the
whole project operational period; tax exemption for
04 years, tax reduction of 50% of the tax payable in
the next 09 years for the corporate income from
investment projects in districts of the province and
Tax exemption for 04 years, tax reduction of 50%
of the tax payable in the next 05 years when project
is launched in Phan Rang-Thap Cham city’s
location under the provisions of the Decree No.
218/2013/ND-CP dated 26th December 2013 of the
Government detailing and guiding the
implementation of some articles of the Law on
Corporate income tax.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
160Domestic
capital
4 3
International
Standard Pre-
Schools
In all districts and
Phan Rang-Thap
Cham City
- Meeting the needs of pre-
school education in the
province and for children of
foreign experts, supervisor
engineers coming to Ninh
Thuan to build nuclear power
plants in the province.
- The province has not formed preschool with international quality
standards; The development of industrial parks and construction areas of
two nuclear power plant and renewable energy plan in the province in
the coming time will attract a large number of foreign experts to live and
work in Ninh Thuan, so the construction of schools at all levels with
high quality international standards to serve the learning needs of people
in and outside the province; children of experts and foreign laborers is
necessary in Ninh Thuan.
- Project position is in the center of the district and the city, convenient
transportation, safety, away from the factories, mills, ... for teaching and
learning.
- To fulfill the
bachelor training
need within the
province and for
the others and
serving children of
foreign experts,
supervisor
engineers coming
to Ninh Thuan to
build nuclear
power plants in the
province..
- Proposed land
area: approx. 3-4
ha
as mentioned above 120
Domestic, joint
venture or 100%
foreign capital
5 4
International
Standard
Vocational-
Schools
Phan Rang-Thap
Cham City; districts
of Ninh Phuoc, Ninh
Hai, Ninh Son and
Thuan Bac
- Building the International
Vocational College with scale
annual training of 400-500
skilled practitioners for many
sectors to meet the demand for
high-quality human resources
for parks, industrial zones and
complexes, businesses and
economic and social
development needs of the
South Central and Central
Highland provinces.
- There is currently only a 01 vocational college in Ninh Thuan to serve
the vocational training and high-school vocationals for labor force in the
province;
- The development of industrial parks and construction areas of two
nuclear power plant and renewable energy plan in the province in the
coming time will be an important motivation for the establishment and
development of high-quality training center of the province.
- The project position is located in planning areas and training
institutions such as the International University, the Vocational
College,...and in the center of the district and the city, convenient
transportation, safety, away from the factories, mills, ... for teaching and
learning.
- Building the
International
Vocational College
with scale annual
training of 400-500
skilled
practitioners ,
meeting the
demand of
vocational training
in and outside the
province.
- Proposed land
area: approx. 3 ha
as mentioned above 120
Domestic, joint
venture or 100%
foreign capital
III VI
1 1
Development of
urban area in the
North West of
Phan Rang-Thap
Cham city
in Phuoc My, Do
Vinh and Bao An
wards, Phan Rang –
Thap Cham city, Ninh
Thuan province
Building new urban area and
forming house stocks in
modern urbans of architectural
planning and infrastructure
- Its position is near the main roads of the city; with the high-speed
railway, highway roads, leading convenient transport of inter-provincial
regions and accelerating economic development along the highway
routes..
- The planning location approaches the main road with the quite
completed pavement structure, power supply system, water supply,
favourable communications for the connection to the planning areas.
- Model urban.
- Proposed land
area: approx. 550
ha
*The land rent: Exempted from land use charges
for the lands under the construction of technical
infrastructures and social infrastructure to be
transferred to the State or not in business as
stipulated in the Decree No. 02/2006 / ND-CP
dated 5th January 2006 of the Government on
promulgating the Regulations on the new urban
zones.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
- In addition, the project will be invested by the
province and support the investment in building the
technical infrastructure and social infrastructure
within and outside the fence of the project; support
the investor in the task of project plan clearance.
1500
Domestic, joint
venture or 100%
foreign capital
FIELDS OF CONSTRUCTION AND REAL ESTATE: 20 projects
2 2
Tourism urban
area in the South
of Dam Nai,
Khanh Hai town
Khanh Hai Town,
Ninh Hai District.
Forming new urban areas in
the Southern of Khanh Hai
Town to gradually complete
the development of tourism
areas near Dam Nai with many
kinds of modern eco-tourism
and development of marine
tourism services, mountain and
swamp
- Khanh Hai Town is an administrative, economic and social center of
Ninh Hai District, and a tourism center located in tourism system of the
South Central as well as a gateway of marine tourism areas of Ninh
Thuan. Dam Nai is far from Ninh Chu coast about 2km, the best
beautiful coast of Ninh Thuan, where there are currently many hotels
with the big scale associated with the common tourism potential of Ninh
Hai District owning many beautiful landscapes such as Nui Chua
National Park, Vinh Hy Bay,..to attract the majority of tourists to the
province and become marine tourism area of Ninh Thuan Province in the
future.
- The place is located in the traffic routes connecting to Yen Ninh street
(along coastal area of the province), with the good infrastructure. The
province is investing to build road along Dam Nai to develop Khanh Hai
new urban area and Dam Nai tourism area. Adjacent to traffic route 702,
from here to Highway 1A about 06km, near Khanh Hoi habor (about
2km) is both a fishing port and cargo port.
Proposed land
area: approx. 43 haas mentioned above 500
Domestic, joint
venture or 100%
foreign capital
3 3Thanh Hai urban
area
In Nhon Hai
Commune, Ninh Hai
District
Building new urban area and
forming house stocks in
modern urban of architectural
planning and infrastructure
- Thanh Hai is the gate of the North and Northeast of Phan Rang City -
Thap Cham , the natural area of 253,830 km2; the population in 2010:
90,209 people; until 2020, Khanh Hai town is expected to merge with
Phan Rang City - Cham Tower and at the time Thanh Hai will become a
center of Ninh Hai district.
- Total natural area of the planning research: 1,505 hectares; the scale of
population: 20,000 people (2020); 25,000 people (2030); the scale of
building land: 500 hectares (2020), 650 hectares (2030)
- Have convenient traffic system such as Highway 1A; provincial road
702, 704, 705, North-South railway, Ninh Chu fishing port, My Tan
fishing pier....in the furture includes North-South highway, coastal road,
Vinh Hy port, Ninh Thuan 2 nuclear power plant, creating the
groundbreaking for the district and facilitating the project.
Proposed land
area: approx. 100
ha
as mentioned above 560
Domestic, joint
venture or 100%
foreign capital
6 4
High class garden
house urban area
in the North of
provincial road
704.
Khanh Hai Town,
Ninh Hai District.
Forming modern urban area
with the low construction
density to gradually complete
the development of Khanh Hai
tourism urban area.
The project location has the relatively completed infrastructure:
convenient transportation system, near Highway 1A, provincial road
702, 704, 705, North-South railway, coastal road...; power and water
supply system is very convenient for the deployment of the project.
Proposed land
area: approx. 43 haas mentioned above 145
Domestic, joint
venture or 100%
foreign capital
7 5Khanh Hai urban
area
Khanh Hai Town,
Ninh Hai District.
Building new urban area and
forming house stocks in
modern urban of architectural
planning and technical and
social infrastructure.
- As a marine tourism area located tourism system of the South Central
and a gateway of marine tourism area of Ninh Thuan province; the
project location is far from Ninh Chu near 2km where there are currently
many hotels with the big scale associated with the common tourism
potential of Ninh Hai District owning many beautiful landscapes such as
Nui Chua National Park, Vinh Hy Bay...as a driving force area to
motivate the development of tourism economics associated with the eco-
tourism activities, community tourism, Dam Nai water surface space and
exiting community.
- Near to the center of Phan Rang city - Thap Cham, linking to Highway
1A and Highway 27, near to Cam Ranh International Airport.
Proposed land
area: approx. 25 haas mentioned above 150
Domestic, joint
venture or 100%
foreign capital
8 6Dong Nam 1
urban area
My Hai Ward, Phan
Rang –Thap Cham
City, Ninh Thuan
Province
Building new urban area and
forming house stocks in
modern urbans of architectural
planning and infrastructure
Investing in project location near the centre of Phan Rang - Thap Cham
city, adjacent to the main roads of the city; project location has the quite
completed investment infrastructure; power supply system, water supply,
drainage, communications to facilitate the connection to the planning
area, the circulation and accelerate the economic development in the
region.
Proposed land
area: approx. 30 haas mentioned above 300
Domestic or
joint venture.
9 7Dong Nam 2
urban area
My Hai and Tan Tai
Ward, Phan Rang
–Thap Cham City,
Ninh Thuan Province
Building new urban area and
forming house stocks in
modern urban of architectural
planning and infrastructure
Investing in project location near the centre of Phan Rang city- Thap
Cham , adjacent to the main roads of the city; project location has the
quite completed investment infrastructure; power supply system, water
supply, drainage, communications to facilitate the connection to the
planning area, the circulation and accelerate the economic development
in the region.
Proposed land
area: approx. 67 haas mentioned above 500
Domestic, joint
venture or 100%
foreign capital
10 8Phuoc Dinh urban
area
Phuoc Dinh
Commune, Thuan
Nam District, Ninh
Thuan Province
Building new urban area and
forming house stocks in
modern urbans of architectural
planning and infrastructure;
creating tourism urban, resort
combined with extra activities
and entertainment activities.
- The project is located at the intersection in the key tourism areas of the
country including Dalat - Phan Rang - Nha Trang identified as one of the
key areas of tourism development strategy of the country. - Forming new
urban areas with modern architecture and infrastructure to serve the
housing needs for travelers, professionals to the province to build and
work at nuclear power plants forming urban tourism and resort
combining to a picnic and recreation activities.
- Areas near the project area has the national grid system passing for
convenient connection in use when implementing the project.
Proposed land
area: approx. 560
ha
as mentioned above 1,500Domestic or
joint venture.
9Vinh Hy tourism
urban area
Vinh Hai commune,
Ninh Hai district.
Investing the construction of
tourism urban area combining
with the outdoor and
entertainment activities.
- This area has a beautiful landscpale being planned as a major tourism
development in the province; the regional tourism development and
urban functions and services associated with Dam Vinh Hy water space,
Vinh Hy fishing villages and mountain landscape ecology;
- Population size: 5,000 to 10,000 people; urban construction land: 150-
200 m2/person.
- Located far from Phan Rang - Cham Tower about 42 km; adjacent
coastal road connecting the provinces of Highway 1A, Highway 27, and
Cam Ranh International Airport.
Proposed land
area: 30 ha.
*The land rent: Exempted from land use charges
for the lands under the construction of technical
infrastructures and social infrastructure to be
transferred to the State or not in business as
stipulated in the Decree No. 02/2006/ND-CP dated
5th January 2006 of the Government on
promulgating the Regulations on the new urban
zones.
* Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
In addition, the project will be invested by the
province and support the investment in building the
technical infrastructure and social infrastructure
within and outside the fence of the project; support
the investor in the task of project plan clearance.
170
Domestic, joint
venture or 100%
foreign capital
10Dinh riverside
urban area.
In the North and
South of Dinh river.
Set up a high class ecological
urban area integrated with
tourism, where both technical
and social infrastructures are
synchronously modern to make
a beautiful beautiful landscape
in the city’s Southern-West, to
exploit and highly value the
land and to preserve Dinh
river’s specific scenes.
Dinh river’s flow is smoothly along the location that is an outstanding
strength to make an environmental landscape of the area, to develop
riverside-garden tourism integrations, and to create a space for the local
people and tourists’ entertainment and relaxation; presently this
essentially is agricultural land for temporary shelters and half-
consolidated houses, thus the compensation is rather low to facilitate the
new construction for developing ecological tourism, villas; This location
is also of National Highway No. 1A, Tu Duc street, Thong Nhat street as
to facilitate the urban linkage development.
Proposed land
area: approx. 830
ha
*The land rent: Exempted from land use charges
for the lands under the construction of technical
infrastructures and social infrastructure to be
transferred to the State or not in business as
stipulated in the Decree No. 02/2006/ND-CP dated
5th January 2006 of the Government on
promulgating the Regulations on the new urban
zones.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
- In addition, the project will be invested by the
province and support the investment in building the
technical infrastructure and social infrastructure
within and outside the fence of the project; support
the investor in the task of project plan clearance.
Under the
Project's
subscription
Domestic, joint
venture or 100%
foreign capital
13 11
Infrastructure
development in
residential area of
Son Hai 2 hamlet,
Phuoc Dinh,
Thuan Nam
Son Hai 2 Hamlet,
Phuoc Dinh
Commune, Thuan
Nam District.
Building and completing
infrastructure in residential
area in Son Hai 2 hamlet.
- The project location is located in the land area regulated by the State so
it is convenient for compensation, clearance plane and the land is
entrusted to deploy the project development; power and water supply
system, convenient transport for the project deployment.
Proposed land
area: approx. 29,09
ha
*The land rent: Exempted from land use charges
for the lands under the construction of technical
infrastructures and social infrastructure to be
transferred to the State or not in business as
stipulated in the Decree No. 02/2006/ND-CP dated
5th January 2006 of the Government on
promulgating the Regulations on the new urban
zones.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
- In addition, the project will be invested by the
province and support the investment in building the
technical infrastructure and social infrastructure
within and outside the fence of the project; support
the investor in the task of project plan clearance.
90Domestic or
joint venture.
14 12
Infrastructure
development in
new residential
area alongside
coastal road in
Phuoc Diem
commune,Thuan
Nam district
Lac Tan Hamlet,
Phuoc Diem
Commune, Thuan
Nam District.
Building and completing
infrastructure in residential
area along coastal road in
Phuoc Diem commune.
- The project location is located in the land area regulated by the State so
it is convenient for compensation, clearance plane and the land is
entrusted to deploy the project development; power and water supply
system, convenient transport for the project deployment.
Proposed land
area: approx. 50
ha
*The land rent: Exempted from land use charges
for the lands under the construction of technical
infrastructures and social infrastructure to be
transferred to the State or not in business as
stipulated in the Decree No. 02/2006/ND-CP dated
5th January 2006 of the Government on
promulgating the Regulations on the new urban
zones.
*Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
- In addition, the project will be invested by the
province and support the investment in building the
technical infrastructure and social infrastructure
within and outside the fence of the project; support
the investor in the task of project plan clearance.
250Domestic or
joint venture.
11 13
Investment of
Ninh Chu cargo
port receiving
10,000 - tonne
container ships
in Khanh Hoi village,
Tri Hai commune,
Ninh Hai district.
Upgrading to cargo port to be
able to receive ships with the
load of 10,000 tons, meeting
the needs of waterway
transport of Ninh Thuan
province entering to a
development period.
- Ninh Chu Port has approved to plan the development of deep-water
harbor system in the South Central by Ministry of Transport up to 2020;
- Along with the formation of industrial park and complex, mechanical
plants, factories producing solar power and wind power, the coastal
resorts ... will contribute to form the economic exchange clues,
development of economic zones, urban areas and coastal industry.
- The construction location of port has more favorable conditions,
covering located next to the coastal road of the province, near Highway
1A, far from Phan Rang City - Thap Cham 15 km to the Southwest, far
from the port and Cam Ranh international airport about 70 km to the
north.
4 wharfs for 5,000-
10,000 ton-
container ships,
total length: 660m
with handling
capacity of 1-1.5
million tons per
year.
- Proposed land
area: 15 ha
*The land rent: The project is exempted from the
land rent during the basic construction duration up
to 03 years from the date getting the decision to
lease the land and continues to be free of land rent
for the next 11 years from the date of completion
and operation under the provisions of the Decree
No. 46/2014/ND-CP of the Government stipulating
on the collection of the land rent and water surface
rent.
*Corporate Income Tax: Take the preferential tax
rate of 10% within 15 years as stipulated in the
Decree No. 218/2013/ND-CP dated 26th December
2013 of the Government detailing and guiding the
implementation of some articles of the Law on
Corporate income tax; Tax exemption for 04 years,
tax reduction of 50% of the tax payable in the next
09 years for the corporate income from investment
projects under the provisions of the Decree No.
218/2013/ND-CP dated 26th December 2013 of the
Government detailing and guiding the
implementation of some articles of the Law on
Corporate income tax.
* Import duties: Exempted from the import duties
on goods imported to create fixed assets in
accordance with the Decree No. 87/2010/ND-CP of
the Government dated 13th August 2010 detailing
the implementation of the Law on Export and
import duties.
500Domestic or
joint venture.
12 14
Investment of Doc
Ham cargo port
(15 million tonnes
per year)
Ca Na commune,
Thuan Nam district.
Building and operating the
cargo port to serve the needs of
local and international
transport and trade; Forming
the economic exchange clue to
create motivation for the
development of industrial
zones, urban and industrial
areas near beach.
- Doc Ham port is a cargo port approved to plan the development of
deep-water port system of Vietnam by Prime Minister up to 2020.
- The construction location of port has more favorable conditions as
close to Highway 1A, far from Phan Rang City - Cham Tower about 35
km to the Southwest, far from a seaport and Cam Ranh International
Airport about 90 km to the North; project plan has geological stability
and basically completed the clearance compensation.
- Along with the formation of industrial park and complex, mechanical
plants, factories producing solar power and wind power, the coastal
resorts ... will contribute to form the economic exchange clues,
development of economiczones, urban areas and coastal industry.
To set up 12
wharfs for general
cargo ships of
30.000-50.000
DWT, for bulky
cargo ship of
100,000 – 200,000
DWT, for liquid
cargo ship of
50,000 DWT. The
handling capacity
is expected to be
25 million tonnes
per year
- Proposed land
area: 30 – 40 ha.
as mentioned above 5000Domestic or
joint venture.
15 15
Infrastructure
development in
Hieu Thien
industrial cluster
in Phuoc Nam
commune, Thuan
Nam district
Forming industrial clusters
with synchronous and modern
infrastructure to attract
investors into the sector focus,
contribute to reducing
environmental pollution from
scattered production facility or
in residential areas.
- As planned, the strip in the south of the province is determined as
industrial development, the project location is located near Doc Ham
deep-water port, it is expected to the load of port landing up to 250,000
tons, and the large industrial areas in the south of the province such as
Phuoc Nam, Ca Na is currently under construction.
- The project location is located near Highway 1A with the adequate
power supply systems, water supply . Located far from residential areas
to facilitate the drainage system layout of industrial waste, waste
handling systems, sewage polluting the environment.
Proposed land
area: 70 ha.as mentioned above 500
Domestic or
joint venture.
16 16
Technical
infrastructure
development in Ca
Na industrial zone
Thuan Nam District
Synchronized developing the
technical infrastructure of the
industrial zones and calling for
background investors to invest
new and renewable energy
industry as well as mechanical
manufacture and high-tech
industries.
- Ca Na area in Thuan Nam district, is with the strengths in infrastructure
and natural conditions to serve renewable energy. Geographical location
is near Highway 1A; adjacent to Ca Na commercial sea port project (can
receive ships with the load of 50,000 tons). Ca Na Industrial Park has
implemented the clearance compensation approximately 30% of the total
land area.
Proposed land
area: approx. 1000
ha
as mentioned above5000
Domestic, joint
venture or 100%
foreign capital
17 17
Technical
infrastructure
development in
Phuoc Tien, Bac
Ai industrial
cluster
in the Southwest of
Phuoc Tien
commune, Bac Ai
district.
- Building synchronized
industrial complex, calling
secondary investor to invest the
processing production plant of
available sources of the
province and neighborhood
areas, to strengthen industrial
development, handicrafts in
Bac Ai district; attract
secondary investors to
concentrated areas to
contribute to reduction of
environmental pollution of the
scattered production facilities;
create the employment and
increase the income for people
in the district in general and
Phuoc Tan commune and
Phuoc Tien in particular center
area, contributing the increase
of the industrial load in the
province.
- Bac Ai has unformed parks and industrial complex; scattered and
unfocused production and processing facilities in the local
- The project position is located near Highway 27A to Dalat and
Southern Highlands, Highway 27B to Cam Ranh; North-South railway;
100% of communes with roads to the town center; near Ba Ngoi- cargo
harbor is one of 10 major seaports of the country, far from Cam Ranh
International Airport is about 70 km, to be convenient for transportation
of goods. And far from high-Da Nhim-Phan Rang voltage power lines
about 0,3km.
- Land is clean, not compensation, clearance when implementing the
project.
Proposed land
area: 75 ha.as mentioned above 200
Domestic, joint
venture or 100%
foreign capital
18 18
Technical
infrastructure
development in
Quang Son
industrial cluster
Ninh Son district.
Building synchronized
industrial complex, calling
secondary investor to invest the
processing production plant of
available sources of the
province and neighboorhood
areas, to strengthen industrial
development, handicrafts in
Ninh Son district; attract
secondary investors to
concentrated areas to
contribute to reduction of
enviromental pollution of the
scattered production facilities;
- Ninh Son district has unformed industrial parks and complex; scattered
and unfocused production and processing facilities.
- The project position is located near Highway 27A to Dalat; the West
and East near to natural forestry, the South near Highway 27B, the North
near agricultural land; the stable geological sites; and material areas
focused on the production and processing of agricultural, forestry, minal
products; the living water supply passes and near power system.
Proposed land
area: about 70 ha.as mentioned above
400 Domestic, joint
venture or 100%
foreign capital
19 19
Technical
infrastructure
development in Tri
Hai industrial
cluster
Ninh Hai District
Forming industrial clusters
with synchronous and modern
infrastructure to attract
investors into the sector focus,
contribute to reducing
environmental pollution from
scattered production facility or
in residential areas.
Ninh Hai District has not formed industrial parks and complex; scattered
and unfocused production and processing facilities; Project location is
adjacent to the main transport routes, near Khanh Hoi port (1.5 km);
which is both fishery and goods port, far from Cam Ranh International
Airport 70 km, far from Ba Ngoi seaport about 50 km and not far away
from Port Ca Na Beach; also adjacent to salt production areas; the stable
geological sites, water and power supply systems... facilitate project
implementation.
Proposed land
area: approx. 25 haas mentioned above 240
Domestic, joint
venture or 100%
foreign capital
20
Construction of
Dinh river
downstream dam
Tan Tai ward, Phan
Rang - Thap Cham
city and An Hai
commune, Ninh
Phuoc District, Ninh
Thuan provinve.
To prevent overflows of the
tide into the land on both
banks of Dinh river (stream
flows through Phan Rang-Thap
Cham city and An Hai
commune, Ninh Phuoc
district’s area); to create a
fresh water resevoir of 04
million m3
capacity that will
supply water for civil and
production utilization, aslo
improve climate of Phan Rang-
Thap Cham city; meet the
needs of tourism development
and integrated public traffic for
urban development..
As plan, investors will directly fund the project expenditures, Ninh
Thuan provincial People’s Committee to make best conditions for the
investors to refund from other projects of supplying the dam water for
civil and production utilization, nhà đầu tư thu lại một phần kinh phí bỏ
ra từ dịch vụ cung cấp nước. National budget will be supportive for
compensation, site clearance, resettlement and some expenditures for
additional works under the prioritized mechanism for water supply
projects on taxation , land or water utilization, etc...
To set up Dinh
river downstream’s
dam with buttress
structure in the 500
meter-wide area
which is distant
from Dao Long I
bridge 1.8 km
towards the
downstream,
including the
items: Overflowed
dam at the water
reservoir: its length
is the same as river-
bed width of
240m; regulator
valve system, boat
or ship anchoring,
bridge over the
dam (the bridge’s
length is 480
meters);
Prioritized mechanism for water supply projects on
taxation, land or water utilization, etc...700 Domestic, FDI