Project Name: Owego Apalachin Elementary
Project OverviewThe Owego Apalachin Elementary School classroom design required NEIS and our partner CiF Lab Solutions to think outside the box and get creative on this highly customized plastic laminate casework order. This k-12 project required modified plastic laminate casework fabricated with over thirty-five different color combinations. Some cabinets reaching ten feet high. Custom pulls and hidden hardware requirements were also designed to give these cabinets a unique look at a lower cost, compared to the typical wood case work classroom.
Ø Case Systems Plastic Laminate Casework
New England | New York | Pennsylvaniawww.neis.cc
Project Statistics Ø Project Size: 120,000 sq. ft. Ø NEIS Contract: $679,000
Project Location: Owego, NY
Project Participants Ø Architect: Highland Associates Ltd. Ø Laboratory Planner: Daniel J. Lynch Ø Construction Manager: Lend Lease
© Northeast Interior Systems
Total Solution Provider