Manual on Public Disclosure Schedules
CMAK | 1
Town Panchayath, Virajpet
Public Disclosure Schedule
Manual on Public Disclosure Schedules
CMAK | 2
Content
Sl.no Particulars Page. no
1 Urban Planning including town planning
4 - 6
2 Regulation of Land- use and Construction of Buildings 7 - 41
3 Planning for Economic and Social development 42 - 97
4 Roads and Bridges 97 - 100
5 Water Supply- Domestic, Industrial and Commercial 101 - 105
6 Public Health, Sanitation, Conservancy and SWM 106 - 116
8 Urban forestry, protection of environment and ecology 117 - 118
10 Slum Improvement & Up-gradation 119 – 122
11 Urban Poverty Alleviation 123 – 124
12 Provision of urban amenities and facilities- parks, gardens and playgrounds 125 - 126
13 Promotion of cultural, educational, and aesthetic aspects 127 - 128
14 Burials and burial grounds, cremations, cremation grounds and electric crematoriums 129 - 130
15 Cattle pounds, prevention of cruelty to animals 131 - 132
16 Vital Statistics including registration of births and deaths 133 – 135
17 Public amenities including street lighting, parking lots, bus stops and public conveniences 136 - 139
18 Regulation of slaughter houses and tanneries 140
Manual on Public Disclosure Schedules
CMAK | 3
Formats for Disclosure
Manual on Public Disclosure Schedules
CMAK | 4
Functions under 12th Schedule
1. URBAN PLANNING INCLUDING TOWN PLANNING Sl.N
o
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has to
be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
1 Urban
Planning
including
town
Planning
1. Town
Planning
Authority
2. Urban
Development
Authority
(UDA)
3. Municipal
Planning
Authority
(i) Report and Maps of
Master Plans including
Zoning Regulations
Plan in force now ULB 1. Annually
2. To be
notified as
and when
changes done
Table 1.1
(ii) Maps of Planning
Districts
Plan in force now ULB 1. Annually
2. To be
notified as
and when
changes done
(iii) Details of provisional
and finally approved
layouts (Survey No, name
of owner, Site details)
Previous three
financial years
including current
year
ULB Half Yearly Table.1.2
4. ULB (iv) Report and maps of
Comprehensive
Development Plan (CDP)
Current plan ULB 1. Annually
2. To be
notified as
and when
changes done
Manual on Public Disclosure Schedules
CMAK | 5
Table 1.1: Report and Maps of Master Plans including Zoning Regulations (Please fill in following information) Sl.
No
Name of the reports related to Master
Plan, Zoning Regulation and CDP
Enclosure in
Maps related to Master Plan, Zoning
Regulations, Planning District and CDP
Enclosure in PDF
1 - - - -
Table 1.2: Number of provisional and final approved layouts (Please fill in following information) Years Number of provisional layouts Number of approved layouts Details of layout as enclosure 2012-13 Nil Nil - 2011-12 Nil Nil - 2010-11 Nil Nil - 2009-10 1 Nil Enclosed Below 2008-09 Nil Nil -
Manual on Public Disclosure Schedules
CMAK | 6
Details of Provisional and final approved layouts
Sl.
No
Name of Layout Survey Number Whether
provisional/approved
Number of sites in the approved layout Name of the owner/
developer of the layout 30*40 40*60 Odd sites
1 Near Chickpete 211/3 Provisional - - 9 N.K.Kuttappa
Manual on Public Disclosure Schedules
CMAK | 7
2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGS
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
2 Regulation of
Land- use and
Construction of
Buildings
UDA/ULB (i) Details of Building
Commencement &
Completion Certificate
(Total application
received, total
permission granted,
location details)
Previous three
years including
current year
ULB Annually Table 2.1 (a)
& Table.2.1
(b)
(ii) Details of Industries
and commercial
complexes approved
(Survey No., Type, Name
of the owner)
Previous three
Financial years
including current
year
ULB Annually Table 2.2
Manual on Public Disclosure Schedules
CMAK | 8
Table 2.1 (a): Details of Building Commencement & Completion Certificate
Total number of application received for building plan approval from past Eight
years
Total number of License granted from past Eight years
Curren
t FY
(2015-
16)
Current
FY
(2014-
15)
Current
FY
(2013-
14)
Current
FY-1
(2012-
13)
Current
FY-2
(2011-
12)
Current
FY-3
(2010-
11)
Curren
t FY-4
(2009-
10)
Current
FY–5
(2008-
09)
Curren
t FY
(2015-
16)
Current
FY
(2014-15
Current
FY
(2013-
14)
Current
FY-1
(2012-
13)
Current
FY-2
(2011-
12)
Current
FY-3
(2010-
11)
Current
FY-4
(2009-
10)
Current
FY–5
(2008-
09)
93 74 105 86 75 87 49 81 72 89 86 60 82 49
Table 2.1 (b): Details of the building plan approval for Eight years Current FY year (year to be displayed in
numeric like 2015-16) Enclosure in the format displayed below
Current FY year (year to be displayed in
numeric like 2014-15) Enclosure in the format displayed below
Current FY year (year to be displayed in
numeric like 2013-14) Enclosure in the format displayed below
Current FY year-1 (year to be displayed
in numeric like 2012-13) Enclosure in the format displayed below
Current FY year-2 (year to be displayed
in numeric like 2011-12) Enclosure in the format displayed below
Current FY year-3 (year to be displayed Enclosure in the format displayed below
Manual on Public Disclosure Schedules
CMAK | 9
in numeric like 2010-11)
Current FY – 4 (year to be displayed in
numeric like 2009-10) Enclosure in the format displayed below
Current FY – 5(year to be displayed in
numeric like 2008-09) Enclosure in the format displayed below
Details of the building plan approval for the year 2008-09:
Mention year 2008-09
Site area Built-up area Location details
Ward Street name Property Number Survey Number
0.07 27.56m² 11 Vijayanagara 17/3E
0.06 ¼ 18.003m² 7 Nehrunagara 25/1A3
0.09 ½ 244m² 9 Subhashnagara 4/2
0.04 76.93m² 11 Vijayanagara 14/2
0.03 121.26m² 5 Mogaragally 29/2F
0.08 112.46m² 3 Arasunagara 97/1, 97/2
0.03 206.31m² 12 Shivakeri 54/48
0.02 ¾ 60.62m² 5 Mogaragally 27/2A
0.04 134.40m² 10 Panjarupete 7/2
0.02 49.64m² 10 Panjarupete 37/1(3)A
0.02 47.48m² 10 S.S.R. Road 37/1 (4)
0.7 ¾ 289.14m² 11 Vijayanagara 14/0
0.47 45.26m² 10 Panjarupete 39/1, 39/2
0.05 ½ 93.68m² 10 Panjarupete 7/2G
0.04 110.88m² 10 Panjarupete 7/2
0.03 87.77 m² 4 Mogaragally 109/D
0.019 110.33 m² 5 Mogaragally 34/1, 34/2
0.03½ 124.38m² 7 Nehrunagara-1 41/2A
Manual on Public Disclosure Schedules
CMAK | 10
0.03 68.42 m² 2 Devangabedi 32/2
0.06 76.37 m² 13 Subhashnagar 59/23
2831 sq ft 116.058 m² 12 Gowrikere 59/2A
0.08½ 63.54 m² 7 Nehrunagar-1 32/2A
0.04 85.14 m² 11 Meenupete 18/1P
0.13 131.10 m² 7 Nehrunagar 50/2
99.07 m² 13 Gowrikere 59/2P
0.08 96.07 m² 11 Meenupete 17/2P
0.06 59.26 m² 5 Mogaragally 27/3C
0.05 146.92 m² 11 Vijayanagara 18/1X
0.10 231.98 m² 12 Shivakere 76/53A
0.13 45.33 m² 4 Telugarabeedi 22/2A, 23/1, 23/2A
0.02 42.90 12 Vijayanagara 14/2 (5)
4465 sq ft 49.80 m² 5 Mogaragally 27/3A
0.06 14.79 m² 7 Nehrunagara 41/2B
0.06 110.13 m² 11 Vijayanagara 14/2(6)
0.07 13.95 m² 1 Charchbeedi 6/21
0.08 139.80 m² 14 gandhinagara 49/11
0.04 57.72 m² 3 Arasunagara 56/4B
1.30 57.31 m² 6 Harikere 103/243
0.10 210.93 m² 15 Chickpete 54/3, 54/4
0.04 71.3 m² 7 Nehrunagara 41/2C
0.10½ 103.45 m² 13 Gowrikere 79/X
Details of building plan approval for the financial year 2009-10
Mention year 2009-10
Site area Built-up area Location details
Ward Street name Property Number Survey Number
0.05 91.73m² 11 Meenupete 18/H
Manual on Public Disclosure Schedules
CMAK | 11
0.04 22.50 m² 4 Telugarabeedi 110/A
3049sq ft 84.31m² 5 Mogaragally 26/2G
0.07½ 182.47 m² 8 Nehrunagar-2 10/2C
0.05 215.04 m² 6 Harikere 43/3(3)
0.05 25.70 m² 11 Meenupete 16/4B
0.02 86.94 m² 8 Nehrunagar-2 8/2C
0.05 118.55 m² 7 Nehrunagar-1 81/5B, 92/5B
0.05 189.00 m² 13 Gowrikere 79/K
220 sq ft 220.50 m² 4 Telugarabeedi 114/2, 115/1, 116/1,
0.25 156.33 m² 14 Gandhinagar 47/B
0.02 40.07 m² 8 Nehrunagar-2 5/2AK
0.09 89.27 m² 7 Nehrunagar-1 24/1
0.05 169.22 m² 4 Telugarbeedi 22/110
0.02 42.05 m² 11 Vijayanagara 17/3AB
0.03¼ 68.16 m² 5 Mogaragally 13/2B
0.03½ 57.20 m² 11 Vijayanagara 18/IV, 35/29
2178 sq ft 78.01 m² 10 Panjarapete 222/3
4356 sq ft 81.13m² 6 Harikere 50/2
4029 sq ft 132.7m² 9 Subhashnagara 33/5
203 sq ft 48.05m² 10 Panjarapete 33/10
0.03 107.36m² 12 Meenupete-2 5/2A
0.06 82.03m² 11 Vijayanagara 17/34
0.08¾ 282.05m² 16 Appaiahswami Road 62/1, 62/2
0.02¾ 58.85m² 5 Shanthinagar 27/3C(1)
0.03 63.44m² 10 Panjarapete 29/3C
0.08 158.13m² 14 Gandhinagar 49/11
0.06 200.24m² 9 Subhashnagara 59/2
0.06 89.98m² 3 Dhandina Mohalla 144/1
0.06¾ 95m² 3 Thimmaiah Layout 257/24
0.06¼ 67.64m² 1 Churchbeedi 68/20
Manual on Public Disclosure Schedules
CMAK | 12
0.06 124.84m² 3 Thimmaiah Layout 257/2
0.07½ 38.20m² 14 Gandhinagar 21/12A
0.06 48.97m² 11 Meenupete 43/3F(1)
0.08 50.55m² 7 Neharunagara 2/31
0.04½ 87.74m² 9 Subhashnagar 59/2Q
0.05 76.90m² 9 Subhashnagar 50/2
0.08½ 95.07m² 4 Gonikoppa Road 84/2A
0.03 116.39m² 10 Vijayanagara 14/P, 18/1K
0.04 64.14m² 10 Vijayanagara 17/3E
0.04 78.37m² 5 Shanthinagara 18/1I
0.03 88.15m² 14 Ghandinagara 14/1B, 91/2A
0.06½ 196.95m² 16 Thimmaiah Layout 257-12(8)
0.05 108.11m² 5 Shanthinagara 27/2E
0.05 110.52m² 9 Subhashnagar 79/P
0.03¼ 67.50m² 5 Bangalibeedi 13/2B
0.10 44.36m² 13 Gowrikere 97/A(3)
0.17 149.58m² 4 Sunkadakatte 72/2
0.2½ 92.88m² 5 S.S.R. Road
0.05½ 80.65m² 5 Mogaragally 13/2B(1)
0.04½ 118.46m² 10 Vijayanagara 14/2 (7)
0.05 94.18m² 16 Shivakere 211/D
0.21 420.27m² 16 Shivakere 55/3
0.05 59.9m² 10 Vijayanagara 17/3B
0.10 81.36m² 13 Gowrikere 97/A(3)
0.5½ 144.73m² 10 Vijayanagara 16/2A, 16/3A
0.3½ 141.28m² 16 Thimmaiah Layout 257/1
0.47½ 99.00m² 16 Shivakere 6A, 7/2A, 76/6A
0.04 77.06m² 10 Vijayanagar 18/11
0.04¼ 54.77m² 1 Churchbeedi 6/2D
1.33 252.55m² 1 Churchbeedi 27
Manual on Public Disclosure Schedules
CMAK | 13
0.05½ 100.37m² 3 Thimmaiah Layout 257/2(8)
0.04 97.82m² 5 Shanthinagar 27/34, 27/30(1)
0.04½ 77.43m² 10 Vijayanagar 14/2
0.06½ 35.70m² 5 Main Road 75/1, 75/2
0.03 33.22m² 15 Chickpete 54/4A
0.04 11.97m² 11 Meenpete 30/2A, 30/2D
0.08 39.34m² 8 Nehrunagara-2 35/2A
0.03 48.77m² 15 Chickpete 22/2D
0.029 36.50m² 10 Vijayanagar 17/3A(1)
0.04¾ 71.72m² 2 Appaiah Swamy Road 45/2B
Details of building plan approval for the financial year 2010-11
Mention year 2010-11
Site area Built-up area Location details
Ward Street name Property Number Survey Number
0.03¼ 92.82m² 11 Meenupete 31/2A
0.07¾ 98.31m² 10 Vijayanagara 17/3AE, 13/3F
0.05¼ 130.30m² 10 Vidyanagara 7/2M
1.00 216.94m² 16 Shivakere 68, 68/1A
0.04 58.26m² 10 Vijayanagara 14/I
0.16 414.90m² 10 Panjarapete 2/17A, 2/17B
0.05 204.96m² 5 Mogaragally 47/2C, 48/2C
0.04 62.34m² 3 Appaiah Swamy Road 46/1, 46/2
0.15 120.75m² 10 Panjarapete 32/1, 32/3, 33/1, 33/2
0.11¼ 74.57m² 5 Devangabeedi 61/1, 61/2
0.10 132.56m² 15 Chickpete 211/3I
0.09 71.63m² 10 Vijayanagara 17/10
0.03 58.88m² 5 F.M.C. Road 95/2
0.07 100.94m² 10 Vijayanagara 17/2V
500sq ft 25.48m² 10 Vijayanagara 17/2
Manual on Public Disclosure Schedules
CMAK | 14
0.09 171.87m² 14 Kithuruchennamma 82/5, 82/1
0.07 113.60m² 9 Subhashnagara 59/2P
0.09 80.38m² 6 Sunnadabeedi 71/4, 71/5
0.06 236.16m² 11 Meenupete 34/2, 43/3
0.05½ 121.05m² 5 Shanthinagara 27/2D, 27/2G
0.16 135.72m² 16 Chickpete 14, 15/1, 15/2
0.05 101.19m² 10 Gonikoppal Road 257/AA, 37/AA
0.02¾ 109.33m² 10 Panjarapete 17/3F
0.05 91.77m² 10 F.M.C. Road 68/2
0.30 126.52m² 7 Nehrunagara 2/32
0.08 88.07m² 10 Vijayanagara 17/2H
0.03 61.93m² 10 Vijayanagara 17/2D
0.02¾ 60.62m² 5 Shanthinagara 27/2A
0.07 113.60m² 9 Subhashnagar 59/2P
0.12 30.8m² 4 Telugarabeedi 34/1, 34/2
0.09¼ 87.18m² 11 Meenupete 43/2A
0.40½ 86.37m² 16 Chickpete 108/10
0.04 58.60m² 10 Vijayanagara 36/2B
0.05¾ 99.90m² 3 Thimmaiah Layout 257/2(8)
0.02¾ 44.07m² 7 Nehrunagara-1 35/4
1350sq ft 67.47m² 8 Nehrunagara-2 301/24
0.04¾ 94.35m² 9 Nisarga Layout 79/W
1200sq ft 67.5m² 3 Maleturikebetta 300/30
0.04 127.17m² 12 Meenupete-2 54/2A
0.03¾ 61.38m² 10 Vijayanagara 14/2(3)
0.05 107.10m² 14 Gandhinagara 92/2(1)
0.04 98.48m² 5 S.S.R. Road 12/2
0.06 114.04m² 3 Appaiah Swamy Road 21/6, 22/6
0.10 31.74m² 3 Sunkadakatte 300/76
0.04 79.62m² 10 Vijayanagara 33/2A, 35/2D
Manual on Public Disclosure Schedules
CMAK | 15
0.03¼ 61.66m² 16 Shivkere 76/56A
0.03 66.18m² 10 Nisargabadavane 79/A10
0.06½ 80.58m² 5 Bangalibeedi 13/2B(2A)
0.07 119.17m² 10 Vijayanagara 17/3
0.11 84.19m² 10 Nisarga Badavane 73/2AB
0.15 58.39m² 10 Nisarga Badavane 73/2AA
0.15 94.14m² 14 Gandhinagara 22/10
0.04¾ 59.55m² 8 Nehrunagara 35/N(8)
0.04¾ 74.40m² 10 Vijayanagara 14/2
0.05 95.54m² 10 Nisargabadavane 79/R
0.06 94.18m² 3 Thimmaiah Layout 257/2M
Details of building plan approval for the financial year 2011-12
Mention year 2011-12
Site area Built-up area Location details
Ward Street name Property Number Survey Number
0.02 39.07 m² 11 Vijayanagara 17/3
0.10 34.27 m² 9 Chickpete 231/11g
0.03 21.67 m² 11 Vijayanagara 17/3N
0.11 147.44 m² 9 Chickpete 17,19/3
0.05 19.93 m2.154.92
m²
10 Mogaragally 48/1,47/2AA,48/2D
0.08 1/4 174.40 m² 8 Thimmaiah Layout 257/1x
2 3/4 57.79 m² 11 Vijayanagara 17/2(12) , 17/3(5)
0.12 214.06 m² 7 Main Road 17/1,17/2
Manual on Public Disclosure Schedules
CMAK | 16
0.05 55.21 m²
(10m)59.59
7 Gowrikere 16/2B
0.10 104.72 m² 8 Appaiah Swamy Road 20/5,21/5,22/5
0.05 145.88 m² 7 Court Road 68/2
0.06 183.43 m² 4 Kaveri Kalyan mantap
road 109/1B
0.24 265.23 m² 5 Main Road 71/1,71/2A,71/2B
0.05 86.06 m² 11 Vijayanagara 17/1G
0.05 87.18 m² 11 Vijayanagara 17/1E
0.10 136.08 m² 11 Vijayanagara 17/3K
0.12 493.61 m² 6 Meenupete 36/2A
0.09 249.54 m² 6 Main Road 59/1,59/2
0.14 118.42 m² 10 Gonikoppal Road 12/2A
0.04 1/2 79.94 m² 1 Church Road 12/2(5)
1.91 103.08 m² 11 Gonikoppal Road 6/1,6/2,7/1,7/2,8/1,8/2,9/1,9
/2
0.20 1/4 80.05 m² 5 SSR Road 27/2b,28
0.06 83.61 m² 8 Appaiah Swamy Road 257/1
0.08 88.58 m² 11 Vijayanagara 17/2H
0.02 1/2 41.05 m² 11 Vijayanagara 17/1AH
0.02 1/2 17.14 m² 11 Vijayanagara 17/1
1742 10.03 m² 7 Mahila Samaj Road 132/4
Manual on Public Disclosure Schedules
CMAK | 17
0.03 3/4 236.6 m² 10 Brite Road 38/15A
0.02 87.3 m² 13 Nisarga Layout 79/4
0.04 154.44 m² 11 Vijayanagara 14/2(8)
0.06 157.28 m² 13 Panjarpete 33/12
0.50 523.14 m² 12 Shivakeri Road 68/A
0.03 36.74 m² 5 Bangali Beedi 29/2I
0.05 98.61 m² 2 Jainer Beedi 19/2A,20/2B
0.04 80.00 m² 2 Jainer Beedi 19/2B
45*30 47.31 m² 10 Neharu Nagar 301/24
0.03 35.54 m² 6 Meenupete 31/2DI
0.3 3/4 63.08 m² 3 Sunkad Katte 300/30
0.06 118.98 m² 3 Appaiah Swamy Road 9/2B,10/2B
0.3 3/4 23.55 m² 3 Sunkad Katte 300/30A
0.10 135.08 m² 9 Chickpete 211/3B
0.04 133.50 m² 11 Gonikoppal Road 1/2A
0.04 3/4 167.20 m² 13 Subhas Nagar 59/2(4)
__ 35.00 m² 10 Neharu Nagar 301/24B
0.10 45.68 m² 3 Sunkad katte 293/6
0.01 1/4 20.60 m² 11 Vijayanagara 40/2
0.07 1/2 208.40 m² 8 Appaiah Swamy Road 251/12(3)
Manual on Public Disclosure Schedules
CMAK | 18
0.04 68.42 m² 6 Meenupete 30/2
19 3/4 425.99 m² 4 Jainer Beedi 70/A,71/1,71/2A,72/1,77/2
0.04 37.47 m² 9 Chickpete 52/2D
0.04 1/2 82.60 m² 9 Birangadu Road 231/11
0.10 95.99 m² 7 Gandhi Nagar 48/1AD
0.03 3/4 28.90 m² 3 Sunkad Katte 300/30T
0.09 48.03/58.04 10 SSR Road 38/16
0.22 92.40 m² 1 Church Road 8/1,8/2
0.04 115.60 m² 1 FMC Road 70/1,70/2
30*40 20.57 m² 1 FMC Road 29/3J
0.15 98.46 m² 4 Mogar Galli 27/2C,28/2C,29/2D
0.29 468.36 m² 5 Main Road 67/1,67/2
0.5 1/4 144.47 m² 3 Daccni Mohla 46/3A
0.1 1/2 78.76 m² 6 Meenupete 30/2C
0.2 1/2 75.66 m² 6 Meenupete 30/2AC(1)
0.05 862,760. m² 9 Berangadu 231/11K(9)
0.10 68.90 m² 6 Private Bus stand Road 61/1,61/2,62/1
0.12 110.45 m² 8 Appaiah Swamy Road 65/1,65/2
0.23 184.26 m² 11 Panjarpete 5/1,5/2
0.02 30.76 m² 12 Shivakeri 111/4
Manual on Public Disclosure Schedules
CMAK | 19
0.05 1/2 75.53 m² 3 Thimaiah layout 257/2
0.08 87.43 m² 11 Vijayanagara 17/1(6)
24*20 51.94 m² 11 SSR Road 3/2B
0.03 56.31 m² 8 Appaiah Swamy Road 8/3G
0.05 53.97 m² 1 Church Road 6/2G
0.01 1/2 24.35 m² 5 Harikeri 48/3A
0.12 264.82 m² 5 Bengali Beedi 14/2,14/1
0.04 56.12 m² 10 Neharu Nagar 35/4A
12, 3/4 175.53 m² 7 Gourikere Road 10/6,9/5,9/4,10/5
0.09,1/2 53.39 m² 10 Neharu Nagar 62/C,57/A,1/4
0.10 62.16 m² 12 Microwave Beside 108/2A
0.5 12 m² 12 Microwave Beside 46/1,46/2
0.03 56.88 m² - SSR Road 38/11P
0.10 116.06 m² 6 Meenupete 5/3B,5/4G
0.4 1/4 65.49 m² 8 Thimaiah layout 257/1
45*30 26.22 m² 10 Naharu nagar 301/24
1 648.18 m² 12 Shivakeri Road 68,68/A
0.06 9/10 117.64 m² 3 Thimaiah Layout 257/2
1.46 1/2 1360.98 m² 1 Church Road 271/1
Manual on Public Disclosure Schedules
CMAK | 20
Details of building plan approval for the financial year 2012-13
Mention year 2012-13
Site area Built-up area Location details
Ward Street name Property Number Survey Number
0.12 264.82 m² 5 Bangala Beedi 14/1,14/2
0.04 56.12 m² 10 Neharu Nagar 35/4A
0.12¾ 175.53 m² 7 Gourikere 10/6,9/5,9/4,10/5
0.09½ 53.39 m² 10 Neharu Nagar 62/C,57/A,1/4
0.10 62.16 m² 12 Near Microwave 108/2A
0.05 12 m² 12 Microwave Road 46/1,46/2
0.03 56.88 m² 5 SSR Road 38/11P
0.10 116.06 m² 6 Meenupete 5/3D,5/4D
0.04½ 65.49 m² 8 Timmaiah Layout 257/2
0.03 26.22 m² 10 Neharu Nagar 301/24
1.00 648.18 m² 12 Shivakeri 68/,68/A
0.06 9/10 117.64 m² 3 Timmaiah Layout
257/2
1.46 ½ 1360.98 m² 1 Church Street 271/1
0.05 63.02 m² 3 Telugu Street 111/1,111/2,112/1,112/2
0.11 143.72 m² 1 Church Street 6/2A1
Manual on Public Disclosure Schedules
CMAK | 21
0.05 52.68m² 11 Vijayanagara 14/W
0.03¾ 72.19 m² 1 12/2(9)
0.17½ 19.70 m² 10 SSR Road 17/1,17/2
0.0¾ 27.76 m² 10 SSR Road 17/5A
0.08 106.93 m² 11 SSR Road 40/2A
0.05 45.56 m² 13 Subhash Nagar 59/2(17)
0.07 233.90 m² 9 Chickpete 52/20
0.04 28.57 m² 11 Vijay Nagar 35/22
0.15½ 147.30 m² 10 Neharu Nagar 2/3F(1),2/31G(1)
0.02¼ 167.46 m² 13 Subhash Nagar 59/2(11)
0.05 92.59 m² 11 Vijay Nagar 18/T
0.02½ 56.16 m² 7 Malabar Road 2/1,2/2
0.03½ 72.80 m² 12 Shivakeri 27/2
0.06¾ 114.06 m² 13 Subhash Nagar 59/2 J¸ï
0.08 108.39 m² 5 Gonikoppa Road 29/1,29/2
0.1¼ 149.04 m² 14 Meenupete Road 3/1,3/2
0.55 281.96 m² 11 SSR Road 5/1,5/2,6/1,6/2,7/1,7/2,8/1,8
/2,9/1,9/2,10/1,10/2
0.03½ 127.34 m² 11 Vijay Nagar 18/25
0.04 1/10 70.67 m² 3 Timmaiah Layout 257/2 ¦
Manual on Public Disclosure Schedules
CMAK | 22
0.07¾ 74.32 m² 14 Meenupete 3/2J
0.04 79.70 m² 11 Vijay Nagar 18/10,32/2F
0.08 128.14 m² 10 Gonikoppa Road 1/1A,2/2A
0.09 64.46 m² 13 Panjarpete 14/1,14/2
0.02¾ 44.02 m² 10 Neharu Nagar Road 301/2¹
0.05 189.15 m² 7 Mahila Samaj Road 3/5¹
0.03 56.97 m² 11 Vijay Nagar 14/eÉ
0.12¾ 220.43 m² 7 Gourikere Road 10/6,9/5,9/4,10/5
0.04 136.25 m² 11 Vijay Nagar 14/(2)
0.03 71.38 m² 9 Chickpete 22/2E
0.10 109.98 m² 9 Beerangadu Road 231/11J¥sï
0.05 137.59 m² 9 Beerangadu Road 231/H(1)
0.06½ 98.27 m² 13 Nisarga Layout 79/51
0.04½ 46.64 m² 4 Telugar Beedi 21/2
0.20 128.30 m² 7 Gandhi Nagar 41/5,41/4
0.37 97.39 m² 4 Mogar Galli 95/2,96/1,96/2,95/1
0.05 17.97 m² 12 Shivakeri 76/5AB
0.02¾ 25.25 m² 10 Neharu Nagar 301/24A
0.05 54.00 m² 5 FMC Road 90/1,91/2J
0.02¾ 64.05 m² 10 Neharu Nagar 301/24
Manual on Public Disclosure Schedules
CMAK | 23
0.12 158.91 m² 4 Telagu Sreet 34/1,34/2
0.04 61.56 m² 3 Telagu Sreet 68
0.17 169 m² 2 Devanga Sreet 73/1,73/2
0.03 43.89 m² 3 Arasu Nagar 76/20
0.04½ 114.46 m² 7 Main Road 19/1A,19/2A,19/3A,20/2A
0.05 94.79 m² 8 Appaiahswamy Road 257/1B,257/2B
0.11 79.77 m² 13 Subhash Nagar 59/2AB,59/2(3)
0.02½ 151.02 m² 10 SSR Road 19/4A
0.06 241.27 m² 11 Vijay Nagar 17/2E
0.020 81.16 m² 7 Gandhi Nagar 80/2
0.09½ 94.16 m² 10 Mogar Galli 41/1,41/2,43
0.15 55.23 m² 7 Mahila Samaj Road 131,14/10
0.05 133.76 m² 7 Gandhi Nagar 92/1,92/5
0.09 236.17 m² 5 Gonikoppa Road 1,2/1,2/2,3/1,3/2
0.02½ 45.67 m² 10 Mogar Galli Road 47/2A(3)
0.05½ 198.90 m² 3 Timmaiah Layout 257/2F
0.04¼ 87.34 m² 1 Church Sreet 12/2(1)
0.02½ 40.95 m² 3 Dhakkani Mohala 45,46/3B
0.02½ 30.97 m² 3 Dhakkani Mohala 45,46/3B
0.31 241.8 m² 3 Sunkad Katte 201/7
Manual on Public Disclosure Schedules
CMAK | 24
.0.05 89.05 m² 10 Neharu Nagar 35/A(1)
0.05 88.47 m² 13 Panjarpete 15/1A,15/2A,15/1,15/2A
0.05 80.67 m² 11 Vijay Nagar 17/2E
0.24½ 112.51 m² 8 Devarkadu Road 38/1,38/10
0.06 89.72 m² 13 Subhash Nagar 79/AiÀÄÄ
0.10 138.36 m² 3 Devanga Street 17/1A,17/5A
0.03 66.88 m² 10 Neharu Nagar 301/31H
0.01¼ 14.85 m² 12 Shivakeri 26/3B
0.13 110.80 m² 4 Telagu Street 8/1,8/2
0.06 89.03 m² 11 Vijay Nagar 17/3(3)
0.44 239.41 m² 5 Main Road 72/1,72/2
0.04 115.25 m² 13 Subhash Nagar 59/2D(1)
0.03 59.50 m² 7 Gandhi Nagar 49/20(1)
0.04¾ 53.70 m² 8 Timmaiah Layout 257/1Z
0.03 26.22 m² 3 Arasu Nagar 76/20
0.07 82.98 m² 11 Vijay Nagar 17/2B
0.014 382.96 3 Dhakkani Mohala 137/2B,137/2(1)
0.08 231.46 7 Gandhi Nagar` 49/22
Manual on Public Disclosure Schedules
CMAK | 25
Details of building plan approval for the financial year 2013-14
Mention year 2013-14
Site area Built-up area Location details
Ward Street name Property Number Survey Number
0.06¼
Type equation here
123.07 m² 13 Panjarapet 33/11
0.06¾ 180.26 m² 11 Vijayanagar 14/V,18/1R
0.04 187.25 m² 11 Vijayanagar 18/1(Y)
0.12 245.18 m² 8 AppaiahSwamy Road 65/1,65/2
2.73 199.05 m² 9 Chikkapete 1/1,1/2
0.06½ 172.80 m² 8 Timmaiah Layout 257/1(PÉ)J
0.03 80.52 m² 11 Vijayanagar 16/4A,17/2B
0.03½ 127.42 m² 13 Nisarga Layout 79/10(B)
0.03½ 104.56 m² 13 Nisarga Layout 79/10(A)
0.09 106.26 m² 12 Shivakeri 76/40
0.06 92.25 m² 11 Vijayanagar 14/2(6)
0.05 161.34 m² 8 AppaiahSwamy Road 8/2L
0.05¼ 90.47 m² 3 Telugu Street 88/1A,88/2J
0.08 213.68 m² 6 Meenupete 43/4,43/2s¹
0.03½ 73.08 m² 13 Subhash Nagar 59/2A
0.55 1855.35 m² 11 SSR Road 5/1,5/2,6/1,6/2,7/1,7/2,8/1
,8/2,9/1,9/2,10/1,10/2
0.05 43.14 m² 7 Gandhi Nagar 25/1J2
0.01½ 40.36 m² 5 Sunnada Beedi 39/2©
0.02¾ 46.12 m² 10 Neharu Nagar 301/31ºÉZï(1)
1.05 244.11 m² 7 Mahila Samaj Road 14/1,132/3,132/2,103/2
0.03 68.25 m² 6 Meenupete 43/3©1
0.15 79.82 m² 7 Gandhi Nagar 49/7
0.04½ 212.64 m² 13 Nisarga Layout 79/ ºÉZï(1)
0.20 619.02 m² 5 Main Road 68/1,68/2
Manual on Public Disclosure Schedules
CMAK | 26
0.09 58.32 m² 7 Gandhi Nagar 24/1
0.05 89.89 m² 3 Timmaiah Layout 257/2AiÀÄÄ
0.02 28.05 m² 13 Panjarapete 10/1,10/2
0.08½ 85.33 m² 3 Timmaiah Layout 257/1©,257/2J©
0.03¼ 44.52 m² 5 Private Bus Stand 44/2¹
0.27½ 145.60 m² 12 Shivakeri 108/10A1
0.04½ 112.69 m² 1 Church Street 12/2J
0.03 56.35 m² 11 Vijayanagar 18/1F
0.04½ 124.18 m² 5 Shanthi Nagar 53/1,53/2,54/1,54/2
0.08 189.72 m² 11 Vijayanagar 39,40/2f
0.04 72.09 m² 6 Meenupete 43/1,43/2,43/1J,43/2J
0.04¼ 69.29 m² 8 AppaiahSwamy Road 257/1«
0.06¾ 68.05 m² 12 Shivakeri 108/2E
0.01 41.86 m² 10 Neharu Nagar 19/2J
0.63 182.11 m² 14 Malabar Road 13/1,13/2
0.05 87.29 m² 6 Meenupete 30/2(3),30/2J
0.02½ 52.96 m² 3 Dhakkani Mohalla 140/©(6)
0.05 130.00 m² 1 Church Street 6/2f
0.05 102.91 m² 2 Jainar Beedi 19/2A,20/2B(1)
0.05 49.36 m² 11 Vijaya Nagar 14/2(4)
0.04 140.52 m² 10 Neharu Nagar 62/©,63/©
0.01¾ 85.68 m² 13 Nisarga Layout 79/A1
0.03½ 60.76 m² 10 Mogara Galli 47/2J(2),49(1)
0.07¼ 61.56 m² 8 AppaiahSwamy Layout 5/2JJZï
0.65 179.53 m² 7 Near Car Stand 40/2,43
0.02½ 53.80 m² 3 Dhakkini Mohalla 140/©(5)
0.04 60.01 m² 7 Gandhi Nagar 41/2¹
0.34 111.86 m² 13 Panjarapete 16/1,16/2
0.017 109.32 m² 4 Mogara Galli 93/1,93/2
0.03½ 118.48 m² 6 Meenupete 43/3PÉ(©)
Manual on Public Disclosure Schedules
CMAK | 27
0.05½ 80.04 m² 6 Meenupete 43/3PÉ
0.07½ 113.29 m² 6 Meenupete 43/3PÉ(J) 3920 Sq.Ft 91.72 m² 6 Sunnada Beedi 71/4,71/5
0.08½ 86.17 m² 9 Chikkapete 211/3
0.06 133.25 m² 12 Shivakeri 76/46
0.02½ 39.68 m² 11 Panjarapete 19/2©
0.02½ 45.68 m² 8 AppaiahSwamy Road 8/2N1A
0.03 94.12 m² 9 Chikkapete 18/2
0.19 76.36 m² 11 Panjarapete 48/1,48/2
0.05½ 93.60 m² 10 Neharu Nagar 29/20
0.03½ 71.35 m² 11 Vijaya Nagar 14/J
0.14 158.45 m² 3 Dhakkini Mohalla 139,140/5
0.05 38.72 m² 13 Panjarapete 223/3
0.04½ 131.02 m² 2 Devanga Beedi 34,35/2
0.04¼ 21.18 m² 1 Church Street 6/2r
0.9¼ 26.11 m² 14 Meenupete Road 43/2A
0.12 205.72 m² 12 Shivakeri 75/56
Details of building plan approval for the financial year 2014-15
Mention year 2014-15
Site area Built-up area Location details
Ward Street name Property Number Survey Number
0.02½ 53.95 m² 5 Bangala Beedi 13/2f
0.23½ 293.39 m² 6 Meenupete 18/2(J),22/1(J), 22/2(J) 0.10 1/3 119.92 m² 3 Timmaiah Layout 257/2 n
0.05 118 m² 1 FMC Road 71/2
0.05½ 77.46 m² 4 Jainer Beedi 62/1,62/2J
0.08½ 68.06 m² 9 Chikkapete 22/2J
Manual on Public Disclosure Schedules
CMAK | 28
0.02½ 60 m² 3 Dhakkani Mohalla 140/(©)2
0.03 108.04 m² 3 Dhakkani Mohalla 140/(©)1 0.13 137 m² 3 Telugar Beedi 87/1,87/2
0.3¼ 27.75 m² 7 Gourikere 93/2
0.04½ 80.52 m² 3 Timmaiah Layout 257/2w(2)
0.10 89.80 m² 1 Church Street 6/2G(1)
0.5¼ 31.23 m² 3 Dhakkani Mohalla 46/3J
0.05¾ 74.58 m² 3 Appaiahswamy Road 25/2D
0.03 94.84 m² 5 Near KSRTC Bus Stand 29/2H
0.9½ 159.59 m² 3 Devanga Beedi 125/A,125/2
0.05 89.19 m² 10 Behind Bright School 40/1
0.05½ 139.84 m² 11 Gonikoppa Road 4/2A
0.06½ 124.08 m² 2 Appaiahswamy Road 53/5,53/6A
0.04 100.62 m² 8 Appaiahswamy Road 76/22P1
0.22 123.19 m² 1 Appaiahswamy Road 43/4,46/1,46/2,47,47
0.13½ 29.13 m² 8 Appaiahswamy Road 9/2A
0.06 85.18 m² 7 Gandhi Nagar 24/4C
0.03½ 92.04 m² 13 Nisarga Layout 79/U
0.03¾ 102.53 m² 13 Nisarga Layout 79
0.05¾ 210.73 m² 13 Subhash Nagar 59/2i
0.50 191.59 m² 12 Shivakeri 68
0.15 55.28 m² 6 Malabar Road 44/3,44/4
0.06 91.87 m² 10 Vidyanagar 7/2D
1.30 57.46 m² 5 Sunnada Beedi 103/2,3
0.28 2331.86 m² 7 Murnad Road 72/2B(1),73,72/1,72/2A
0.05 111.87 m² 3 Siddapur Road 300/15A(1)
0.03¾ 50.72 m² 3 Arasu Nagar 76/20AB
0.06 84.48 m² 13 Subhash Nagar 59/2
0.06 53.95 m² 4 Telugar Beedi 51/5(1),61/6(1)
0.20 244.24 m² 3 Sunkada Katte 300/41
Manual on Public Disclosure Schedules
CMAK | 29
2.¾ 67.02 m² 11 Vijaya Nagar 37/2B,38/A
0.09 94.38 m² 3 Appaiahswamy Road 4/2,4/2A,5
0.59 186.20 m² 11 Panjarapete 49/1,49/2,50,51/1,51/2,52/
1,52/2,53/1,53/2,54
34*25=850 Sq.Ft 33.72 m² 10 Neharu Nagar 301/24(1)
0.02½ 52.92 m² 3 Dhakkani Mohalla 140/B(6)
0.05½ 86.23 m² 7 Gourikere 87/1A
0.09 71.62 m² 8 Devarkadu Road 38/9
0.03½ 120.60 m²
4 Mogargalli, Kavery
Kalyan Mantap Road 109/1E
3.30¾ 72.90 m² 3 Sunkada Katte 300/30
0.05 76.44 m² 4 Appaiahswamy Road 76/22J
0.04 93.37 m² 10 Neharu Nagar 52/16A
0.08 86.56 m² 5 Gonikoppal Road 29/1,29/2
0.03 51.09 m² 11 VijayaNagar 47/2BT
0.07 266 m² 8 Devarkadu Road 62/2B
0.20 101.32 m² 11 Panjarapete Road 21/2
35*40 Sq.Ft 66.73 m² 3 ArasuNagar 76/20P24
15*24Sq.Ft 37.94 m² 10 Mogargalli 31/2H
0.01¾ 142.62 m² 5 Sunnada Beedi 42/1,42/2
0.20¼ 101.50 m² 5 SSR Road 27/2B,28
0.36 412.62 m² 10 Neharu Nagar 63
0.04¾ 173.22 m² 13 Nisarga Layout 79/H
0.04½ 94.34 m² 10 Mogargalli 47/1A,47/2A(1)
0.05 123.70 m² 11 Vijaya Nagar 17/3A4
0.03¾ 88.85 m² 13 Nisarga Layout 79
0.04 75.84 m² 7 Gandhi Nagar 41/1(A)
0.04 88.92 m² 11 VijayaNagar 14/X
0.04,60 110.42 m² 10 SSR Road 14/1A
Manual on Public Disclosure Schedules
CMAK | 30
0.07 87.33 m² 8 Appaiahswamy Road 8/2N
0.07 120.00 m² 4 Telugara Beedi 28/3,31,32,33
0.08½ 320.20 m² 3 Dhakkani Mohalla 46/3F
0.01½ 40.54 m² 7 Gandhi Nagar 22/8B
0.08½ 203.84 m² 10 SSR Road 10/1,10/2(2)
1200Sq.Ft 42.90 m² 13 Panjarapete 222/7
0.15 134.65 m² 7 Gandhinagar Road 93/2A
720 Sq.Ft 74.81 m² 14 Meenupete Road 10/2L
0.04¼ 65.71 m² 11 VijayaNagar 14/2(10)
0.07 352.39 m² 13 Subhash Nagar 59/2B
0.10 122.84 m² 5 Harikere, Sunnada Beedi 52/1,52/2,52/3
0.37 169.94 m² 4 Mogargalli 95/2,96/1,96/2,95/1,95/2A
0.04.½ 96.14 m² 1 Church Road
(Timmaiah Layout) 12/2B
0.05 82.17 m² 10 Neharu nagar 81
0.05 205.71 m² 8 Appaiahswamy Road 29/1,29/2
0.05 118.82 m² 12 Shivakeri 48/2
0.03 60.30 m² 11 Vijaynagar 40/2A
0.05 142.50 m² 10 Mogargalli Road 47/2A(1)
Details of building plan approval for the financial year 2015-16
Mention year 2014-15
Site area Built-up area Location details
Ward Street name Property Number Survey Number
Manual on Public Disclosure Schedules
CMAK | 31
Enclosure Ref Table 2.1.b
Table 2.2: Details of approved Industries/Commercial Areas
Current FY year (year to be displayed in
numeric like 2015-16) Enclosure in the format displayed below
Current FY year (year to be displayed in
numeric like 2014-15) Enclosure in the format displayed below
Current FY year (year to be displayed in
numeric like 2013-14) Enclosure in the format displayed below
Current FY year-1 (year to be displayed
in numeric like 2012-13) Enclosure in the format displayed below
Current FY year-2 (year to be displayed
in numeric like 2011-12) Enclosure in the format displayed below
Current FY year-3 (year to be displayed
in numeric like 2010-11) Enclosure in the format displayed below
Current FY -4 (year to be displayed in
numeric like 2009-10) Enclosure in the format displayed below
Manual on Public Disclosure Schedules
CMAK | 32
Current FY - 5(year to be displayed in
numeric like 2008-09) Enclosure in the format displayed below
Details of approved industrial/ commercial area: Year 2008-09
Mention year 2008-09
Details Ward No Street Name Survey No Site Area Built Up Area Owner Name
1 14 Mahila samaja
Road
14/1, 132/2,
132/3 3439sq ft 499.75m² President Kodava mahila
sahakara sangha
2 5 Mogaragally 44/2D(1) 0.01¼ 12.27m² K.A.Ashraf s/o Moosa Haji
3 5 F.M.C. Road 95/2D(1) 5881 sq ft 781.62m² P.J.Aiyappa, s/o Ganapayhy
4 5 Mogaragally 110/D 0.04 109.60m² Kancherira Changappa S/o K.P. Kariyappa
5 6 Chikkpete 1/1, 1/2 0.73 1387.3m² No 281, Agriculture Fedration co-oprative
society Ltd.
6 5 Main Road 65/1, 65/2 0.07 100.62m² Muttuvalli, Jamiya masjid, Khaji Mohalla
7 1 Murnar Road 27/1 1.46 ½ 183.90m² Santha Annamma Degree Charch Collage Catholic
Manual on Public Disclosure Schedules
CMAK | 33
8 9 Meenupete 29/1, 39/2 0.44 200.40m² Chethanya matapura Muthappa Temple
9 10 Panjarpete 6/1, 6/2, 7/1, 7/2,
8/1, 8/2, 9/1, 9/2,
10/1, 10/2.
83200 sq ft 411.84m² Rakshitha Infrastructure
Company, Suman Mandanna
Details of approved industrial/ commercial area: Year 2009-10 Mention year 2009-10
Details Ward No Street Name Survey No Site Area Built Up Area Owner Name
1 14 Kithuru Rani
Chennamma Road 40/2, 43/ 27443 sq ft 123.35m² Viktoriya Club
2 4 Mogaragally 110/A 0.04 22.50m² Vyavasthapakru, Virajpet
Vyavasaya Sahakara Bank.
3 13 Gowrikere 4/1, 4/2 0.04 172.86m² Maletira P. Kushalappa.
4 5 Bangalibeedi 13/1A(1).
13/2A(1) 78.82 sq ft 59.86 m² S.Y. Munavar Husain
5 15 chikkpete 17, 19/3 0.11 187.98m² B.K. Aiyappa,
S/oB.M. Kaverappa
6 10 Panjarapete 26/2 0.50 721.66m² V.T. Chandrashekhar
7 4 Telugarabeedi 109/1BA (4356 sq
ft) 4356 sq ft 432m² B.K. Chandru &
N.S. Shreeja
8 S.S.R. Road 37/(1) (2) 0.05 110.65m² K.M. Muthanna
W/0 K.U. Muthanna.
Manual on Public Disclosure Schedules
CMAK | 34
9 14 Kithuru Rani
Chennamma Road 48/B 0.05 153.68m² President, Karnataka
Sangha, Virajpet
10 6 Main Road 57/1, 57/2 0.07 212.65m² K. Moidu.
S/o P.S. Kunji Mohamad
11 5 Main Road 95/2A, 95/1A,
95/2C, 95/2B,
96/2A
0.16 ½ 14.04.81m² P.G. Aiyappa.
S/o Ganapathy
Details of approved industrial/ commercial area: Year 2010-11
Mention year 2010-11
Details Ward No Street Name Survey No Site Area Built Up Area Owner Name
1 12 Meenupete 38/1, 38/2, 38/2A 7841 Sq Ft 463.22m²
N.K. Abdulf Shareef,
Karyadharshi, Karnataka
Salafi Movement Society,
Dhakshina kannada,
Mangalore (Masidi)
2 11 Meenupete/
Malabar Road 43/2C, 43/4 1.018 519.76m²
P.S.Chanagappa.
S/oP.A. Nanaiah
3 5 F.M.C. Road 24/1, 24/2 0.10 54.21m² Virajpete
4 13 Main Road 35/2A, 35/2A 0.6 ½ 26.10m² A.E. Umesh Kumar
Manual on Public Disclosure Schedules
CMAK | 35
Details of approved industrial/ commercial area: Year 2011-12
Mention year 2011-12
Details Ward No Street Name Survey No Site Area Built Up Area Owner Name
8 7 Main Road 17/1,17/2 0.12 214.06 President,vice-president Shaffi
jumma masidi
13 5 Main Road
71/1,71/2A,71/2B 0.24 265.23 m2 Vidya kuttappa w/o kuttappa
18 6 Main Road
59/1,59/2 0.09 249.54 E Aziz meharuf, I U M Emar
19 10 Gonikoppal Road 12/2A 0.14 118.42 A M Hussain s/o Mohiddin
Hazi
40 3 Sunkad katte 300/30A 0.3 3/4 23.55 H K Bhadramma w/o Kunja
42 11 Gonikoppal Road 1/2A 0.04 133.50 M A Shafi w/o Abdulla
Manual on Public Disclosure Schedules
CMAK | 36
49 4 Jainer Beedi 70/A,71/1,71/2A,72
/1,77/2 19 3/4 425.99 Kuppad M Muddappa
59 5 Main Road 67/1,67/2 0.29 468.36 President Coorg Provisional co-
operative Marketive federation
64 6 Private Bus Stand
Road 61/1,61/2,62/1 0.10 68.90 m2
Shadalli Shaik Haji
Mohammed Abdul hafiz,
Muttavalli Trustee
66 11 Panjarapete 5/1,5/2 0.23 184.26 Smt M Suman Mandanna
76 7 Gourikere Road 10/6,9/5,9/4,10/5 12, 3/4 175.53 B R Bojappa, Smt B B Lalita,
Sri B B Nagarj, Smt B S
Shashikala
84 12 Shivakeri Road 68,68/A 1 648.18 Chairman Kodava Samaj
Details of approved industrial/ commercial area: Year 2012-13
Mention year 2012-13
Details Ward No Street Name Survey No Site Area Built Up Area Owner Name
Manual on Public Disclosure Schedules
CMAK | 37
84 12 Shivakeri 68,68/A 1.00 648.18 m² President,Kodava Samaj
76 7 Gourikeri Road
10/6,9/5,9/4,10/5 0.12¾ 175.53 m² B.R.Bojappa,Smt B.B.Lalitha,
Sri B.B. Nagaraj,Smt
B.S.Shashikala
17 10 Gonikoppa Road
17/3,17/4 0.10 35.50 m² Jarinabanu,Shakilabanu,
18 10 SSR Road 17/1,17/2 0.17½ 19.70 m² Sahirabanu M.A,T.H.
Nigarsultana, T.H.Mohammed
Saroz,T.H.Mohammed Saleem
19 10 SSR Road 17/5A 0.00¾ 27.76 m² V.G.
Shakeelabanu,V.G.Jarinabanu
C/o Abul Gafar
27 7 Malabar Road 2/1,2/2 0.02½ 56.16 m² Padmavathi and Manojkumar
30 5 Gonikoppa Road 29/1,29/2 0.08 108.39 m² Ayubkhan S/o
Y.Mohammedkhan
32 11 SSR Road 5/1,5/2,6/1,6/2,7/1,
7/2,8/1,8/2,9/1,9/2,
10/1,10/2
0.55 181.96 m² K.P.Kunjimohammed,N.P.Mos
a,D.P.Mammutti,N.K.Abdulrah
man
42 7 Gourikere Road 10/6,9/5,9/4,10/5 0.12¾ 220.34 m² B.R.Bojappa,B.G.Lalitha,B.B.
Nagaraj
Manual on Public Disclosure Schedules
CMAK | 38
53 5 FMC Road 90/1,91/2J 0.05 54.00 m² T.K.Vishnu S/o Kuppushetty
57 2 Devanga Street 73/1,73/2 0.17 169 m² President Coorg Honey & Wax
Producers Co-Operative
Society
68 5 Gonikoppa Road 1,2/1,2/2,3/1,3/2 0.06 236.17 m² C.P.Prakash S/o
C.P.Kunjikannan
76 13 Panjarpete 15/1A,15/2A,15/1 0.05 88.47 m² T.A.Narayan
85 5 Main Road 72/1,72/2 0.44 239.41 m² S.M.Khadarbhasha S/o
Mainusab
Details of approved industrial/ commercial area: Year 2013-14
Mention year 2013-14
Details Ward No Street Name Survey No Site Area Built Up Area Owner Name
5 9 Chikkapete 1/1,1/2 2.73 199.05 m²
No.281 Agricultural Producers
Co-operative Marketing
Society Ltd.
Manual on Public Disclosure Schedules
CMAK | 39
14 6 Meenupete 43/4,43/2¹ 0.18 213.68 m² P.N.Changappa S/o
P.A.Nanaiah
16 11 SSR Road 5/1,5/2,6/1,6/2,7/1,
7/2,8/1,8/2,9/1,9/2,
10/1,10/2
0.55 1855.35 m²
Sri K.P.Kunnimohammed S/o
Moiddin Kutti, Sri N.P.Moosa
S/o Moiddin Kutti, Sri
P.P.Mamutti S/o kutti ali, Sri
S.K.Abdul Rehman alias Abbu
S/o M.Kunnimohammed
17 5 Sunnada Beedi 39/2© 0.01½ 40.36 m² M.G.Abdulrehman S/o
R.Mohammed Gous
505 7 Mahila Samaj Road 14/1,132/3,132/2,1
03/2 1.05 244.11 m²
Chairman Kodagu Mahila
Samaj
29 5 Main Road 68/1,68/2 0.20 619.02 m² N.E.Moidu Tasleem & N.Nazar
148 13 Panjarapete 10/1,10/2 0.02 28.05 m² Chulakhan kunnivalappin latif
S/o Asan koya
122 5 Private Bus Stand 44/2¹ 0.03¼ 44.52 m² M.A.Mazahar Hussain
35 6 Meenupete 43/1,43/2,43/1J,4
3/2J 0.04 72.09 m²
Nazeer S/o Abdul Ghanni, Sri
A.N.Hidayitulla S/o Abdul
Nazeer
Manual on Public Disclosure Schedules
CMAK | 40
49 7 Near Car Stand 40/2,43 0.65 179.53 m² President Victoria Club
Virajpet
Details of approved industrial/ commercial area: Year 2014-15
Mention year 2014-15
Details Ward No Street Name Survey No Site Area Built Up Area Owner Name
27 12 Shivakeri 68 0.50 191.59 m² President Kodava Samaj
Virajpet
28 6 Malabar Road 44/3,44/4 0.15 55.28 m² C T Vishwanath S/o Late C M
Timmaiah
31 7 Murnad Road 72/2B(1),73,72/1,7
2/2A 0.28 2331.86 m²
M P Kushalappa S/o Late
Poovaiah
37 11 Vijaya Nagar 36/2B,38/A 2. ¾ 67.02 m² K Valson S/o Late K Raman
Manual on Public Disclosure Schedules
CMAK | 41
54 5 Sunnada Beedi 42/1,42/2 0.01 ¾ 142.62 m² Naseema M H W/o
Mohammed A S, Aleema W/o
Sadali
55 5 S S R Road 27/2B,28 0.20¼ 101.50 m² Nafijahan w/o Late D M
Khaleel Ahmed.
68 10 S S R Road 10/1,10/2(2) 0.08½ 203.84 m² M K Parvathi W/o M P
Kushalappa
81 10 Mojar galli Road 47/2A(1) 0.05 55.40 m² P G Sumesh S/o P P Govinda
Details of approved industrial/ commercial area: Year 2015-16
Mention year 2015-16
Details Ward No Street Name Survey No Site Area Built Up Area Owner Name
Manual on Public Disclosure Schedules
CMAK | 42
Manual on Public Disclosure Schedules
CMAK | 43
3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has to
be disclosed
Level of
Disclosure
(ULB/War
d)
Frequency
of
Disclosure
Reference Remarks
3 Planning for
Economic and
Social
development
ULB List and brief of the Social and
Economic Development Schemes.-
eg; 18% scheme, Ashraya and such
other Govt. programs
Details of budget allocation and
expenditure of these schemes
Details of Beneficiaries
Previous three
financial years
including current
year
ULB Annually Table 3.1
Table 3.1
List and brief of the social and economic Development Schemes for three years
Current FY(2015-16)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 44.61 25.07 Enclosured below
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 44.61 25.07 Enclosured below 1 22.75% 42.83 31.59 Enclosed Below
2 7.5% 16.27 7.62 Enclosed Below
3 3% 5.02 0.12 Enclosed Below Current FY(2014-15)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 44.61 25.07 Enclosured below 1 22.75% 76.69 54.66 Enclosed Below
2 7.5% 21.86 14.09 Enclosed Below
3 3% 7.02 5.14 Enclosed Below
Manual on Public Disclosure Schedules
CMAK | 44
Current FY(2013-14)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 44.61 25.07 Enclosured below 1 22.75% 69.48 29.20 Enclosed Below
2 7.5% 20.30 7.53 Enclosed Below
3 3% 5.60 2.57 Enclosed Below Current FY-1(2012-13)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 44.61 25.07 Enclosured below 1 22.75% 28.92 27.11 Enclosed Below
2 7.5% 9.22 4.28 Enclosed Below
3 3% 3.81 0.97 Enclosed Below Current FY-2(2011-12)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 44.61 25.07 Enclosed Below
Current FY-3 (2010-11)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 39.66 26.05 Enclosed Below
Current FY-4(2009-10)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 41.35 4.22 Enclosed Below
Current FY-3(2008-09)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 18% 30.37 30.11 Enclosed Below
List of beneficiaries under 18% for the Year 2008-09:
Sl.No Beneficiaries Name
Manual on Public Disclosure Schedules
CMAK | 45
«zsÁå sÁå¸À 1 PÁªÉÃj 2 «ÄãÀ 3 £ÀAiÀÄ£À ºÉZï.Dgï. 4 £À«Ã£À 5 ¢ªÀå f. 6 ®Qëöä ºÉZï.Dgï
ªÉÊzÀåQÃAiÀÄ ªÉZÀÑ 1 ²æäªÁ¸ï ªÀÄÆwð ºÉZï.PÉ. 2 ºÉZï.Dgï. UÀuÉñï. 3 ªÀÄjAiÀÄ¥Àà 4 sÁUÀå ®Qëöä 5 PÀȵÀÚ ªÀÄÆwð 6 ºÉZï.JA. ªÀĺÀzÉêÀ.
®WÀÄ ªÁºÀ£À vÀgÀ¨ÉÃw
1 ªÀÄzsÀĸÀÆzÀ£ï, ²ªÀPÉÃj 2 ºÉZï.J¸ï. ªÉAPÀmÉñï, ²ªÀPÉÃj 3 ºÉZï.J>ï. ªÀÄÄgÀĽ, ²ªÀPÉÃj. 4 ¢Ã¥ÀPï ºÉZï.¦. 5 ªÀÄÄgÀĽ PÉ. 6 n.Dgï. PÀgÀÄt 7 AiÉÆÃUÉÃ±ï ©.¹. 8 ªÀÄt n.J¸ï. 9 ºÉZï.JA. CgÀÄt 10 ºÉZï.E. ¥Àæ«Ãuï PÀĪÀiÁgï 11 ºÉZï.f. £À«Ã£ï PÀĪÀiÁgï 12 ¸ÀħæªÀÄt ºÉZï.JA., 13 «zsÁåzÀgï ºÉZï.PÉ.
Manual on Public Disclosure Schedules
CMAK | 46
UÀtPÀAiÀÄAvÀæ «vÀgÀuÉ 1 ºÉZï.J¸ï. UÀuÉñï. 2 PÉ.Dgï. £ÀAiÀÄ£À. 3 ºÉZï.eÉ. ®°ÃvÀ. 4 ºÉZï.J¸ï. ²ªÀ±ÀAPÀgï. 5 ¸ÀÄAzÀgÀ 6 f.£ÁUÉÃAzÀæ.
±ËZÁ®AiÀÄ ¤ªÀiÁðt
1 ©.Dgï. PÁªÉÃj 2 ©.J£ï. PÀÄAZÀ¥Àà 3 ºÉZï.PÉ. vÀAUÀªÀÄä 4 ºÉZï.JA. dªÀj
ZÀªÀÄð PÀÄngÀ ªÀÄvÀÄÛ CzÀPÉÌ ¸ÀA§A¢ü¹zÀAvÉ ¸ÁªÀiÁVæ 1 ºÉZï.f. PÀĪÀiÁgï 2 ºÉZï.PÉ. gÁªÀÄZÀAzÀæ. 3 ºÉZï. Dgï. ªÀÄÄgÀÄUÀ. 4 £ÀgÉÃAzÀæ 5 ºÉZï.¹. gÀ« 6 eÁ£ÀÄ 7 ºÉZï.JA. ªÀiÁzÉêÀ
ªÀÄ£É j¥ÉÃj
1 ªÀĺÉñï 2 ºÉZï.J¸ï. ¨ÉÆÃd 3 ªÉAPÀl gÀªÀÄt 4 £ÁUÀªÀÄä 5 ºÉZï.PÉ. ¸ÀÄAzÀgÀ
ªÀÄgÀt ¥ÀjºÁgÀ
Manual on Public Disclosure Schedules
CMAK | 47
1 ®Qëöä ºÉZï.PÉ.
«zÀÄåvï ¸Ë® sÀå 1 ºÉZï.±ÁAw. 2 ºÉZï.Dgï. UÀuÉñï. 3 ºÉZï.Dgï. ªÀÄÄgÀÄUÉñï 4 ºÉZï.J£ï. gÁdÄ 5 ºÉZï.J. UËj. 6 ºÉZï.J. dªÀj 7 ºÉZï.PÉ. ¸ÀÄAzÀgÀ. 8 ºÉZï.Dgï. gÁªÀÄZÀAzÀæ 9 ºÉZï.J. £ÁUÀªÀÄä 10 ºÉZï.J¸ï. gÀ« 11 ºÉZï.Dgï. £ÁUÀªÀÄt 12 ºÉZï.PÉ. dAiÀÄ 13 ²æäªÁ¸ï ªÀÄÆwð 14 ºÉZï. ªÀÄÄgÀÄUÀ 15 ºÉZï. ¨ÉÆÃd 16 ºÉZï.Dgï. gÁzsÀ 17 ºÉZï.J¸ï. ¸ÀÄgÉñï
¥Àj²µÀ× eÁw/ ¥ÀAUÀqÀ PÁ>ÉÆäAiÀÄ°ègÀĪÀ ¸ÀªÀÄÄzÁAiÀÄ ¥Àj²µÀ× eÁw/ ¥ÀAUÀqÀ PÁ>ÉÆäAiÀÄ°è UÀæAxÁ®AiÀÄ
¥ÀĸÀÛPÀ «vÀgÀuÉ
List of the beneficiaries under 22.75% in 2009-10
Sl.No Beneficiaries Name
Manual on Public Disclosure Schedules
CMAK | 48
ªÀÄ£É j¥ÉÃj 1 ±ÀAPÀgÀªÀÄä 2 ªÉAPÀlgÀªÀÄt 3 £ÁUÀªÀÄä 4 ªÉîĪÀÄÄgÀÄUÀ 5 ºÉZï.JA. ±ÁAw 6 ¦.eÉ. ²ªÀªÀÄä 7 ¥À¥À¤ 8 ºÉZï.J£ï. ªÀÄÄgÀÄUÀ 9 £ÀAd 10 ºÉZï.J¸ï. CªÀÄätÚ 11 ºÉZï.PÉ. ¥ÀƪÀªÀÄä 12 CªÀÄätÚ 13 ºÉZï. dªÀj 14 ºÉZï.J£ï. ªÀÄÄgÀÄUÀ 15 ºÉZï.JA. ¥ÉÆ£ÁßQë 16 ºÉZï.J£ï. zsÀªÀÄAiÀÄAw 17 ºÉZï.Dgï. UÀuÉñï 18 ªÀÄÄgÀÄUÉñï 19 ¸ÀħæªÀÄt ºÉZï.JA. 20 ºÉZï.JA. ªÉî
±ËZÁ®AiÀÄ 1 ¦.¹. PÀÄAd¥Àà 2 ºÉZï.PÉ. vÀAUÀªÀÄä 3 ºÉZï.PÉ. dAiÀÄ 4 ºÉZï.JA. ¸ÀħæªÀÄt 5 ºÉZï.¹. «ÄãÁQë 6 ªÀÄaÑ
ªÀÄgÀt ¥ÀjºÁgÀ
Manual on Public Disclosure Schedules
CMAK | 49
1 ºÉZï. gÀ« 2 ºÉZï.f. ¸Àwñï 3 eÁ£ÀQ 4 ªÉîĪÀÄÄgÀÄUÀ 5 VjeÁ 6 ºÉZï.r. ªÁ¸ÀÄ
ªÉÊzsÁåQÃAiÀÄ ªÉZÀÑ 1 ºÉZï.PÉ.²æëªÁ¸ï 2 J.¹. ªÀÄAdÄ£Áxï
List of the beneficiaries under 22.75% in 2010-11
Sl.No Beneficiaries Name
ªÉÊzsÀåQÃAiÀÄ ªÉZÀÑ 1 Zɮī 2 ºÉZï.JA. CgÀÄt
ªÀÄgÀt ¥ÀjºÁgÀ 1 ¥Á>É CªÀÄäAiÀÄå 2 ºÉZï.PÉ. PÁwðPï 3 ºÉZï.r. ªÁ¸ÀÄ 4 ºÉZï. ¥ÀƪÀ 5 PÀȵÀÚAiÀÄå 6 ªÀÄ°èUÉ 7 ºÉZï.J. UËj 8 ªÀÄÄgÀÄUÉñï 9 ºÉZï.PÉ. C¥ÀàtÚ 10 ºÉZï.J. eÉÆÃw 11 ºÉZï.J¸ï. ªÀÄÄvÀÛªÀÄä
Manual on Public Disclosure Schedules
CMAK | 50
12 ºÉZï.J. £ÁUÀªÀÄä
«zÁå¨Áå¸À 1 ºÉZï.Dgï. UÀeÉÃAzÀæ 2 ºÉZï. ¸Àwñï 3 ºÉZï. sÁUÀå ®Qëöä 4 £ÁUÀgÁeï
ªÀÄ£É j¥ÉÃj 1 ªÉÃ®Ä ªÀÄÄgÀÄUÀ 2 ªÉAPÀl gÀªÀÄt 3 ºÉZï.PÉ ¸ÀÄAzÀgÀ 4 ¥Á¦ 5 J.f. UÉÆÃ¥Á>ï 6 ®Qëöä 7 JA.J¸ï. ¥ÉæêÀÄ 8 ¥Á¥ÀÄ 9 UÀAUÉ 10 ¥À¥À¤ 11 zÉêÀ¥Àà 12 ¥À¥Àw 13 ºÉZï. ¥Á¥ÀÄ 14 ºÉZï. Dgï. UÀAUÉ 15 ºÉZï. zÉêÀ¥Àà 16 ¥À¥À¤ 17 ºÉZï. ¥Á¥ÀÄ 18 ºÉZï.JA. ¸ÀħæªÀÄt 19 ¥ÁªÀðw 20 ®Qëöä 21 UÀAUÉ 22 ºÉZï.JA. UËj 23 ©. VjeÁ
Manual on Public Disclosure Schedules
CMAK | 51
24 VjeÁ 25 gÀd¤PÁAvï 26 ºÉZï.f. UÉÆÃ¥Á>ï 27 ºÉZï. zÉêÀ¥Àà 28 PÀtÚªÀÄä 29 vÀAUÀªÀÄä 30 F.JA. ¥Á¥ÀtÚ 31 ¸ÀIJ® 32 ¥À¥Àw 33 ¨ÉƼÀÄî 34 JA.f. UÉÆÃ¥Á>ï 35 ¥Á¥ÀÄ 36 ºÉZï.¥ÁªÀðw 37 ºÉZï.f. UÉÆÃ¥Á>ï 38 ºÉZï.¥Á¥ÀÄ 39 zÉêÀªÀÄä 40 ¦.J. PÀȵÀÚ 41 ºÉZï zÉêÀ¥Àà 42 ºÉZï.PÉ. vÀAUÀªÀÄä 43 ºÉZï.J. UÀAUÀªÀÄä 44 ¦.PÉ. ZÀ¤AiÀÄ 45 «.eÉ. ¥ÀzÀä 46 ºÉZï.Dgï. UÀAUÉ 47 PÀȵÀÚ 48 ªÉAPÀlªÀÄä 49 zÉêÀªÀÄä 50 JA.J¸ï. ¥ÉæêÀÄ 51 ªÉAPÀlªÀÄä 52 zÉêÀªÀÄä 53 PÀtÚªÀÄä
Manual on Public Disclosure Schedules
CMAK | 52
54 gÀÄQät 55 zÉêÀ¥Àà 56 ¥À¥Àw 57 ¥ÁªÀðw. ºÉZï. 58 ºÉZï. ¹ÃvÀªÀÄä 59 ºÉZï.J£ï. ºÀ£ÀĪÀÄ 60 zÉêÀªÀÄä 61 ºÉZï.PÉ. sÀzÀæªÀÄä 62 JA.ºÉZï. UÉÆÃ¥Á>ï 63 ¹.f. ¥ÁªÀðw 64 PÀtߪÀÄä 65 ºÉZï.J¸ï. PÀĪÀiÁgï 66 JA.J¸ï. ¥ÉæêÀiÁ 67 ©.Dgï. PÁªÉÃj
±ËZÁ®AiÀÄ ¤ªÀiÁðt 1 ªÀÄÄgÀÄUÉñï 2 ºÉZï.JA. gÁdÄ 3 ºÉZï.Dgï. UËj 4 ºÉZï.JA. gÁdÄ 5 ºÉZï.JA, ±ÁAw 6 ºÉZï.J¸ï ªÉAPÀmÉñï 7 ©.Dgï. gÀÄQät 8 VjeÁ 9 PÀȵÀÚ 10 £ÉÃvÁæªÀw 11 ºÉZï.PÉ. vÁAiÀĪÀÄä 12 ºÉZï.¦.gÁd 13 §£ÀߪÀÄä 14 ºÉZï.PÉ. ±ÁAw 15 ZÉ£ÀßAiÀÄå
Manual on Public Disclosure Schedules
CMAK | 53
16 ®Qëöä 17 ºÉZï.r. ®Qëöä 18 ±ÉÃRgï 19 ºÉZï.PÉ. PÀ¢æ 20 £ÉÃvÁæªÀw 21 ZÉ£ÀßAiÀÄå 22 ¥À¥Àw 23 ºÉZï.JA. ±ÁAw 24 n. ªÀÄÄgÀÄUÉñï 25 ±ÉÃRgï 26 ¨ÉÆÃgÀAiÀÄå 27 ¦.¹. ¥ÉæªÀiÁ 28 ºÉZï.PÉ. ®Qëöä 29 ºÉZï.PÉ vÁAiÀĪÀÄä 30 f.UÉÆÃ¥Á>ï 31 ºÉZï.J. UËj
¸ÀªÀiÁd PÀ!Áåt E!ÁSÉUÉ, «gÁd¥ÉÃmÉ vÁ®ÆèPÀÄ, ¥ÉÆ£ÀßA¥ÉÃmÉ CA¨ÉÃqÀÌgï sÀªÀ£À ¤ªÀiÁðtPÉÌ zsÀ£À ¸ÀºÁAiÀÄ
±Á!Á ªÀÄPÀ̽UÉ ±Á!Á ¨ÁåUï ªÀÄvÀÄÛ PÉÆqÉ «vÀgÀuÉ
ºÁ¹UÉ, ºÉÆ¢PÉ ªÀÄvÀÄÛ ¢A§Ä «vÀgÀuÉ 1 ºÉZï.¦. ¥Àæ±ÁAvï 2 ºÉZï.Dgï. QlÖ 3 ºÉZï.JA. ±ÁAw 4 ºÉZï.eÉ. ªÀiÁzÉêÀÅ 5 ºÉZï.Dgï. ¥ÉÆ£À߸Áé«Ä 6 ºÉZï.F. zÉë
Manual on Public Disclosure Schedules
CMAK | 54
7 ºÉZï.J>ï. ºÀ£ÀĪÀÄ 8 ºÉZï.Dgï. £ÁUÀgÁeï 9 ºÉZï.Dgï. eÁ£ÀQ 10 ºÉZï.©. ¨ÉÆÃgÀAiÀÄå 11 ºÉZï.PÉ. ªÀÄjAiÀÄ¥Àà 12 ºÉZï.JA. vÀAUÀªÀÄä 13 ¦.¹. eÁ£ÀÄ 14 ºÉZï.¦. gÁeï 15 ºÉZï.ºÉZï. jãÁ 16 ºÉZï.eÉ. ªÀÄ®èUÉ 17 ºÉZï.Dgï. gÁzsÀ 18 ºÉZï.JA. ¸Á«wæ
r¹Öç§ÆåµÀ£ï ¥ÉÆæÃUÁæªÀiï: lÆ!ïQmï «vÀgÀuÉ 1 ºÉZï.PÉ gÁdÄ 2 Vjñï 3 ¥Àæ sÁPÀgï 4 ºÉêÀÄAvï
r¹Öç§ÆåµÀ£ï ¥ÉÆæÃUÁæªÀiï: mÉÊ®jAUï ªÀÄ¶Ã£ï «vÀgÀuÉ 1 ºÉZï.J£ï. vÀµÀä 2 ªÀiÁ°Û CAiÀÄå¥Àà 3 ®QëöäzÉë ºÉZï.J¸ï. 4 ±ÀPÀÄAvÀ>Á C¥ÀàAiÀÄå 5 ºÉZï.©. PÁªÉÃj 6 ºÉZï.¦. «Ã°£À 7 ¥ÀzÀªÀÄäªÀw 8 C²é¤ ºÉZï.J£ï. 9 vÀAUÀªÀÄä ºÉZï.JA. 10 ºÉZï.n. gÉÃSÁ 11 ¦.Dgï. PÁªÉÃj
Manual on Public Disclosure Schedules
CMAK | 55
12 PÀ«vÁ JA.©. 13 ºÉZï.Dgï. ªÀÄAdļÀ 14 C¤vÁ ºÉZï.©. 15 gÀªÀÄå²æà ºÉZï.J£ï. 16 ºÉZï.©. VÃvÁ 17 ªÀ°èAiÀĪÀÄä 18 JA. ªÀÄÄvÀÄÛ 19 ¸À©vÁ PÉ.J£ï 20 ºÉZï. JA. ªÀÄAdļÀ 21 ¦.J¸ï. ¸ÀIJÃ>Á
QAiÉÆäPïì¤AzÀ 6 wAUÀ¼À PÀA¥ÀÆålgï vÀgÀ¨ÉÃw 1 ºÉZï.J. gÉÃtÄPÁ 2 PÀ«vÁ JA.©. 3 ®QëöäzÉë ºÉZï.J¸ï. 4 PÁªÉÃj «. 5 ¸ÀIJÃ>Á n. 6 ¥ÀÆtÂðªÀÄ 7 ºÉZï.JA. gÀªÀÄå²æà 8 ºÉZï.J¸ï. ±ÀÄæw 9 ºÉZï.J¸ï. ±ÉéÃvÀ 10 ºÉZï.eÉ. ®°vÀ 11 ºÉZï.Dgï. PÀȵÀÚ 12 ºÉZï.«.DPÁ±À 13 ¸ÀÄPÀ£Àå ºÉZï.Dgï 14 CgÀÄuï PÀĪÀiÁgï 15 ¸ÀAzsÁå ºÉZï.¹ 16 ºÉZï.J¸ï. gÀªÀÄå 17 ºÉZï.¦. ¸ÀÄPÀ£Àå 18 ºÉZï.J¸ï. UÀuÉñï 19 ºÉZï.PÉ. ¸ÀĪÀÄ®vÀ
Manual on Public Disclosure Schedules
CMAK | 56
20 ºÉZï.¹. PÁwðPï 21 ºÉZï.¹. ²ªÀUÀ«Ä
List of the beneficiaries under 22.75% in 2011-12
Sl.No Beneficiaries Name ªÉÊzÀåQÃAiÀÄ ªÉZÀÑ
1 ºÉZï.PÉ.ªÀÄAdÄ,vÀAzÉ: PÀĪÀiÁgï,¸ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ
2 ¥ÀÀæPÁ±ï,£ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
3 ºÉZï.«.²ªÀÅ,²ªÀPÉÃj,«gÁd¥ÉÃmÉ
4 ºÉZï.Dgï.UÀuÉñï,vÀAzÉ: aPÀÌgÀAUÀ,¸ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ
5 gÁf UÀAqÀ:¹zÀÝ£ÁAiÀÄPÀ,C¥ÀàAiÀÄå ¸Áé«Ä gÀ¸ÉÛ,«gÁd¥ÉÃmÉ
6 sÁUÀå®QÑöä,ªÀÄ>ÉwjPÉ ¨ÉlÖ,«gÁd¥ÉÃmÉ
7 ºÉZï.df.¢£Éñï,vÀAzÉ:ºÉZï.«.¨ÉÊgÀÄ,²ªÀPÉÃj
±ËZÁ®AiÀÄ ¤ªÀiÁðt 1 ºÉZï.PÉ.£ÁUÀªÀÄä,UÀAqÀ: ºÉZï.PÀĪÀiÁgï,¸ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ.
2 ºÉZï.«.gÁdÄ,²ªÀPÉÃj,«gÁd¥ÉÃmÉ
3 ¨ÉÆÃd.ºÉZï.J¸ï. vÀAzÉ:¸ÀħâAiÀÄå,²ªÀPÉÃj,«gÁd¥ÉÃmÉ
4
ºÉZï.gÁªÀÄÄ.ºÉZï.J. vÀAzÉ:ªÉAPÀl.ºÉZï.¦.,²ªÀPÉÃj,«gÁd¥ÉÃmÉ
5 ºÉZï.¦.ªÀÄÄvÀÛ, vÀAzÉ:¥À¼À¤¸Áé«Ä,£ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
6 ºÉZï.J>ï.D£ÀAzÀ,ºÀjPÉÃj,«gÁd¥ÉÃmÉ
7 ºÉZï.J£ï.±ÉÆà sÀ,ªÉÆUÀgÀUÀ°è,«gÁd¥ÉÃmÉ
8 ºÉZï.CA.Vjd,CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
Manual on Public Disclosure Schedules
CMAK | 57
ªÀÄ£É j¥ÉÃj 1 ªÉAPÀlgÀªÀÄt,CgÀ¸ÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
2 ºÉZï.J>ï.D£ÀAzÀ,ºÀjPÉÃj,«gÁd¥ÉÃmÉ
3 gÉêÀw CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ.
4 ¥ÉÆ£ÀߪÀÄä, ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
5 ¥ÁªÀðw, UÀAqÀ:ZÉÆêÀÄ,CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
6 ºÉZï.¥ÁªÀðw,CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
7 ºÉZï.«.UËgÀªÀÄä,²ªÀPÉÃj,«gÁd¥ÉÃmÉ
8
ºÉZï.JA.PÀtÚªÀÄä,UÀAqÀ: ZÉ£Àß ¸Áé«Ä,C¥ÀàAiÀÄå¸Áé«Ä gÀ¸ÉÛ,«gÁd¥ÉÃmÉ
9 ºÉZï.f.zÉë,²ªÀPÉÃj,«gÁd¥ÉÃmÉ
10 ºÉZï.PÉUËj,²ªÀPÉÃj,«gÁd¥ÉÃmÉ
11 ºÉZï.«.¥ÀĵÀà,CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
12 UÀAUÀªÀÄä, UÀAqÀ: ªÉAPÀlgÀªÀÄt.ºÉZï.
13 ºÉZï.«.UËgÀªÀÄä UÀAqÀ:ºÉZï.J£ï.ªÉAPÀlgÀªÀÄt,ªÀÄ>ÉwjPÉ ¨ÉlÖ
14 eÁ£ÀQ, ¸ÀÄAPÀzÀPÀmÉÖ,«gÁd¥ÉÃmÉ
15 ºÉZï.±ÀAPÀgÀªÀÄä,ªÉÆUÀgÀUÀ°è,«gÁd¥ÉÃmÉ
16 ºÉZï.PÉ.UËj,CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
17 ºÉZï.JA.ªÉî, ªÉÆUÀgÀUÀ°è,«gÁd¥ÉÃmÉ
18 sÁ£ÀÄ, ¤¸ÀUÀð §qÁªÀuÉ,«gÁd¥ÉÃmÉ
19 ºÉZï.Dgï.UÀAUÉ,CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
20 ºÉZï.Dgï.PÁªÉÃj, UÀAqÀ:gÁªÀÄ°AUÀA,ªÀÄ>ÉwjPÉ ¨ÉlÖ
21 ºÉZï.PÉ.gÁdÄ, vÀAzÉ: PÁj,¸ÀÄAPÀzÀ PÀmÉÖ,«gÁd¥ÉÃmÉ
22 ¥ÀĵÀà, ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
23 gÁdÄ.ºÉZï.J£ï. aPÀÌ¥ÉÃmÉ,«gÁd¥ÉÃmÉ
Manual on Public Disclosure Schedules
CMAK | 58
24 ¥ÀÀæPÁ±ï.J¸ï. ªÀÄÄRågÀ¸ÉÛ,«gÁd¥ÉÃmÉ
25 ºÉZï.Dgï. eÁ£ÀQÌ, CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
26 ¥À¼À¤, ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
27 ºÉZï.PÉ.C¥ÀàtÚ vÀAzÉ:¢|| PÁAiÀÄð¥Àà,¸ÀÄAPÀzÀPÀmÉÖ,«gÁd¥ÉÃmÉ
28 ºÉZï.J¸ï.CAiÀÄå¥Àà vÀAzÉ:¸ÉÆêÀÄ,£ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
29 PÀªÀÄ®ªÀÄä, PÀ®Äè PÉÆÃgÉ,«gÁd¥ÉÃmÉ
30
eÉÆåÃw.JA.AiÀÄÄ.UÀAqÀ:ªÀÄ£ÉÆúÀgï,C¥ÀàAiÀÄå¸Áé«Ä gÀ¸ÉÛ,«gÁd¥ÉÃmÉ.
31 a£ÀߪÀÄä UÀAqÀ: £ÁUÉñï,C¥ÀàAiÀÄå¸Áé«Ä gÀ¸ÉÛ,«gÁd¥ÉÃmÉ
32 ºÉZï.J>ï.ºÀ£ÀĪÀÄ vÀAzÉ:ºÉZï.J>ï.VqÀØ,²ªÀPÉÃj,«gÁd¥ÉÃmÉ
33
ªÀÄ°èUÉ.ºÉZï.PÉ UÀAqÀ:¢||PÀÄlÖ¥Àà.ºÉZï.r,£ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
34 ºÉZï.J£ï.®°vÀ UÀAqÀ:£ÀAd¥Àà,¸ÀÄAPÀzÀPÀmÉÖ,«gÁd¥ÉÃmÉ
PÀA¥ÀÆålgï ºÁUÀÆ ¦æAlgï ¤ÃrgÀĪÀÅzÀÄ
1
C)ºÉZï.PÉ.¸ÀħæªÀÄtÂ, vÀAzÉ:ºÉZï.M.PÀtÚ«ÄãÀÄ¥ÉÃmÉ, D)ºÉZï.©.C¶ðvÀ, vÀAzÉ: §¸ÀªÀgÁeï¥ÀAdgï¥ÉÃmÉ
±ÀªÀ¸ÀA¸ÁÌgÀ
1
ºÉZï.J.®Qëöä, ¥À¼À¤ ¸Áé«Ä9.ºÉZï.JA. ¸ÀÄtÚzÀ ©Ã¢,«gÁd¥ÉÃmÉ
2
PÀªÀÄ®.JA.©, UÀAqÀ:¢|| JA.JA.¨É½îAiÀÄ¥Àà C¥ÀàAiÀÄå¸Áé«ÄgÀ¸ÉÛ,«gÁd¥ÉÃmÉ
«zÁå¨Áå¸À 1 ¥Àæ¥ÀÄ>ï vÀAzÉ:£ÁUÀgÁeï,ºÀjPÉÃj,«gÁd¥ÉÃmÉ
Manual on Public Disclosure Schedules
CMAK | 59
2 ¸ÀÄAzÀgÀ,ºÉZï.PÉ. vÀAzÉ: PÀĪÀiÁgï,«ÄãÀÄ¥ÉÃmÉ,«gÁd¥ÉÃmÉ
3 ¸ÀħæªÀÄtÂ,¸ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ
4 ºÉZï.JA.ªÉî, ªÉÆUÀgÀUÀ°è,«gÁd¥ÉÃmÉ
5 «±Àé£Áxï,¸ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ
6 gÉÃtÄPÁ.ºÉZï.J. vÀAzÉ: D£ÀAzÀ.ºÉZï.f.ºÀjPÉÃj,«gÁd¥ÉÃmÉ
7 ¦.¸ÀIJî vÀAzÉ: ¦.J¸ï.¸ÀħæªÀÄtÂ,vÉ®ÄUÀgÀ ©Ã¢,«gÁd¥ÉÃmÉ
8
ºÀjñï.ºÉZï.© vÀAzÉ: ¸ÀAzÉÃ±ï «.J£ï. ºÀjPÉÃj,«gÁd¥ÉÃmÉ
9 ®QÑöä UÀAqÀ: gÁd¥Àà ªÀÄ>ÉwjPÉ ¨ÉlÖ,«gÁd¥ÉÃmÉ
10 D£ÀAzÀ ªÀÄUÀ: VjñÀ.ºÉZï.J. ºÀjPÉÃj ¸ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ
11 ºÉZï.JA.GzÀAiÀÄ vÀAzÉ: ªÀÄÄvÀÛ¥Àà £ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
12 ¤Ã®ªÀÄä ªÀÄUÀ: ¸ÀAvÉƵÀPÀĪÀiÁgï £ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ.
13 ºÀÉZï.¦.gÁf ªÀÄUÀ:PÀĪÀiÁgï ¸ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ
14
gÉÆðPïì «zÁå¸ÀA¸ÉÜ «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
15 ¸ÀªÉÇÃðzÀAiÀÄ «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
16
¸ÀPÁðj ªÀiÁzÀj ¥ÀæxÀ«ÄPÀ ±Á>É «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
17
¸ÀAvÀ C£ÀߪÀÄä ¥sËæqÀ±Á> «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
18
GzÀÄð ¸À.¥ÁæxÀ«ÄPÀ ±Á>É «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
19
¸ÀAvÀ C£ÀߪÀÄä ¸ÀAAiÀÄÄPÀÛ ¥sËæqÀ±Á>É «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
Manual on Public Disclosure Schedules
CMAK | 60
20
¸ÀAvÀ C£ÀߪÀÄä ±Á>É «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
21
dAiÀÄ¥ÀæPÁ±ï £ÁgÁAiÀÄt ±Á>É «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
22
ZÀZïÀð ¥À©èPï ¸ÀÆÌ>ï «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
23
PÀÆUïÀð ªÁå° ¸ÀÆÌ>ï «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
24
ªÀiËAl£ï ªÀåªï ¸ÀÆÌ>ï «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
25
«£ÁAiÀÄPÀ EAVèÃµï ±Á>É «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
26
¥ÀzÀ« ¥ÀƪÀð PÁ>ÉÃdÄ «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
27
¸ÀPÁðj ¥ÀæxÀ«ÄPÀ ±Á>É «zÁå¨Áå¸À zsÀ£À¸ÀºÁAiÀÄ ªÉÆvÀÛ ¤ÃrgÀĪÀÅzÀÄ
28 ªÀÄAdļÁ vÀAzÉ: ¨Á§Ä.JA. ¸ÀÄAPÀzÀPÀmÉÖ,«gÁd¥ÉÃmÉ
29 ºÉZï.©.¸ÀĤ>ï vÀAzÉ: ¨ÉÆÃd.ºÉZï.J¸ï. ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
30 ºÉZï.J.DPÁ±ï vÁ¬Ä:eÁ£ÀQ ²ªÀPÉÃj «gÁd¥ÉÃmÉ.
31 PÀ«vÀ vÀAzÉ: ºÉZï.J¸ï. gÁd ²ªÀPÉÃj «gÁd¥ÉÃmÉ
32 ºÉZï.J¸ï.P˱À®å vÀAzÉ: ²æäªÁ¸À ²ªÀPÉÃj «gÁd¥ÉÃmÉ
33 ¤±Á vÀAzÉ: ºÉZï.PÉ. UÀuÉñï CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
34 ºÉZï.PÉ.EA¢gÁ vÁ¬Ä: PÀ¢æ ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
35 gÀªÀÄå.ºÉZï.¹ vÀAzÉ: ZÀAzÉêÃRgï ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
36 ¸ÀwÃ±ï ºÉZï.PÉ. vÀAzÉ: PÉAZÀ ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
Manual on Public Disclosure Schedules
CMAK | 61
37
gÀÁPÉñï.ºÉZï.« vÀAzÉ: ªÉAPÀmÉÃ±ï ºÉZï.r. ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
¸ÉÆÃ!Ágï ¢Ã¥À C¼ÀªÀr¹gÀĪÀÅzÀÄ
1
ªÀÄ°èPÁdÄð£À vÀAzÉ: PÁ¼ÀAiÀÄå ºÀjPÉÃj ¸ÀÄtÚzÀ ©Ã¢,«gÁd¥ÉÃmÉ
2 sÀ¢æ UÀAqÀ: ¨ÉÆgÀAiÀÄå ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
3 ºÉZï.®Qëöä UÀAqÀ: ªÀiÁzÀAiÀÄå £ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
4 vÀļÀ¹ UÀAqÀ: gÀªÉÄñï CgÀ¸ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
5 ¸ÀIJî UÀAqÀ: gÉÃtÄPÀĪÀiÁgï £ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
6
vÀļÀ¹ ªÀiÁjAiÀĪÀÄä zÉêÀ¸ÁÜ£À n.JA.¹.PÁélæ ï ¸ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ
7 ºÉZï.J¸ï. §¸ÀªÀ vÀAzÉ: ¸Àħâ.ºÉZï.J¸ï. «ÄãÀÄ¥ÉÃmÉ
8 ºÉZï.PÉ.¸ÀħæªÀÄt vÀAzÉ: PÀ¥Àð ªÉÆUÀgÀUÀ°è,«gÁd¥ÉÃmÉ
List of the beneficiaries under 22.75% in 2012-13
PÀ£ÁðlPÀ ¥Àj²µÀ× d£ÀgÀ C©üªÀÈ¢üÞUÁV ¸ÀܽÃAiÀÄ ¸ÀA¸ÉÜUÀ¼À ¤¢ü¬ÄAzÀ ¤UÀ¢üvÀ C£ÀÄzÁ£À, MzÀV¸À!ÁzÀ C£ÀÄzÁ£À, RZÀÄð ªÀiÁqÀ!ÁzÀ C£ÀÄzÁ£À ªÀÄvÀÄÛ ¥sÀ!Á£ÀÄ sÀ«UÀ¼À PÉÆæÃrÃPÀÈvÀ «ªÀgÀ
f!ÉèAiÀÄ «ªÀgÀ: ¥ÀlÖt ¥ÀAZÁ¬Äw, «gÁd¥ÉÃmÉ, PÉÆqÀUÀÄ ªÀiÁ»w ªÀµÀð: 2012-13
PÀæ .¸ÀA PÁAiÀÄð PÀæªÀÄUÀ¼À «ªÀgÀ ¤UÀ¢ü¥Àr¹zÀ
±Éà C£ÀÄzÁ£À
RZÀÄð ªÀiÁqÀ!ÁzÀ
MlÄÖ C£ÀÄzÁ£À
1 DgÉÆÃUÀå,WÀ£ÀvÁdå ºÁUÀÆ PÁ£ÀÆ£ÀÄ CjªÀÅ.ªÀÄvÀÄÛ ²©gÀUÀ¼À£ÀÄß DAiÉÆÃf¸ÀĪÀÅzÀÄ ºÁUÀÆ ««zsÀ PÁAiÀÄðPÀæUÀ¼À£ÀÄß ºÀ«ÄäPÉƼÀÄîªÀÅzÀÄ.(s ÁªÀiÁ£Àå) 50000
Manual on Public Disclosure Schedules
CMAK | 62
2 ¥ËgÀPÁ«ÄðPÀjUÉ ¸ÀªÀĪÀ¸ÀÛç ,PÁå¥ï ¸Éélgï,gÉìģïPÉÆÃmï, PÉÆqÉ, ªÉøÀÖPÉÆÃmï, UË è ï(s ÁªÀiÁ£Àå) 250000 92295
3 ¥ËgÀPÁ«ÄðPÀgÀ ªÀÄPÀ̽UÉ NzÀ®Ä C£ÀÄPÀÆ®ªÁUÀ®Ä J>ÉPÀæöÖ>ï E£ïªÀlðgï (s ÁªÀiÁ£Àå)
205000
4 ±Á>ÉUÀ½UÉ CA¨ÉÃqÀÌgï ¥ÀĸÀÛPÀUÀ¼ÀÄ(s ÁªÀiÁ£Àå) 50000
5 «zsÁå zsÀ£À ¸ÀºÁAiÀÄ(s ÁªÀiÁ£Àå) 270000 4000
6 ªÀÉÊzÀåQÃAiÀÄ ªÀÄvÀÄÛ ±ÀªÀ¸ÀA¸ÁÌgÀs(¸ÁªÀiÁ£Àå) 30000 3000
7 ¸ÀªÀ®vÀÄÛ «vÀgÀuÉ, ¸ sÉ PÁAiÀiðPÀæªÀÄ ªÉZÀÑ 70000 57609
8 ±ËZÁ®AiÀÄ ¤ªÀiÁðt(J¸ï.J¥sï.¹) 50000 90000
9 ªÀÄ£É j¥ÉÃj(J¸ï.J¥sï.¹) 50000 204000
10 £À½ ¤Ãj£À ¸ÀA¥ÀPÀð 300000
11 PÀA¥ÀÆålgï vÀgÀ sÉÃw ªÉZÀÑ, qÉæöÊ«AUÀ 242000 15147
12 ¥Àj²µÀÖ eÁw ªÀÄvÀÄÛ ¥Àj²µÀÖ ¥ÀAUÀqÀzÀªÀgÀÄ ªÁ¹¸ÀĪÀ ¥ÀæzÉñÀzÀ ¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£ÀUÀ½UÉ CqÀÄUÉ ¥ÁvÉæUÀ¼ÀÄ,¥ÉÃAqÁ>ï ,HlzÀ mÉç>ï ªÀÄvÀÄÛ ZÉÃgï 500000 525035
13 ¤ªÉñÀ£À RÀjâUÁV gÀÆ 50000 gÀAvÉ ¸ÀºÁAiÀÄzsÀ£À 100000
14 SÁ° ¤ªÉñÀ£ÀªÉÇA¢gÀĪÀ ¥sÀ>Á£ÀĨsÀ«UÀ½UÉ ¥ÀPÀÌ ªÀÄ£É ¤«Äð¸À®Ä gÀÆ 70000 zÀAvÉ ¸ÀºÁAiÀÄzsÀ£À 140000
15 1 jAzÀ 7£Éà vÀgÀUÀwªÀgÀUÉ ªÁå¸ÀAUÀ ªÀiÁqÀĪÀ ¥Àæw ªÁqÀðUÉ PÀ¤µÀ× 10 ªÀÄPÀ̽UÉ ±Á>Á ¨ÁåUï ºÁUÀÆ >ÉÃR£À ¸ÁªÀiÁVæUÀ¼ÀÄ
200000
16 7jAzÀ 10£Éà vÀgÀUÀwªÀgÀUÉ ªÁå¸ÀAUÀ ªÀiÁqÀĪÀ ¥Àæw ªÁqÀðUÉ PÀ¤µÀ× 10 ªÀÄPÀ̽UÉ PÉÆqÉ ºÁUÀÆ >ÉÃR£À ¸ÁªÀiÁVæUÀ¼ÀÄ 200000
17 ¥Àj²µÀÖ eÁw ªÀÄvÀÄÛ ¥ÀAUÀqÀ ¸ÀªÀÄÄzÁAiÀÄzÀ ¥ÀæzÉñÀUÀ¼À°è ¸ÉÆîgï ©Ã¢ ¢Ã¥À C¼ÀªÀr¸ÀĪÀÅzÀÄ. 600000
18 ««zsÀ C©üªÀÈ¢Þ PÁªÀÄUÁjUÀ½UÉ 1074000 1505193
Manual on Public Disclosure Schedules
CMAK | 63
MlÄÖ 4381000 2496279
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ¸ÀºÁAiÀÄzsÀ£À
1 ºÉZï f ªÀÄÄgÀÄUÀ ªÉÊzÀåQÃAiÀÄ 2000
2 PÀȵÀÚ EªÀgÀ ¥ÀwßAiÀÄ ªÉÊzÀåQÃAiÀÄ 2000 MlÄÖ 4000
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ¸ÀºÁAiÀÄzsÀ£À
1 ºÉZï.J¸ï.CAiÀÄå¥Àà
±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
2 ²æêÀÄw zÉêÀªÀÄä ±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
3 ºÉZï.¦.ªÀÄÄPÀÛ ±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
4 ºÉZï.PÉ.dAiÀÄ ±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
5 ¸ÀgÉÆÃdªÀÄä ±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
6 ºÉZï ¦ «ÄãÁ
±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
7 ºÉZï ¹ UÀuÉñÀ
±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
8 gÁzsÀªÀÄä
±ËZÁ®AiÀÄ ¤ªÀiÁðt 10000
9 ¥ÀÄ¥Àà
±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
10 ªÀ¸ÀAw
±ËZÁ®AiÀÄ ¤ªÀiÁðt 10000
Manual on Public Disclosure Schedules
CMAK | 64
11 ªÀiÁzÉë ºÉZï E
±ËZÁ®AiÀÄ ¤ªÀiÁðt 10000
12 sÁUÀå ±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
13 gÁt UÀAqÀ ºÀZï « ªÉAPÀmÉñï
±ËZÁ®AiÀÄ ¤ªÀiÁðt 10000
14 zÉêÀªÀÄä
±ËZÁ®AiÀÄ ¤ªÀiÁðt 5000
MlÄÖ 90000
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ¸ÀºÁAiÀÄzsÀ£À
1 ²æêÀÄw ¸ÀgÀ¸Àéw ªÀÄ£É j¥ÉÃj 5000
2 ²æêÀÄw gÁzsÀ ªÀÄ£É j¥ÉÃj 5000
3 ²æêÀÄw ¸ÀÉ°é ªÀÄ£É j¥ÉÃj 5000
4 ²æêÀÄw ªÉAPÀlªÀÄä ªÀÄ£É j¥ÉÃj 5000
5 ºÉZï.J£ï.®°vÀ ªÀÄ£É j¥ÉÃj 5000
6 ²æêÀÄw ¥Á¥ÀªÀÄä ªÀÄ£É j¥ÉÃj 5000 7 UËj ªÀÄ£É j¥ÉÃj 10000 8 ºÉZï Dgï ¥ÀÄ¥Àà ªÀÄ£É j¥ÉÃj 5000 9 ¸Á«wæ J¸ï ªÀÄ£É j¥ÉÃj 5000 10 ¸ÀtÚ ¸Àħ⠪ÀÄ£É j¥ÉÃj 3000 11 ±ÁAw ªÀÄ£É j¥ÉÃj 3000 12 gÁªÀÄZÀAzÀæ ªÀÄ£É j¥ÉÃj 3000 13 ªÀiÁzÉë ªÀÄ£É j¥ÉÃj 10000 14 £ÁUÀªÀÄt ºÉZï ¦ ªÀÄ£É j¥ÉÃj 10000 15 ªÀÄ°UÉ ºÉZï f ªÀÄ£É j¥ÉÃj 3000 16 ºÉZï ¦ gÀ« ªÀÄ£É j¥ÉÃj 3000
Manual on Public Disclosure Schedules
CMAK | 65
17 ªÀÄÄgÀÄUÀ ºÉZï J£ï ªÀÄ£É j¥ÉÃj 10000 18 ºÉZï J£ï £ÁUÀªÀÄä ªÀÄ£É j¥ÉÃj 3000 19 ºÉZï ¸ÀħâªÀÄä ªÀÄ£É j¥ÉÃj 3000 20 £ÁUÀªÀÄä ªÀÄ£É j¥ÉÃj 10000 21 ºÉZï Dgï DgÀÄäUÀA ªÀÄ£É j¥ÉÃj 3000 22 ºÉZï ¦ ²ªÀÅ ªÀÄ£É j¥ÉÃj 10000 23 UËj UÀAqÀ: gÀAUÀ¸Áé«Ä ªÀÄ£É j¥ÉÃj 10000 24 £ÁUÀgÁdÄ ºÉZï ¦ ªÀÄ£É j¥ÉÃj 3000 25 ªÀÄAdļÁ ªÀÄ£É j¥ÉÃj 10000 26 ±ÁAw UÀAqÀ: ¥Ëw PÀĪÀiÁgÀ ªÀÄ£É j¥ÉÃj 3000 27 ºÉZï JA ¥ÀÄlÖ Áé«Ä ªÀÄ£É j¥ÉÃj 10000 28 ªÉAPÀlªÀÄä ªÀÄ£É j¥ÉÃj 5000 29 £ÁUÀªÀÄä ªÀÄ£É j¥ÉÃj 3000 30 ºÉZï ¦ £ÁUÀgÁdÄ ªÀÄ£É j¥ÉÃj 5000 31 PÀtÚªÀÄä ªÀÄ£É j¥ÉÃj 10000 32 §tÚªÀÄä ªÀÄ£É j¥ÉÃj 1000 33 gÁzsÀ ªÀÄ£É j¥ÉÃj 5000 34 zÀAqÀ¥Át ªÀÄ£É j¥ÉÃj 5000 35 ªÀÄ¼É ¥ÀjºÁgÀ £ÀµÀÖzÀ zsÀ£À ¸ÀºÁAiÀÄ ªÀÄ£É j¥ÉÃj 5000 36 ºÉZï JA ±ÁAw ªÀÄ£É j¥ÉÃj 5000 MlÄÖ 204000
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ¸ÀºÁAiÀÄzsÀ£À 1 ²æêÀÄw ªÀÄAUÀ¼À ±ÀªÀ¸ÀA¸ÁÌgÀ 1000 2 ºÉZï f PÀĪÀiÁgï ±ÀªÀ¸ÀA¸ÁÌgÀ 1000
Manual on Public Disclosure Schedules
CMAK | 66
3 dAiÀÄ 1000 MlÄÖ 3000
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ¸ÀºÁAiÀÄzsÀ£À
1 ºÉZï.PÉ.zÁPÀëAiÀÄt «zÁå¨Áå¸À 2000 2 ªÉÃ®Ä ªÀÄÄgÀÄUÀ «zÁå¨Áå¸À 2000
MlÄÖ 4000
PÁªÀÄUÁj PÀæ.¸ÀA PÁAiÀÄð PÀæªÀÄUÀ¼À «ªÀgÀ ¤UÀ¢ü¥Àr¹zÀ ±ÉÃ
C£ÀÄzÁ£À
1 ¥ËgÀPÁ«ÄðPÀjUÉ PÁ>ÉÆä §½ EgÀĪÀ ¸ÀªÀÄÄzÁAiÀÄ
±ËZÁ®AiÀÄUÀ½UÉ ¸ÉÆÃPï ¦qï ¤ªÀiÁðt 96516
2 £ÉºÀgÀÄ £ÀUÀgÀ ¸ÀªÀÄÄzÁAiÀÄ sÀªÀ£À PÁªÀÄUÁj 423290
3 ¸ÀÄAzÀzÀ PÀmÉÖ ¸ÀªÀÄÄzÁAiÀÄ sÀªÀ£À ¤ªÀiÁðt PÁªÀÄUÁj 258260
4 ªÁtÂdå vÉjUÉ 69824
5 gÁdzsÀ£À 14215
6 DzÁvÀ vÉjUÉ 17109
7 PÁ«ÄðPÀ ªÀAwUÉ 2124
8 ¸ÀÄtÚzÀ ©Ã¢AiÀÄ°è ZÀgÀAr PÁªÀÄUÁj 623855
MlÄÖ 1505193
Manual on Public Disclosure Schedules
CMAK | 67
PÀ£ÁðlPÀ 7.25% C©üªÀÈ¢üÞUÁV ¸ÀܽÃAiÀÄ ¸ÀA¸ÉÜUÀ¼À ¤¢ü¬ÄAzÀ ¤UÀ¢üvÀ C£ÀÄzÁ£À, MzÀV¸À!ÁzÀ C£ÀÄzÁ£À, RZÀÄð ªÀiÁqÀ!ÁzÀ C£ÀÄzÁ£À ªÀÄvÀÄÛ ¥sÀ!Á£ÀÄ sÀ«UÀ¼À PÉÆæÃrÃPÀÈvÀ «ªÀgÀ( 2000-2001 jAzÀ 2010 gÀªÀgÉUÉ)
f!ÉèAiÀÄ «ªÀgÀ: ¥ÀlÖt ¥ÀAZÁ¬Äw, «gÁd¥ÉÃmÉ, PÉÆqÀUÀÄ ªÀiÁ»w ªÀµÀð: 2012-13
PÀæ .¸ÀA PÁAiÀÄð PÀæªÀÄUÀ¼À «ªÀgÀ ¤UÀ¢ü¥Àr¹zÀ ±Éà C£ÀÄzÁ£À
RZÀÄð ªÀiÁqÀ!ÁzÀ MlÄÖ C£ÀÄzÁ£À
1 1 jAzÀ 10£Éà vÀgÀUÀwªÀgÀUÉ ªÁå¸ÀAUÀ ªÀiÁqÀĪÀ ¥Àæw ªÁqÀðUÉ PÀ¤µÀ× 5 ªÀÄPÀ̽UÉ ±Á>Á ¨ÁåUï,PÉÆqÉ ºÁUÀÆ >ÉÃR£À ¸ÁªÀiÁVæUÀ¼ÀÄ
100000
2 ±ÀªÀ¸ÀA¸ÁÌgÀ ºÁUÀÆ vÀÄvÀÄð ªÉÊzÉÊQÃAiÀÄ aPÀvÉìUÁV zsÀ£À ¸ÀºÁAiÀÄ gÀÆ 1000 zÀAvÉ
18000
3
¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£ÀUÀ½UÉ PÀÄrAiÀÄĪÀ ¤Ãj£À ¤Ãj£À ¹Ã£ïmÉÃPïì mÁåAPï ºÁUÀÆ ¥ÉÊ¥ï C¼ÀªÀr¹ PÀÄrAiÀÄĪÀ ¤Ãj£À ªÀåªÀ¸ÉÜ MzÀV¸ÀĪÀÅzÀÄ.
177000
4 PÀqÀħqÀªÀjUÉ £À°è ¤Ãj£À ¸ÀA¥ÀPÀðUÁV ¸ÀºÁAiÀÄzsÀ£À 50000
5 ¨ÉùPï PÀA¥ÀÆålgï, mÉÊ®jAUï ªÀÄvÀÄÛ qÉæöÊ«AUï 250000
6 J¸ï.J>ï.¹ ªÉÄîàlÄÖ ªÁå¸ÀAUÀ ªÀiÁqÀĪÀ «zÁåyðUÀ½UÉ gÀÆ 1000 zÀAvÉ zsÀ£À¸ÀºÁAiÀÄ 1,41,000
Manual on Public Disclosure Schedules
CMAK | 68
7 DgÉÆÃUÀå,WÀ£ÀvÁådå £ÉʪÀÄð®å ºÁUÀÆ EvÀgÉà PÁAiÀÄðPÀæªÀÄUÀ¼À£ÀÄß ºÀ«Ää PÉƼÀÄîªÀÅzÀÄ 50000
8 ¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£ÀUÀ½UÉ CqÀÄUÉ ¸ÁªÀiÁUÀæUÀ¼ÀÄ HlzÀ ZÉÃgï ºÁUÀÆ ¥ÉÃAqÁ>ï
350000
9 ««zsÀ PÁªÀÄUÁjUÀ½UÉ 260000 192819 10 ªÉÊzsÀåQÃAiÀÄ ¸ÀºÁAiÀÄ 3000
11 ±ÀªÀ ¸ÀA¸ÁÌgÀ ªÉZÀÑ 5000 12 PÀqÀÄ §qÀ ªÀÄPÀ̽UÉ «zsÁåzsÀ£À ¸ÀºÁAiÀÄ
13 ²y°UÉÆArgÀĪÀ ªÀÄ£ÉUÀ¼À j¥ÉÃj ºÁUÀÆ UÀæºÀ ¤ªÀiÁðt AiÉÆÃd£É(J¸ï.J¥sï.¹)
81000 14 ±ÀËZÁ®AiÀÄ ¤ªÀiÁðt(J¸ï.J¥sï.¹) 75000
15 P˱À®å vÀgÀ sÉÃw ºÉÆA¢gÀĪÀ GzsÉÆåÃVUÀ½UÉ ¸À®PÀgÀuÉ «vÀgÀuÉ(J¸ï.J¥sï.¹)
34266
16 PÀA¥ÀÆålgï vÀgÀ sÉÃw,qÉæöÊ«Auï vÀgÀ sÉÃw, mÉÊ®jAUï vÀgÀ sÉÃw(J¸ï.J¥sï.¹)
20196
17 EvÀgÉÃ(J¸ï.J¥sï.¹)
MlÄÖ 1396000 411281 2012-13
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ªÉÆvÀÛ
1 ²æà eÉêÀiïì ªÉÊzÀåQÃAiÀÄ 2000 2 ¸ÀgÀ¸ÀÄ ªÉÊzÀåQÃAiÀÄ 1000
MlÄÖ 3000
Manual on Public Disclosure Schedules
CMAK | 69
2012-13
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ªÉÆvÀÛ
1 ²æêÀÄw ¥ÀÄlÖªÀÄä ±ËZÁ®AiÀÄ 5000 2 ²æêÀÄw ¸ÀgÉÆÃdªÀÄä ±ËZÁ®AiÀÄ 5000 3 ¦.PÉ.AiÀıÉÆÃzsÀ ±ËZÁ®AiÀÄ 5000 4 n.ªÀÄt ±ËZÁ®AiÀÄ 5000 5 AiÀıÉÆÃzsÀ ±ËZÁ®AiÀÄ 5000 6 AiÀıÉÆÃzsÀ ±ËZÁ®AiÀÄ 5000 7 ªÀÄtÂ.n. ±ËZÁ®AiÀÄ 5000 8 ¸ÀħæªÀÄt ±ËZÁ®AiÀÄ 5000 9 PÀ>Áåt ¤¢ü ±ËZÁ®AiÀÄ 5000 10 ªÀÁ¸ÀÄ ±ËZÁ®AiÀÄ 5000
11 ¸ÀħæªÀÄt ±ËZÁ®AiÀÄ 5000
12 JA « ¨Á§Ä ±ËZÁ®AiÀÄ 5000
13 ±ÀjÃ¥sï ±ËZÁ®AiÀÄ 10000
14 ¥ÀÄlÖªÀÄä ±ËZÁ®AiÀÄ 5000
MlÄÖ 75000
2012-13
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ªÉÆvÀÛ
1 ²æêÀÄw UÉæù ªÀÄ£É j¥ÉÃj 5000
Manual on Public Disclosure Schedules
CMAK | 70
2 ²æêÀÄw zÉêÀQÌ ªÀÄ£É j¥ÉÃj 5000 3 «.«.zÁªÉÆÃzsÀgï ªÀÄ£É j¥ÉÃj 10000 4 PÀ>Áåt ¤¢ü ªÀÄ£É j¥ÉÃj 5000 5 ²æà ¦Ãlgï ªÀÄ£É j¥ÉÃj 5000 6 £ÀÆgï dºÁ£ï ªÀÄ£É j¥ÉÃj 10000 7 ¦.PÉ.ªÀÄÄgÀÄUÀ£ï ªÀÄ£É j¥ÉÃj 5000 8 PÀÉ.°Ã>Á ªÀÄ£É j¥ÉÃj 5000 9 PÉ.JA.¦Ãlgï ªÀÄ£É j¥ÉÃj 10000 10 ©.E.PÀȵÀÚ¥Àà ªÀÄ£É j¥ÉÃj 10000 11 J£ï.PÉ.zÉêÀQÌ ªÀÄ£É j¥ÉÃj 5000 12 ¨Á§Ä ªÀÄ£É j¥ÉÃj 5000 13 ºÀA¸À ªÀÄ£É j¥ÉÃj 5000 14 PÀ>Áåt ¤¢ü ªÀÄ£É j¥ÉÃj 10000 15 ¥ÀzÁäªÀw ªÀÄ£É j¥ÉÃj 5000
MlÄÖ 100000
ªÀÄgÀt ¥ÀjºÁgÀ 2012-13
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ªÉÆvÀÛ
1 ²æêÀÄw ¦.PÉ.©AzÀÄ ªÀÄgÀt ¥ÀjºÁgÀ 1000 2 ªÀiÁAiÀĪÀÄä ªÀÄgÀt ¥ÀjºÁgÀ 1000 3 dAiÀÄ®Qëöä ªÀÄgÀt ¥ÀjºÁgÀ 1000 4 CªÀÄätÂÚ ªÀÄgÀt ¥ÀjºÁgÀ 1000 5 UÉÆëAzÀ ªÀÄgÀt ¥ÀjºÁgÀ 1000
MlÄÖ 5000
Manual on Public Disclosure Schedules
CMAK | 71
ºÉÆ°UÉ AiÀÄAvÀæ
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ªÉÆvÀÛ
1 PÀ>Áåt ¤¢ü ºÉÆ°UÉ AiÀÄAvÀæªÀ£ÀÄß Rjâ¹zÀ §UÉÎ ²æà «£ÁAiÀÄPÀ ªÀiÁPÉðnAUï ºÉÆ°UÉ AiÀÄAvÀæ 34266
MlÄÖ 34266
PÁªÀÄUÁj 2012-13
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ªÉÆvÀÛ
1 £ÉºÀgÀÄ £ÀUÀgÀ ¹ PÉ ªÀÄ£ÉAiÀÄ JqÀ ¨ÁUÀzÀ°è ZÀgÀAr
¤ªÀiÁðt PÁªÀÄUÁj 182684 2 gÁdzsÀ£À PÁªÀÄUÁj 1456
3 ªÁtÂdå PÁªÀÄUÁj 2370 4 DzÀAiÀÄ PÁªÀÄUÁj 4185
5 PÁ«ÄÃðPÀ ªÀAwUÉ PÁªÀÄUÁj 2124 MlÄÖ 192819
Manual on Public Disclosure Schedules
CMAK | 72
CAUÀ«PÀ®gÀ C©üªÀÈ¢üÞUÁV ±ÉÃÀ 3%À gÀAvÉ gÀÆ 5.77 ªÉÆvÀÛPÉÌ vÀAiÀiÁj¸À!ÁzÀ QæAiÀiÁ AiÉÆÃd£É
f!ÉèAiÀÄ «ªÀgÀ: ¥ÀlÖt ¥ÀAZÁ¬Äw, «gÁd¥ÉÃmÉ, PÉÆqÀUÀÄ ªÀiÁ»w ªÀµÀð: 2012-13
PÀæ . ¸ÀA PÁAiÀÄð PÀæªÀÄUÀ¼À «ªÀgÀ ¤UÀ¢ü¥Àr¹zÀ
±Éà C£ÀÄzÁ£À
RZÀÄð ªÀiÁqÀ!ÁzÀ
MlÄÖ C£ÀÄzÁ£À
1 CAUÀ«PÀ®jUÉ ªÉÊzsÀåQÃAiÀÄ ¸ÀºÁAiÀÄ 24000 2000
2 ²y®UÉÆAqÀ ªÀÄ£ÉUÀ¼À zÀÄgÀ¹Ü 10000
3 CAUÀ«PÀ®gÀ ªÀÄPÀ̽UÉ ±Á>Á ¨ÁåUï,PÉÆqÉ, ¸ÀªÀĪÀ¸ÀÛç ºÁUÀÆ >ÉÃR£À ¸ÁªÀiÁVæUÀ¼ÀÄ
74000
4 ¸ÀéAvÀ GzsÉÆåÃUÀ PÉÊUÉƼÀÄîªÀ GzsÉÆåÃVUÀ½UÉ ¸À®PÀgÀuÉ «vÀgÀuÉ
4895
5
CAUÀ«PÀ®jUÉ CxÀªÁ CªÀgÀ£ÀÄß CªÀ®A©¹zÀ PÀÄlÄA§UÀ¼À ªÀÄPÀ̼À «zsÁå¨Áå¸ÀPÉÌ zsÀ£À ¸ÀºÁAiÀÄ
24000
6 ««zsÀ ±ËZÁ®AiÀÄ ºÁUÀÄ ¸ÀPÁðj PÀlÖqÀUÀ½UÉgÁåA¥ïPÁªÀÄUÁj 273000 78938
7 CAUÀ«PÀ®gÀ PÀÄlÄA§zÀ ªÀÄ£ÉUÀ½UÉ E£ïªÀlðgï MzÀV¸ÀĪÀÅzÀÄ
182000
MlÄÖ 577000 95833
Manual on Public Disclosure Schedules
CMAK | 73
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ¸ÀºÁAiÀÄzsÀ£À
1 PÉ ªÁ¸ÀÄ ªÀÄ£É j¥ÉÃj 10000
MlÄÖ 10000
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ¸ÀºÁAiÀÄzsÀ£À 1 ºÉÆ°UÉ ªÉIJãï Rjâ 4895
MlÄÖ 4895
PÁªÀÄUÁj PÀæ.¸ÀA PÁªÀÄUÁjAiÀÄ «ªÀgÀ ªÉZÀÑ
1 ggÁåA¥ï ¤ªÀiÁðt 10587
2 ¥ÀÄgÀ sÀªÀ£À ggÁåA¥ï ¤ªÀiÁðt 2000
3 gÁdzsÀ£À 275
4 DzÁAiÀÄ vÉjUÉ 134
5 PÁð«ÄPÀ ªÀAwUÉ 635
6 ªÁtÂdå vÉjUÉ 3168
7 ZÀÄ£ÁªÀuÉ ¥ÀæAiÀÄÄPÀÛ ggÁåA¥ï ¤ªÀiÁðt 62139
MlÄÖ 78938
PÀæ.¸ÀA ¥sÀ!Á£ÀĨsÀ«UÀ¼À ºÉ¸ÀgÀÄ PÁAiÀÄðPÀæªÀÄ ¸ÀºÁAiÀÄzsÀ£À
1 n Cgï ¸ÀħæªÀÄt ªÉÊzÀåQÃAiÀÄ 2000
MlÄÖ 2000
Manual on Public Disclosure Schedules
CMAK | 74
List of the beneficiaries under 22.75% in 2013-14
PÀæ ÀA ¥sÀ¯Á£ÀĨsÀ«UÀ¼À ºÉ ÀgÀÄ GzÉÝñÀ ªÉÆvÀÛ
1 «dAiÀÄ PÉ«ÄPÀ ïì & ªÀiÁPÉðnAUï ««zsÀ ¸À®PÀgÀuÉUÀ¼À Rjâ 850096
2 «£ÁAiÀÄPÀ ªÀiÁPÉðnAUï ««zsÀ ¸À®PÀgÀuÉUÀ¼À Rjâ 211435
3 ¥Àæ¥sÀįÁè ªÀįÁèr ¦.ºÉZï.r «zsÁå zsÀ£À ¸ÀºÁAiÀÄ 20000
4 L.n ¥ÁªÀw PÁªÀÄUÁj ªÉZÀÑ 21664
5 PÁAiÀÄðPÀæªÀÄ ªÉZÀÑ PÁAiÀÄðPÀæªÀÄ ªÉZÀÑ 4378
6 22.75 ªÉĸïPÁAUÉ ¥ÁªÀw ¸ÀªÀÄÄzÁAiÀÄ sÀªÀ£À «zÀÄåZÀÑQÛ ©®Äè 9435
7 N JªÀiï ¸ÀAvÉÆõï PÀĪÀiÁgï wgÀ ÀÌj À ÁVzÉ 0
8 N JªÀiï ¸ÀAvÉÆõï PÀĪÀiÁgï wgÀ ÀÌj À ÁVzÉ 0
9 N JªÀiï ¸ÀAvÉÆõï PÀĪÀiÁgï PÁªÀÄUÁj ªÉZÀÑ 55127
10 N JªÀiï ¸ÀAvÉÆõï PÀĪÀiÁgï PÁªÀÄUÁj ªÉZÀÑ 87474
11 ºÉZï.J UÀuÉÃ±ï ²ªÀPÉÃj ±ËZÁ®AiÀÄ ¸ÀºÁAiÀÄzsÀ£À 5000
12 DzÁAiÀÄ vÉjUÉ 3263
13 gÁdzsÀ£À vÉjUÉ 463
14 ªÁtÂdå vÉjUÉ 6527
15 PÁªÀÄUÁj ªÀAwUÉ 1632
16 ¥ÀÆeÁ gÁt ºÉZï.J vÀAzÉ:-«±Àé£Áxï ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
111 ©.J 4000
17 ¸ÀAzÉÃ±ï ©.ºÉZï vÁ¬Ä:-±ÁgÀzÀ ºÉZï J¸ï ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
11 ¦ AiÀÄÄ ¹ 3000
Manual on Public Disclosure Schedules
CMAK | 75
18 PÁªÀå ºÉZï JA vÀAzÉ:- ªÀÄt ºÉZï J¸ï
1©.J 4000
19 ¸ÀĤ¯ï vÀAzÉ:-D£ÀAzÀ ºÉZï f ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
1©.J 4000
20 ¸ÀĪÀÄ ºÉZï.r vÀAzÉ:-zɪÀtÚ ºÉZï.PÉ ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
11 ©.J 4000
21 gÉtÄPÁ ºÉZï.J vÀAzÉ:-D£ÀAzÀ ºÉZï.r ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
111 ©.PÁA 4000
22 ºÀ¶ðvÁ ©.£ÁAiÀÄPï vÀAzÉ:-§ ÀªÀgÁeï £ÁAiÀÄPï ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
11 ¦ AiÀÄÄ ¹ 3000
23 ºÀÉZï eÉ zÁPÁë¬Ät ²ªÀPÉÃj «gÁd¥ÉÃmÉ
1 ©.PÁA 4000
24 ¦æAiÀiÁ.PÉ vÀAzÉ:-PÀ£ÀPÀgÁdÄ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
25 ºÉZï « gÁPÉñï vÀAzÉ: ªÉAPÀmÉÃ±ï ²ªÀPÉÃj «gÁd¥ÉÃmÉ
¢éÃwÃAiÀiÁ ¦.AiÀÄÄ.¹ 3000
26 ºÉZï J¸ï P˱À®å vÀAzÉ:-²æäªÁ¸ï ²ªÀPÉÃj «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.J 4000
27 J.J£ï «£ÉÆÃzï vÀAzÉ:- £ÁUÉÃ±ï ºÉZï Dgï
¥ÀæxÀªÀÄ ©.J 4000
Manual on Public Disclosure Schedules
CMAK | 76
28 ºÉZï JA ¥ÀÆtÂðªÀiÁ vÀAzÉ: ºÉZï Dgï ªÀiÁzsÀªÀ ²ªÀPÉÃj «gÁd¥ÉÃmÉ
¢éÃwÃAiÀiÁ ©.©©.JA 4000
29 ºÉZï JA ºÀjñï vÀAzÉ:- ºÉZï Dgï ªÀiÁzsÀªÀ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
30 ¸ÉÆêÀıÉÃRgï vÀAzÉ:-ºÉZï J£ï ªÀÄÄgÀÄUÉñï
¢éÃwÃAiÀiÁ ¦.AiÀÄÄ.¹ 3000
31 ªÀÄAdÄ ºÉZï J¸ï vÀAzÉ:- ¸ÉƪÀÄAiÀÄå ºÉZï CgÀ ÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
J¸À.J¸ï.J¯ï.¹ 2000
32 ºÉZï J£ï ¸ÀÄfÃvÁ vÀAzÉ:-£ÁUÀgÁdÄ ªÀÄ ÉvÉjPÉ ÉlÖ «gÁd¥ÉÃmÉ
¢éÃwÃAiÀiÁ ¦.AiÀÄÄ.¹ 3000
33 vÀµÀä J£ï vÀAzÉ:- £Àad¥Àà ºÉZï ©¸ÀÄAPÀzÀ PÀmÉÖ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
34 ¸ËªÀÄå ºÉZï J¸ï vÀAzÉ:-¸ÉÆêÀÄAiÀÄå ºÉZï.fCgÀ ÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¢éÃwÃAiÀiÁ ©.PÁA 4000
35 ¹AzsÀÄ vÀAzÉ:- gÀ«CgÀ ÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¢éÃwÃAiÀiÁ ©.PÁA 4000
36 ¤±Á ºÉZï.f vÀAzÉ:- UÀuÉñï CgÀ ÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.PÁA 4000
37 ªÀÄiÁ¤¥sÁ vÀAzÉ:-UÁAiÀÄwæ £ÀgÀ¹AºÀ ²ªÀPÉÃj «gÁd¥ÉÃmÉ
J¸À.J¸ï.J¯ï.¹ 2000
38 ¸ËAzÀAiÀÄð vÁ¬Ä:-£ÁUÀªÀÄ «ÄãÀÄ¥ÉÃmÉ
J¸À.J¸ï.J¯ï.¹ 2000
Manual on Public Disclosure Schedules
CMAK | 77
39 ¨ÁªÀŸÁgïJAlgï ¥ÉæöʸÀgï ªÉÄʸÀÆgÀÄ
«zÁåyðUÀ½UÉ ¥ÀĸÀÛPÀ Rjâ 19787
40 ªÉÄʸÀÆgÀÄ mÁ¥Àð°£ïì «zÁåyðUÀ½UÉ ¨ÁåUïÀ Rjâ 4273
41 PÀ«vÀ PÀĪÀiÁj vÀAzÉ:- ÉÆÃd ²ªÀPÉÃj «gÁd¥ÉÃmÉ
1©.J 4000
42 ºÉZï.¦ «°Ã£À ±ËZÁ®AiÀÄ ¸ÀºÁAiÀÄzsÀ£À 5000
43 «£ÉÆÃzï PÀĪÀiÁgï ¥ËgÀ PÁ«ÄðPÀ ¸ÀªÀÄiÁgÀA sÀ PÁ¦ü ªÉZÀÑ
3881
44 «dAiÀÄ PÉ«ÄPÀ ïì & ªÀiÁPÉðnAUï wgÀ ÀÌj À ÁVzÉ
45 ºÉZï.PÉ §£ÀߪÀÄä ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
46 ºÉZï.JA ±ÀAPÀgÀ ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
47 aPÀÌgÁªÀÄ ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
48 PÀÁªÉÃj ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
49 ªÀÄÄgÀÄUÉÃ±ï ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
50 ªÉî ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
51 ¸ÀtÚ ¸Àħ⠥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
52 gÀAUÀªÀÄä ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
53 ¸ÀÄAzÀgÀ ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
54 ºÉZï.JA ¸ÀħæªÀÄt ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
55 PÀªÀÄ® ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
56 ªÉAPÀlªÀÄä ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
57 vÀļÀ¹ ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
Manual on Public Disclosure Schedules
CMAK | 78
58 ¸ÀgÀ ÀÄ ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
59 ªÉ®ÄªÀÄÄgÀÄUÀ ¥ËgÀ PÁ«ÄðPÀjUÉ ¥ÉÆæÃvÁìºÀ zsÀ£À 2000
60 ªÉÄ//J.Dgï £À¹Ãgï CºÀªÀÄzï ¥ËgÀ PÁ«ÄðPÀ ¸ÀªÀÄiÁgÀA sÀ Hlü ªÉZÀÑ
15000
61 ¹n ÉAlgï J ÉPÁæ¤Pïì «.¥Éà ¥ËgÀ PÁ«ÄðPÀjUÉ PÀÄPÀÌgï ªÀÄvÀÄÛ §ºÀĪÀiÁ£À Rjâ¹zÀ ªÉZÀÑ
53544
62 «£ÉÆÃzï PÀĪÀiÁgï ¸ÀªÀÄiÁgÀA sÁ PÁ¦ü ªÉZÀÑ 1750
63 ¦.PÉ JA ¸ËAqïì «.¥Éà ¸ÀªÀÄiÁgÀA sÁ ªÉZÀÑ 1200
64 ªÉÄ//J.Dgï £À¹Ãgï CºÀªÀÄzï ¥ËgÀ PÁ«ÄðPÀ ¸ÀªÀÄiÁgÀA sÀ Hlü ªÉZÀÑ
18000
65 ¸ÀªÀiÁgÀA sÀ ªÉZÀÑ 3590
66 «dAiÀÄ PÉ«ÄPÀ ïì & ªÀiÁPÉðnAUï ºÉÆ°UÉ «Ä±À£ï 26200
MlÄÖ 1540719
List of the beneficiaries under 7.25% in 2013-14
PÀæ ÀA ¥sÀ¯Á£ÀĨsÀ«UÀ¼À ºÉ ÀgÀÄ GzÉÝñÀ ªÉÆvÀÛ
1 «£ÁAiÀÄPÀ ªÀiÁPÉðnAUï ªÀÄAqÀå
¥sÀ Á£ÀÄ sÀ«UÀ½UÉ ««zsÀ ¸ÁªÀiÁVæ «vÀgÀuÉ Rjâ
284543
2 «dAiÀÄ PÉ«ÄPÀ ïì & ªÀiÁPÉðnAUï PÀÄtÂUÀ ï
¥sÀ Á£ÀÄ sÀ«UÀ½UÉ ««zsÀ ¸ÁªÀiÁVæ «vÀgÀuÉ Rjâ
137935
3 DzÁAiÀÄ vÉjUÉ PÁªÀÄUÁj 8622
Manual on Public Disclosure Schedules
CMAK | 79
4 ªÉÄ//ªÀÄÄ£Àß «.¥Éà £À°è ¤ÃgÀÄ ÀA¥ÀPÀð ªÉZÀÑ 36150
5 ¥ÀzÁäªÀw ªÀÄ£É j¥ÉÃj 5000
6 ¨ÁµÀ JA.J ªÀÄ£É j¥ÉÃj
7 ªÉÄ//¨ÁªÀŸÁgï,ªÉÄʸÀÆgÀÄ ¥sÀ Á£ÀÄ sÀ«UÀ½UÉ ¥ÀĸÀÛPÀ ÉÃR£À ¸ÁªÀiÁVæ «vÀgÀuÉ Rjâ
26460
8 ªÉÄ// ªÉÄÊ ÀÆgÀÄ mÁ¥Àð É£ïì,ªÉÄʸÀÆgÀÄ
¥sÀ Á£ÀÄ sÀ«UÀ½UÉ ¨ÁåUï «vÀgÀuÉ Rjâ
8545
9 ¤ªÀÄð® ©.J¸ï vÀAzÉ:- ²ªÀ¥Àà©.PÉ ªÀÄ ÉvÉjPÉ ÉlÖ «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.©.JA 1000
10 ¸ËªÀÄå ¦.¦ vÀAzÉ:-¥ÉæªÀiïPÀĪÀiÁgï ªÀÄ ÉvÉjPÉ ÉlÖ «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.PÁA 1000
11 C©üµÉPï r vÀAzÉ:-PÉ eÉ ¢ªÁPÀgÀ ¥ÀAdgï ¥ÉÃmÉ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
12 PÉ.© zsÀ£Àå vÀAzÉ:-¥À¼ÀAUÀ¥Àà ¥ÀAdgï ¥ÉÃmÉ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
Manual on Public Disclosure Schedules
CMAK | 80
13 ±ÀgÀtå vÀAzÉ:- ¸ÀÄgÉñï«dAiÀÄ £ÀUÀgÀ «gÁd¥ÉÃmÉ
r.JA.¦ 1000
14 n.¦ ¥ÀædÓ¯ï vÀAzÉ:- n.J£ïUÀuÉÃ±ï «dAiÀÄ £ÀUÀgÀ «gÁd¥ÉÃmÉ
¢éÃwÃAiÀiÁ ©.PÁA 1000
15 «WÉßñÀégÀ vÀAzÉ: ¹zÀÝ°AUÀ aPÀÌ¥ÉÃmÉ «gÁd¥ÉÃmÉ
¢éÃwÃAiÀiÁ ¦.AiÀÄÄ.¹ 1000
16 ¸À©ÃºÁ.© vÀAzÉ:- §²Ãgï ªÉÆUÀgÀUÀ°è «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.PÁA 1000
17 JA.J¸ï U˸ï SÁ£ï vÀAzÉ:-µÀjÃ¥sïG¯ÁèSÁ£ï ªÉÆUÀgÀUÀ°è «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
18 vÀ¹èêÀiÁ vÀAzÉ:- ¸ÉÊAiÀÄzï UÀ¥sÀÆgï
¥ÀæxÀªÀÄ ©.J 1000
19 ªÉƺÀªÀÄäzï §AUÁ½ ©Ã¢ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.J 1000
20 ¸Àaãï JA.eÉ vÀAzÉ:-dUÀ¢Ã±ïJA.f UÁA¢ü£ÀUÀgÀ «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.©.JA 1000
Manual on Public Disclosure Schedules
CMAK | 81
21 «AzÁå ¦.« vÀAzÉ:- «dAiÀĦ.Dgï UÁA¢ü£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
22 ¢£Éñï PÀĪÀiÁj f.J¸ï vÀAzÉ:-ºÀj UÁA¢ü£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
23 JA.J£ï PÁªÉÃgÀªÀÄä vÀAzÉ:-£ÁtAiÀÄå
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
24 £À¤ß£ï J.J vÀAzÉ:- CfÃeïUÁA¢ü£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
25 ¸ÀĦvÀæ vÀAzÉ:-¸ÀÄgÉñïJ.Dgï UÁA¢ü£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.J 1000
26 J.J C«ÄãÁ ²¥sÁ vÀAzÉ:-C±Àæ¥sï ªÀÄ®¨Ágï gÀ ÉÛ «gÁd¥ÉÃmÉ
¢éÃwÃAiÀiÁ ©.PÁA 1000
27 ±²æÃfvï vÀAzÉ:- PÀgÀÄuÁPÀgÀuï aPÀÌ¥ÉÃmÉ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
Manual on Public Disclosure Schedules
CMAK | 82
28 JA.PÀ®è£Á vÀAzÉ:-¸ÉÆêÀÄAiÀÄå aPÀÌ¥ÉÃmÉ «gÁd¥ÉÃm
¥ÀæxÀªÀÄ ©.PÁA 1000
29 ªÉƺÀªÀÄÄäzï gÀ¦üÃPï vÀAzÉ:- ªÉƺÀªÀÄäzï
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
30 ¸ÀAvÉÆõï PÀĪÀiÁgï JZï vÀAzÉ:-gÁªÀÄÄ ºÉZï J¸ï
¥ÀæxÀªÀÄ ©.PÁA 1000
31 «.eÉ gÉÆùè vÀAzÉ:-eÉêÀiïì £ÉºÀgÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
32 zsÀ£Àå ²æà ªÀ ÀAvÀ ¦J¸ï £ÉºÀgÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.J 1000
33 «.eÉ «PÉÆÖÃjAiÀiÁ vÀAzÉ:-eÉêÀiïì £ÉºÀgÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.PÁA 1000
34 ¥Ë¹AiÀiÁ JA.© vÀAzÉ:-¨Á¥ÀÄnÖJA.J £ÉºÀgÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥Á°mÉQßPï 1000
Manual on Public Disclosure Schedules
CMAK | 83
35 vÀ¹æ£ï vÀAzÉ: ªÀÄRÄâ ï
¢éÃwÃAiÀiÁ ¦.AiÀÄÄ.¹ 1000
36 ¥sÀfãï JA vÀAzÉ: ªÀÄRÄâ ï £ÉºÀgÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
37 n.JA sÀªÀ£ï vÀAzÉ:-ªÀÄAzÀtÚ £ÉºÀgÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
38 n.JA ÉÆÃPÉñï vÀAzÉ:-ªÀÄAzÀtڣɺÀgÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
39 ªÉƺÀªÀÄäzï ±Á»zï vÀAzÉ:-eÁQÃgï ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.J 1000
40 ªÀĺÀªÀÄäzï ªÀÄÄd«Äïï vÀAzÉ:-CºÀªÀiÁ£ÀįÁè mË£ï ¨ÁåAPï »A sÁUÀ
¢éÃwÃAiÀiÁ ©.J 1000
41 ±ÀÁ»AiÀÄ vÀgÀ£ÀÄA vÀAzÉ:-ºÀ©§Äâ Áè
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
Manual on Public Disclosure Schedules
CMAK | 84
42 vÁ¹Ã£ï J£ï.J vÀAzÉ:-£ÀfÃgï CºÀªÀÄäzï ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.PÁA 1000
43 ¸À«ÄãÁ ÀªÀðvï vÀAzÉ:-C©üçįÁè ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
44 ±À«ÄãÁ JA.J¸ï vÀAzÉ:-ºÀA À JA.ºÉZï ¸ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
45 CªÀĮĢÝãï n.¦ vÀAzÉ:- n.¦ ªÉƺÀªÀÄäzï D°
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 1000
46 J. L±ÀéAiÀÄð vÀAzÉ:- J.C±ÉÆÃPï vÉ®ÄUÀgÀ ©Ã¢ «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.J 1000
47 ªÀĺÀÉñï J.J¸ï vÀAzÉ:-¸Á§Ä
¢éÃwÃAiÀiÁ ¦.AiÀÄÄ.¹ 1000
48 VÃvÁ PÉ.¹ vÀAzÉ:-ZɮĪÀgÁeï CgÀ ÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
©.J 1000
Manual on Public Disclosure Schedules
CMAK | 85
49
JA.J¸ï ²ªÀgÀAf¤ vÀAzÉ:-²ªÀgÁA ªÉÆzÀ°AiÀiÁgïCgÀ ÀÄ£ÀUÀgÀ «gÁd¥ÉÃmÉ
¦.AiÀÄÄ.¹ 1000
50 Dw¥sï vÀAzÉ:-dQæÃAiÀiÁ §AUÁ¼À ©Ã¢
¦.AiÀÄÄ.¹ 1000
51 ¸À«ÄÃgÀ vÀAzÉ:-C§Æ§PÀÌgï £ÉºÀgÀÄ £ÀUÀgÀ
¦.AiÀÄÄ.¹ 1000
52 gÀA²ÃzÀ vÀAzÉ:-PÁ¹ªÀiï £ÉºÀgÀÄ £ÀUÀgÀ
¦.AiÀÄÄ.¹ 1000
53 ªÁ¸ÀÄ ªÀÄ£É j¥ÉÃj 5000
54 vÀºÀ²¯ÁÝgÀgÀÄ «.¥Éà PÀ£ÀßqÀ gÁeÉÆåÃvÀìªÀ ¸ÀªÀiÁgÀA sÀ ªÉZÀÑ 18000
55 ªÉÄ//«dAiÀÄ PÉ«ÄPÀ ïì ºÉÆ°UÉ «Ä±À£ï 39300
56 vÀºÀ²¯ÁÝgÀgÀÄ «.¥Éà UÀtgÁeÉÆåÃvÀìªÀ ªÉZÀÑ 10000
MlÄÖ 623555
Manual on Public Disclosure Schedules
CMAK | 86
List of the beneficiaries under 3% in 2013-14
PÀæ¸ÀA ¥sÀ¯Á£ÀĨsÀ«UÀ¼À ºÉ ÀgÀÄ GzÉÝñÀ ªÉÆvÀÛ
1 «£ÁAiÀÄPÀ ªÀiÁPÉðnAUï ªÀÄAqÀå
CAUÀ«PÀ® ªÀÄPÀ̽UÉ PÉÆqÉ Rjâ 1176
2 «dAiÀÄ PÉ«ÄPÀ ïì & ªÀiÁPÉðnAUï PÀÄtÂUÀ ï
ºÉÆ°UÉ AiÀÄAvÀæ,AiÀÄÄ.¦.J¸ï ºÁUÀÆ mÉæöÊ ¸ÉÊPÀ¯ï Rjâ
158809
3 DzÁAiÀÄ vÉjUÉ 3265
4 ¨ÁªÀŸÁgï JAlgï ¥ÉæöʸÀ ï CAUÀ«PÀ® ªÀÄPÀ̽UÉ ¥ÀĸÀÛPÀÉ Rjâ 2205
5 ªÉÄʸÀÆgÀÄ mÁ¥Àð É£ïì CAUÀ«PÀ® ªÀÄPÀ̽UÉ ¨ÁåUï Rjâ 712
MlÄÖ 166167
List of the beneficiaries under 22.75% in 2014-15
2014-15 £Éà ¸Á°UÉ 22.75% QæAiÀiÁ AiÉÆÃd£ÉAiÀÄAvÉ 10 jAzÀ ªÉÄîàlÖ ±Á¯Á ªÀÄPÀ̽UÉ zsÀ£À ÀºÁAiÀÄ ¤ÃrgÀĪÀ «ªÀgÀ
PÀæ. ÀA «zsÁåyðUÀ¼À ºÉ ÀgÀÄ ªÀÄvÀÄÛ «¼Á À «zsÁåºÀðvÉ ªÉÆvÀÛ
1 ¤±Á ºÉZï.f vÀAzÉ:UÀuÉÃ±ï ºÉZï.Dgï, CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
vÀÈwÃAiÀÄ ©.PÁA 4000
2 ªÀÄAdÄ ºÉZï.J¸ï vÀAzÉ: ÉÆêÀÄAiÀÄå ºÉZï.f CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwAiÀiÁ ©.PÁA 4000
Manual on Public Disclosure Schedules
CMAK | 87
3
zÁPÁë¬Ät ºÉZï.PÉ vÀAzÉ:PÀĪÀiÁgÀ ºÉZï.J¯ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.PÁA 4000
4
¥À®è« ºÉZï.Dgï vÀAzÉ: ¦ gÁd£ï ºÀjPÉÃj ÀÄtÚzÀ©Ã¢,«gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
5 ºÉZï.JA ÉÆêÀıÉÃRgï vÀAzÉ:ªÀÄÄgÀÄUÉÃ±ï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¢éwAiÀiÁ ©.PÁA 4000
6 ºÉZï.Dgï ÀÆAiÀÄð vÀAzÉ:ºÉZï.PÉ gÁªÀÄZÀAzÀæ ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
7
ÀÄavÀæ ¹ vÀAzÉ:ZɮĪÀgÁeï PÉ ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
¢éwAiÀiÁ ©.PÁA 4000
8
ÀªÀå ©.JA vÀAzÉ:ªÀÄÄgÀÄUÉÃ±ï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.PÁA 4000
9 ZÁgÀÄ®vÀ ©.« vÀAzÉ:ªÉîĸÁé«Ä C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
10
²ªÀ±ÀAPÀgï ºÉZï.J¸ï vÀAzÉ: ÀÄAzÀgÀ «ÄãÀÄ¥ÉÃmÉ n.JA.¹ PÁélð¸ï, «gÁd¥ÉÃmÉ.
JA.PÁA 6000
11 sÀĪÀ£ÉÃ±ï ºÉZï.J£ï vÀAzÉ:£ÁUÀgÁdÄ
ºÉZï.Dgï ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ. ¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 88
12
C²é¤ PÀĪÀiÁj ºÉZï.J¸ï vÀAzÉ: ÀÄAzÀgÀ ºÉZï.PÉ «ÄãÀÄ¥ÉÃmÉ n.JA.¹ PÁélð¸ï, «gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ©.J 4000
13 ÀÄfÃvÀ ºÉZï.J£ï vÀAzÉ:£ÁUÀgÁdÄ
ªÀÄ ÉwjPÉ ¨ÉmïÖ, «gÁd¥ÉÃmÉ ¢éwAiÀÄ ©.J 4000
14
ºÉZï.PÉ zsÀ£Àĵï vÀAzÉ:PÀ¢gï ªÉîÄ, ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
15 P˱À®å ºÉZï.J¸ï vÀAzÉ:²æäªÁ À
¥ÀæxÀªÀÄ ©.J 4000
16
ºÉZï.« ªÉÆúÀ£ï PÀĪÀiÁgï vÀAzÉ:ªÉAPÀmÉÃ±ï ºÉZï.J¸ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
17
PÁªÀå ºÉZï.PÉ vÀAzÉ:PÀĪÀiÁgï ºÉZï.J¯ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 4000
18 ºÉZï.Dgï C²é¤ vÀAzÉ:gÁdÄ ºÉZï ²ªÀPÉÃj,«gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.E 4000
19
ºÉZï.J ¢°Ã¥ï PÀĪÀiÁgï vÀAzÉ:DªÀÄÄðUÀ «ÄãÀÄ¥ÉÃmÉ n.JA.¹ PÁélð¸ï, «gÁd¥ÉÃmÉ.
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
20
²®à ºÉZÀ.PÉ vÀAzÉ:PÀĪÀiÁgÀ ºÉZï.J¯ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 89
21
ÀĤvÁ Dgï vÀAzÉ:gÁd¥Àà ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
22
dUÀ¢Ã±ï vÀAzÉ:±ÉÃRgï PÉ, ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
23
¥ÀÉÆ£ÀߪÀÄä vÀAzÉ:¥Ëw ¢°Ã¥ï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 3000
24 £À«Ã£ï PÀĪÀiÁgï ¹ vÀAzÉ:PÉ ZɮĪÀgÁdÄ, ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
25
ºÉZï.« ±Á°¤ vÀAzÉ:ªÉîĪÀÄÄgÀÄUÀ «ÄãÀÄ¥ÉÃmÉ n.JA.¹ PÁélð¸ï, «gÁd¥ÉÃmÉ.
J¸ï.J¸ï.J¯ï.¹ 2000
26
ºÉZï.« DPÁ±ï vÀAzÉ:ªÉîĪÀÄÄgÀÄUÀ «ÄãÀÄ¥ÉÃmÉ n.JA.¹ PÁélð¸ï, «gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ©.J 4000
27 gÉÃSÁ ºÉZï.Dgï vÀAzÉ:gÁd£ï ºÀjPÉgÉ ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.J 4000
28 sÀÁªÀ£Á ºÉZï.« vÀAzÉ:ªÀ ÀAvÀPÀĪÀiÁgï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
29 À ÀĦæAiÀiÁ ºÉZï.J¸ï vÀAzÉ: ÀħæªÀÄt ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
30 ÀAVÃvÁ ºÉZï,Dgï vÀAzÉ:gÀªÉÄñï
ºÉZï.J¸ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ. J¸ï.J¸ï.J¯ï.¹ 2000
Manual on Public Disclosure Schedules
CMAK | 90
31
ÀAvÉÆõï PÀĪÀiÁgï ºÉZï.Dgï vÀAzÉ:¥Ëw gÁªÀÄÄ, £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
©.PÁA 4000
32 ºÉZï.PÉ AiÉÆÃUÉñï vÀAzÉ:PÀ¢gï ªÉîÄ
¢éwAiÀiÁ ¦.AiÀÄÄ.¹
3000
33 ÀAzÉñï J.ºÉZï vÀAzÉ:ºÀjÃ±ï ºÉZï.© ¢éwÃAiÀiÁ ©.©.JA
4000
34 QgÀuï PÀĪÀiÁgï J vÀAzÉ:CªÀiÁ ÀAiÀÄå J¸ï.J¸ï.J¯ï.¹ 2000
35
¥Àæ¢Ã¥ï ºÉZï.J£ï vÀAzÉ:£ÀAd¥Àà ÀÄAPÀzÀPÀmÉÖ, «gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ¦..AiÀÄÄ.¹
3000
36
ºÉZï.PÉ «µÀÄÚ vÀAzÉ:ºÉZï PÀĪÀiÁgï ¥ÉÆðøï PÁélð¸ï «gÁd¥ÉÃmÉ.
J¸ï.J¸ï.J¯ï.¹ 2000
37 C¤vÀ ºÉZï.JA vÀAzÉ:ªÀÄ°èPÁdÄð£À J¸ï.J¸ï.J¯ï.¹ 2000
38
²®à ºÉZÀï.¦ vÀAzÉ:¥ÉÆ£ÀÄ߸Áé«Ä ºÉZï.PÉ ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ¦..AiÀÄÄ.¹
3000
39
¢ªÀå ºÉZï.JA vÀAzÉ:ªÀÄ°èPÁdÄð£À ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ.
¢éwAiÀiÁ ¦.AiÀÄÄ.¹
3000
Manual on Public Disclosure Schedules
CMAK | 91
40
²®à ºÉZï.Dgï vÀAzÉ:gÀ« ÀÄtÚzÀ©Ã¢,
«gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
41
¢Ã¥À ºÉZï.¦ vÀAzÉ:¥ÉÆ£ÀÄ߸Áé«Ä ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ.
J¸ï.J¸ï.J¯ï.¹ 2000
42
VæõÀä ºÉZï Dgï vÀAzÉ:gÁd£ï ºÀjPÉÃj, ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ.
¢éwAiÀiÁ ¦.AiÀÄÄ.¹
3000
43
ªÀ ÀAvï PÀĪÀiÁgï vÀAzÉ:gÁdÄ ²ªÀPÉÃj, «gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ©.J 4000
44 PÀ«vÀ PÀĪÀiÁj ºÉZï.© vÀAzÉ: ÉÆÃd, ²ªÀPÉÃj, «gÁd¥ÉÃmÉ.
©.J 4000
45 ªÀÄÄgÀ½ PÉ vÀAzÉ:PÀ£ÀPÀgÁdÄ, C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ.
JA.J 6000
46 ¦æÃAiÀiÁ PÉ vÀAzÉ:PÀ£ÀPÀgÁdÄ, C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ.
©.J 4000
47 ÀĪÀÄAvï ¦
vÀAzÉ:PÀÄk¥Àà J¸ï.J¸ï.J¯ï.¹ 2000
Manual on Public Disclosure Schedules
CMAK | 92
48 ªÀÄAdÄ ¦ vÀAzÉ:¥À¼À¤ CAiÀÄå¥Àà ÉlÖ, «gÁd¥ÉÃmÉ.
JA.PÁA 6000
49 ºÉZï.ºÉZï ¹AzÀÆ vÀAzÉ:ºÀjñÀ ºÉZï.© ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
50 PÀÁªÀå JA vÀAzÉ:ªÀÄÄgÀÄUÉñï aPÀÌ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
¢éwAiÀiÁ ©.PÁA 4000
51 ºÉêÀiÁªÀw ºÉZï.Dgï vÀAzÉ:¥Ëw gÁªÀÄZÀAzÀæ ºÉZï.r ²ªÀPÉÃj, «gÁd¥ÉÃmÉ.
©.E 6000
List of the beneficiaries under 7.25% in 2014-15
2014-15 £Éà ¸Á°UÉ 7.25% QæAiÀiÁ AiÉÆÃd£ÉAiÀÄAvÉ 10 jAzÀ ªÉÄîàlÖ ±Á¯Á ªÀÄPÀ̽UÉ zsÀ£À ¸ÀºÁAiÀÄ ¤ÃrgÀĪÀ «ªÀgÀ
PÀæ. ÀA «zsÁåyðUÀ¼À ºÉ ÀgÀÄ ªÀÄvÀÄÛ «¼Á À «zsÁåºÀðvÉ ªÉÆvÀÛ
1 ¸Á¢AiÀiÁ CAdÄA vÀAzÉ:C¯ÁÛ¥ïºÀÄ ÉÃ£ï §AUÁ½©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 93
2 ¢Ã¥ÀPï ¦. K vÀAzÉ:-C¤¯ï PÀĪÀiÁgï CAiÀÄå¥Àà ÉlÖ,«gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ¦ AiÀÄÄ ¹ 3000
3 PÉ.J ªÉƺÀªÀÄäzï vÀAzÉ:C§Äݯï gɺÀªÀiÁ£ï CAiÀÄå¥Àà ÉlÖ,«gÁd¥ÉmÉ.
r¥ÀèªÉÆà 3000
4 ÀfvÀ J£ï.PÉ
vÀAzÉ:ªÉïÁAiÀÄÄzsÀ£ï ÀÄAPÀzÀPÀmÉÖ,«gÁd¥ÉÃmÉ
vÀÈwÃAiÀiÁ ©.PÁA 4000
5 QvÁð£À «.f vÀAzÉ: VjÃ±ï «.J£ï «dAiÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.J¸ï.¹ 4000
6 JA.P˲PÀ vÀAzÉ:ªÀÄ£ÉÆÃeï vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
7 CPÀëAiÀiï vÀAzÉ: ®PÀët, ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.PÁA 4000
8 DAiÉÄñÀ ±ÁAw£ÀUÀgÀ,«gÁd¥ÉÃmÉ. ¢éwÃAiÀiÁ ©.©.JA
4000
9 gÉhÄèsÁ ºÀgï ªÉÄÊ£ï ±ÁAw£ÀUÀgÀ,«gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 94
10 zÉêÀ¹ mÉÆÃt vÀAzÉ: CAvÉÆÃt n.r £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¦.AiÀÄÄ.¹ 3000
11 ÀavÀ J£ï.J vÀAzÉ:-
Cfvï J£ï.J£ï zÉêÀAUÀ©Ã¢, «gÁd¥ÉÃmÉ.
©.J¸ï.¹ 4000
12 n.Dgï ZÀAzÀ£À vÀAzÉ:-n.J¸ï gÀªÉÄñï ÀÄAPÀzÀPÀmÉÖ,«gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
13 Dgï gÀªÀÄå vÀAzÉ:-gÁeÉÃAzÀæ ¦ vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ.
©.©.JA 4000
14 ¤Q¯ï n.© £ÉºÀgÀÄ £ÀUÀgÀ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.PÁA 4000
15 ¥ÀÀæfvÀ PÉ.¦ vÀAzÉ: ¥Àæ¨sÀPÀgÀ£ï.PÉ UËj PÉgÉ «gÁd¥ÉÃmÉ
L.n.L 3000
16 «£ÀAiÀiï JA vÀAzÉ:-ªÀÄAdÄ£Áxï CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
¢éwÃAiÀiÁ ©.J 4000
17 ÉÆëÄAiÀiÁ
vÀAzÉ: ÉÃzÀÄ CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 95
18 PÀɫãï gÉÆÃræUÀ ïì vÀAzÉ:¹ÖÃ¥sÀ£ï gÉÆÃræUÀ ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ.
©.E 5000
19 ÉëAiÀÄgï ¹.« vÀAzÉ:ªÀVÃð¸ï ÉëAiÀÄgï «zÁå£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
©.E 5000
20 U˸ï SÁ£ï JA.J¸ï vÀAzÉ:±ÀjÃ¥sÀįÁè SÁ£ï, ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ.
©.E 5000
21 ÀÄPÉÊ£Á ¸À«ÄæãÁ vÀAzÉ:¹¢ÝPï JA.JA
«zÁå£ÀUÀgÀ «gÁd¥ÉÃmÉ. ©.E 5000
22 C«ÄãÀ §Ä±Áæ vÀAzÉ:ªÉƺÀªÀÄzï ¸Á¢üPï «dAiÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
©.E 5000
23 ªÉƺÀªÀÄzï vÀªÁ¥sï J.Dgï ¥ÀAdgÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ.
©.E 5000
24 eÉÆãï gÉÆä±ï vÀAzÉ: ÀÄgÉñï eÉÆà ɥsï ÀÄAPÀzÀPÀmÉÖ, «gÁd¥ÉÃmÉ.
©.E 5000
25 QgÀuï «.f vÀAzÉ:Vj±ï, «dAiÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
©.E 5000
26 ºÀ¹Ã£À ¹.JA vÀAzÉ:D° ¹.JA ±ÁAw£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
©.E 5000
27 D¬ÄµÀ J.J¸ï vÀAzÉ:C§ÄÝ¯ï ±ÀjÃ¥sï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ.
©.E 5000
Manual on Public Disclosure Schedules
CMAK | 96
28 £ÀAiÀiÁeï ªÀÅgï gɺÀªÀiÁ£ï vÀAzÉ:ªÁQ¥sï §AUÁ¼À©Ã¢, «gÁd¥ÉÃmÉ.
¥ÀæxÀªÀÄ ©.©.JA 4000
29 ¹AzsÀÄ.¦ vÀAzÉ:¥ÀzÀä£Á¨sÀ £ÉºÀgÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
¦.AiÀÄÄ.¹ 2000
30 PÀªÀ£À Dgï vÀAzÉ:gÀªÉÄÃ±ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ.
¦.AiÀÄÄ.¹ 2000
List of the beneficiaries under 3% in 2014-15
2014-15 £Éà ¸Á°UÉ ±Éà 3% QæAiÀiÁ AiÉÆÃd£ÉAiÀÄAvÉÉ CAUÀ«PÀ®jUÉ zsÀ£À ¸ÀºÁAiÀÄ ¤ÃrgÀĪÀ «ªÀgÀ
PÀæ. ÀA ¥sÀ¯Á£ÀÄ sÀ«UÀ¼À ºÉ ÀgÀÄ ªÀÄvÀÄÛ
«¼Á À CAUÀ«PÀ® ¥ÀæªÀiÁt
¥ÀvÀæ ªÉÆvÀÛ
1
L±Á vÀAzÉ:E£ÁAiÀÄvï SÁ£ï, £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
EzÉ 2350
2
ZÀAzÀæ±ÉÃRgï ºÉZï.J¸ï vÀAzÉ: ÀÄAzÀgÀ ºÉZï.PÉ ªÀÄ®¨Ágï gÀ ÉÛ, «gÁd¥ÉÃmÉ.
EzÉ 2350
Manual on Public Disclosure Schedules
CMAK | 97
3
UÁ£À« ©.J¸ï vÀAzÉ:£ÁgÁAiÀÄt, ¥ÀAdgÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ.
EzÉ 2350
4
ªÀÄzÀ£ï vÀAzÉ:ÀPÁ½ªÀÄÄvÀÄÛ ªÀÄ ÉwjPÉ ÉmïÖ, «gÁd¥ÉÃmÉ.
EzÉ 2350
5
ÀAiÀÄåzï ªÀiÁeï vÀAzÉ: ÉÊAiÀÄzï C¨Áægï, ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ.
EzÉ 2350
6
¢ªÀå ¥Àæ sÁ ºÉZï.Dgï vÀAzÉ:gÀ«ÃÃAzÀæ £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
EzÉ 2350
7
gÀQëvÁ vÀAzÉ: ÀÄgÉñï, ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ.
EzÉ 2350
8
PÉ ªÁ ÀÄ, £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
EzÉ 2350
9
À«ÄæãÁ vÀAzÉ:E£ÁAiÀÄvï SÁ£ï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
EzÉ 2350
10
PÀµÀÚ ºÉZï.r vÀAzÉ:zÉêÀ¥Àà, £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
EzÉ 2350
11
ZÀAzÀÀæ J¥sï.JA.¹ gÀ ÉÛ, «gÁd¥ÉÃmÉ.
EzÉ 2350
Manual on Public Disclosure Schedules
CMAK | 98
12
L±Á vÀAzÉ:E£ÁAiÀÄvï SÁ£ï, £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
EzÉ 2350
List of the beneficiaries under 24.10% in 2015-16
2015-16 £Éà ¸Á°UÉ ±Éà 24.10 AiÉÆÃd£ÉAiÀÄr «zÁåzsÀ£À ÀºÁAiÀÄPÁÌV §AzÀAvÀºÀ CfðUÀ¼À «ªÀgÀ
PÀæ. ÀA ¥sÀ¯Á£ÀÄ sÀ«UÀ¼À ºÉ ÀgÀÄ «zÁåºÀðvÉ ªÉÆvÀÛ
1 AiÉÆÃUÉñïÀéj vÀAzÉ:¢//dAiÀÄgÁA vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 3000
2 ºÉZï.f ¥À«vÀ vÀAzÉ:UÉÆæ «ÄãÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 3000
3 ÀÆAiÀÄð ºÉZï.J£ï
vÀAzÉ:£ÁUÀgÁdÄ ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 3000
4 ²ªÀ vÀAzÉ:CAiÀÄå¸Áé«Ä ªÉÆUÀgÀUÀ°è «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 99
5 ±ÁgÀzÀ vÀAzÉ:£ÀAdAiÀÄå ¦ UÁA¢ü£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
6 ¸ËAzÀAiÀÄð ºÉZï.JA vÀAzÉ:ªÀÄÄgÀÄUÉÃ±ï ªÉÆUÀgÀUÀ°è «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
7 ÀAVÃvÀ ºÉZï.Dgï
vÀAzÉ:gÀªÉÄÃ±ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
8 Éé
vÀAzÉ:gÀ« ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
9 C¤vÀ vÀAzÉ:ªÀÄ°èPÁdÄð£À ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
10 ÀĤvÀ
vÀAzÉ:gÁd¥Àà ÀÄAPÀzÀPÀmÉÖ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
Manual on Public Disclosure Schedules
CMAK | 100
11 ºÉêÀÄAvï PÀĪÀiÁgï vÀAzÉ:ªÀĺÀzÉêÀ C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
12 C±ÉÆÃPÀ J¸ï vÀAzÉ:¹zÀÝ£ÁAiÀÄPÀ C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
13 C£ÀĵÀ vÀAzÉ:ºÀjñï ÀÄtÚzsÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
14 ¤ªÀÄð® ¹ vÀAzÉ:a£À߸Áé«Ä C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
15 ZÁgÀÄ®vÁ ©.« vÀAzÉ:ªÉÄîĸÁé«Ä C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
Manual on Public Disclosure Schedules
CMAK | 101
16 ¤±ÁAvï vÀAzÉ:ªÀÄt ²ªÀPÉÃj «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
17 zsÀ£ÀÄµï ºÉZï.PÉ vÀAzÉ:PÀ¢gï ªÉÃ®Ä ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
18 ªÉÆúÀ£ï PÀĪÀiÁgï ºÉZï.« vÀAzÉ:ªÉAPÀmÉÃ±ï ²ªÀPÉÃj «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
19 ¹AzÉñï PÀĪÀiÁgï vÀAzÉ:ºÉZï.Dgï £ÁUÀgÁdÄ ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
20 sÀ«µÀå
vÀAzÉ:gÀ« £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 4500
21 £À«Ã£ï PÀĪÀiÁgï ¹ vÀAzÉ:PÉ ZɮĪÀgÁeï ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
22 L±ÀëAiÀÄ𠲪ÀPÉÃj, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
Manual on Public Disclosure Schedules
CMAK | 102
23 zÁPÁë¬Ät vÀAzÉ:£ÁUÀgÁdÄ ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 4500
24 ºÀ¶ðvÀ vÀAzÉ:£ÁUÉÃ±ï ªÉÄÊPÉÆæêÉêï gÀ ÉÛ, «gÁ¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 4500
25 sÀĪÀ£Éñï
vÀAzÉ:£ÁUÀgÁdÄ ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
26 ÀÄ sÁ²æà vÀAzÉ: ¢//dAiÀÄgÁA J¸ï.J vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
27 sÁªÀ£À
vÀAzÉ:ªÀ ÀAvÀPÀĪÀiÁgï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
28 ²®à r vÀAzÉ:£ÁUÉÃ±ï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
Manual on Public Disclosure Schedules
CMAK | 103
29 ²®à ºÉZï.PÉ vÀAzÉ:PÀĪÀiÁgÀ ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
30 ¹AzsÀÄ ºÉZï.ºÉZï vÀAzÉ:ºÉZï.© ºÀjñï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
31 ÀĦæAiÀiÁ
vÀAzÉ: ÀħæªÀÄt ºÉZï.¦ ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 4500
32 ªÀÄAdļÀ vÀAzÉ:ªÀ ÀAvÀ JA.J ªÀÄ®¨Ágï gÀ ÉÛ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 4500
33 Àa£ï
vÀAzÉ:¥Àæ sÁPÀgÀ ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ¦.AiÀÄÄ.¹ 4500
34 sÀĪÀ£À
vÀAzÉ: ºÉZï.J gÀ« £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.PÁA 6000
35 ºÉZï.JA zÀ±Àð£ï PÀĪÀiÁgï aPÀÌ¥ÉÃmÉ «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.J 6000
Manual on Public Disclosure Schedules
CMAK | 104
36 ¥ÉÆ£ÀߪÀÄä vÀAzÉ:¢°Ã¥ï ºÉZï.JA ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.©.JA 6000
37 AiÉÆÃUÉÃ±ï ºÉZï.PÉ vÀAzÉ:PÀ¢gï ªÉÃ®Ä §AUÁ¼À©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.PÁA 6000
38 ªÀÄAdÄ ºÉZï.J¸ï vÀAzÉ: ÉÆêÀÄAiÀÄå CgÀ ÀÄ£ÀUÀgÀ,
«gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.PÁA 6000
39 PÁªÀå ºÉZï.PÉ vÀAzÉ:PÀĪÀiÁgÀ ²ªÀPÉÃj «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.J 6000
40
¦æAiÀÄ vÀAzÉ:PÀ£ÀPÀgÁdÄ C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 6000
41 vÀµÀä ºÉZï.J£ï vÀAzÉ:£ÀAd¥Àà ¹zÁÝ¥ÀÄgÀ gÀ ÉÛ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 6000
Manual on Public Disclosure Schedules
CMAK | 105
42 P˲Pï vÀAzÉ: ÉÆÃPÉÃ±ï «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.©.JA 6000
43 C²é¤ vÀAzÉ:PÀȵÀÚ £ÁAiÀÄPï ¥ÀAdgÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 6000
44 £ÀA¢¤ vÀAzÉ:ªÀÄt ºÉZï.« ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 6000
45 À˪ÀÄå
vÀAzÉ:ªÀÄÄgÀÄUÉÃ±ï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 6000
46 £ÀA¢¤ vÀAzÉ: CgÀÄuï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 6000
47 gÀ²ä vÀAzÉ:wªÀÄäAiÀÄå ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 6000
Manual on Public Disclosure Schedules
CMAK | 106
48 ÀAzÉñÀ
vÀAzÉ:ºÀjñï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 6000
49 ÀÄfvÀ ºÉZï.J£ï
vÀAzÉ:£ÁUÀgÁdÄ ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 6000
50 ªÀÄ£ÉÆÃeï vÀAzÉ:¥À¼À¤¸Áé«Ä £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
vÀÈwAiÀÄ ©.J 6000
51 gÁPÉñï vÀAzÉ: ªÉAPÀmÉÃ±ï ºÉZï.r ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
vÀÈwAiÀÄ ©.PÁA 6000
52 ªÀĪÀÄvÀ PÀĪÀiÁj J¸ï.JA vÀAzÉ:ªÀÄ£ÉÆúÀgï J¸ï C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ
vÀÈwAiÀÄ ©.J 6000
53 ºÉZïÉ.JA ÉÆêÀıÉÃRgï vÀAzÉ:¢//ºÉZï.PÉ ªÀÄgÀÄUÉÃ±ï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
vÀÈwAiÀÄ ©.PÁA 6000
Manual on Public Disclosure Schedules
CMAK | 107
54 ªÀÄAdÄ ¦ vÀAzÉ:¥À¼À¤ J¸ï CAiÀÄå¥Àà ÉlÖ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ JA.PÁA 15000
55 ZÀÉÃvÀ£ï vÀAzÉ:«.ºÉZï ¥Àæ sÁPÀgï ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
©.E 30000
56 C²é¤ ºÉZï.Dgï vÀAzÉ:gÁdÄ ºÉZï.JA ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.E 30000
57 ºÀ¶ðvÀÁ vÀAzÉ:§ ÀªÀgÁeï £ÁAiÀÄPï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.E 30000
Manual on Public Disclosure Schedules
CMAK | 108
2015-16 £Éà ¸Á°UÉ ±Éà 24.10% AiÉÆÃd£ÉAiÀÄr C¤® gÀ»vÀ PÀÄlÄA§zÀªÀjUÉ C¤® ÀA¥ÀPÀð ¥ÀqÉAiÀÄ®Ä §AzÀAvÀºÀ CfðUÀ¼À «ªÀgÀ.
PÀæ. ÀA ¥sÀ¯Á£ÀĨsÀ«AiÀÄ ºÉ ÀgÀÄ /
«¼Á À ¥ÀrvÀgÀ aÃn
ÀASÉå UÁå¸ï ¸Ë® sÀå EzÉ/E®è
1
a£ÀߪÀÄä PÉ UÀAqÀ:PÀ£ÀPÀgÁdÄ C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ zÀÆ:8861310303
24145265 E®è
2
dAiÀÄ ºÉZï.PÉ UÀAqÀ:gÁdÄ PÉ.PÉ ²ªÀPÉÃj, «gÁd¥ÉÃmÉ zÀÆ:9483834963
24145236 E®è
3
gÀªÀiÁå ºÉZï.¹ UÀAqÀ:gÀAfvÀ ²ªÀPÉÃj, «gÁd¥ÉÃmÉ zÀÆ:9740129908
U00122912 E®è
Manual on Public Disclosure Schedules
CMAK | 109
4
vÀAUÀªÀÄä ºÉZï.JA UÀAqÀ:ªÉÆtÚAiÀÄå C¥ÀàAiÀÄå ¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ zÀÆ:9449764334
U00115232 E®è
5
ªÀÄiÁ®w UÀAqÀ:CgÀ ÀgÁeï C¥ÀàAiÀÄå¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ zÀÆ:-9590043021
114794 E®è
6 ªÀÄAdÄ£ÁxÀ ºÉZï.r ºÀjPÉÃj, «gÁd¥ÉÃmÉ zÀÆ:7022356069
- E®è
7
ºÉZï.Dgï «ÄãÁQë UÀAqÀ: gÁªÀÄ CAiÀÄå¥Àà ÉlÖ «gÁd¥ÉÃmÉ zÀÆ:9632707653
U00111190 E®è
8 ºÉZï.PÉ ±ÁåªÀiï vÀAzÉ:¢//PÁ½AUÀ ÀÄAPÀzÀPÀmÉÖ, «gÁd¥ÉÃmÉ
24146740 E®è
9 UÀAUÁ UÀAqÀ:gÀ« ÀÄAPÀzÀPÀmÉÖ, «gÁd¥ÉÃmÉ
24146756 E®è
Manual on Public Disclosure Schedules
CMAK | 110
10
sÀgÀvï PÀĪÀiÁgï vÀAzÉ:ªÁ ÀÄ ºÉZï.r ²ªÀPÉÃj, «gÁd¥ÉÃmÉ zÀÆ 9008737930
U00107931 E®è
11 ºÉZï.PÉ «ÄãÀ UÀAqÀ:PÀȵÀÚ zÉêÁAUÀ©Ã¢, «gÁ¥ÉÃmÉ
108828 E®è
12
EA¢gÁ PÉ.J¸ï UÀAqÀ: ÀÄgɱï PÉ ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
E®è
13
¸Á«wæ UÀAqÀ:ªÉAPÀmÉÃ±ï ¹zÁÝ¥ÀÄgÀ gÀ ÉÛ, «gÁd¥ÉÃmÉ
100790 E®è
14
ÀÄgÉñï J¸ï vÀAzÉ: ÀħæªÀÄt ªÀÄ ÉwjPÉ ÉlÖ «gÁd¥ÉÃmÉ.
VRPU
00100388 E®è
15
vÁAiÀĪÀÄä ºÉZï.« vÀAzÉ:FgÀAiÀÄå ºÀjPÉÃj «gÁd¥ÉÃmÉ zÀÆ:8197728172
VRPU 118098 E®è
Manual on Public Disclosure Schedules
CMAK | 111
16
¥ÀzÁäªÀw ºÉZï.« UÀAqÀ:ªÉAPÀmÉñÀ ²ªÀPÉÃj «gÁd¥ÉÃmÉ zÀÆ:9945118405
VRPU
24145358 E®è
17
¹ÃªÀiÁ vÀAzÉ: gÁZÀAiÀÄå ÀÄAPÀzÀPÀmÉÖ, «gÁd¥ÉÃmÉ
zÀÆ:9620327726
VRPU
22146282 E®è
18 ªÀÄt ºÉZï.« vÀAzÉ:¥À¼À¤¸Áé«Ä ªÀÄ ÉwjPÉ ¨ÉlÖ
VRPU 117313 E®è
19
ÀIJî UÀAqÀ:gÉÃtÄPÀĪÀiÁgï ©.© ÀÄAPÀzÀPÀmÉÖ
ªÉÆ:9916837248
VRPU
24146361 E®è
20 ºÉZï.© ÉÆÃgÀAiÀÄå ºÀjPÉÃj «gÁd¥ÉÃmÉ zÀÆ:9972796079
VRPU 118097 E®è
21
ºÉZï.« gÉÃtÄPÁ UÀAqÀ:«±Àé£ÁxÀ ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
zÀÆ:8861256031
VRPU 117029 E®è
Manual on Public Disclosure Schedules
CMAK | 112
22
ºÉZï.« UËgÀªÀÄä UÀAqÀ:ºÉZï.J£ï ªÉAPÀlgÀªÀÄt ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
VRPU
24144622 E®è
23
ªÀ¤vÀ ºÉZï.J¸ï UÀAqÀ: ÀÄgÉñï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
zÀÆ:9535441782
VRPU118012 E®è
24
PÀÁ¼ÀªÀÄä UÀAqÀ:¢//¥ÀÄlÖAiÀÄå ÀÄtÚzÀ©Ã¢ «gÁd¥ÉÃmÉ
zÀÆ:9535723305
VRPU116645 E®è
25
ªÀgÀ®Qëöä UÀAqÀ:ªÉAPÀmÉÃ±ï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ zÀÆ:8884740887
VRPU
24146377 E®è
26
gÁzsÀªÀÄä UÀAqÀ: ÉîÆgÀAiÀÄå ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
zÀÆ:9482105660
VRPU 118043 E®è
27 ºÉZï.J¸ï UÉÆÃ¥Á® ²ªÀPÉÃj «gÁd¥ÉÃmÉ zÀÆ:9740231045
VRPU
24145302 E®è
Manual on Public Disclosure Schedules
CMAK | 113
28
ÀAvÉÆÃµï ºÉZï.JA vÀAzÉ:ªÀÄÄvÀÛ¥Àà ÀÄAPÀzÀPÀmÉÖ, «gÁd¥ÉÃmÉ
zÀÆ:8147081334
VRPU 109589 E®è
29 PÁ²ªÉÃ®Ä ªÀÄ ÉwjPÉ ÉlÖ «gÁd¥ÉÃmÉ zÀÆ 9482774879
VRPU 108552 E®è
30
ÀtÚ Àħâ vÀAzÉ:§£Áßj ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ zÀÆ:8762478946
VRPU 117100 E®è
31
AiÉÆÃUÉñï J.J¸ï vÀAzÉ:±ÀAPÀgï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ zÀÆ:9036394398
VRPU
22146283 E®è
32
±ÉÆà sÀ ºÉZï.« UÀAqÀ:±ÉÃRgï ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ zÀÆ:9611718982
VRPU
24144623 E®è
33 ÀħæªÀÄt ºÉZï.PÉ
vÀAzÉ:PÀtÚ «ÄãÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
- E®è
Manual on Public Disclosure Schedules
CMAK | 114
34 aPÀÌgÁªÀÄ ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ - E®è
List of the beneficiaries under 7.25% in 2015-16
2015-16 £Éà ¸Á°UÉ ±ÉÃ7.25 AiÉÆÃd£ÉAiÀÄr «zÁåzsÀ£À ¸ÀºÁAiÀÄPÁÌV DAiÉÄÌAiÀiÁzÀ ¥sÀ¯Á£ÀÄ sÀ«UÀ¼À «ªÀgÀ
PÀæ. ÀA ¥sÀ¯Á£ÀĨsÀ«UÀ¼À ºÉ ÀgÀÄ «zÁåºÀðvÉ ªÉÆvÀÛ
1 ªÀÄjÃAiÀĪÀiï «Ä±Áä vÀAzÉ:eÁeïð Dgï.n £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
2 J¸ï.J¸ï ±ÀUÀÄ¥sÀ vÀAzÉ:±À§âgï CºÀªÀÄäzï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
3 ®Qëöä vÀAzÉ:PÀȵÀÚ ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
J¸ï.J¸ï.J¯ï.¹ 2000
4 «.r CPÀëvÀ vÀAzÉ:© zÉêÀgÁeï UËjPÉgÉ, «gÁd¥ÉÃmÉ
¦.AiÀÄÄ.¹ 3000
5
ÀÁºÀ£À J¸ï.J¸ï vÀAzÉ: ÀvÀåAiÀiÁ£ï ¥ÀAdgÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 115
6 EªÀiÁæ£ï vÀAzÉ:C¨ïd® «ÄãÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
7 ¤PÀÖ£ï ÉÆà ÉÆà vÀAzÉ:«£ÀìAmï «.eÉ «ÄãÀÄ¥ÉÃmÉ, ªÀÄ®¨Ágï gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
8 F±À£ï «.J vÀAzÉ:D£ÀAzÀ «.Dgï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
9
¤¢ü ©.J vÀAzÉ:CgÀÄt ©.JA QÃwð ÉÃOmï , «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
10 n.J¸ï ¥ÀªÀ£À vÀAzÉ:n.J£ï ÀÄzÀ±Àð£ï aPÀÌ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
11 ÉßúÀ
vÀAzÉ:C±ÉÆÃPÀ JA.Dgï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
12 ÀÄæöäw ¦.JA
vÀAzÉ:ªÉÆúÀ£ï zÁ¸ï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 116
13 sÀgÀvï J¸ï
vÀAzÉ: ÀÄAzÀgï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
14 zsÀ£Àå J£ï.Dgï vÀAzÉ:gÁdÄ J£ï.© CAiÀÄå¥Àà ÉlÖ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
15
¤w£ï vÀAzÉ:±À²zÀgÀ PÉ.n ¹zÁÝ¥ÀÄgÀ gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
16
C±Àéw vÀAzÉ:ºÀjzÁ¸ï ¹zÁÝ¥ÀÄgÀ gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
17 £ÉúÁ J£ï vÀAzÉ:CPÀâgï ¥ÁµÀ ÀÄtÚzÀ©Ã¢ «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
18 ¥sÀjãÀ vÀAzÉ: v˦üPï CºÀªÀÄäzï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
19
CPÀëAiÀÄ PÉ ¢¯ÁAiÀÄ vÀAzÉ:¹ÃvÁgÁªÀÄ PÉ¢¯ÁAiÀÄ CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 117
20
GµÁ ¦.§ vÀAzÉ: É®Äè ¦.J ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
21 ªÉÆäµÁ vÀAzÉ: ¦.PÉ PÀȵÀÚ vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
22 PÀªÀ£À vÀAzÉ:¢//gÀªÉÄñï n.JA.¹ PÁélð¸ï ²ªÀPÉÃj «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
23 ±À°ð vÀAzÉ: ÀÄgÉñï PÉ CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
24 ÉÆèëÄAiÀÄ J¸ï
vÀAzÉ: ÉÃzÀÄ CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
25
n.Dgï °TvÀ vÀAzÉ:n.PÉ gÁeÉÃAzÀæ zÉêÁAUÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 118
26
ZÀÉÃvÀ£ï Dgï vÀAzÉ:gÀ« J¸ï vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
27 C¥sï¸Á vÀAzÉ:ªÀÄÄ£Á¹gï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
28
ÉÊAiÀÄzï PÁ²ÃgÀ vÀAzÉ:£ÀfÃgï CºÀªÀÄäzï zÀRͤªÉƺÀ Áè, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
29
ºÀ¶ðvÀ PÀÄAzÀgï vÀAzÉ:©.J zÉÃd¥Àà J¥sï.JA.¹ gÀ ÉÛ, «gÁd¥ÉÃmÉ
¢éwÃAiÀÄ ¦.AiÀÄÄ.¹ 3000
30
PÀÈwñï J.J¸ï vÀAzÉ: ÀwÃ±ï ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
31
ÀªÀÄjãï vÀAzÉ:¢//PÀ°Ã¯ï J¥sï.JA.¹ gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
32 ®Ä¨ï £ÁvÀgÀ£ÀÄßA vÀAzÉ:JA.PÉ d°Ã¯ï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀÀæxÀªÀÄ ¦.AiÀÄÄ.¹ 3000
Manual on Public Disclosure Schedules
CMAK | 119
33 zÀ±Àð£ï J¯ï.J¸ï vÀAzÉ: ÀħæªÀÄt J¸ï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 4000
34
ªÉÆäµÁ vÀAzÉ:zÉêÀgÁdÄ «ªÉÃPï ©°ØAUï J¥sï.JA.¹ gÀ ÉÛ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 4000
35 ÀIJävÀ ¹.r
vÀAzÉ:zÉêÀAiÀÄå CgÀ ÀÄ£ÀUÀgÀ,«gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 4000
36 ºÀ¶ðvÀ vÀAzÉ:PÁAiÀÄð¥Àà PÉ.JA C¥ÀàAiÀÄå¸Áé«Ä gÀ ÉÛ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 4000
37
vÀÁ»Ãgï CºÀªÀÄäzï J¸ï.JA vÀAzÉ:ªÀÄĪÀiÁÛeï CºÀªÀÄäzï «dAiÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 4000
38 ºÁfÃgÀ PÉ.ºÉZï vÀAzÉ:ºÀA À ¦ ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 4000
39 UÀAUÀªÀÄä ©.J¸ï vÀAzÉ: ÀħâAiÀÄå aPÀÌ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.PÁA 4000
Manual on Public Disclosure Schedules
CMAK | 120
40 ²®à vÀAzÉ: ÀÄPÀĪÀiÁgÀ£ï UËj mÁåAPï gÀ ÉÛ «gÁd¥ÉÃmÉ
vÀÈwAiÀÄ ©.PÁA 4000
41
AiÀıÀ¹é¤ n.J¸ï vÀAzÉ: ÀħæªÀÄt vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.©.JA 4000
42
gÀªÀÄå Dgï vÀAzÉ:gÁeÉÃAzÀæ vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
©.©.JA 4000
43
ÀÄavÀæ vÀAzÉ:n.¦ £ÀlgÁeï vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.©.JA 4000
44
gÀQëvï vÀAzÉ:¥À¼ÀAUÀ¥Àà ¥ÀAdgÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.¹.J 4000
45 J¸ï.J¸ï ÀĪÀÄAiÀÄ vÀAzÉ:±À©Ãgï CºÀªÀÄäzï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.¹.J 4000
46
C¸ï¦£À vÀAzÉ:C«Äzï AiÀÄÄ.J¸ï ªÀÄ®¨Ágï gÀ ÉÛ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.¹.J 4000
Manual on Public Disclosure Schedules
CMAK | 121
47 d Àß vÀAzÉ:PÁzÀgï ÀÄAPÀzÀPÀmÉÖ, «gÁd¥ÉÃmÉ
¥ÀæxÀªÀÄ ©.J¸ï.¹ 4000
48
«ÄeÉñï vÀAzÉ:ªÀÄt vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 4000
49
ÀĦævÀ vÀAzÉ:gÀªÉÄñï JA.J¸ï vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 4000
50
C«ÄãÀ ²Ã¥sÀ vÀAzÉ:C±Àæ¥sï D° ªÀÄ®¨Ágï gÀ ÉÛ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 4000
51 ¥sÀgÀÆd vÀ ï ¤ÃªÀiï vÀAzÉ:v˦üPï CºÀªÀÄäzï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ.
¢éwAiÀÄ ©.J 4000
52 °TvÀ ©.© vÀAzÉ:¨Á§Ä £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 4000
53 gÉÃSÁ ºÉZï.Dgï vÀAzÉ:gÁd£ï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 4000
Manual on Public Disclosure Schedules
CMAK | 122
54 ©AzÀÄ vÀAzÉ:¢//¥ÀzÀä£Á sÀ ¦.PÉ £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.J 4000
55
ªÀĺÀªÀÄäzï EªÀiÁÝzï J.J¸ï vÀAzÉ: À«ÄªÀůÁè §AUÁ¼À©Ã¢, «gÁd¥ÉÃmÉ.
¢éwAiÀÄ ©.©.JA 4000
56 zÀȱÀÀå J¸ï.eÉ vÀAzÉ:¢//eÁ£ï ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
vÀÈwAiÀÄ ©.J¸ï.¹ 4000
57
PÉ.JA ZÁAzÀ¤ vÀAzÉ:PÉ.r ªÀÄAzÀtÚ §AUÁ¼À©Ã¢, «gÁd¥ÉÃmÉ
vÀÈwAiÀÄ ©.J¸ï.¹ 4000
58 «PÉÆÖÃjAiÀiÁ vÀAzÉ:eÉêÀiïì £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.¹.J 4000
59 n.f ¥Àædé¯ï vÀAzÉ:UÀuÉÃ±ï «zÁå£ÀUÀgÀ, «gÁd¥ÉÃmÉ
¢éwAiÀÄ ©.¹.J 4000
60 £ÀAiÀiÁeï Ggï gɺÀªÀiÁ£À §AUÁ¼À©Ã¢, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.©.JA 4000
61 CPÀÀëAiÀÄ r.J¯ï vÀAzÉ:®PÀëöät ²ªÀPÉÃj, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.PÁA 4000
Manual on Public Disclosure Schedules
CMAK | 123
62 C©fvï «.JA vÀAzÉ:ªÀįÉèñï UÁA¢ü£ÀUÀgÀ, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.PÁA 4000
63 D¬ÄµÁ vÀAzÉ:C§ÄÝ¯ï ±ÀjÃ¥sï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
©.E 15000
64 J. Dgï ªÀĺÀªÀÄäzï vÀ¥sÁ¥sï vÀAzÉ:gÀ»ÃA J aPÀÌ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.E 15000
65 qÉæ£ïì £ÀgÉÆãÀ vÀAzÉ:CAvÉÆÃt £ÀgÉÆãÀ ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.E 15000
66 zsÀ£ÀÀå PÉ.¦ vÀAzÉ:¥À¼ÀAUÀ¥Àà UÁA¢ü£ÀUÀgÀ, «gÁd¥ÉÃmÉ
vÀÈwÃAiÀÄ ©.E 15000
67 JA.J¸ï U˸ï SÁ£ï vÀAzÉ:±ÀjÃ¥sÀįÁè SÁ£ï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ
©.E 15000
68
CAl¤ É£ÁPïì vÀAzÉ:ªÀiÁnð£ï zÉêÁAUÀ©Ã¢, «gÁd¥ÉÃmÉ
©.E 15000
Manual on Public Disclosure Schedules
CMAK | 124
2015-16 £Éà ¸Á°£À 7.25% AiÉÆÃd£ÉAiÀÄr C¤® gÀ»vÀ PÀÄlÄA§zÀªÀjUÉ C¤® ÀA¥ÀPÀð¥ÀqÉAiÀÄ®Ä §AzÀAvÀºÀ CfðUÀ¼À «ªÀgÀ.
PÀæ. ÀA ¥sÀ¯Á£ÀÄ ¨sÀ«AiÀÄ ºÉ ÀgÀÄ / «¼Á À ¥ÀrvÀgÀ aÃn ÀASÉå
1 gÀ« n.PÉ ªÀÄ®¨ÁgÀÄ gÀ ÉÛ, «gÁd¥ÉÃmÉ 107931
2 ÀħæªÀÄt n.PÉ
vÀAzÉ: PÀȵÀÚ «ÄãÀÄ¥ÉÃmÉ «gÁd¥ÉÃmÉ zÀÆ:8762586210
26148115
3 ÀĤ¯ï PÀĪÀiÁgï J£ï.«
vÀAzsÉ:«dAiÀÄPÀĪÀÄgÀ J£ï.¹ «ÄãÀÄ¥ÉÃmÉ «gÁd¥ÉÃmÉ zÀÆ:9742780634
U00109348
4 ªÀÄAdÄ£ÁxÀï ºÉZï.J¯ï vÀAzÉ:°AUÀ¥Àà «ÄãÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ -
5 dĪÉÃjAiÀiÁ UÀAqÀ:ªÉƺÀªÀÄäzï ºÀ¤Ã¥sï «ÄãÀÄ¥ÉÃmÉ «gÁd¥ÉÃmÉ U00111043
Manual on Public Disclosure Schedules
CMAK | 125
6 PÀÉ.eÉ gÀ«ÃAzÀæ vÀAzÉ:d£ÁzsÀð£À UÁA¢ü£ÀUÀgÀ, «gÁd¥ÉÃmÉ zÀÆ:9482982177
U00108618
7 ªÀĺÀzÉë UÀAqÀ:zÉêÀgÁeï ±ÉnÖ UÁA¢ü£ÀUÀgÀ, «gÁd¥ÉÃmÉ zÀÆ 8762121931
25148247
8 eÉÆåÃw PÉ ªÀÄ ÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ 117010
9 PÀÉ.PÉ ¨Á®£ï vÀAzÉ:PÉ PÀȵÀÚ £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
24145977
10 ªÀÄÄvÀÄÛgÁd ©.PÉ £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ zÀÆ:9591669917
U00103235
11 J£ï.Dgï VÃvÁ UÀAqÀ:gÁdÄ CAiÀÄå¥Àà ÉlÖ, «gÁd¥ÉÃmÉ
24146545
12 §²Ãgï PÉ.JA «dAiÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
-
Manual on Public Disclosure Schedules
CMAK | 126
13 gÀÄQät UÀAqÀ: ÀħæªÀÄt ªÀÄ ÉwjPÉ ¨ÉlÖ, «gÁd¥ÉÃmÉ
-
14 UÀÄgÀĪÀªÀÄä UÀAqÀ:ZɮĪÀ ªÀįÉwjPÉ ÉlÖ, «gÁd¥ÉÃmÉ
-
15 ±ÀªÀiï±Ázï ¥sÁwªÀÄ vÀAzÉ:¢//d»gÀÄ¢ÝÃ£ï §AUÁ¼À©Ã¢, «gÁd¥ÉÃmÉ zÀÆ:8050310262
112344
16 ÀQãÀ
ªÀÄ®¨Ágï gÀ ÉÛ zÀÆ:9483230732 24146675
17 eɺÁgÁ©ü UÀAqÀ ¥Ëw ¸Á¨ï eÁ£ï ÀÄtÚzÀ ©Ã¢ «gÁd¥ÉÃmÉ
24147037
18 ºÁfÃgÀ SÁ£ÀA UÀAqÀ ÀzÀAªÀiï ¥ÁµÀ ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ 108926
19 djãÁ UÀAqÀ ªÉƺÀªÀÄäzï §²Ãgï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
-
Manual on Public Disclosure Schedules
CMAK | 127
20 £ÁUÀgÀvÀß UÀAqÀ:ªÀÄÄvÀÛ¥Àà Dgï ªÉÆUÀgÀUÀ°è, «gÁd¥ÉÃmÉ zÀÆ:9880607801
U00108618
21 °rAiÀiÁ J.JA ÀÄAPÀzÀPÀmÉÖ «gÁd¥ÉÃmÉ
zÀÆ: 9632692269 110469
22
²Ã® J¸ï UÀAqÀ: gÁeÉñï vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ zÀÆ:7760040347
U00108719
23 F±Àéj UÀAqÀ:gÁªÀÄPÀȵÀÚ vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ
24146462
24 ªÀĺÉÃ±ï ºÉZï.J vÀAzÉ:C¥ÀàAiÀÄå J¥sï.JA.¹ gÀ ÉÛ, «gÁd¥ÉÃmÉ -
25 ªÉÄÃWÀ£À UÀAqÀ:C£ÀÆ¥ï zÉêÁAUÀ©Ã¢, «gÁd¥ÉÃmÉ
-
Manual on Public Disclosure Schedules
CMAK | 128
26 ¥ÀAPÀd UÀAqÀ:gÀªÉÄñï vÉ®ÄUÀgÀ©Ã¢, «gÁd¥ÉÃmÉ zÀÆ:9741665971
24146391
27 ©.«. ¥ÀÀæ«Ãt PÀĪÀiÁgï CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
108650
28 PÁègÁ ¦.JA UÀAqÀ:¸ÉÖöÊUÀ£ï gÉÆÃeÁjAiÉÆà UÁA¢ü£ÀUÀgÀ, «gÁd¥ÉÃmÉ
-
List of the beneficiaries under 3% in 2015-16
2015-16 £Éà ¸Á°UÉ ±Éà 3% AiÉÆÃd£ÉAiÀÄr zsÀ£À ¸ÀºÁAiÀÄPÁÌV §AzÀAvÀºÀ CfðUÀ¼À «ªÀgÀ
PÀæ. ÀA ¥sÀ¯Á£ÀĨsÀ«UÀ¼À ºÉ ÀgÀÄ GzÉÝñÀ
1 eÁ£Àì£ï ¯ÉÆà ÉÆà vÀAzÉ:¦ü°¥ï ÉÆèÉÆà £ÉºÀgÀÄ£ÀUÀgÀ , «gÁd¥ÉÃmÉ
¥ÉÆõÀuÁ ªÉZÀÑ
2 ¥À®è« vÀAzÉ: ÉÆÃPÉÃ±ï ºÀjPÉÃj ÀÄtÚzÀ©Ã¢, «gÁd¥ÉÃmÉ
¸ÁzsÀ£À À®PÀgÀuÉ/¥ÉÆõÀuÁ ªÉZÀÑ
Manual on Public Disclosure Schedules
CMAK | 129
3 CAiÀÄå¥Àà ©.J¸ï aPÀÌ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
ÀºÁAiÀÄzsÀ£À/¥ÉÆõÀuÁ ªÉZÀÑ
4 ¥Ë°£ï ÉÆà ÉÆà vÀAzÉ:¥Ë¯ï ÉÆèÉÆà CgÀ ÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
ªÉÊzÀåQÃAiÀÄ ÀºÁAiÀÄzsÀ£À/¥ÉÆõÀuÁ ªÉZÀÑ
5 ZÀAzÀæ vÀAzÉ:dªÀgÉÃUËqÀ J¥sï.JA.¹ gÀ ÉÛ, «gÁd¥ÉÃmÉ
«zÁåzsÀ£À ÀºÁAiÀÄ/¥ÉÆõÀuÁ ªÉZÀÑ/ªÉÊzÀåQÃAiÀÄ ÀºÁAiÀÄzsÀ£À
6 PÁègÁ ¦.JA UÀAqÀ: ÉÖöÊUÀ£ï gÉÆÃeÁjAiÉÆà UÁA¢ü£ÀUÀgÀ, «gÁd¥ÉÃmÉ
C¤® ÀA¥ÀPÀðPÁÌV ÀºÁAiÀÄzsÀ£/¥ÉÆõÀuÁ ªÉZÀÑÀ
7 ¤ÃvÁ Qæ¶Ö£Á vÀAzÉ:¢// ±ÀAPÀgï eÉÆà ɥsï £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
ºÉÆ°UÉ «ÄµÀ£ï/¥ÉÆõÀuÁ ªÉZÀÑ
8 ªÀÄÄ sÁgÀPï vÀAzÉ:ªÉƺÀªÀÄäzï D° £ÉºÀgÀÄ£ÀUÀgÀ, «gÁd¥ÉÃmÉ
«Ã¯ï ZÉÃgï/¥ÉÆõÀuÁ sÀvÉå
9 ZÀAzÀÀæ±ÉÃRgï ºÉZï.J¸ï vÀAzÉ: ÀÄAzÀgÀ «ÄãÀÄ¥ÉÃmÉ, «gÁd¥ÉÃmÉ
¸ÁzsÀ£À À®PÀgÀuÉ/¥ÉÆõÀuÁ ªÉZÀÑ
Manual on Public Disclosure Schedules
CMAK | 130
10 ÉÆÃPÉñï
vÀAzÉ:«.J ªÀiÁZÀAiÀÄå UÁA¢ü£ÀUÀgÀ, «gÁd¥ÉÃmÉ.
«zsÁåzsÀ£À ÀºÁAiÀÄ/¥ÉÆõÀuÁ ªÉZÀÑ
4. ROADS & BRIDGES
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
4 Roads and
Bridges
ULBs & UDA (i) Total Road Length
(type of road, its length
and width)
Current status ULB/Ward Annually Table 4.1 MIS
(ii) Details of Roads
proposed & executed for
carpeting/ re-carpeting
Current year ULB Annually Table 4.2
(a) and 4.2
(b)
(iii) Percentage of
footpath to the total road
length of main roads
current status ULB Annually Table 4.3
Manual on Public Disclosure Schedules
CMAK | 131
Table 4.1: Road types(2011-12)
Total existing road length in kms
Water bound macadam (WBM) Bituminous Cement Concrete (CC) Mud road Total
- 26.28 2.94 0.5 29.72
Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in current Financial year (year to be mentioned numeric like 2011-12)
Type of road Total Road length approved and tendered for
carpeting in kms
Total Road length approved and tendered
for re-carpeting in km
Water bound macadam (WBM) 1916.25 m² 1916.25 m²
Bituminous 630 m² 630 m²
Cement Concrete (CC) 2496.60 m² 2496.60 m²
Mud road - -
Total 5042.85 m² 5042.85 m²
Table 4.2.b: Details of roads approved and tendered for carpeting and recarpeting in current financial year (year to be mentioned
numeric like 2011-12)
Manual on Public Disclosure Schedules
CMAK | 132
Type of road Total Road length approved and
tendered for carpeting in kms
Total Road length approved and
tendered for re-carpeting in km
Water bound macadam (WBM) Enclosure as per the format given below Enclosure as per the format given below
Bituminous Enclosure as per the format given below Enclosure as per the format given below
Cement Concrete (CC) Enclosure as per the format given below Enclosure as per the format given below
Mud road Enclosure as per the format given below Enclosure as per the format given below
Format for enclosure reference table 4.2.b(2011-12)
Road length Approved and tendered for carpeting, WBM, Bituminous and CC road
(newly surfacing of the roads)
Road length Approved and Tendered for re-carpeting, WBM, Bituminous and CC
road
Type of Road Ward
Number
Street Name Length of Road
in Kms
Type of Road Ward
Number
Street Name Length of Road in
Kms
Bituminous 15 Junior College Road 0.21 Km Bituminous 15 Junior College Road 0.21 Km
Water bound
macadam (WBM)
18 Nirsarga layout Road 0.11 Km Water bound
macadam (WBM)
18 Nirsarga layout Road 0.11 Km
Cement Concrete 8 Ganpathi Beedi 0.06 Km Cement Concrete 8 Ganpathi Beedi 0.06 Km
Cement Concrete
(CC) 6 Shanthi nagar near parvati
house Road ,VijayNagar 3rd
stage Road
0.493 Km
Cement Concrete
(CC) 6 Shanthi nagar near
parvati house Road
,VijayNagar 3rd
stage
Road
0.493 Km
Cement Concrete
(CC) 10 Road near vijaya Chandra in
panjarpet
0.070 Km Cement Concrete
(CC) 10 Road near vijaya
Chandra in panjarpet
0.070 Km
Cement Concrete
(CC) 5 Sweepers colony of Sunnad
beedi
0.081 Km Cement Concrete
(CC) 5 Sweepers colony of
Sunnad beedi
0.081 Km
Manual on Public Disclosure Schedules
CMAK | 133
Cement Concrete
(CC) 16 Near Shivakeri mariyamma
Temple, Thimmaiah layout
Road,Appaiah Swamy Road
0.235 Km
Cement Concrete
(CC) 16 Near Shivakeri
mariyamma Temple,
Thimmaiah layout
0.235 Km
Cement Concrete
(CC)
15 Chikpet(GMP school
Road),Behind Microwave
0.127 Km Cement Concrete
(CC)
15 Chikpet(GMP school
Road),Behind
0.127 Km
Cement Concrete
(CC)
12 Meenapet police station Road 0.03 Km Cement Concrete
(CC)
12 Meenapet police station
Road
0.03 Km
Cement Concrete
(CC)
14 Gandhi nagar police quarters
Road
0.104 Km Cement Concrete
(CC)
14 Gandhi nagar police
quarters Road
0.104 Km
Cement Concrete
(CC)
11 Vegetable Market Road 0.03 Km Cement Concrete
(CC)
11 Vegetable Market Road 0.03 Km
Table 4.3: Footpath coverage to main roads
Total length of the main roads in ULB Jurisdiction:10.0kms
Total length of the footpath built against main road: 2.0 kms
5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL
Manual on Public Disclosure Schedules
CMAK | 134
Sl.N
o
Functions as
per 12th
Schedule
Agency
Responsible with
in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of Disclosure
Reference Remarks
5 Water Supply-
Domestic,
Industrial and
Commercial
Water Board/
ULB
(i) Percentage of total water
supply (Surfaced,
Underground and external
source)
current status ULB Level Half yearly Table 5.1 SLB1
(ii)Total number of
connection & percentage of
Coverage (Household/ public
stand posts/ Commercial and
Industrial Connection),
quantity of w/s
current status ULB Level Half yearly Table 5.2 SLB
(iii) Frequency and Timing
for Water Supply.
current status ULB Level Half yearly Table 5.3 SLB
(iv) Quality of Water Supply
(percentage of samples
complied with the Water Act
norms)
current status ULB Level Half yearly Table 5.4 SLB
(v) Cost Recovery in Water
Supply Services (Revenue
Generated per KL of
Previous three
financial years
including
ULB Level Annually Table 5.5 SLB
1 Service Level benchmarking by DMA, GoK
Manual on Public Disclosure Schedules
CMAK | 135
water/Cost incurred per KL
of Water Supplied)
current year
(vi) Water tariff Current status ULB Level Annually Table 5.6
Format 5.1 -Per capita production of water
Water supplied through Surface Source 2.0 in MLD
Water Supplied through Underground Source 0.40 in MLD
Water supplied through external source 0 in MLD
Format 5.2- Water Supply Coverage
Total Number of Households 3158 in numbers
Number of house holds with direct water supply connections 1900 in numbers
Total number of Public Stand Posts 135 in numbers
Total number of commercial connections 35 in numbers
Format 5.3- frequency & Timings of water supply
Manual on Public Disclosure Schedules
CMAK | 136
Frequency and Timing for Water Supply
Number of days of water supply per week in Normal season Number of hours of water supply on any supplied day (Normal season)
6 Wards –Daily
10 Wards- Day by day
1½ Hours
Format 5.4- Quality of water supply
Total number of water samples collected at the consumer end 0 in Numbers/6 months
Number of water samples that meet potable water standards in 0 Numbers/6 months
Manual on Public Disclosure Schedules
CMAK | 137
Format 5.5- Cost recovery in water supply (same as in SLB)
SNo Expenditure
2015-16
2014-15 2013-14 2012-13
2011-12
2010-11
2009-10
2008-09
1 Total contractual (if outsourced) cost for Bore wells, O & M of piped
network, O & M of vented dam/ Impounding structure/ Jack well/ Intake
well, valves, replacement of distribution network, supplying of spare
materials, salaries of Contract labours, vehicles etc)
1.41 0.63 0 0 0 0 0 0
2 Total expenditure borne by ULB on Bore wells, O & M of piped network,
O & M of vented dam/ Impounding structure/ Jack well/ Intake well,
valves, replacement of distribution network, supplying of spare
materials, vehicles etc
5.73 4.17 7.80 40.70 7.08 3.21 5.70 6.42
3 Salaries of employees under water supply (Permanent and Daily wages) 30.92 39.30 27.48 24.60 20.82 15.5
6 19.65 17.02
4 Purchase of items (for water treatment, for pumping machinery and
spare parts if any 5.95 5.00 1.50 19.03 0 6.00 18.52 14.26
5 Electricity Bill for water supply (Surface source and Ground water) 15.47 23.63 29.17 13.00 13.10 9.65 17.94 16.76
Revenue
1 Amount collected out of current year demand 15.66 8.24 11.71 16.28 10.23 6.04 4.51 2.50
2 Amount collected for providing new connection 1.35 2.02 1.25 1.49 0.30 0.46 0.43 0.36
Manual on Public Disclosure Schedules
CMAK | 138
Format 5.6- Water Tariff
Water Tariff
Present water charges (which ever is applicable) Residential: 45.00 Rs/Month
Commercial:_180.00Rs/Month
Manual on Public Disclosure Schedules
CMAK | 139
6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
6 Public Health,
Sanitation,
Conservancy and
SWM
ULBs/ Water
Board/ UDA
(i) Street Sweeping (road
wise street sweeping
schedule)
Current status as
per action plan
ULB/Ward Half Yearly Table 6.(a).1
& 6.(a).2
SWM
Action Plan
(ii) General statistics on
Solid Waste Management
(Generation quantity,
Details of the Secondary
Collection Points, landfill
location, user fee)
current status ULB Annually Table
6.(a).3.1&
6.(a).3.2
SWM MIB
(iii) Percentage of HH
covered under Door-to-
Door Collection
current status ULB Half Yearly Table
6.(a).4
SLB and
MIB
(iv) Percentage of
households participating
in segregation
current status ULB Half Yearly Table
6.(a).5
(v) Extent of Scientific
treated and Disposal of
current status ULB Annually Table
6.(a).5
SLB and
MIB
Manual on Public Disclosure Schedules
CMAK | 140
MSW (%)
(vi) Cost recovery under
SWM (Revenue generated
per ton of SW/
Expenditure per ton of
SWM (in Rs.))
Previous three
financial years
including current
year
ULB Annually Table
6.(a).6
SLB
Sewerage & Drainage:
(vii) Percentage of
coverage of UGD
current status ULB Annually Table 6.(b).1 SLB
(viii) Percentage of Waste
Water Treated
current status ULB Annually Table 6.(b).2 SLB
(ix) Percentage of extent
of reuse and recycle of
treated waste water
current status ULB Annually Table 6.(b).3 SLB
(x) Cost recovery under
UGD (Revenue generated
under UGD/ Expenditure
under UGD (in Rs.))
previous three
financial years
including current
year
ULB Annually Table 6.(b).4 SLB
Storm Water Drains
Manual on Public Disclosure Schedules
CMAK | 141
(xi) Statistics of storm
Water Drains ( location,
length and its cleaning
frequency)
current status ULB Annually Table 6.(c).1
(xii) % age roadside
drains to road length (
Paved and unpaved)
current status ULB Annually Table 6.(c).2 SLB
(xiii) Incidences of
Water Logging and
Flooding (No.s of cases per
year/ total number of
identified points)
current status ULB Annually Table 6.(c).3 SLB
Public Health (if applicable)
(xiv) No of Municipal
Hospitals and its location
details
Current Status ULB Annually Table
6.(d).1.1
And 1.2
(xv) Facilities available &
OPD Timings
Current Status ULB Annually
(xvi) Number of cases of
vector Born Diseases per
1000 population
ULB Annually Table 6.(d).2
Manual on Public Disclosure Schedules
CMAK | 142
(xvii) Number of cases of
Water Born Diseases per
1000 population
Annually
Table 6(a).1 Private sector participation details for SWM
Package Number Scope of work Name of the contractor
Contract period (dd/mm/yyyy to dd/mm/yyyy)
Contract value in Rs. In lakhs
Package-I Street sweeping and other sanitary works
P.J.Vishwanth 24/5/2011 to 23/05/2012 44,990/month
Package-I Street sweeping and other sanitary works
P.J.Vishwanth 01/06/2012 to 31/05/2013 87,083/month
Package-I Street sweeping and other sanitary works
- 01/06/2013 to 31/05/2014 -
Table 6(a).2
Street Sweeping Schedule
Package
number
ward
number
Road ID if avaliable Road name Road length
in Kms
Sun Mon Tue Wed Thu Fri Sat
01 6, 7, SSR Road A type 3 * * * * * * *
Manual on Public Disclosure Schedules
CMAK | 143
13,14(part), 4,9,10
Mogaragalli * * * * * * *
Nehru Nagar Road * * * * * * *
Telugara Beedi Road
* * * * * * *
Gandhi Nagar Gowri Kere Road
to Meenpete Road End
* * * * * * *
01
1,5,7,8 (Part), 3,11,12
Vijayanagar
B type
8
* *
Murnad circle to Chatra Kere
* *
Boyikere Road * *
Devarakadu Road * *
Microwave Kodava Samaj Road to
Shivakere Road End
* *
Arasu Nagar * *
01 1,8,13 (Part),
Shuhash Nagar Church Road
C type 8 *
Manual on Public Disclosure Schedules
CMAK | 144
2,15,16 Appiya Swamy Road
*
Dhakani Mohalla *
Sunkada Khate to Ayappa Betta End
*
Source: SWM Action Plan
Table 6(a).3.1
Details Handled by SHG
(No.s)
Handled by Service Provider, if
applicable (No.s)
Handled by ULB
(No.s)
Handled by
RWA/NGO (No.s)
Non slum Household’s - - 2970 -
Slum Household’s - - 290 -
commercial establishments - - 669 -
Bulk generators - - 131 -
Expected User fee generation (demand) - - - -
Table.6 (a) 3.2
General statistics on Solid Waste Management
Manual on Public Disclosure Schedules
CMAK | 145
Total Quantity of waste generated in the city per day(TPD)
Total Quantity of waste Collected (TPD)
User fee Slab details enclosed
Resolution date passed from Council
Land fill location Number of secondary transportation vehicles under SWM
5.0TPD 4.5TDP - -
Sy No.315/4,
Arji Village,
Perumbaadi
03(Tactor trailors)
Secondary storage
containers Location Map
-
Source: SWM Action Plan
Table 6(a).4
Number of Households participating in segregation NIL
Table 6(a).5 Scientific Disposal of MSW
Total waste collected & transported to disposal sites 4.5 in tones/day
Total waste processed in scientific manner Nil in tones/day
Manual on Public Disclosure Schedules
CMAK | 146
Table 6(a).6 Cost recovery under SWM in Rs Lakhs
Expenditure 2008-09
(In Lakhs)
2009-10
(In Lakhs)
2010-11
(In Lakhs)
2011-12
(In Lakhs)
2012-13
(In Lakhs)
2013-14
(In Lakhs)
2014-15
(In Lakhs)
2015-16
(In Lakhs)
1. Salary of the employees under SWM 16.80 25.71 24.36 27.83 26.60 35.84 30.73 30.24
2 Total Contractual cost if outsourced under MSWM for
hiring services, vehicles or equipments, O& M of
vehicles, fuel cost, labour cost etc. 0 0 0 0 0 5.22 27.01 20.90
3 Total expenditure borne by ULB on SWM for O &M of
vehicles, purchase of tools and equipments,
insurance cost for vehicles, landfill management cost
like tipping fee etc.
13.00 5.72 8.68 8.21 - 9.66 5.73 1.74
Revenue
Manual on Public Disclosure Schedules
CMAK | 147
1 Total Revenue generated under SWM - - - _ _ _ _
Sewerage
Table.6 (b) 1. UGD Coverage
Total Number of households with direct UGD Connections Nil in Numbers
Table.6 (b) 2 Percentage Waste Water treated
Total waste water collected at sewage treatment plant 0 in MLD
Quantity of waste water treated 0 in MLD
Table.6 (b) 3 extent of reuse and recycle of waste water
Quantity of waste water recycled & reused out of treated waste water 0 in MLD (when mouse is moved on MLD then it should show “million Liters per day”)
Table.6 (b) 4 Cost recovery under UGD (Input screen)
Expenditure Rs in Lakhs
1. Electricity bill for sewage treatment plant -
2 Total salaries of ULB employees working in STP & UGD system -
3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items, repair
and replacement of spares, labour cost etc.) -
Total O& M cost born by ULB under UGD and STP (purchase of items, repair and
replacement of spares etc.) -
Manual on Public Disclosure Schedules
CMAK | 148
Revenue
1 Total revenue collected from UGD -
Storm Water Drains
Table.6(c).1
Statistics of storm water drains
Name of major storm water drains Length in kms Cleaning frequency per annum
Mogara Galli to Vijayanagar End 1.5 Twice
Kaveri Kalyana Mantap to Maszid 0.5 Twice
Dhakani Mohalla to Murnad Road 1 Twice
Appaiah Swamy Road to Murnad Road 1.1 Twice
Table.6 (c) 2
Length of road side drains 32Kms
Table.6 (c) 3
Manual on Public Disclosure Schedules
CMAK | 149
Number of water logging and flooding cases per year……in numbers 4
Total number of identified points….in Numbers 4
Public Health to be filled by the ULBs if they are managing this function
Table 6 (d).1.1
Public Health
Name of the Municipal
hospitals
Location details Detail of facilities
Number of
beds
Number of
staff
OPD2 Timings of
the OPD
Lab Facility (yes/No) Others if any
- - - - - - -
Table 6(d). 1.2
Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000
population
- -
2 Out Patient department
Manual on Public Disclosure Schedules
CMAK | 150
Function 7 is not managed by ULB in Karnataka State hence the details are not mentioned
8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY
Sl.N
o
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for
which
information
has to be
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
Manual on Public Disclosure Schedules
CMAK | 151
disclosed
8 Urban forestry,
protection of
environment
and ecology
ULB Trees (if applicable)
(i) Number of tree cut/uprooted
to the number of existing trees
current
status
ULB Half Yearly Table 8.1
(ii) Number of sapling planted
to the number of trees
cut/uprooted to the number of
existing trees
Current year ULB Half Yearly
Water bodies (if applicable)
(iii) Existing number, New
Proposals for Revival of water
bodies, budget and expenditure
current
status
ULB Annual Table 8.2
Table.8.1 (To be filled by the ULBs if they are managing this function)
Urban forestry
Manual on Public Disclosure Schedules
CMAK | 152
Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted
- - -
Table.8.2
Protection of Environment and Ecology
Sl. No Name existing water bodies like
lake, tanks, pond etc.
Proposed for revival in Yes/No Amount budgeted for revival in Rs.
in lakhs
Expenditure met in
Rs. in Lakhs
- - - - -
Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned
10. SLUM IMPROVEMENT & UP-GRADATION
Manual on Public Disclosure Schedules
CMAK | 153
Sl.No Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
10 Slum
Improvement &
Up-gradation
ULB/UDA (i) Details on declared
and undeclared slums
(numbers, location,
number of households,
population, area)
current status ULB/Ward Half yearly Table 10.1
(ii) Details of slum
improvement schemes
(schemes, slums benefited,
budget and expenditure)
Previous three
financial years
including current
year
ULB/Ward Half yearly Table 10.2.
(iii) Beneficiary list under
each scheme
current status ULB/Ward Half yearly Table 10.2
Manual on Public Disclosure Schedules
CMAK | 154
(iv) Status of Basic
Services in Slums
(a) No of connections -
Water Supply & sanitation
(% coverage)
(b) Length of Roads and
drains (paved and
unpaved)
(c) No and % of houses
(pacca and katcha houses)
current status ULB/Ward Half yearly Table 10.3
Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same)
Details of declared slums Enclosure as per the format given Below
Details of un declared slums Enclosure as per the format given Below
Format for enclosure as mentioned in table 10.1
Details of declared and undeclared slums
Name of the slum Declared/ Undeclared Extent in Sq. mt Population Number of Households
Harikere Declared 0.43 706 143
Sunkada Kathe Declared 0.53 627 155
Mogaragalli Declared 0.55 1170 261
Manual on Public Disclosure Schedules
CMAK | 155
Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)
Current Year
Name of the slum
Improvement Schemes
Total Number of Budget and under each
Scheme (in Rs Lakhs)
Expenditure met under
each scheme( in Rs
Lakhs)
Beneficiary list as
enclosure Slums Beneficiaries
NIL
Current Year - 1
Name of the slum
Improvement Schemes
Total Number of Budget and under each
Scheme (in Rs Lakhs)
Expenditure met under
each scheme( in Rs
Lakhs)
Beneficiary list as
enclosure
Slums Beneficiaries
NIL
Current Year - 2
Name of the slum
Improvement Schemes
Total Number of Budget and under each
Scheme (in Rs Lakhs)
Expenditure met under
each scheme( in Rs
Lakhs)
Beneficiary list as
enclosure
Slums Beneficiaries
NIL
Manual on Public Disclosure Schedules
CMAK | 156
Table 10.3 Basic Service status in Slums (Apr-2012-sep 2013)
Status of Basic services in Slums
Total number of
households with
direct water supply
connections
(numeric)
Total number of
public taps/mini
water cisterns
(numeric)
Total length
of roads
paved and
unpaved in
Kms
Total
households
connected to
UGD
(numeric)
Total
length of
road side
drains in
Kms
Total number
of HH with
individual
toilets
(numeric)
Number of
Functional
Community
Toilets
(numeric)
Total number of
pacca/kaccha
houses
(numeric)
Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the
works undertaken by ULB” (plz Insert this without fail)
Manual on Public Disclosure Schedules
CMAK | 157
11. URBAN POVERTY ALLEVIATION
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
11 Urban Poverty
Alleviation
ULBs
/DMA/UDA
(i) Details of the Urban
Poverty Alleviation
Schemes (eg. Components
of SJSRY )
Current status ULB Annually Table 11.1
Table 11.1 Details of Urban Poverty Alleviation(2011-12)
Name of Schemes under
urban poverty alleviation
(multiple entries)
Budget for
the schemes
Expenditure met
for the scheme
Number of
beneficiaries
under the scheme
list of the beneficiaries to be enclosed
USEP(L&S) 1.00 0.12 1 Enclosed Below
UWSP(L&S) 3.00 - - -
UWSP(Rev. found) 0.40 - - -
Step-Up - - - -
UCDN 0.42 - - -
UWEP 0.75 - - -
Manual on Public Disclosure Schedules
CMAK | 158
All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
List of the beneficiaries under USEP(L&S)
Sl.No Beneficiaries Name
& Address Project Cost Subsidy Bank
1
Satish M.G S/o late
Govindraju Daccni
Mahla, Virajpet
50,000 12,500 Indian bank,
virajpet branch
List of the beneficiaries under UWSP(L&S)
1. Nil
List of the beneficiaries under UWSP(Rev. found)
Nil
List of the beneficiaries under UWEP
1. Nil
Manual on Public Disclosure Schedules
CMAK | 159
12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDS
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
12 Provision of
urban amenities
and facilities-
parks, gardens
and playgrounds
ULBs/UDAs Playground/ Parks/Gardens
(i) Percentage of area
under parks and gardens
to the total ULB area
Current status ULB Annually Table 12.1
(ii) Percentage of
developed parks and
gardens (%)
Current status ULB Annually Table 12.1
(iii) Number, Location,
Area, Amenities, details of
the maintaining agency
Current Status ULB Annually Table 12.2
(a) and 12.2
(b)
Table.12.1. Area reserved under Parks & Gardens
1. Total ULB area: 8.26 in Sq.kms
2. Area reserved under Parks & Gardens 26000 in Sq.meters
Manual on Public Disclosure Schedules
CMAK | 160
3. Area of developed parks and gardens 0 in sq. mts
Table.12.2 (a) Amenities under parks & Gardens
Locations of the
park
Park Area in
sq. mt
Amenities available under each park (yes/no) Contact details of the
Maintaining Agency
Children
play area
Seating
facility
Track for
walking/jogging
Facility for
exercise
Name Contact
number
(numeric)
Telugara Beedi Nil
Rotary Park Nil
Table 12.3.(b) Play ground details
Locations of the playgrounds playground Area in sq. mt
Contact details of the Maintaining Agency
Name Contact
number(numeric)
-Nil-
Manual on Public Disclosure Schedules
CMAK | 161
13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTS
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
13 Promotion of
cultural,
educational, and
aesthetic aspects
ULBs (i) Details of Community
halls, Cultural Centers,
marriage halls, municipal
educational institutes
Current Status ULB Annually Table 13.1
(a) and 13.1.
(b)
(ii) Details of
advertisement hoardings,
rates, revenue generated
Current Status ULB Annually Table 13.2.1
and 13.2.2
Table 13.1.a Details of cultural Centers
Community halls/Auditorium Details
Name Address Booking office
address and contact
details
- - -
Manual on Public Disclosure Schedules
CMAK | 162
Table 13.1 (b) Details of educational institutes (only if applicable)
Name of the Municipal Educational Institutes Number of teachers in each municipal
Educational Institutes(in numbers)
Name Address Numbers
Nil Nil Nil
Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)(2011-12)
Details of Advertisement hoardings
Number of Hoardings Slab rates for advertisement
(As Enclosure)
Advertisement tax demand for
the current year in Rs. in lakhs
Advertisement tax collected in
the current year in Rs. in lakhs
11 460 per year 0.05 0.03
Slab Rates
Sl.No Particulars Maximum Amount of Tax per Annum(In Rs)
1 For a space upto 0.2 sq mtr 15.00
2 For the space over 0.2 sq mtr and upto 0.5sq mtr 30.00
3 For the space over 0.5 sq mtr and upto 2.5 sq mtr 35.00
4 For every additional 2.5 sq mtr or less 35.00
Manual on Public Disclosure Schedules
CMAK | 163
14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMS
Sl.No Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
14 Burials and burial
grounds,
cremations,
cremation
grounds and
electric
crematoriums
ULBs (i) Numbers, type,
Location of burial grounds
and cremation facilities
available, fee charged if
any
Current Status ULB Annually Table 14.1
(a). and
14.1(b)
(ii) Details of facility of
“Herse/ Corpse
Vehicles”(number and
contact details)
Current Status ULB Annually Table 14.2
Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums
Details of Burial grounds, cremation grounds & electric crematoriums
Name of the
Community
burial ground
with locations
Name and
location of the
Crematoriums/
Burial ground
Facilities available in the Crematoriums ( Yes / No)
Electric Burning Burial Availabilit
y of wood
Water
facility
Cleaning
facility
Others
if any
Maintaining agency
Name Contact
details
Hindu Rudra
Bhoomi
Meenapet - - √ - √ √ - - -
Manual on Public Disclosure Schedules
CMAK | 164
Hindu Arasunagar - - √ - √ √ - - -
Hindu Telugara Beedi - - √ - - √ - - -
Hindu Sunkada Kathe - - √ - - √ - - -
Christian Church Road - - √ - √ √ - - -
Muslim Sunnada Beedi - - √ - √ √ - - -
Hindu Shivakere - - √ - - √ - - -
Hindu Chambe Bellur
Road
- - √ - √ √ - - -
Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)
Fee slab for each crematoriums and burial grounds Nil
Table 14.2: Details of Hearse Vehicles
Hearse/Corpse vehicle details
Number of hearse vehicles available Fee details for the vehicle
(in Rs)
Contact details to hire
the vehicle
Maintaining agency
Contact Number Name Contact Number
- - - - -
Manual on Public Disclosure Schedules
CMAK | 165
15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS
Sl.No Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
15 Cattle ponds,
prevention of
cruelty to
animals
ULBs (i) Numbers of stray
animals, vaccinated
Current Status ULB Annually Table 15.1 (a)
and 15.1 (b)
(ii) List of ‘Kanji House’
(care centers for stray
animals).
Current Status ULB Annually Table 15.1 (a)
Table.15.1.1 Details of stray animals (input & output screen are same)
Number of stray animals Number of stray dogs vaccinated Location of Kanji House (care
centers for Stray animals) if
applicable Dogs Cows Pig Others if applicable
---------------------------------------Nil--------------------------------------
Manual on Public Disclosure Schedules
CMAK | 166
Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)
List of location of Veterinary hospitals 1
List of Animal Welfare Association (if available) Nil
Name and location of NGOs working for animal
welfare( if available) Nil
Manual on Public Disclosure Schedules
CMAK | 167
16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHS
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
16 Vital Statistics
including
registration of
births and deaths
ULBs (i) General information
pertaining to city
(population, area,
households etc.)
Current Status
and recent census
details
ULB Annually Table 16.1 City
website
(ii) List of citizen service
centers with location
Current status ULB Annually Table 16.2
(iii) Total Births and
Deaths recorded along
with Birth and Death rates.
Current status ULB Half Yearly Table 16.3
(iv) Citizen Charter to be
published
Current status ULB Annually Table 16.4
Manual on Public Disclosure Schedules
CMAK | 168
Table 16.1: City General information as per recent census details (should be added in their respective ULB website
City General information
Present
population
Present area in
sq.km
Total number
of households
Population
density
Total male
population
Total female
population
Total SC/ST
Population
Total Slum
population
Literacy rate
17246 8.26 4380 - 8724 8522 2040 2503 72.65%
Table 16.2: List of Citizen Service centers
Sl. No Address of the Citizen Service centers if applicable
1 Public Grievence Redressal Cell, Virajpet Town Panthayath, Khitturu Chenamma Road, Virajpet
Table 16.3: Details of Birth & Death
Total births
recorded
(2011-12)
Total deaths
recorded
(2011-12)
Total births
recorded
(2012-13)
Total deaths
recorded
(2012-13)
Total births
recorded
(2013-14)
Total deaths
recorded
(2013-14)
Total births
recorded
(2014-15)
Total deaths
recorded
(2014-15)
Total births
recorded
(2015-16)
Total deaths
recorded
(2015-16)
952 153 1026 156 1162 111 1117 124 1381 149
Manual on Public Disclosure Schedules
CMAK | 169
Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below
format
Service Details Period of catering the service Procedure to
Apply
Officer incharge
Designation Contact Number
Birth Certificate 3 Days
Through
Application
Health
Inspector 08274 - 257332
Death certificate 3 Days
Through
Application
Health
Inspector 08274 - 257332
Property Tax Application 1-2 Days Through
Application Chief Officer 08274 - 257332
Khatha Certificate 45 days Through
Application Chief Officer 08274 - 257332
others 7 days Through
Application Chief Officer 08274 - 257332
Enclosure if already citizen
charter being maintained -
Manual on Public Disclosure Schedules
CMAK | 170
17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC CONVENIENCES
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
17 Public amenities
including street
lighting, parking
lots, bus stops
and public
conveniences
ULBs (i) number of street lights Current status ULB Annually Table 17.1 SLB
(ii) No. of Street Lights/
Km of Road Length (No.s)
Current status ULB Annually Table 17.1 SLB
(iv) Details of agency
maintaining street lights
(name and contact details)
Current status ULB Annually Table 17.2
(v) List of Authorized
Parking Areas along with
parking capacities and fee
Current status ULB Annually Table 17.3
(vi) Number and locations
of bus stops and public
toilets (Community and
commercial) with its user
charge.
Current status ULB Annually Table 17.4
Manual on Public Disclosure Schedules
CMAK | 171
Table.17.1: Details of streetlights
Total number of streetlights Types of streetlights with number
Tube light High Mast LED CFL Sodium vapor Solar
Streetlight
Solar
Homelight
1011 311 11 22 17 631 11 8
Table 17.2: Details of Agency Maintaining Streetlight
Package Number Wards Covered details of the agency Maintaining the streetlights
Name Phone Number
Nil Nil Nil Nil
Table.17.3: Details of Parking Lots
Details of parking lots Enclosure as per the format
Format
Parking lot location Parking Capacity Fee Slab
Two wheeler
Four wheeler
Two wheeler
Four wheeler
Nil Nil Nil Nil Nil
Manual on Public Disclosure Schedules
CMAK | 172
Table.17.4 Details of toilets
Public toilets Community Toilets
Location Fee slab Location Fee slab
Office Premises - Harikere -
Car Stand 2Rs(Sthri Shakthi) Mogaragalli -
Appaiah Swamy
Road 2Rs(Sthri Shakthi) Shivakeri -
Private Bus Stand 2Rs(Agency) Sunna Beede PK’s Quaters -
Mutton Market - Meenapete PK’s Quaters -
Taluq Ground -
Vegetable Market -
Arasu Nagar -
Manual on Public Disclosure Schedules
CMAK | 173
Table17.5: Details of Bus stop
Location of Public toilets User charges for Pay and Use toilets in Rs.
Pay and use toilets Community based Toilets Pay and use toilets Community based Toilets
3 5 2.00 Nil
Location of Bus stop( As Enclosure)
Area Address
Near Navodhaya, Panjara Pete
Near Mutton Stall Junction,Gonikoppa Road
Dodda Chowki, F.M.C.Road
Murnad Circle, FMC Road
Chickpete Junction, Chickpete
Sunkada Kathe
Pragathi School, Telugara Beedi
Madikeri Road
Near Kodava Samaj, Shivakeri
Near Govardhana's House , Devara Kadu Road
Near Chatrakere , Madikeri Road
Clock Tower, FMC Road
Malabar Road, Meenu pete
Manual on Public Disclosure Schedules
CMAK | 174
18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES
Table.18.1(a): list of Slaughter houses
Sl.No Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of Disclosure
Reference Remar
ks
18 Regulation of
slaughter houses and
tanneries
ULBs (i) Number, Location of
Slaughter House /
Tanneries along with
facilities available and
capacity
Current status ULB Annually Table 18.1(a)
and (b)
Table 18.1 (b): Details of Slaughter House
Number of Slaughter Houses Functional Number of slaughter houses Non functional
1 0
Location of the
slaughter House
Whether the Slaughter
house is been regulated by
KSCB (Yes/No)
Capacity Number of animals
slaughtered per week
Facilities
Washing Medical Examination
Removal of Waste
Others if any
Sunnada Beedi
Yes 175 to 210 √ √ - -