+ All Categories
Transcript
Page 1: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far
Page 2: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far
Page 3: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far

W.C W.CW.CW.C

W.CW.CW.C

W.C W.C

Production & Performance Facility Consulting121 Gates Ave. Brooklyn, NY 11238tel: 718.789.8169 fax: [email protected]

Project:

Date: Scale:

Db:

NYHS - SMITH AUDITORIUM

1/4" = 1'0"

cb

03/06/17

Orch. Level Groundplan

TS 01

VENUE SPECIFICATIONS

A

B

C

D

E

F

G

H

J

K

AV F1 AV F2 AV F3

AV F4

Rem. Showcontrol

DS roll drops ( 10)

MS Black out drops ( 3)

US Roman Shade (5)LED lighting trough

Line of balcony above

Proj. surface when closed ( typ.)

Mechoshades ( blackout)

plugs availible for steps

Stage+0'-0"

-2'-1"

-1'-5"

+0'-0"+0'-4" +0'-0"

R. SMITH GREAT HALL

Hallway ( x-over)To Loading DockUS Wall Proj. surface ( white)

12'-1

0 1/

2"

75'-3"

25'-0

"

7'-4

"

12'-3"

Page 4: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far
Page 5: TS 03 - New-York Historical Societyl7 50° 613l14/50 ° 2 62l14/36 26° 372 l14/26 9° 2 l14/19 71 ts 1 21 l11/ts 50° 3 74 l14/50 ° 732 l14/36 ts 1 22 l11/ts near box boom left far

Top Related