Mu
ultis
F
Th
Wa
spor
Feasibi
his document ha
agg
rt C
ility Stu
as been produce
ga W
ycli
udy Se
ed in partnershi
Wag
ing
eptemb
p with the follow
ga
Co
ber 201
wing organisatio
omp
6
ons:
plex
Table of Contents
1.0 Executive Summary .................................................................................................. 2
2.0 Introduction and Definition of Cycling Facilities ........................................................ 5
3.0 Planning Context and Cycling Trends .................................................................... 10
4.0 Consultation – Cycling Desires in Wagga Wagga .................................................. 20
5.0 Facility Benchmarking ............................................................................................ 28
6.0 Development Options ............................................................................................. 29
7.0 Analysis of the Pomingalarna Reserve Option ....................................................... 44
8.0 References ............................................................................................................. 57
9.0 Appendices List ........................................................................................................ 1
Appendix 1 Multisport Cycling Complex Survey Questions ......................................... 2
Appendix 2 Details on Sites visited for Benchmarking ................................................ 5
Appendix 3 Lifecycle Costs For Each Facility ........................................................... 10
Appendix 4 Details On Economic Impact Calculations .............................................. 19
Wagga W
1.0
Backgr
In NoveCity of PomingCombinstudy isassistan
The Coclubs:
1. 2. 3. 4. 5.
Consul
In 2015needs areceivegroups are:
1. 2. 3. 4. 5. 6. 7. 8.
9. 10.
The Co
“Wagga
a)
b)
c)
d)
NationaIn additPark, w
Wagga Multisp
Executiv
round
ember 2013Wagga Wa
galarna Resned Cyclings the outcomnce from Co
ombined Cy
Bicycle WaWagga WaTolland CycMTB WaggWagga Tria
ltation and
5 the Comand gather d 472 respthe scope
BMX track Criterium trCycling eduJump/PumMountain BVelodrome Car parkingAmenities meeting rooBBQs and Fenced chi
ombined Cyc
a Wagga ha
Contains aattracts famContains PomingalarIs a compleurban areaIs a comple
al, State andtion, benchm
was also und
port Cycling Co
ve Summa
3 the Waggagga a concserve. In r
g Clubs in dme of the pouncil Office
cling Club g
agga Waggaagga Cyclingcling Club I
ga Inc. athlon Inc.
Research
bined Cyclresponses
ponses. Asof this stud
rack ucation areap track
Bike (MTB) with lights
g building witom, timing ashelters ldren’s play
cling Clubs
as a multisp
a unique comilies from amodern brna Reserveex that is we.
ex that is ow
d local cyclmarking of tdertaken.
omplex Feasib
ary
a Wagga Ccept for a Mresponse todeveloping planning woers.
group is ma
a Inc. g Club Inc.nc.
Undertake
ing Clubs to the prop
s a result oy was dete
a
playground
th toilets, carea and pu
yground.
also develo
port cycling
ombination oacross the nbuilt structue. ell connecte
wned and m
ing trends wtwo similar
bility Study
Combined CMultisport Co this presa process
ork undertak
ade up of a
en
conducted posed MSCof this survrmined. Th
change roomublic addres
oped a visio
complex th
of on/off ronation. tures that
ed both soc
maintained b
were reviewfacilities, th
Cycling ClubCycling Com
entation Cfor planningken by the
representa
a communCC at Pominvey and dise project el
ms, canteess space
on for the co
at is known
oad cycling
compleme
cially and ph
by an engag
wed during he Stromlo
bs presentemplex (MSC
ouncil resog the compCombined
tive from ea
nity survey ngalarna Rescussions wements ide
n, office sp
omplex, wh
n nationally b
and non-cy
ent the n
hysically to
ged local co
the developForest Park
ed to the CoCC) to be loolved to asplex. This fe
Cycling Clu
ach of the f
to identifyeserve. Thewith potent
entified for i
pace, storag
ich is:
because it:
ycling facili
natural bea
the Wagga
ommunity.”
pment of thk and Bathu
Page 2
ouncil of cated at
ssist the easibility ubs with
following
y cycling e survey tial user nclusion
ge area,
ities that
auty of
a Wagga
e study. urst Bike
Wagga W
While Pstudy cPoming
Initial cundertaOffice oWagga site sub
Concep
Figure 1.
Wagga Multisp
Pomingalarnconsidered galarna Res
its appropriits availableits close proits existing
consultationaken with thof EnvironmCity Golf C
bject to the a
pt Layout
.1 Layout for
port Cycling Co
na Reserve18 altern
serve as the
iate land use space oximity to thuse and de
n on a prhe Departmment and HClub. All haadditional d
r the Propose
omplex Feasib
e was the pate sites.
e best site fo
se zoning
he city evelopment
roposed deent of Primeritage, Co
ave initially idetailed plan
ed Wagga Wa
bility Study
preferred sThe analy
or the deve
by a cyclin
evelopmentary Industri
ouncil’s Planidentified thnning steps
agga Multispo
site of the Cysis undertlopment be
g club.
t at Pominies – Crownnning Depahat the deves identified i
ort Cycling Co
Combined Ctaken of acause of:
ngalarna Rn Lands, Loartment andelopment mn the body
omplex.
Cycling Cluall sites co
Reserve haocal Land Sd the Lessemay be suite
of this stud
Page 3
ubs, this onfirmed
as been Services, ee of the ed to the y.
Wagga W
Cost an
A quantIf constestimatkind co
The Coof comp
Subjectimplemsources
Recom
Given th
That Co
a cobe
b susuCpr
Wagga Multisp
nd Funding
tity survey etructed, theed net costntributions f
ombined Cypleting a Re
t to this reventation of s which cou
Federal GState GovCouncil Sporting gCommuniCorporate
mmendation
he evidence
ouncil,
ontribute $5e undertake
ubject to thuitable, en
Combined Croject.
port Cycling Co
g
estimate of e economic t to maintaifrom host c
cling Clubseview of Env
view confirmf the variouuld include:
Governmentvernment gr
groups ty
e sponsorsh
ns:
e presented
5,000 in paren for the pr
he Review ter into a
Cycling Club
omplex Feasib
the capital benefit to
n a fully bulubs).
are requesvironmenta
ming the suus stages w
grants rants
hip.
d in this rep
rtnership furoject
of EnvironMemoran
bs to partne
bility Study
cost of a Mthe City is
uilt facility is
sting that Cl Factors (R
uitability of would requi
ort it is reco
nding to all
mental Facdum of Uer in the fut
MSCC at Poestimated
s $50,183 p
ouncil contrREF) for the
f the proposre partners
ommended:
ow a Revie
ctors determnderstandinture plannin
mingalarnato be $11.7
per year (thi
ribute $5,00e project.
sed site, it ship funding
:
w of Enviro
mining the ng with thng and imp
a Reserve is78M annuais figure ref
00 towards
is anticipag from a va
onmental Fa
Pomingalahe Wagga plementation
Page 4
s $8.2M. ally. The flects in-
the cost
ated that ariety of
actors to
arna site Wagga
n of this
Wagga W
2.0
2.1
In NoveconcepOrdinar That Co
a b
c
The cyc
6. 7.
8.
9. 10.
In May proposapreferreSurvey address
After ccompleof the s
Cycling
1. 2. 3. 4. 5. 6.
Suppor
1. 2.
3. 4. 5.
Wagga Multisp
Introduct
Introducti
ember 201t for a multry Meeting o
ouncil: receive andreceive anclubs note that scycling clupossible de
cling clubs i
Bicycle WaWagga Wa(www.waggTolland Cyc(http://nsw.MTB WaggWagga Tria
2015 the cal with 472 ed location
respondensed in Secti
consideratiote a feasibi
study.
g Facilities
BMX track Criterium trCycling eduJump/PumMountain BVelodrome
rting Infras
Car parkingAmenities meeting rooBBQs and Fenced chiSpectator f
port Cycling Co
tion and
ion
3 the Wagtisport cyclinof Council h
d note the red note the
staff will entbs to assis
evelopment
nvolved in t
agga Waggaagga Cyclinggacyclingclucling Club Icycling.org
ga Inc. – off athlon Inc. –
clubs condupeople comby 87% of nts also sion 6.1 of th
on of the slity study. T
s
rack ucation areap track
Bike (MTB) with lights.
structure
g building witom, timing ashelters ldren’s play
facilities.
omplex Feasib
Definition
ga Wagga ng complexheld Novem
eport correspon
ter into furtst them in t
of the prop
the combine
a Inc.– recreg Club Inc.ub.com) nc. – road c.au/Contactroad cyclin
– local triath
cted a commpleting therespondentuggested
his study.
survey resThe followin
a
Playground
th toilets, carea and pu
yground
bility Study
n of Cycli
Combinedx at Poming
mber 18 201
ndence from
ther discussthe implem
posal.
ed group in
eational roa– road and
cycling t/Club-Page
ng (www.mthlon (www.w
mmunity surve survey. Pots who answ18 other p
ults the Cng facility el
d.
change roomublic addres
ing Facili
d Cycling Cgalarna Res3:
m the comb
sions with tentation of
ncludes:
ad cycling (wtrack cyclin
es/Tolland-Cbwagga.asnwaggatriclu
vey (Appenomingalarnwered the qpotential si
Combined Cements we
ms, canteess space
ties
Clubs preseserve. Coun
bined Wagg
the combinf a long ter
www.bww.ong
CC) n.au) b.org).
ndix 1) to gaa Reserve
question regites. These
Cycling Clure to be inc
n, office sp
ented to Concil resolve
ga Wagga
ned Wagga rm process
org.au)
auge interewas chosegarding sitee suggestio
ubs determcluded in th
pace, storag
Page 5
ouncil a d at the
cycling
Wagga for the
st in the n as the
e choice. ons are
mined to e scope
ge area,
Wagga W
It was d
1. 2. 3. 4.
The bikunnecefor the n
2.2
BMX –children2008 STrails abuilt dir
Figure 2.
Wagga Multisp
determined
Bike shop Coffee shoDam for triaAnything el
ke shop andessary as a neighbourin
Definition
– is an abbn began racummer Oly
and Flatlandrt track and
.1: Karratha B
port Cycling Co
that the foll
p athlons lse not liste
d dam weremobile unit
ng golf club
n of Cyclin
breviation fcing their biympics in Bed. This studdirt jumps.
BMX - Examp
omplex Feasib
owing were
d in the sco
e considerecould be pto be a pro
ng Terms
for bicycle cycles on deijing. The dy is focussAn example
ple of a track
bility Study
e out of the
ope above.
ed cost prohrovided for
ovider of foo
motocross.dirt tracks. Bfive disciplising on Trae of a track
only layout.
scope of th
hibitive. Theevents and
od and beve
. BMX begBMX racingnes of BMX
ails BMX wlayout can
e project:
e coffee shod that there erages.
gan in the g became a X riding areith the provbe seen in
op was conwas an opp
early 1970 medal spo
e Street, Pavision of a Figure 2.1.
Page 6
nsidered portunity
0s when ort at the rk, Vert, purpose .
Wagga W
Criteriumultiplecriteriumconfigu
Figure 2.
Jump Tthey areJumps metres.
Figure 2.
Wagga Multisp
um (Crit Tre laps arounm track tharation optio
.2: Toowomb
Track (Dirt e constructecover an ar. They are lo
.3: Yerrabi Di
port Cycling Co
rack) – is and a closedat included ons, the long
ba Criterium T
Jumps) – ed on a rearea of 60m ocated at G
irt Jumps in N
omplex Feasib
a track that circuit ranghills. The l
gest being 1
Track Layouts
are used msonably flatx 60m for d
Gungahlin in
North Canber
bility Study
caters for rging from 1layout of th1760m.
ts.
mainly by BMt site with adirt jumpingn North Can
rra.
road bike ra to 2km. In he track is
MX and dirt a series of cg with heighnberra.
acing where2015 Toowshown in F
jump mounonsecutive
hts ranging f
e cyclists cwoomba buiFigure 2.2
ntain bikes.jumps. Yerfrom 600m
Page 7
complete ilt a new with six
Usually rrabi Dirt m to 1.8
Wagga W
Pump heightsRiders cand lownew pu
Figure 2.
Multispand off-to, runn
MTB – commosuspenlighter arange o
Wagga Multisp
track – are. A typical fcan roll aro
wer body asmp track am
.4: Pump Tra
port Cyclin-road cyclin
ning, walking
Mountain on forms aresion movemand have a
of terrains.
port Cycling Co
e usually sfootprint is 3und the fac
s they ride amongst the
ack at Majura
g Complexng that can g and skatin
Bikes are be downhill ament to enaapproximate
omplex Feasib
smaller than30m x 30m
cility withoutaround the pine forest
Pines Canbe
x (MSCC) –also be us
ng.
bicycles whand cross coable quick dely 100mm
bility Study
n a dirt jum. It is a loopt pedalling btrack. Maju(Figure 2.4
erra.
– is an activsed for non-
hich are deountry. Dowdescents ov
m of suspen
mp area boping trail syby using a pura Pines in4).
ve recreation-cycling act
signed for wnhill bikes ver rough tension move
oth in footpstem of dirt
pumping mon Canberra
n area that ivities such
off-road ridare heavy w
errain. Crossment and a
print size ant berms andotion with this the locat
has facilitieh as, but no
ding. The twwith 200mms country bare designe
Page 8
nd jump d rollers. he upper tion of a
es for on ot limited
wo most m plus of bikes are ed for a
Wagga W
MTB Pfeaturesand biapproxiPlaygro
Figures
Wagga Multisp
Playgrounds such as ske handlinmately 100
ound feature
2.5: Typical f
port Cycling Co
– is a sksee saws, long techniq0m x 50m ces.
features of a M
omplex Feasib
ills developog rides, baues. Stromalled ‘The P
MTB Playgro
bility Study
pment areaanks and slomlo ForestPlayground
ound.
a for mountopes to hel
Park in ’. Figures 2
tain bikes tp riders impCanberra
2.5 highlight
that would prove their
has an t some typic
Page 9
include balance area of cal MTB
Wagga W
Velodroconnecmost coaround standar
The Bafootprinevents. slope athe trac
Figure 2.
3.0
3.1
3.1.1
The Co
“That W
a)
b)
c)
d)
Wagga Multisp
omes – arted by two ommon. The45 degrees
rd velodrom
thurst Bike nt of approx Any rainw
and the cornck is 7m.
.6: Bathurst V
Planning
Policy and
Multisport
ombined Cyc
Wagga Wag
Contains a attracts famContains mPomingalarIs a compleurban areaIs a comple
port Cycling Co
re an arenstraights. Te shorter ths, while a 3
mes are usua
Park velodximately 100
water drainsners having
Velodrome –
g Context
d Plannin
Cycling C
cling Clubs
gga has a m
unique commilies from amodern builtrna Reserveex that is we and
ex that is ow
omplex Feasib
a for trackThey range he track the 333m track ally indoors
rome (Figu0m x 160m to the cen
g a maximu
southern end
and Cyc
g
omplex Vis
developed
multisport cyc
mbination ofacross the nt structures e. ell connecte
wned and m
bility Study
k cycling. Tin length fr
steeper thecan have a
s, while mos
re 2.6) is a m. Lighting hntre, with thum slope of
d.
cling Tren
sion
a vision for
ycling compl
f on/off roadnation. that comple
ed both soc
maintained b
They consisrom 150m te banks area slope of ust grassroot
333m long has also behe straightsf 9 degrees
nds
r the propos
lex that is k
d cycling an
ement the n
cially and ph
by an engag
st of two 1to 500m, we. A 250m tup to 32 degts facilities a
outdoor veeen includeds having a 5 (16%). Th
sed comple
nown nation
nd non-cycli
natural beau
hysically to t
ged local co
180 degreewith 333m btrack has a grees. Interare outdoor
elodrome thd to allow f5.7 degreee average
ex. It is:
nally becau
ing facilities
uty of
the Wagga
ommunity.”
Page 10
e bends eing the slope of
rnational rs.
at has a for night s (10%) width of
use it:
s that
Wagga
Wagga W
3.1.2
Draft R
This Rivand Enva netwo
The Pocyclists
Wagga
Wagga would a
Draft W
In SepteStrategtranspoWagga considehealthy
A sepaplan wakey cyctravellin
Recrea
The Restrategy(strateg10 half-could, apump/ju
Wagga
The puworks rrecreatitrip genReserveHighwa
Wagga Multisp
Relevant P
Riverina Mu
verina Murrvironment Dork of liveab
omingalarna by providin
a View (Dra
View is Coassist Coun
Recreation We create We promotWe promot
We are a fa
Wagga Wag
ember 2015y (WWITS
ort planningWagga val
ers how we community
rable portioas adopted cling corridong to recrea
ation and O
ecreation ay found thagic objective-court baskeat any time,ump track o
a Wagga Bi
urpose of threquired to ional riding nerator. Ape through
ay. Bagley D
port Cycling Co
Planning Do
urray Regio
ray RegionaDepartmentble towns an
a MSCC wng a safe ve
ft Commun
ouncil’s draftcil in achiev
is a part ofsafe spaceste participatte our city a
amily friend
gga Integra
5 Council c). This doc
g and infrasues as a cocan foster
y.
on of the Wby Council ors within t
ational venu
Open Space
nd Open Sat Wagga We number 5etball courts, ride skatebor BMX circu
cycle Plan
his plan waconstruct cat Poming
pendix B4 Silverlite R
Drive is the
omplex Feasib
ocuments
onal Plan
al plan is bt. Goal Thrend villages t
ill be a regenue for the
nity Strateg
t Communitving the follo
f our everyds and placetion across nd villages
ly city.
ated Transp
ommencedcument, whstructure prommunity aa prospero
WWITS is that the Octohe city to ees such as
e Strategy 2
Space StratWagga requ1). As a ress. The MSCboards or suit, or challe
2011
as to identicycle paths,galarna Res
of the planReserve. Thmain acces
bility Study
being deliveee in the plathat meet th
gional facilie whole fam
gic Plan)
ty Strategicowing objec
day life es a variety of
port Strateg
developinghen complrovision for and how we us econom
e Wagga Wober 312016enable ridePomingala
2005-2015
tegy is curruires more sult, Counc
CC could fuscooters at enge each o
ify preferre on or off r
serve. It don proposes his does coss road to P
ered by the an is, ‘Stronhe commun
ty that will mily to ride, r
c Plan. The ctives from
f sports and
gy
g the Waggeted will gthe City. Twould like y, together
Wagga Activ6 Council mer safety wharna Reserv
rently beingunstructure
cil has consrther fulfill tthe criteriumother at the
d cycling rroad. The poes mention
a cycle paonnect to B
Pomingalarn
NSW Goveng regional nity’s chang
assist meerun or walk.
developmenthe plan:
recreation
a Wagga Inguide the fThe WWITSthe City to lwith a soci
ve Travel Pmeeting. Thishen commuve.
g renewed.ed facilities
structed threthis objectivm track, rideMTB playg
routes and lan has no
n Pomingalaath adjacenBagley Drivna Reserve.
ernment’s Pcities supping needs’.
eting the n
nt of a MSC
ntegrated Tfuture direcS will includlook in the fially connec
Plan - Cyclis plan identuting. This
Research s for youngee skate pave as younge BMX bike
ground.
plan infrasdirect refer
arna Resernt to Pominve under th.
Page 11
Planning orted by
needs of
CC
ransport ction for de what future. It cted and
ng. This tifies the includes
for this g people arks and g people es at the
structure rence to rve as a ngalarna he Sturt
Wagga W
Plan of
Pomingcommustaff an
3.2
This Separticipwhen e
3.2.1
Figure 3populareasternTable 3much hThe mabe one
Figure 3.
Wagga Multisp
f Managem
galarna Resnity land. Ad is expecte
Cycling S
ection revieant and spestimating th
Bicycle Ne
3.1 shows Brity of cyclinn states with3.1 shows igher propo
ajor cities hof the contr
.1: Bicycle Ne
port Cycling Co
ment for Pom
serve is owA plan of med to be co
Sports Tre
ews cyclingectator numhe economic
etwork
Bicycle Netwng generallyh 1.45% of that Melbo
ortion of comhave better ributing fact
etwork statis
omplex Feasib
mingalarna
wned by themanagemenmpleted in
nds
trends frombers. The dc benefit ge
work’s datay by state apeople usi
urne (3.92%mmuters riddeveloped tors to the lo
stics on comm
bility Study
a Reserve
e Crown (Snt for this searly 2017.
m both natdata from thenerated for
a on cyclingand region. ing a bike t%), Sydney
ding to workcycling net
ower partic
muter cycling
tate Goverite is curren
tional and lhis Sectionr Wagga W
participatioVictoria is
to get to woy (3.3%) a
k compared tworks thanipation leve
g.
nment) andntly being u
local levelswill be useagga by a M
on. It gives leading the
ork comparnd Canberrto Wagga W
n Wagga Wel in Wagga
d is categoupdated by
s. It consideed later in thMSCC.
an indicatioe way for thred to NSWra (2.76%) Wagga with
Wagga, whic Wagga.
Page 12
rized as Council
ers both his study
on of the he south
W at 1%. have a
h 1.04%. ch could
Wagga W
Table 3.1
Commefrom the
a) A
b)
c)
Wagga Multisp
1: Percent of
Loca
ACT
Arm
Albu
Bath
Coot
Griff
Graft
Leet
Melb
Oran
Sydn
Tamw
Tum
Wag
Wod
ents in regae Bicycle N
Road CyclAdelaide, BRoad cyclinDay and chroads, som
BMX is stillocated BMdominant. Olympic sp
Criterium rais gaining aauthorities has been sevents bec
port Cycling Co
f Commuters
al Governm
– Canberr
idale
ury
hurst
tamundra
fith
fton
on
bourne City
nge
ney City
worth
ut
ga Wagga
donga
ard to State etwork duri
ling is on Brisbane anng events ahallenge rid
metimes dirt
ll strong, alMX facilitieCompetitiv
port.
acing is biga high profilreluctant to
some succeome an attr
omplex Feasib
Riding to Wo
ment Area (
ra
y
and Nationng a consu
the up gend some regare growingdes. A new t
or gravel, w
lthough mas are gette BMX is
g in some ple. Again, fi
o close off sess from horaction and
bility Study
ork in NSW LG
(LGA) % C
nal cycling tltation sess
enerally, esgional centr
g, e.g. Bicyctrend is ‘gra
well away fr
ay be losingting good part of th
places — thfinding apprsuitable roadolding twiligh
activator fo
GAs.
Commuters
2
1
1
0
1
0
1
1
3
0
3
0
0
1
1
trends that wsion in Octo
specially fores – Bendicle Networkavel grindinrom most ve
g it (sic) apuse, but se Cycling
e summer ropriate circds if locals ht crits in ‘dor retail distr
s riding to
2.76
.29
.46
0.69
.53
0.64
.91
.00
3.92
0.66
3.30
0.54
0.25
.04
.20
were receivber 2015 w
or recreatioigo, Canber
k events sucg’ — road b
ehicular traf
ppeal to theskate boardAustralia p
series aroucuits has becomplain. In
downtown’ loricts.
work
ved by Counwere:
on, e.g. Merra and Byrch as Ride biking on litffic.
e very younrds (sic) arportfolio an
und Port Pheen a probleInternationalocations wh
Page 13
ncil staff
elbourne ron Bay. to Work
ttle used
ng. Well re often
nd is an
hillip Bay em, with
ally there here the
Wagga W
d)
e)
f)
g)
3.2.2
The Narepeateof the selected
The NCof particeach stpreviou
Measur2011 tosignifica2015.
When mdecline
It is intesales hAustrali
Wagga Multisp
Mountain ba number obecause ofremote andfor more Warburton.resorts aninterested concern.
Track cyclindeclining. TNorthern Tthe culture.
Cycle Tourand rail trai
Commutersmore benenumber of meeting ph
The Nation
ational Cycled bienniallyyear to ridd and interv
CPS providecipation for tate and ters week, mo
red over theo 16.5% inant change
measured oin Australia
Cycling parin 2015 Cycling par2015.
eresting thahave increaian Bicyclin
Fewer childRoads are With increaMore bikes
port Cycling Co
biking has bof states, bf increasedd require lonaccessible Downhill d MTB pain coverage
ng may be There is said
Tasmania wh
rism – a laril tourism is
s – from a efit than maf people cohysical activ
nal Cycling
ing Participy since Mar
de. The surviewed via t
es data on ceach state
rritory. Cyclonth and ye
e previous wn 2013 ande in particip
over the pran cycling p
rticipation o
rticipation o
at cycling pased. Baseg Council s
dren are ridgetting bus
ased home es are sitting
omplex Feasib
enefited frout the numb
d number ofng car trips
facilities tcourses h
arks. Big ee of the thr
suffering sod to be a lahere many
rge numberbig in Victo
physical acany sportingommuting bvity guideline
g Participat
pation Surverch/April 20rvey coverstelephone.
cycling partand territoring participar.
week the cyd 17.4% inpation meas
revious moparticipation
over the pas
over the pas
participationed on a c
staff membe
ing to apposier entertainmein the shed
bility Study
om the consbers in comf events. Sand overnigthat can bave been
events mayrills and sp
omewhat asck of coachsmall town
r of Australoria and oth
ctivity perspg activities.by bike anes by suppo
tion Survey
ey (NCPS) 11. March/As approxim
ticipation atry, and the pation rates
ycling particn 2015. Nasured over
nth and yen since 2011
st month ha
st year has
n has declinconsultationer, some of
intments be
ent options,d.
struction of hmpetitive evSome of theght accommbe reachedsuccessfull
y be sustapills. Insura
s its profile hes and facis have trac
lians are traher states ar
pective, a 3. There ared LGAs caorting this tr
y
is a standApril is con
mately 25,00
t a national capital citieacross Au
cipation ratationally ther the previo
ear there ap1:
as declined
declined fro
ned between completethe reasons
ecause of “s
families ar
high grade vents have de new facilimodation. Td by bike ly impleme
ainable becnce and lia
as an Olymilities for tra
cks and raci
avelling intere starting t
30 minute be now a laran contriburend.
ardised sursidered the00 people
level and as and non-cstralia are m
e has chanere has beous week b
ppears to h
from 27.1%
om 40.2% i
n 2011 andd in Januas for this co
stranger dan
e less activ
facilities redropped – ities are so
There is nowor bike-tra
ented at socause televability issue
mpic sport haining. It is sing is embe
ernationallyto invest.
bike commurge and inc
ute to comm
rvey that hae most popuwho are ra
allows for escapital areameasured o
nged from 1een no stabetween 20
have been
% in 2011 to
n 2011 to 3
d 2015, yetary 2016
ould be:
nger”
ve
Page 14
cently in possibly
omewhat w a push ain, eg. ome ski vision is es are a
as been strong in edded in
y to ride,
ute is of creasing munities
as been ular time andomly
stimates as within over the
18.2% in atistically 011 and
a slight
o 24.3%
36.3% in
t bicycle with an
Wagga W
3.2.3
BMX Au
A phonAustraliparent tof peopperiod. conduconly a svolunte
BMX Achampidemons
Table 3.2
Wagga grass gnot builcontribu
MorganClub. It of a cluChamp
The neamembebeen detrack.
Wagga Multisp
BMX Trend
ustralia’s 20
MembershiMembershiQueenslan81% of parFinancially
ne conversia and a Coto athlete ra
ple to a city.The 2014 t over the ssmall club wers to run th
Australia ponships eastrating that
2: Total Ride
Ye
Lo
To
Wagga hagrowing ovelt to standaute to their l
n Street Cyis likely a g
ub starting.ionships wi
arest BMX ers. Their mependent o
port Cycling Co
ds
014 Annual
ip over the ip grew 15%d has 36%
rticipants arethe organis
ation took ouncil Officeatio involve. A nationalNational Cseven dayswith 60 memhe National
produces aach year. Nt numbers i
ers at BMX Na
ear
ocation
otal Riders
as seven Ber the tracksrd, and thelow use.
ycles have good track b Bathurst, th 1500 ride
Club to Wamembershipon willing ad
omplex Feasib
Report stat
last eight ye% between 2of membere male and sation is stro
place on er. The Presment in eve series evehampionsh
s. It attractembers, rece Champion
a report oNumbers frncreased b
ational Champ
2014
Sheppa
1,362
MX tracks s and little
e lack of ap
received fobuilt to stanfor examplers in March
agga Waggp has been dults to guid
bility Study
tes that BM
ears has gr2013 and 2
rship followe 80% of rideong with a 2
August 21sident stateents. A seri
ent could attips event in
ed $10.85 meived assistships.
on the nurom the lasetween 201
mpionships.
4
rton B
2
that get litttyre wear mpropriate m
our enquiriendard woulde, built a th 2016.
a is Bordergrowing ov
de the club.
MX is in exci
own from 62014 ed by WA aers are und2014 surplu
2015 betd that BMXes or chamtract approxn Sheppartomillion reventance from
umber of st three yea14 and 2016
2015
risbane
1,437
tle to no usmarks on thmaintenance
es in the lasd attract ridetrack in 201
r BMX at Alver the last. They have
ting times.
,800 to 17,0
nd NSW wier 20
us of $345,6
ween the is a sport t
mpionship evximately $3on, Victorianue to the the Counci
participantsars are reco6.
2016
Bathurs
1,500
se. Evidenche tread pate to these f
st 10 yearsers and incr15 and attr
bury-Wodot five yearse a state co
It also state
000
ith 19%
614.
President that has a vvent can drM over a th
a, cost $100city. Sheppl and attrac
s in the orded in Ta
st
ce for this iths. The trafacilities wo
s regardingrease the likracted the
onga. They s. Membersompetition s
Page 15
es that:
of BMX very high raw a lot hree day 0,000 to parton is cted 100
national able 3.2
is in the acks are ould also
a BMX kelihood National
have 56 ship has standard
Wagga W
3.2.4
CyclingEach scycling
3.2.5 Lo
Cyclingthree bsteady Anaconthe samwagga/ Table 3.3
During cycling
a) b)
c) d) e) f)
g)
h)
Wagga Multisp
Cycling Au
Australia state has a
are (Source
Over 3M Au1.5M peopl104,000 perepresentedCycling Aucompared 28% of totaNSW has t
ocal Cyclin
generally ike shops ibetween 20
nda, online me period 2population-
3: Bicycles s
consultatioin Wagga W
Wagga WaFamilies calike organisPurchasingThere are nUsually all Bike technpurchase. General cudesirable. There are s
Bicycle Ty
BMX
Cross CouMTB
Downhill /AMountain
Road Bike
Grand Tot
port Cycling Co
ustralia
seeks to bcycling bo
e: Cycling N
ustralians ple cycle at leeople cycled 1% of the
ustralia in 2to the prev
al membershe largest m
ng Trends
is growing increased o013 and 20and private2009-2013 -forecast-20
sold at the thr
on with locaWagga can
agga havingan ride anytsed team spg a bike canno annual fethe family cology has
ulture is c
strong clubs
ype 20
24
untry 91
All MTB
19
es 79
tal 214
omplex Feasib
e the key ody under tNSW 2014 a
participated east once p
ed to work e working po2014 has avious year. hip membership
in Wagga Wover the fiv15. These n
ely. (PopulaSource: w
031)
ree bike shop
al bike storbe mostly a
g a relativelytime. You aports. n equal buyiees for ridincan participaimproved d
hanging w
s and social
09 2010
41 273
19 969
90 204
93 855
43 2301
bility Study
lobby grouthe Cyclingand ABS):
in cycling inper week, w
in 2011 aopulation ina membersRecreation
p with 8,004
Wagga. Tabve year perinumbers do
ation growthwww.wagga.
ps in Wagga b
re owners attributed to
y good climare not pige
ing into an ang. ate. It is a bdramatically
where cyclin
l groups tha
0 2011
267
1026
213
897
2403
p for cycling Australia
n the last 12which is 6%
nd 90,000 that year. Chip of 24,2al members
4 followed b
ble 3.3 shoiod 2009 too not includh of Wagga .nsw.gov.au
between 2009
in 2015, tho:
ate to ride ion holed in
adventure.
broad, versay meaning
ng is beco
at support n
2012 2
255
1040 1
226
951 1
2472 2
ng generallyumbrella. S
2 months of the popuin 2006. B
Cars repres269 nationaship grew 6
by Victoria w
ws the como 2013 by 2e bikes soldWagga inc
u/city-of-wag
9 to 2015.
hey sugges
n. to specific t
atile marketit is an at
oming more
new and dev
2013 201
299 28
1132 118
250 25
1027 103
2708 276
y across ASome stati
ulation Both these sent 60% ally which is6% and rep
with 5,722.
mbined sale26% and red at K-Martcreased by gga-wagga
sted the gr
times to pa
t. ttractive pro
e fashiona
veloping rid
14 2015
88 271
83 1139
50 251
39 1033
60 2694
Page 16
Australia. stics on
Figures
s stable presents
es of the emained t, Big W, 9.5% in /wagga-
rowth of
articipate
oduct to
ble and
ders.
Wagga W
There a3.4.
Table 3.4
Club
Bicy
Tolla
Wag
Wag
Wag
On the 2015. H
Each wgroups ride eac
The Strindicateof the mriders uNorth (J
Wagga Multisp
are five cycl
4: Membersh
b
ycle Wagga
and Cyclin
gga Mounta
gga Triathlo
gga Wagga
whole bicyHowever, as
week there would ave
ch week. M
rava app foes hundredsmore populause Strava June 2015)
port Cycling Co
ing clubs in
hip numbers
a Wagga In
g Club Inc
ain Bike Cl
on Club Inc
Cycling C
ycle club ms demonstra
are aroundrage 20 ridany riders w
r smart phos of rides inar routes boin Wagga estimated
omplex Feasib
n Wagga Wa
of Bicycle Cl
c.
.
ub Inc.
c.
lub Inc.
embership ated below,
d 10 organders, meaniwould on av
ones is popn the Waggoth on and oWagga. Thbetween 40
bility Study
agga. Their
lubs in Wagg
2001
105
30
-
-
140
in Wagga cycling par
nised grouping 200 ridverage ride
pular in Wagga Wagga loff road are he Busines0 to 80% of
r membersh
a Wagga.
2003 2
160
30
-
-
140
Wagga hasrticipation h
p rides for ers participthree times
gga Waggaocal governlisted in Ta
s Case for riders use S
hip numbers
2005 2
NA 1
30
180 1
-
N/A N
s declined as increase
both on anpate in at les per week.
. Looking anment area able 3.5. It is
Mountain Strava.
s are listed
2010 20
155 1
30 4
120 1
37 5
N/A 1
between 20ed.
nd off roadeast one or
at activity on each weeks estimatedBiking in S
Page 17
in Table
015
36
45
28
58
29
001 and
. These rganised
n Strava k. Some d 50% of Sydney’s
Wagga W
Table 3.5
Strav
Cartw
Edwa
Elizab
Gap R
Grega
Grega
Inglew
Kinca
Koori
Lake
Lloyd
Mitch
Pomi
Post
SMW
Third
Wagg
Wagg
In 2014challengThe finiat the Bfestival.riders a
Wagga Multisp
5 Strava rider
va Segment
wrights Hill
ard St West
beth Avenu
Rd Flats No
adoo Hill fr
adoo Rd Ea
wood climb
aid Sprint –
ingal Rd –
Albert Rd
d to Bridge
hell Road –
6hr track a
Pomi Burn
C spring fi
boxcar, m
ga Cycle tra
ga Rambo 2
4 the Rotage. The focish line was
Beer and Ci. In 2015 th
and 3500 fes
port Cycling Co
r counts in th
t
– Hampde
t
ue Climb
orthbound
rom Elizab
ast bound
b from Bak
– Kincaid S
Lake Alber
(north – do
– Red Hill
– Inglewood
as of 10/06
n – Edward
nish – Our
midnight tra
ack – Gran
2013
ary Club ofcus was coms at Victory der Festiva
here were 7stival attend
omplex Feasib
he Wagga are
en Ave
eth Side
kers Lane
St
rt to Kulgo
ownhill)
Rd
d to Gregad
6/2013
St
ra Rd
ain – Riverw
ndstand Sta
f Wollundrymmunity par
Memorial Gl. In 2014 a00 riders aders.
bility Study
ea.
R
oa Flat
doo
walk
art
y started trticipation aGardens wh
about 300 pend 2000 fes
iders Jan/F
82
61
68
129
85
169
135
77
80
97
48
53
117
28
151
56
28
29
the Gears and getting there live eneople rode stival attend
Feb 2016
and Beersthe whole fantertainmenand 1500 pders. In 201
Riders All
331
225
372
398
424
492
507
302
384
378
296
306
698
305
481
254
165
190
s communitfamily out font could be people atten16 there we
Page 18
l Time
ty cycle or a ride. enjoyed
nded the ere 1102
Wagga W
On the Run &runnersriders rnumberriders hincreas
Table 3.6
The WPomingobserva Figure 3.
Wagga Multisp
second Su& Ride. Ths/walkers usregistering ir of riders has steadilyed number
6: Number of
Wagga MTBgalarna Resations that
.2: Average r
port Cycling Co
unday of Sehis event se the sameinto this freparticipatingy decreaseof alternativ
f Riders regis
Y
2
2
2
2
2
2
B Club hasserve sincet MTB rid
rider counts p
0
10
20
30
40
50
60
Number of Riders
P
omplex Feasib
eptember ehas been
e 10km couee event is g on the d
ed over theve events in
stering for the
Year
2011
2012
2013
2014
2015
2016
s been rece 2010. Thding has
per day at Po
14
26
0
0
0
0
0
0
0
July to Dec…
Jan to Jun 2011
PomingaDa
bility Study
each year thn conducteurse around
listed in Fiay is doub
e last five yn the region
e Wagga Lake
Total reg
cording numhe results increased
omingalarna R
51
35
2012
Aug to Dec…
Jan to Jun 2014
arlarna aily Ride
he communed annualld the Lake Aigure 3.6. Ele those reyears. Onen during ear
e Run & Ride
istered cyc
439
525
437
357
324
289
mber of ridin Figure significant
Reserve main
4539
49
July to Dec…
Jan to June…
July to Dec…
Averageers
nity organisy since 1Albert preciEvent organegistered. Ae reason forly spring.
e
clists
ders using 3.2 suppor
tly in the
n trail.
e
se the Wagg1972. Ridenct. The nunisers estimAlso the nuor this may
the main rt MTB Au
last five
Page 19
ga Lake ers and umber of mate the mber of
y be the
trail at ustralia’s
years.
Wagga W
Given tthat witWagga
3.2.6
The Pregave a article increasand typ
Some o
The MTthree evwas onlthe lastmembewho buthe moume”.
4.0
4.1 Co
In 2015concepcapture
Figure 4are reqyou wisrespondout of tconstru
Wagga Multisp
the strong gth improved.
MTB Trend
esident of Msummary owas that ing. The re
pes of riding
of the comm
Cross CounCross Cou(RAMBO) sCyclocrossWomen onDownhill evFour-cross Gravity End
TBA presidvents you cly one 24-ht five years ership, MTBuild some ofuntain bike
Consulta
ommunity
5 the Combt. A copy o
ed thoughts
4.1 shows tuired to besh”. The reding to this the scope bction and m
port Cycling Co
growth in cyd infrastruc
ds
Mountain Bof the statusnumbers a
easons he g for people
mon events
ntry 3-hour,untry sprintseries s – road bikely MTB evevents (4X) – four
duro – hybr
ent stated could do withour race in we have se
BA clubs, cluf them) andspace is o
ation – Cy
Survey
ined Cyclinof the survefrom the cy
the results fe developedesults demoquestion. T
because it maintenance
omplex Feasib
ycling salescture, cyclin
ike Australis of MTB raat individuagave for theto choose f
now availab
6-hour, 12t races su
es modifiedents
r bikes race id between
“on any wethin a few hAustralia o
een increasub memberd events runne worthy o
ycling De
ng Clubs coey questionycling comm
from Questd or improveonstrate a The Combinhad a low e. Access t
bility Study
s and stronng participa
ia (MTBA), cing and pa
al events ae increase ifrom. Also,
ble are:
2-hour and 2uch as the
d for off-road
together todownhill an
eekend nowhours of wheor you had tses in mounrship, trails n by privateof their inve
esires in W
onducted a s are prese
munity.
tion 4 “Whaed in Waggdemand fo
ned Cycling demand anto an ongoin
g growth ination would
in the memarticipation are declininincluded thamore peop
24-hour eve Riverina
d riding
o the bottomnd cross co
w you probere you liveto wait six wntain bike sabeing built
e promotersestment and
Wagga W
survey focuented in Ap
at types of cga Wagga?or all types
Clubs decind one of thng water su
n participatio continue t
mber newsletrends. Theng, but totat there arele are riding
ents Alpine Mo
m of the hill untry racing
ably have e. Remembeweeks betwales, numbe(and profes
s. These bud that is a p
Wagga
using on theppendix 1. T
cycling facili? Please tic
of facilitieded to makhe highest
upply would
on, it is conto grow in
etter July 2e message ftal participe now moreg recreation
ountain Bik
g.
a choice oer back whe
ween other rer of eventsssional trail usinesses thpositive ind
e multisportThis survey
ities do youck more thaes with 425ke the triathexpected c also be diff
Page 20
nsidered Wagga
24 2015, from the
pation is e events nally.
e Open
of two or en there races. In s, MTBA builders
hink that dicator to
t cycling y largely
u believe an one if 5 people lon dam
costs for ficult.
Wagga W
Questiorequest
Item 1 alreadyClub is facilitiesOwnersThe res
Figure 4.
Wagga Multisp
on 4 in the ts received
Downhill MFlow ll MouCyclo-crossTiming faciPublic addrDog facilitieCamping/aLighting forSite for moBike wash Recovery r
- Downhill y provided a
already des - was not s however cst of the item
.1: Survey re
port Cycling Co
survey alsothat are rele
TB trails untain Bike s area whiclities ress area es ccommodar night evenbile bike mefacilities
room.
MTB trailsat Willans Heveloping thincluded ascan and doms are inclu
sponse to cy
omplex Feasib
o allowed reevant to the
tracks that ch could be
tion optionsnts echanic ins
s - was notHill. Item 2 -his type of s there are ao currently wuded in the s
ycling facility
bility Study
espondentse Multisport
could caterincorporate
s
tead of full
t included - Flow tractrail that walready numwalk their dscope of th
y needs in Wa
s to specifyt Cycling Co
r for gravity ed with a cri
on bike sho
in the scopk - was not
will complemmerous dogdogs on leais study.
agga Wagga.
other faciliomplex are:
enduro eveterium circu
op
pe of this st included a
ment the MS parks arou
ash at Pom
ities desired
ents uit
study becauas the WagSCC. Item und Wagga ingalarna R
Page 21
d. Other
use it is ga MTB 6 - Dog Wagga.
Reserve.
Wagga W
4.2 Bic
Bicycle want to1997 anof BWWwww.bw
BWW h
On the cycling track atstreets
Howevecycling and wo
During providebe storethe mapeople
4.3 Wa
The Wacentral used foincludedspectat
The CluOctobeuntil Se
As the fat any ocyclists
The Clu200 comclosed locationnon-eve
The WWteach c
Wagga Multisp
cycle Wag
Wagga Wo promote cnd has worW were onww.org.au).
have regula
Each SundCoffee GrinA “fat tyredA long ride
October 1complex wt the Crickeand roads.
er, one of complex wuld be of be
a consultate bikes for loed on site arket for usecould partic
agga Wagg
agga WaggWagga Wa
or cricket in d in the facor facilities
ub has activr until mid-M
eptember. A
facility is beone time for.
ub holds a mmpetitors frat a cost of
n for attractent commun
WCC presidchildren how
port Cycling Co
gga Wagga
agga Inc. iscycling as arked to advan the comm
r rides throu
ay a 2-hournds ride on ” off road riabout 100k
13 2015 thewould be. Shet Ground
BWW’s aimwere availabenefit to the
tion sessionower socioeand then boers and procipate in rec
ga Cycling
ga Cycling Cagga. The the summe
cility are amand twin ro
vities througMarch. Trac
At this time t
eing shared r safety rea
major track rom all ovef $5,500 forting spectatnity would n
dent statedw to ride in a
omplex Feasib
a Inc. (BW
s a group oa safe and ance cyclingmittee to d
ughout the y
r road ride tWednesdayde on the fikm on the s
e BWW prehe respondfor example
ms is to fole, it would
eir club”.
n it was alsoeconomic faorrowed byovide furthecreational a
g Club Inc
Club Inc. istrack surro
er and rugbymenities, toioller door sto
ghout the wck racing is the velodrom
by cycling,asons, for ex
carnival aner the stater traffic contors. A dedinot be disru
that “at tha safe envir
bility Study
WW)
of cyclists wresponsibleg facilities a
develop the
year. They
that finishesy mornings irst Sunday
second Sun
esident waed saying “e. Our acti
oster new pprovide a s
o suggestedamilies. A ray families toer social beactivities.
c. (WWCC
s based at tounds the Wy league trailets, changorage shed
whole year, on each W
me is in use
cricket andxample, bal
nd two road . Each of ttrol. These icated crite
upted for the
he proposedronment aw
who enjoy e mode of tand participe Wagga W
are:
s at a caféfrom 9amof each moday of each
as asked w“they do novities focus
people into safe environ
d the cyclinange of unu
o ride at theenefits to W
)
the WaggaWagga Wagaining in thege rooms, t.
particularlyWednesday n
e for training
d football it lls entering
carnivals ethe road catake place
rium track aese types of
d MSCC cyway from veh
riding as a transport. T
pation. For eWagga Bicy
onth h month.
hat their likot use the cs around so
cycling. Thnment to lea
g complex used secone complex. T
Wagga Wag
Velodromegga Crickete winter. Otrack lighting
y training. Tnight. The rg.
can only beonto the tra
ach year. Tarnivals req
in the CBDat the MSCf events.
yclists couldhicles any ti
social actiThe Club stexample, mycle Plan (
kely demancurrent Wagocial rides o
herefore, if arn necessa
could be a d hand bikeThis would
gga as more
e in Kincaidt Ground, wther assets g, boundar
The track seroad season
e used by oack are a h
These attracquires streeD, providingCC would m
d train and ime of the w
Page 22
vity and tarted in
members (Source:
nd for a gga Bike on quiet
f such a ary skills
base to es could expand
e young
d Street, which is that are
ry fence,
eason is n is April
ne sport azard to
ct 100 to ts to be
g a good mean the
families week”.
Wagga W
The WWDistrict locationat this lo
1. 2. 3. 4. 5. 6.
4.4 Wa
The WaRiverinaJanuarySturt Uparticip
The Wasubject usually
Off roahttp://trePomingexcellen
4.5 Tol
The Toinductefor bike
The Cluthe Toll
Wagga Multisp
WCC presidKart Racin
n. This trackocation are
Working arThe track isHaving to bThe track isThe surfaceIt is flat so
agga Triat
agga Triatha Triathlon y to March.
University inants (Sourc
agga Triathto Lake Alblocated at A
d adventure-x.com.au
galarna Resnt venue fo
lland Cycl
lland Cycline, Barry O’
e riders to en
ub organiseand Interclu
port Cycling Co
dent also indng Club offk is hotmix, :
round the Kas locked thubook througs marginallye is in averathere are no
hlon Club
hlon Club ISeries whThe first ev
n Wagga Wce: www.wa
lon Club Inbert being sApex Park,
re racing is). Triathlonserve, alonr adventure
ling Club
ng Club was’Hagan. Thenjoy their sp
es local roadub Road Ra
omplex Feasib
dicated “theff Tasman r
is 7.5m wid
art Club actus cannot bgh the Kart Cy short at 85age conditioo hill challen
b Inc.
nc. was eshich has sixvent of this Wagga. Thaggatriclub.o
c. organisesuitable for Lake Alber
a growingn Club memg with cros
e events.
Inc.
s establishee Club’s mport among
d racing eaace in Febru
bility Study
e Club holdsroad. Theyde and 850m
tivities. e used for aClub for ins50m (1200mon with cracnges”.
stablished x events in series was
he 2016 evorg).
es monthly eswimming
rt where the
g sport (seembers havess country
ed in 1988ission is to st like-mind
ach Sundayuary and th
s twilight criy hold aboum long. The
adhoc trainiurance purpm minimumcks (it is in a
in 1994. Thn different s the ‘Comevent was o
events in Win) during th
eir storage s
e www. httpe commenMTB or tra
by Wagga provide a
ded people.
throughoute Tolland O
iterium evenut 10 evente challenges
ing. poses. would be b
a flood zone
he Club hetowns in th
e and Try Ton January
Wagga Wagghe warmer shed is loca
p://adventurted that a ail running,
Wagga Sposafe and fr
t the year. TOpen in Apri
nts at the Wts per years of running
better). e).
elped estabhe Riverina
Triathlon’ at y 31 and h
ga (tri or dumonths. Th
ated.
rerace.comcriterium
would pro
orting Hall oriendly envi
They also oil.
Page 23
Wagga & r at this g events
blish the a during Charles
had 182
uathlons hese are
m.au and track at
ovide an
of Fame ronment
organise
Wagga W
4.6 MT
In July 2since itsPomingPuddingthrough
MTB Wthe 3.5dramati
The MTamenitiwomen and punumber
The twohour in Victoria2015 thbetweewould bhold 24children
Downhibetweefor thesdevelopside of but wou
Pomingwith 23align wInternatenviron
Wagga Multisp
TB Wagga
2005 MTB Ws inception.
galarna Resg Reserve a
h native bus
Wagga runs 5km green ically increa
TB Waggaies and BB
and junior ump track wr of visitors”
o regional eSeptember
a. The RAMhe 6-hour n 150 and be necessa4-hour eventn.
ill MTB andn downhill ase types of ped with jumPomingala
uld complem
galarna Reskm of singl
with the ‘Trational Mounmentally su
port Cycling Co
Inc.
Wagga was. The Club serve, Willaand the Tumshland.
two regionaloop in 20
ased.
a PresidentBQ sheltersr categorieswould incre”.
events at Por. These tw
MBO has arevent joine220. To kee
ary to have ts, also hav
Gravity Enand cross cevents at
mps, bermsrna Reserv
ment it by fin
serve is the e track andail Solutionntain Bike Austainable.
omplex Feasib
s formed anhas been inans Hill, Livmut bike tra
al events an013 the nu
t stated “ths is increass. Also consease Wagg
omingalarnawo events atround 60 rided the Evoep growing an amenitie
ve formal ca
duros are gcountry racinPomingalar
s and drop ve could be nishing at a
home for thd 12.3km ofns – IMBA’Association
bility Study
nd has expenvolved in dvingstone N
ack. Many o
nd 10 local umber of w
he need fosing. Particstructing othga Wagga’s
a Reserve attract ridersders while
ocities serie these evenes building.ar parking, B
growing spong, blendingrna Reservoffs. Appro a suitable
an appropria
he MTB Waf fire trails (s Guide to
n). The Club
erienced condeveloping National Pa
of these area
events per women and
for user sucipation is her types os ability to
are the RAMs from as fa
the 6-hour es and thents and exp. Sites suchBBQ shelte
orts in Austrg gravity an
ve, machineximately 2klocation. T
ate location
agga. It has (Figure 4.2)o Building Sb aims to b
nsistent grotrails and/oark, the Wias offer gre
year. With t children u
upport infraincreasing
of MTB tracattract a g
MBO 3-hour as Canbehas aroun rider num
pand into 24h as Stromlrs and a pla
ralia. Gravitynd enduro ce built trailskm of new this is not in.
a well-deve). The trailsSweet Singbuild interes
owth in partor running eiradjuri Tra
eat single tra
the developusing the s
astructure sparticularly
cks such asgreater ran
ur in July anerra and Nod 100. How
mbers incre4-hour disco Forest Paayground fo
y Enduro ishallenges. T
s would neetrail on the n the MSCC
eloped trail s have beengle Track’ sting trails
Page 24
icipation events at ail, Plum ail riding
pment of site has
such as y in the s a jump nge and
nd the 6-orth East wever in ased to iplines it ark, that or young
s a cross To cater ed to be Eastern
C scope
network n built to (IMBA - that are
Wagga W
Figure 4.
Police
PCYC Wis a Bimaintaiuses th
In a phothey arewould uone bec
Wagga Multisp
.2: Pomingala
Citizens Y
Wagga Wagcycle Educned by Couis area for c
one convere planning use the curcause it is n
port Cycling Co
arna Reserve
Youth Clu
gga is locatcation Areauncil. PCYCchildren to i
rsation on Mon moving
rrent BEA (next door to
omplex Feasib
e Trail Networ
ub (PCYC W
ted in Gurwa (BEA) whC Wagga, anformally ri
March 10 20to a new s
(or one at Po their venue
bility Study
rk.
Wagga W
wood Streethich faces as part of tide their bik
016 with thesite in the fuPomingalare.
agga)
Central WaSpring Streheir vacatio
kes.
e PCYC Cluuture. Whenna Reserve
agga. Adjaceet. The Bon care pro
ub Managern they move). They on
cent to their BEA is ownogram, occa
r, it was stave it is unliknly use the
Page 25
4.7
building ned and asionally
ated that kely they
existing
Wagga W
4.8 No
The des
Table 4.1
Group
Road Ru
Wagga VCar Clubabout sixcar clubsthrough each yea
Sport anRecreatBorambo
WaggaROrientee
Wagga Multisp
on-Cycling
sires of non
1: Desires of
C
unners 1
Vintage b. Also x other s come Wagga ar
1
nd ion - ola
1
Roos ers
1
port Cycling Co
g User Gro
n-cycling us
f Non-Cycling
Date Contacted
0/3/16
1/3/16
1/3/16
1/3/16
omplex Feasib
oups
er groups th
g User Group
CurreActivitie
Pominga
Trail runninweekly
Nil.
Nil
2-3 events year. Club members atraining
bility Study
hat were co
ps
ent es at alarna
D
ng Tr
ViAnhe3,Ca
If thutwo
per
ad hoc
In simincgrorPowo
onsulted are
esired ActiPominga
rail running w
ntage Car Cnnual rally (celd at Downs000 people aar shows
a group appem to run a ilising MSCCould be supp
the immediamilar use. Evcrease as throws. A permrienteering coomingalarna ould be desir
e detailed T
ivities at larna
weekly
lub currently side Hall - attend).
roached program
C they portive
ate future vents will e club
manent ourse at Reserve
rable
Table 4.1.
Facilities D
Toilets, shelwater
Carpark, toilmeeting rooshelters, BBMay get morpeople than Downside gPomingalarnReserve is ctown
Subject to gdesired activOpen to travfrom BorambPomingalarnReserve
Orienteers ato events beconducted inforested arewhere there facilities andcome prepaaccordingly.
For major evWaggaRoosPortaloos. Ablock could this necessitdepending oaccess arrangemen
For local evecurrent car pfacilities are suitable. Forevents parki50-100 cars be required
Page 26
Desired
ters and
lets, m,
BQs. re
iven na closer to
roups vities. velling bola to na
are used eing n as are no
d hence red
vents s hire A toilet obviate ty on
nts.
ents parking
r major ing for would
Wagga W
Questioproposerespond
Table 4.2
No.
1
2
3
4
5
6
7
8
9
10
11
These activitieactivitiesuggesdiverse
All of thproposecontrollkarting)go kartcontroll
Wagga Multisp
on 10 of theed site be dents with a
2: Non-Cyclin
Activity
Running, w
School fete
Traditionalkarting
Conference
Skating, sk
Camping, f
Photograp
Learn to rid
Horse ridin
Crossfit, Fr
Radio cont
have been es receivedes already ted multiple range of us
he activitiesed infrastrued boats. ) there wouting would ed boats wo
port Cycling Co
e communiused for if
a total of 37
ng activities
walking, ori
es, fairs, ex
sports –
es, convent
kateboardin
family picnic
hy, bird wat
de or drive t
ng
risbee, outd
trolled cars,
grouped ind the higheoccur regue times ranses possible
s suggesteducture deveFor the trald not be en
also be could be pos
omplex Feasib
ty survey af facilities a3 suggestio
suggested in
enteering, s
hibitions, co
soccer, foo
tions, sports
g, roller bla
cs, parties,
tching and n
training
door gym an
, planes and
nto 11 activest numberlarly at Ponging frome for the pro
d are consielopment eaditional spnough usabconsidered ssible, howe
bility Study
asked ‘Otheare providedons. The res
n the Commu
school cros
oncerts, car
otball, arch
s club meet
ading
alfresco din
nature awa
nd boot cam
d boats
vity themesr of sugge
omingalarna 34 to 3. oposed dev
idered feasexcept for ports (soccble flat grou
a dangerever dam co
er than cycd’. This qusults are in
unity Survey
s country a
r shows, ma
hery, athlet
tings, coach
ning, weddi
reness edu
mp
s. Theme nestions witha Reserve. Overall the
velopment.
sible at Pomthe three
cer, footbalund for a larr amongst onstruction
cling activitieestion was Table 4.2.
nd duathlon
arkets
tics, golf a
hing clinics
ngs
cation
umber 1 ruh 155. Run
The remaie responses
mingalarna traditional
l, archery, rge sportingcycling acnot in the p
es, what cos answered
N
n
and go
unning and nning and ining themes demonst
Reserve gsports anathletics,
g field. Archctivities. Thproject scop
Page 27
ould the by 276
umber
155
34
33
32
31
31
20
12
12
10
3
walking walking
es were rate the
iven the nd radio golf, go
hery and he radio pe.
Wagga W
5.0
A literafacilitiesCanberand Yemembe
The feaFurther Stromloroad cyfrom bo
Table 5.Proposa
Featu
EstimSpent
Whole
MainteRequi
Mount
Criteri
Velod
BMX T
FormaFacilit
Eques
Amen
ChildrplaygrBBQ
Wagga Multisp
Facility B
ature reviews. On Fridarra. The threerrabi Dirt ers visiting t
atures of Sr details ono Forest Paycling facilitioth inside an
1: Featuresal.
ures
ated Capitat
e site area
enance irements
tain Bikes
ium Circuit
rome
Track
al Running ties
strian Trails
nities Block
ren’s’ round and
port Cycling Co
Benchma
w and site ay July 10 2ee sites visJumps. Thhe Bathurst
Stromlo Fore these par
ark is uniquies on the ond outside t
s of Stromlo
Stromlo
al $8 millio
1,200 h
$800,00ACT Gomaintencontrac
50km ctrails, dojump tra
1.2km
No
No
2.5km iloop
s Yes
Yes - $8
Yes
omplex Feasib
rking
visits were2015 a Cousited were Shis was follt Bike Park
est Park anks, Majura e to Austra
one site. Bethe ACT.
Forest and
o Forest Pa
on
ectares
00. 1 FTE wovernment. nance ts
ross countrownhill tracack
rrigated gra
800,000
bility Study
e carried ouncil OfficerStromlo Forlowed by aon Wednes
nd BathursPines and
alia becausecause of th
Bathurst Bi
ark Bath
$9 m
79 he
with 7
Not asite hopen
ry ck,
12kmtrails
Prop
Yes -
Yes istand
ass No
No
Yes -
No
out to provr and threerest Park, Ma Council sday July 30
t Bike Parkd Yerrabi De it has on
hese feature
ike Parks co
hurst Bike P
million
ectares
available ashas only jusned
m cross cou
osed 1.5km
- $1.4 millio
internationadard $1.5M
- $550,000
vide a benccycling clu
Majura PineOfficer and0 2015
k are compirt Jumps a-road (critees it draws
ompared to W
Park Pr
Esmi
22
s the st been
Es$1
ntry 25tra
m PrEs
on Pr$0
al Pr$1
No
Inf
Pr$0
Pr$1
chmark forub memberses Recreatid two cycli
pared in Taare in Appe
erium track)events and
Wagga Wagg
roposed W
stimated $1illion
25 hectares
stimated 160,521
5km cross cails
roposed 1.8st.: $0.8M
roposed Est0.7M
roposed Est1.1M
o
formal fire t
roposed Est0.7M
roposed Est139K
Page 28
r cycling s visited on Area ing club
able 5.1. endix 2. ) and off d visitors
ga MSCC
Wagga
1.5
country
8km
t.
t.
trails
t.
t.
Wagga W
6.0
6.1
The like30% mo
Table 6.1
Ame
BBQ
BMX
Bicy
Carp
Carp
Crit
Jum
MTB
Pum
Velo
The WReservequestio
A companalysiswould Voluntedevelop
Wagga Multisp
Developm
Site Optio
ely footprintovement sp
1: Area requir
enities
Q Shelters
X Track
ycle Educa
park - seal
park - gras
erium Trac
mp track
B Playgrou
mp track
odrome
Wagga Cyclie was sugn, 258 (87%
plete list ofs was undebe the mo
eers from thped trials.
port Cycling Co
ment Opt
ons
t of the MSpace as per
red for multis
ation Area
ed
ss
ck
und
ing Surveyggested as %) agreed P
f the sites sertaken on ost suitablehe club have
omplex Feasib
tions
CC is 8.7 hTable 6.1.
sport cycling
Length
31
10
120
40
50
600
1910
40
60
30
160
Allow in b
Total Area
y Questionone poten
Pomingalarn
submitted ieach of the site. Pome spent thou
bility Study
hectares. T
g complex ele
h Wid
14
5
80
40
20
20
10
40
30
30
10
between m
Total Area
a of MSCC
7 asked antial site. Ona Reserve
n the surveese sites w
mingalarna usands of h
his includes
ements.
dth N
4
5
0
0
0
0
0
0
0
0
00
movement s
a of MSCC
Footprint (
about the Of the 296 was the pr
ey is recordwhich determReserve is
hours devel
s all the cyc
Number
1
4
1
1
1
1
1
1
3
1
1
Total
space 30%
Footprint
(Hectares)
preferred s6 people teferred site
ded in Tabmined Poms home of oping the 2
ycling eleme
Area
9
1
1
12
19
1
5
16
66
20
86
site. Pominhat answe
e.
ble 6.2. Premingalarna R
the MTB 23km of sus
Page 29
ents and
a m2
434
200
9,600
,600
,000
2,000
9,100
,600
5,400
900
6,000
6,734
0,020
6,754
8.7
ngalarna red this
eliminary Reserve Wagga.
stainably
W
T
Wagga Wagga Multi
Table 6.2: Sites su
Nam
Pomingalarna R
Equex
Wagga Wagga C
Charles Sturt U
Rocky Hill
Lake Albert
Old Leagues Cl
Willans Hill
Jubilee Park
Botanic Garden
isport Cycling Comp
uggested for a Mul
me
Reserve S
A
C
Cricket Ground K
niversity (CSU) E
N
L
ub C
C
B
ns T
plex Feasibility Stud
tisport Cycling Co
Location
Sturt Hwy
Ashmont
Copland St East Wa
Kincaid St Central
Estella
North Kooringal
Lake Albert
Central
Central/South Wagg
Bourkelands
Turvey Park
dy
omplex in the Wagg
Votes Z
258
agga 9
4
4
3
3
2
ga 2
1
1
ga Cycling Survey
Zoning Availa
Land (
RE1 17.8
RE1 27.0
RE1 0.26
SP2 1500.
RE1 33.4
RE1 15.0
RE3 3.3
RE1 93.0
RE1 32.0
RE1 14.0
y
ble
ha)
Feasible
0
Comments i
“Home” of MTB WLand is on the eatrees.
Used by footbaInsufficient usable
Site has a sealedground. Insufficien
CSU is open torecreation facilities
Hilly and heavily available * See no
Long and narrow, residents do not w
No longer availabl
Given the steep gusable land availa
Used by hockey, union. Insufficient
Used by botanic and zoo. Insufficie
ncluding existi
Wagga. It has 23kstern side of the re
all, netball and ee land available.
cycle track aroundnt usable land availa
o community use s.
wooded. Insufficotes following.
development is inawant views impeded
le – housing by priv
grades of the hill thable.
touch football, athusable land availab
gardens, music bent usable land ava
Page 3
ing facilities
km of MTB trails. eserve with limited
equine activities.
d cricket / football able
of their existing
cient usable land
appropriate. Local .
vate developer.
here is insufficient
hletics and rugby ble.
owl, parks depot ailable.
30
W
Wagga Wagga Multi
Nam
Silverlite Reserv
Gumly Reserve
Riverside
Showground
Murrumbidgee T
Livingstone
Wiradjuri Reser
Borambola
North Wagga
isport Cycling Comp
me
ve A
G
C
T
Turf Club C
M
rve C
S
N
plex Feasibility Stud
Location
Ashmont
Gumly Gumly
Central
Turvey Park
Central
Mangoplah
Central
Sturt Hwy Borambo
North Wagga
dy
Votes Z
1
1
1
1
1
1
1
ola 1
1
Zoning Availa
Land (
E2 62.0
RE1 40.0
RE1 80.0
RE2 16.8
RE2 61.7
E1 1244.
RE1 24.0
RU1 8.7
RE1 37.6
ble
ha)
Feasible
0
Comments i
Mostly bushland.development.
This site is in a Considered unava
This site is in a owned or leased.
Used for showggreyhound racinunavailable
Used for horseunavailable
Heavily forested unsuitable
This site is in a flo
Site has numeroutrack. Owned by Considered unsuit
Most of the avConsidered unsuit
ncluding existi
. Not currently z
flood zone and is ailable.
flood zone and paConsidered unavail
ground activities ing and exhibitio
e racing activities
and 20km from
ood zone. Consider
s sporting facilities,State Governmenttable
ailable land is intable
Page 3
ing facilities
oned for facility
privately owned.
arts are privately lable.
ncluding soccer, ons. Considered
s. Considered
city. Considered
ed unsuitable
, including a BMX . 20km from city.
n a flood zone.
31
Wagga W
*Rocky (1%). Rboundenorth, nsection trees su
The sitedevelopnot con
6.2
6.2.1
BMX AguidelinChamplong, haas park
Wagga requiredbe at lereplace
In SeptWagga the Mayfor an buildingdifferenversus Wagga 8m.
Wagga Multisp
Hill ReservRocky Hill ed by Koorinnorth Koorin
of this landuch as Kurr
e was inspepment potensidered fea
The flat lanStreet inteoperationalThere is a rSouth of thThe large prohibitive
Cycling F
Options fo
Australia hanes outlineionship leveave a starti
king and gra
currently hd by BMX Aeast 2.5m he some of th
tember 201should aim
y 17 2016 Internationa
g many of nce betweenfive metresWagga be
port Cycling Co
ve, includinReserve, inngal Road tngal residend is quite atrajongs and
ected by Contial for act
asible for a m
nd north of trsection wol land also hrailway ease railway eaamount ofto develop
Facilities O
or BMX
as producee the requel. All trackng hill, min
andstands.
has seven Australia. Fhigh and 8mhe current s
15 the presm for, at a Brett Barneal Champio
the recentn national as. This extraecause there
omplex Feasib
ng flats runncluding tho the East
nts to the wettractive withCypress P
ouncil staff oivities suchmultisport c
he railway eould be nehas a high cement runnasement is f exposed any infrastr
Options fo
ed a best irements f
ks need to himum three
BMX tracksor example
m wide. Havites that are
sident of Bminimum, a
es from Dirtonship levet BMX trac
and internata height wile are a num
bility Study
ning down he flats, is (near Monuest and Simh great viewine.
on July 22 2h as walkingcycling comp
easement aeeded for tcommercialning throughvery low angranite roc
ructure.
or Pominga
practice dofor a trackhave at mine turns and
s. None aree, the heighving a dedie degrading
MX Austraa National tz Designs l track. Dirtcks aroundtional standll increase tmber of trac
to Coplandowned by
umental Cemmkin Street ws, large gr
2015. It is cog, running aplex becaus
and adjacenhe velodro value to Co
h the centrend is subjecck in the h
alarna Res
ocument cak from Clunimum thre have certa
e built to tht and widthcated track
g.
lia, Barry KChampionsand Constrtz have be
d Australiadard is the ethe chancecks with 5m
d Street, reCouncil (s
metery), Coresidents toranite bould
onsidered toand riding. Hse:
nt the Koorinme and crouncil
e of the flat act to overlanhill area w
serve
alled ‘Trackub level ue straights,
ain support
he minimum of the star
k that is we
Knight, recoships level tructions recen involvedincluding
eight metre s of getting
m starting ra
eceived thresince 2001)opland Streo the south.ders and po
o have recrHowever th
ngal Road/Criterium trac
area nd flows
would make
k Guidelineup to Inter, be 280m tinfrastructu
m club stanrting ramp nell maintaine
ommended track. Howecommendedd in designBathurst. T
e high starting national eamps, but le
Page 32
ee votes ) and is et to the The hill
ockets of
reational he site is
Copland ck. This
e it cost
es’. The rnational to 450m ure such
ndard as needs to ed could
Wagga ever, on d aiming ning and The key ng ramp vents to ess with
Wagga W
The key
The exTrack GBathursis on a 6.1). Th Figure 6.
Wagga Multisp
y design ele
Starting HilLength of trWidth of traMinimum oMinimum oStarting gaFirst straighTranspondeFencing onTwo covereGrandstandcan be a grFloodlightsParking spaarea along Drug testin
pected footGuidelines st Bike Parkvery steep
he Pominga
.1: Bathurst I
port Cycling Co
ements for a
l needs to brack 300m tack 8m first of four straigof three turnte 7.3m widht length of er cable at
n straights med staging ad available rassed hill s – minimumace availabthe side of g area.
tprint of sucwhich allow
k has an intsite (about
alarna Rese
International
omplex Feasib
an Internatio
be at least 8to 400m straight, re
ghts s
de, 50cm hig70m start hill and
minimum twarea of 10mfor 3000 p
side and/or m 150 lux buble for 1000
Bagley Driv
ch a facilityws for fourernational s30% grade
erve site wou
BMX track bu
bility Study
onal Champ
8m high and
est 6m inclu
gh and slip
d finish linewo metres from x 8m people. This
marqueesut proposing0 vehicles. Tve
y would be r straights astandard trae) and the euld be on a
uilt in 2015/1
pionship lev
d 8m wide
ding turns
resistant
e om track
s does not
g 500 lux foThis can be
120m x 80around 100ack which cearthworks e 10% grade
6 for $1.5 mil
vel track are
have to be
r Wagga We informal su
0m. (Sourc0m long eaost approxiexpense wae.
llion.
e:
formal sea
Wagga uch as the
ce = BMX Aach and wimately $1.5as high (see
Page 33
ating but
grassed
Australia dth 6m) 5M. This e Figure
Wagga W
The cosDirtz Deweeks f
Dirtz reclay loatranspo
Additionto be in
Details in Sectispectatconcep
Figure 6North.
Wagga Multisp
st of a BMXesign and Cfor $90,000
ecommendeam soil avaonder netwo
nally the cocluded for a
on the costion 7.2. Whor moundst BMX track
6.2: View ove
port Cycling Co
X track canConstruction0. Another in
ed budgetinailable onsitork and hotm
ost of 500 lua BMX facil
ts proposedhen detaileds be no mok proposed
er proposed I
omplex Feasib
vary greatns in 2016 n Casey, Me
g $250,000te. This incmix corners
ux lighting, ity at Pomin
d for the Intd design is ore than 20for Poming
International
bility Study
tly dependinbuilt the Oaelbourne, w
0 for Waggacludes 3D d.
two coverengalarna Re
ternational Bcompleted 0% so they
galarna Res
BMX Track
ng on the sakleigh Sou
was built for
a Wagga gdrafted des
ed staging aeserve.
BMX Track for the BMXy can be aerve is pres
at Pomingala
slope and suth track in
$250,000.
iven the 10ign, earthw
areas and w
at PomingaX track it is appropriatelsented in Fi
arna Reserve
soil type of Melbourne
0% slope anworks, starte
water conne
alarna Reses recommenly maintainigure 6.2.
e looking tow
Page 34
the site. in three
nd deep er ramp,
ection is
erve are nded the ed. The
wards the
Wagga W
6.2.2
The purriders to
The cuWagga1991 asServicetraffic lipath an
Figure 6.
This facit and mstandarmost da
This Bicbeen clof the pthe Bicy
Wagga Multisp
Options fo
rpose of a bo improve th
urrent facilit, has a foots a joint pro
es, PCYC aights, one r
nd 12m of g
.3: Wagga Bi
cility is showmany of thrds, discussays by fami
cycle Educassified op
proposed Mycle Educat
port Cycling Co
or Bicycle E
bicycle educheir skills a
ty at the Ptprint of 40oject betweand Waggarailway crosravel path.
ike Education
wing signs ohe signs arsion with a lies.
cation Area erational so
Multi-Purpostion Area w
omplex Feasib
Education A
cation area nd become
Police Citizem x 40m (F
een then Ro Wagga Cssing, 120mThe averag
n Area at PCY
of aging as e faded. Aneighbour
is proposeo it can be se Stadiumill be require
bility Study
Area
is to provid aware of ro
ens & YouFigure 6.3).oads and Tity Council.
m of asphalge width of t
YC, Spring St
AC path isAlthough the
on August
ed to be mosold. This wand PCYC
ed.
de a safe pload riding r
uth Club, S Now 25 ye
Traffic Autho. It has 35 ltic concretethe paths is
treet Central W
s cracking ae facility is t 20 2015 in
oved in thewas resolve
C projects.
ace for childules.
Spring Streeears old, it ority now Rroad signs
e (AC) paths 2.5m.
Wagga.
nd has grasaging and
ndicates the
future. Theed by CounIf this occu
dren and ne
et, Central was constr
Roads and Ms (actual sizh, 20m of c
ss growing d not up toe area is s
e land has ncil in consirs a new h
Page 35
ew adult
Wagga ructed in Maritime ze), two concrete
through current
still used
already deration
home for
Wagga W
The newgiven thfacility activitieArea at
Figure 6.
6.2.3
Criteriucycling Wollundroads.
Phil Ayebe a stawork werollers talways difficult
For a d2015 a release
Wagga Multisp
w facility cohe number close to the
es and aid Pomingala
.4: Example o
Options fo
m tracks vaevents. Fo
dry Lagoon
es, CEO foandard vehell. A flat arto warm upheld in cato get com
dedicated olength of 1
ed a feasibil
port Cycling Co
ould be simof roundab
e amenitiesin supervis
arna Reserv
of a Bicycle E
or a Criteriu
ary greatly or example precinct. In
or Cycling Nhicle lane plrea for stagp, and therepital cities. petitors to t
off-road circ.8km to 2kmity study on
omplex Feasib
milar to the obouts in Ws building, sion. Detailsve are in Se
Education Are
um Track
in both len, in Waggan Orange e
NSW, recomus shoulde
ging is requiefore requiGiven race
ravel very f
cuit the Wam and a widn a Criterium
bility Study
one in FiguWagga Wagg
playgrounds on the co
ection 7.2.
rea.
ngth and wia Wagga tevents are h
mmended oer (about 5mired to set ure a flat ares usually far. Some ju
agga Waggadth of 3.5mm Cycling F
ure 6.4. It shga. It would and pumposts propos
dth. Streetshis takes pheld in the
n May 9 20m). Length vup shade terea. State aonly last a
unior events
a Cycling Cto 5m. Humacility.
hould also d be prefer
p track to psed for the
s may be cplace in theindustrial a
016 the minvaries but lents. Cyclistand Nationapproximate
s are held in
Club recomme City Cou
have a rourable to loc
promote joinBicycle Ed
closed for we CBD aro
area on 4-la
nimum widthoops of abts set up stal adult eveely 40 minun regional a
mmended inuncil in Mar
Page 36
ndabout cate this nt family ducation
weekend ound the ane wide
h should out 1km tationary ents are utes it is areas.
August rch 2015
Wagga W
The sco
The Toothis tracline. It amenitiThe trac
BathursIt will raissues.
The speof 6m w1100m hills ansimilar fthat a nTrack a
Figure 6.
Wagga Multisp
ope they us
Length rangWidth minimCapacity toSome unduLinkage wit
owoomba Cck is 8m bewas openees buildingck is on a s
st Regional ange from Their high
ecifications wide (see and the fin
nd flats, tighfacilities. Conon-symmeat Pomingala
.5: Aerial view
port Cycling Co
sed around
ge 800m tomum 6m exo include shulations th shared p
Criterium traetween the wed in 2014 , fencing, a
sloping site a
Council is p5m to 6m level cost e
recommenFigure 6.5)
nal 1800m. ht and sweomments fr
etrical coursarna Reser
w of propose
omplex Feasib
layout was:
3km xcept for finiorter loops
ath network
ack has sixwhite edge and cost $
a bike trackat the Toow
planning to wide, asph
estimate is $
nded for Po). This circThe Pomin
eeping bendrom professse is attractve are in Se
ed Criterium T
bility Study
ishing straig
k and roads
circuit optiolines with 3
$2.34M. Thk leading towomba show
construct ahaltic concr$1M for the
omingalarnacuit has thrgalarna Reds; howeve
sional cyclistive. Detailsection 7.2.
Track at Pom
ght minimum
s.
ons ranging300mm to 5his cost inco the site, cwgrounds.
a 2000m critrete on a strack only.
a Reserve iree loops, oeserve tracker it is not st Brad McGs on the cos
mingalarna Re
m of 8m
g from 350 t500mm on tcluded the tcivil drainag
terium tracksloping site
s 1.8km lonone being k is propose
symmetricGee on Maysts propose
eserve.
to 1760m. Wthe outside track, landsge and eart
k at their Bithat has d
ng and an 700m, the
ed to have cal like somy 25 2016 ined for the C
Page 37
Width of of each
scaping, thworks.
ke Park. drainage
average second
a mix of me other ndicated Criterium
Wagga W
6.2.4 O
The keyunlikelycarpark
Wagga pop up tempora
For mabatters maximis
Details 7.2. Thcompac
Figure 6main am
Wagga Multisp
Options for
y purpose y a club wok so they are
Wagga cuoccasional
ary in natur
intenance pcan be damses grip for
on the cosese costs hcted gravel/
6.6: Aerial viemenities and t
port Cycling Co
Jump Trac
for the Jumould use the easily acc
urrently haslly such as re due to the
purposes it mpened, par riders.
sts proposehave been /clay. A prop
w of proposethe criterium
omplex Feasib
ck
mp Track ise area for
cessed.
no formal in Wilks Pa
eir location
needs a rearticularly in
d for the Jubased on uposed layou
ed Jump Tractrack is abov
bility Study
s to providean event.
Jump Tracark on the rand quality
eadily accen dry month
ump Track using 1000m
ut can be se
ck at Pomingve.
e a recreatiIt should b
ck. Informariver. These
y of construc
ssible watehs. This min
at Pomingam3 of importeen in Figur
galarna Reser
ion site for be close to
l areas buile tracks arection.
er supply sonimises dus
alarna Reseted fill cappre 6.6.
rve. The build
casual usethe amenit
lt by younge usually sm
o the face ast and crack
erve are in ped with 10
ding to the rig
Page 38
ers. It is ties and
g people mall and
and side king and
Section 00mm of
ght is the
Wagga W
6.2.5 O
Similar for casuthe amPoming
Wagga up occatempora
For mabe damgrip for
Details 7.2. Th7mm AC
Figure 6Reserve
Wagga Multisp
Options for
to the Jumpual users. I
menities angalarna Res
Wagga curasionally suary in natur
intenance pmpened, par
riders.
on the cosese costs C surface. T
6.7: Proposedlooking sout
port Cycling Co
Pump Trac
p Track, thet is unlikely
nd carpark serve is sho
rrently has nuch as in Wre due to the
purposes it rticularly in
sts proposedhave been Total length
d Pump Tracth.
omplex Feasib
ck
e key purpoy a club wo
so they aow in Figure
no formal pWilks Park eir location
needs a readry months
d for the Pubased on
h of the trac
ck between A
bility Study
ose for the Pould use theare easily
e 6.7.
pump track. k on the riv
and quality
adily accesss. This min
ump Track using com
ck would be
Amenities Blo
Pump Tracke area for a
accessed.
Informal arver. These y of construc
sible water imises dust
at Pomingapacted earapproxima
ock and Bike
k is to providan event. It The prop
reas built bytracks are
ction.
supply so tt and crack
alarna Reserth from onstely 300m.
e Education A
de a recreashould be
posed loca
y young peousually sm
the side batking and ma
erve are in site capped
Area at Pom
Page 39
ation site close to
ation for
ople pop mall and
tters can aximises
Section d with a
ingalarna
Wagga W
6.2.6
The purroad ridcorner o
Cost essaws acompacPlaygro
Figure 6Golf Club
6.2.7
Phil Ayeshould Coffs Hevents countryWagganight st
Wagga 450m lohave redeterior
Wagga Multisp
Options fo
rpose of a Mding skills. of Pominga
stimates forand log ridected gravelound at Pom
6.8: Proposedb.
Options fo
es, CEO fobe 333m in
Harbour, haare held in
y champions. These usuay.
Wagga curong. The seeopened allorating due to
port Cycling Co
or MTB Play
MTB PlaygrThe propos
alarna Rese
r the MTB es on and l/clay conn
mingalarna R
d MTB Playgr
or Velodrom
or Cycling Nn length. Thas been prondoor and ships held oually attract
rrently has eal is in aveowing wateo water ing
omplex Feasib
yground
round is to psed locationrve, as show
Playgroundaround th
necting pathReserve are
round at Pom
me
NSW, recomhe Bathurst oven to woroccur in thon outdoor t around 15
a velodromerage condr into the paress and po
bility Study
provide a sen for this faw in Figure
d have beehe old rifle hs. Detailse in Section
mingalarna Re
mmended onBike Park d
rk well for he large cit
facilities. C0 competito
me which is ition. It wasavement. Toor drainage
eries of funacility is rec 6.8.
n based onrange con
s on the cn 7.2.
eserve lookin
n May 9 20design, whiregional areies that ha
Currently thors, bringing
an outdoors crack sea
The pavemee.
obstacles tcommended
n building ancrete canycosts propo
ng South East
016 that an ch is basedeas. State
ave these faere is one g their famil
r AC track thaled in 2012ent is in ave
to help devd at the no
a wall ride ayon. Costs osed for th
t towards the
outdoor ved on one loand Nationacilities. Thper year inlies for abo
hat is 7m w2 but most erage condi
Page 40
elop off-orth east
and see include
he MTB
e existing
lodrome cated at
nal track here are Wagga ut a two
wide and of these tion and
Wagga W
These c12mm wand fallallowingwide enout of c
In Mayinvestigpavemeis becacompar
While thon the tcracks
If crackanotherwith apwould nexisting
CostingSurveyotrack coon the cin Figur
Figure 6Educatio
Wagga Multisp
cracks are swide and rul adjacent tg a state evnough for ccones.
y 2016 Mgations. In ent of sand,use of the trison, but ar
he track is top edges nneed to be
k sealing is dr 10 years. propriate dneed to beg facility app
g for the nor’s estimaonstruction,costs propore 6.9.
6.9: Proposeon Area and A
port Cycling Co
starting to buns at 110pto the crackvent to proccone work. T
McMahon Esummary
, silt and clathickness ore built on a
mostly holdnear the cofilled over t
done withinIf the track
rainage ins completely
proaches th
new velodrte dated S 500 lux flo
osed for Po
d VelodromeAmenities Blo
omplex Feasib
become a spsi. The craks, can cauceed becauThis is whe
Earth Sciethe results
ay. The reasof the asphaa strong pav
ding its shancrete wallhe next 12
n 12 monthsk were to btalled. Givey replaced.e end of its
rome at PSeptember 2oodlights, wmingalarna
e track at Poock.
bility Study
safety issueacks, which use wheel dse of these
ere cyclists
ence drilleds showed 6son the tracalt. Many revement.
ape, there is. In total themonths to p
s it is expecbe replaceden the poor A velodro
s useful life.
Pomingalarn26 2016. T
water conne Reserve a
omingalarna
e for the tracare about 5
deviation. Ce cracks. A
develop ba
d seven t65mm thickck is holdingesidential st
s a large amere is 500 lprotect the w
cted the pav it would nquality of t
me project
na ReserveThe main cection and cre in Sectio
Reserve loo
ck cyclists. 5mm wide,
Cycling NSWlso the curr
alancing ski
test holes k asphalt og up well onreets are o
mount of crineal metreweak pavem
vement woueed to be cthe paveme
should not
e was basecost activitiecovered staon 7.2 and t
oking South
A track bikalong with
W was closrent 7m tracills by riding
for geoteon top of n a weak panly 30 to 50
racking, pares of cracksment.
uld then hocompletely ent materialot proceed
ed on a Qes are eart
aging areasthe layout is
towards the
Page 41
ke tyre is the rise
se to not ck is not g in and
echnical a weak
avement 0mm for
rticularly s. These
ld up for dug out s, these until the
Quantity thworks, . Details s shown
e Bicycle
Wagga W
6.2.8
The foll
Infrast
Ameni
Carpa
Carpa
BBQs
FencePlaygr
Details Section6.10). H
The ma
Wagga Multisp
Options fo
owing supp
tructure
ties Buildin
rk - Sealed
rk - Grass
and shelter
d round
on the cosn 7.2. The aHow this lay
ain items on
Sound fit oCCTV systeCarparks, fSealed accLocked secInternal graSite drainagSheltered BFenced plaConnectingand bicycle
port Cycling Co
or Support
port infrastru
Purpos
g Toiletscanteeoffice sroom, toutdoospace.
Space park on
Overfloeventsvehicle
rs Picnic nstainlesshelter
Play aryoung t
ts of the pramenities syout would l
n the suppor
ut em with 30 formal (sealcess road frocurity gate oavel servicege and deteBBQs x twoayground g services te wash dow
omplex Feasib
Infrastruct
ucture is rec
se
, change ron, storage a
space, meettiming area r public add
for 30 vehicn a sealed s
ow parking f, up to 1000
es.
node – douss steel BBQand picnic
rea for childto ride.
oposed supstyle is baseook at Pom
rt infrastruc
cameras led) and infoom the Golfon Bagley D roads
ention basin
o the site –n bays) and
bility Study
ture
commende
oom, area, ting and
dress
cles to surface.
for large 0
ble Q with tables.
dren too
pport infrasted on the S
mingalarna R
cture costing
formal (grasf Club entra
Drive near G
n
– communicd sewer.
d for the co
Comments
Similar desSet into the360 degreerooms unde
Needs to bbuilding another facilit
Allowing 3m400 cars wWest. The between thcontainer.
Adjacent facarers can
Close to ameducation a
tructure for Stromlo ForReserve is s
g sheet in S
ss) ance to ameGolf Club en
cations (Wi-
mplex:
s
sign to the Se side of thee viewing onerneath. Se
e adjacent d centrally ies.
m widths anould fit on Bother 600 we velodrom
acilities like watch child
menities andarea.
Pomingalarest Park bshown in Fig
Section 7.2 a
enities ntrance
-Fi), power,
Stromlo strue hill, excelln top level aee Figure 6.
to the amenlocated to t
nd 20m for 2Bagley Drivwould be loc
me and the M
pump trackdren in com
d bicycle
arna Reservbuilding (seegure 6.11.
are:
water (for
Page 42
ucture. ent and .
nities he
2 rows, e cated MTB
k so fort.
ve are in e Figure
building
Wagga W
Figure 6.
Figure 6towards
Wagga Multisp
.10: Amenitie
6.11: Proposethe Sturt Hig
port Cycling Co
es Building at
ed Amenitiesghway.
omplex Feasib
t Stromlo For
s Building (ri
bility Study
rest Park, Ca
ight) at Pom
nberra.
mingalarna Reeserve lookinng to the So
Page 43
uth West
Wagga W
7.0
7.1
One of PomingexistingbushlanThe co(Cootambe addr
Wagga Multisp
Analysis
Preferred
the importagalarna Resg vegetationnd. It wouldomplex ovemundra Waressed in a
port Cycling Co
of the Po
Pominga
ant goals ofserve (Figun. The MTBd be built amerall would
attle and CyREF.
omplex Feasib
omingala
larna Res
f the layout ure 7.1). ThB Playgrounmongst treed have sopress Pine
bility Study
arna Rese
serve Layo
is to utilisehe preferrednd is the oes so it wouome impac
suckers). T
erve Optio
out
e the open ad layout wonly componuld not requt on nativ
This is one c
on
area on theould have nent of the uire any tre
ve grasses component
e south easminimal imcomplex th
ees to be res and sma
that would
Page 44
t side of mpact on
hat is in emoved. all trees
need to
W
F
Wagga Wagga Multi
Figure 7.1: Poming
isport Cycling Comp
galarna Reserve sh
plex Feasibility Stud
howing context of
dy
Multisport Cyclingg Complex.
Page 445
Wagga W
In Septprinted.groups The Colayout (
Many sretainedinterestmotorbi
The premultispofacility. occasioinfrastruevents.
Figure 7.
Wagga Multisp
tember 201. Scaled cutan opportu
ombined Cy(see Figure
stakeholderd. For exat is that theikes be kep
eferred layoort elementOne elem
onally useducture for ca
7.2: Preferred
port Cycling Co
5 an aerial touts of eac
unity to suggcling Clubs 7.2).
rs have reqmple, the W
e bushland pt out”.
out uses thts. Section
ment that wd for largeramping. Mo
layout of Mu
omplex Feasib
image mapch of the progest a layoand Counc
quested thaWaggaRoobe retained
he footprint6 of this st
was not adr events aobile facilitie
ultisport Cycli
bility Study
p of the easoposed facut at Pomincil then used
at the naturos (Orienteed as uncha
t dimensiontudy addresddressed isand therefoes such as t
ing Complex
stern side oilities were ngalarna Red these as
ral beauty ering Club)anged as p
ns listed in ssed the lays a campinore it is notoilets woul
at Pomingala
of Pomingathen used teserve. Fiftea guide to d
of Pominga) President ossible and
Table 6.1:yout specificng area. Thot proposed be brough
arna Reserve
alarna Reseto give Stakeen were redevelop a p
alarna Ressaid “our
d that vehic
: Area requcs for eachhis would
ed to deveht in as req
e.
Page 46
erve was keholder eceived.
preferred
serve be primary
cles and
uired for h cycling only be lop any uired for
Wagga W
7.2
Estimat
Tables The key
a) b) c) d)
7.2.1 Es
A summelemen Table 7.2
Wagga Multisp
Asset Ma
ted lifecycle
Amenities BMX TrackCriterium TBicycle EduJump TrackPump TracMountain BVelodromeSupport Inf
7.2.1 to 7.2y financial e
Capital CosAnnual opeRenewal coAnnual esti
stimated C
mary of thet are in App
2.1: Summar
Cap
Am
BM
Bic
Crit
Jum
Pum
MT
Vel
Sup
Rev
Det
Pre
Leg
Pro
Con
Tot
port Cycling Co
nagement
e costs for th
k Track ucation Arek
ck Bike (MTB) frastructure
2.3 are a sestimate sum
sts for all elerational incosts to replaimated econ
Capital Cos
e capital copendix 3.
ry of whole si
pital Cost I
menities
MX
cycle Educa
terium Trac
mp Track
mp Track
TB Playgrou
odrome
pport Infras
view of Env
tailed Desig
eliminaries (
gal Advice
oject manag
ntingencies
tal Capital
omplex Feasib
t – 30 Yea
he following
a
Playground
.
summary ofmmaries dis
ements of tcome and exace assets nomic bene
ts
osts are in
ite capital cos
Item
tion Area
ck
nd
tructure
vironmental
gns and Cos
(install of sit
gement (10%
s 10%
Costs
bility Study
r Lifecycle
g elements
d
f the key finsplayed are
the developxpenses what the end o
efit to the W
table 7.2.1
sts.
Factors
stings 8%
te services)
%) & procur
e Costs an
are present
nancial resue:
pment. hich producof their usef
Wagga Wagg
. Finer det
)
rement (1%
nd Income
ted in Appe
ults using t
ces an annuful life. ga Local Go
ails on cap
Cost – E
$666,
$1,103,
$152,
$823,
$64,
$115,
$45,
$718,
$2,186,
$10,
$470,
$333,
$50,
%) $741,
$748,
$8,230,
e
endix 3:
the life cycl
ual loss.
overnment A
pital costs f
Est.
,235
,596
,681
,455
,600
,600
,400
,503
,200
,015
,903
,291
,000
,453
,193
,124
Page 47
e costs.
Area.
for each
Wagga W
7.2.2 A
Table 7is baseevents season
Maintenbookingmowingwear anrates. D
Table 7.2
Wagga Multisp
nnual Ope
7.2.2 showsed on Counand annuaal charge fo
nance expegs and orgag, security ind tear. UtilDetails on th
2.2: Summary
Income
Trade sh
Floodlig
Floodlig
Floodlig
Charge
Venue S
Cycling
Operati
Site Man
Amenitie
BMX Tra
Criterium
Bicycle
Jump Tr
Pump T
MTB Pla
Velodro
Support
TOTAL
Annual
port Cycling Co
rational Inc
s the MSCCncil’s fees l user fees or sports us
enses allowanising maiinspectionsity charges
hese costs a
y of whole of
Operation
hows, car s
ht user fees
ht user fees
ht user fees
for incident
Sponsorship
Clubs Hom
onal and M
nagement -
es
ack
m Track
Education A
rack
Track
ayground
me
t Infrastructu
Operation
Operating
omplex Feasib
come and
C operationsand chargefor cycling
sers which is
w for a perntenance a, sweepingare also in
are present
f site operatio
nal
shows, exhib
s - BMX Ho
s - Criterium
s - Velodrom
tal users
p
me Status An
Maintenanc
- user booki
Area
ure
and Maint
Loss
bility Study
Expenses
s, maintenaes which aclub membs $21 per s
rson to speand repairs. of tracks acluded for eted in Appen
onal income a
bitions, mar
ours
m Hours
me Hours
nnual User
ce Costs
ings and org
tenance Co
ance and rere cost rec
bers. This iseason or $4
end eight h Maintenanand generaelectricity, wndix 3.
and expenses
rkets
Fee
ganising re
osts
enewal costcovery. Oths based on 42 per year
hours per wnce activitieal repairs frwater, gas, s
s.
Tota
pairs
-
ts. Lightingher income
Council’s sr.
week on mes include crom vandalsewer and g
al
$675
$7,230
$7,230
$7,230
$4,200
$10,000
$12,600
$44,965
$/Year
$4,160
$26,263
$10,773
$10,283
$9,680
$1,613
$1,613
$7,200
$10,283
$13,280
$95,148
-$50,183
Page 48
income is from
standard
anaging cleaning, ism and garbage
Wagga W
7.2.3 Es
Renewaor refurpaintingof the reAppend
Table 7.2
Wagga Multisp
stimated R
al costs havrbishment og, replacingenewal cosdix 3.
2.3: Summar
port Cycling Co
Renewal Co
ve been caof an existin the AC onts are in tab
ry of whole si
Renew
Amenitie
BMX Tra
Criterium
Bicycle
Jump Tr
Pump T
MTB Pla
Velodrom
Support
Total Re
omplex Feasib
osts
alculated forng asset th the criteriuble 7.2.3. Fi
ite renewal co
wal/Refurbis
es
ack
m Track
Education A
rack
rack
ayground
me
Infrastructu
enewal Cos
bility Study
r each cyclat is in poo
um track or iner details
osts.
shment Co
Area
ure
sts
ing facility. or conditionresealing ton renewa
osts A
A renewal n. Exampleshe entrancel costs for e
Av $/Year
$10,659
$2,439
$24,513
$1,852
$1,280
$1,210
$2,653
$3,782
$17,768
$66,156
is the replas at the MSe road. A seach eleme
Page 49
acement SCC are ummary nt are in
Wagga W
7.2.4 Es
The ecocoming to partiaccomp
Table 7.2
Sport
BMX
BMX
BMX
MTB CroCountryMTB CroCountryMTB CroCountryMTB CroCountry
Road Cy
Road Cy
Road Cy
Running
Running
Cycling RunningCycling Running
Tourism
Trade sh
Using ththat coueconomis preserecorde
* Economeconomic
Wagga Multisp
stimated E
onomic ben to Wagga icipant visipanying the
2.4 Annual ev
oss y oss y oss y oss y
ycling
ycling
ycling
g
g
/ g /
g
m
hows
hese event uld be attrib
mic benefit vented in tabed in Appen
my ID is a wec analysis.
port Cycling Co
Economic B
nefit to Wagfor events tors, the e participant
vents at MSC
Event / Ac
National C
State even
Regional e
Worlds – 2CC Evocities 6participant
RAMBO -
NSW SchoChampionTrack Opeextras
Regional e
Regional schampions
Regional s
Orienteeri
Sports trai
Trail duath
Cycling to
Cars, bikemarkets
TOTALS
figures the buted to thevia the use ble 7.2.5. Fdix 4.
eb based pack
omplex Feasib
Benefit to W
ga Wagga at the MSC
economic imand numbe
CC and associ
ctivity
Championsh
nts
events
24-hour or N
6-hour - extts
extra partic
ools MTB nships ens (Velodro
events (Crit
schools ships
schools cros
ng nationals
ining camps
hlons
urist
es, exhibition
total numbe MSCC is of Economurther expla
kage officially
bility Study
Wagga Wag
has been cCC. These empact calcer of days s
iated visitors
hips
National
tra
cipants
ome) -
t) - extras
ss country
s or state
s
ns,
ber of extra v38,744. Th
my ID*. The anation of h
y adopted by W
gga
alculated baevents are lculations alstaying.
s numbers.
Number per year
0.1
1
3
1
1
3
1
2
2
2
2
1
3
6
1
4
33.1
visitor nightis figure watotal econo
how the eco
Wagga Wagg
ased on theisted in tabso include
r
Participfrom Wagga
30
50
100
30
50
40
50
100
100
100
300
50
30
50
0
1000
2080
ts generatedas then useomic impactonomic ben
ga City Counc
e number ofble 7.2.4. Ad
estimated
pants PartOutTow
0
0
0
0
0
0
0
d in Waggaed to determt on Wagganefit is calcu
cil for demogra
Page 50
f visitors dditional
people
ticipants t of wn
2989
500
200
600
50
30
400
50
50
300
300
100
30
100
2000
1000
8699
a Wagga mine the a Wagga ulated is
aphic and
Wagga W
Table 7.2
7.3
On Febmet at PLands ain princ
a) b)
c)
ConsultPresideCouncilobjectiofacilitiesfor the straying
The neBMX traand a hsaid reresiden
7.4
7.4.1
In May full repoIn summThe becorrosio
Wagga Multisp
2.5 Estimated
Ben
Econ
Econ
Econ
Tota
Land Own
bruary 2 20Pomingalarand Local Liple suppor
A REF incluStandard aunder trusteThe Local Lan emergean informal
tation with tent of the Col Officers aon to the cos where the
golf driving golf balls a
arest resideack is approhillside and egarding Sats be comp
Technical
Geotechni
2016 McMaort titled ‘Pomary the rearing capacon and are f
port Cycling Co
d Annual Eco
efit
nomic Bene
nomic Bene
nomic Bene
al Annual B
ners and N
16 the Charna ReserveLand Servicrt of the proj
uding consiapprovals areeship to thLand Servicncy. The lal carpark wo
the Lesseeombined Cy
and the Coomplex proere is a winng range. Hand riders t
ential area oximately 8impact on
an Isidore pleted during
l Assessm
cal Assess
ahon Earth omingalarnaesults showcities and Cfavourable
omplex Feasib
onomic Benef
efit - Direct s
efit - Industr
efit - Consum
Benefits
Neighbour
airperson ofe with Officeces and Offject subject
deration of re obtained he Crown. ces requestast time it would be ade
of the Wagycling Clubsmbined Cy
oposal. He for both pa
He did undhat would h
is Rivervie850m. Thes
these residresidents.
g the REF s
ment of Po
sment
Science dra Reserve Ged the site CBR are goto supportin
bility Study
fit to Wagga W
spend impa
rial Impact
mption Imp
r Conside
f the Combers from thefice of Envirt to:
Aboriginal from Crow
ted the travewas officiallyequate.
gga City Gos, and agai
ycling Clubsindicated aarties. He dderstand thhave to be m
ew Drive. Te houses a
dents is likeIt is reco
stage of the
omingalarn
rilled five boGeotechnicais moderat
ood indicatng built infra
Wagga.
Am
act $7,5
$3,4
act $79
$11
rations
bined Cycline Departmeronment an
Heritage anwn Lands giv
elling stock y used was
olf Club occn on June 2s Presidentan opennesdid request hough theremanaged.
The distanceare bufferedely to be miommended e project.
na Reserv
ore holes acal Investigately reactiveing stiff soiastructure.
ount
500,838
489,008
96,932
,786,778
ng Clubs annt of Primad Heritage.
nd impact oven Council
route be pas in the 197
curred in M21 2016 andt. Overall thss to negotthat, if poss
e could be
e from Rive by the golfinimal, if at that consu
ve
cross the Mtion May 20
e which is ‘nls with a lo
nd Council ry Industry . They indic
on fauna andl manages
assable for 74 floods; th
March 2016 d July 15 20he Lessee tiate sharedsible, space conflicts b
erview Drivf course ve all. Similarultation wit
MSCC footpr016’ was prnormal’ for ow risk of c
Page 51
Officers - Crown
cated an
d flora. the land
cattle in herefore
with the 016 with had no
d use of e be left between
e to the getation r can be h these
rint. The roduced. Wagga.
concrete
Wagga W
7.4.2
A formaoverflowhave a Effects intersecEnginee
ManagithroughChamp
EmergeSturt HRoad inReservegravel s
7.4.3
Based oReservebecausits use Develop
Wagga do not Infrastru
A condbe donapproxiproject
The key
Wagga Multisp
Traffic Con
al sealed caw grassed clocked gateof casual u
ctions (Sturer and of si
ng vehiclesh Council’s Dionships co
ency vehicuighway. In
ntersection. e. This hasservice road
Developme
on advice fe will not be, while thewill be by
pment Appl
Wagga Citrequire devucture Clau
ition of the e through mately $10elements.
y environme
MaintainingEffects on fHeritage inEffects of bTraffic and ManagemeNoise Dust Effects of cManagemeVisual impaWaste man
port Cycling Co
nsideration
arpark has carpark for e and low c
user traffic, art Highway milar chara
s for eventDevelopme
ould have up
ular accesstimes of hIn these tim
s been allowd.
ent Applica
from Councbe considee BMX tracklocal day tication may
ty Council wvelopment ause 65 and 6
SEPP is tha REF. A
0,000. The
ental issues
g biodiversitflora and facluding Abo
built infrastruaccess
ent of run-of
camping ent of large acts nagement.
omplex Feasib
ns
been plann1,000 vehi
cable fencinat an averagand Bagleycter to curre
ts however nt Applicatip to 1,000 v
s needs to igh floods
mes residenwed for in
ation (Coun
cil’s Planninred as a mk or MTB trato day visitoy need to be
will be the oapproval. U66) 2007 de
hat Council quote has REF would
s the REF w
ty and naturuna original Heructure
ff and poten
events
bility Study
ned for 30 cles has be
ng adjacent ge daily est
y Drive) is cent use by t
r needs to ion processvehicles req
be maintaRoche Roa
nts require ethe MSCC
ncil DA)
ng Directoramajor recrearails could aors and clue submitted
owners of tUnder the Sevelopment
consider thbeen obtai
d consider t
will need to
ral characte
ritage
ntial impact
vehicles toeen planneto entries t
timate of 10considered the Golf Clu
be assesss. Some evequiring parki
ined betwead goes unemergency design wit
ate, the MSation facility
attract a maubs. If a mad at that time
the proposetate Envirot can occur
he impacts oined from athe effects
consider ar
er of Poming
on nearby w
o cover dailyd for eventsto prohibit il00 vehicles,negligible b
ub.
ed on a caents such asing.
een Riverviender water access throth the inclu
CC proposay. This hasjor recreatioajor event we.
ed infrastrucnment Planas complyin
of the devea local provon the env
re:
galarna Res
watercourse
y casual uss. It is propllegal vehic, on McNickby Council’
ase by cass the BMX
ew Estate near the M
ough Pominusion of an
al at Pomins been detonal event, were to ha
cture and thnning Policyng develop
elopment. Tvider for a vironment o
serve
es
Page 52
sers. An posed to le entry.
kle Road s Traffic
se basis National
and the McNickle ngalarna
internal
ngalarna ermined most of
appen, a
herefore y (SEPP ment.
This can REF at
of all the
Wagga W
An impotree plalandscaconcepcurrent large trnative gof the R
7.4.4
The neaThis woAdvice 32mm s
Providinwith 12systemsa 4G bo
The neathe Golmanholsewer m
Figure 7.
Wagga Multisp
ortant consanting betwaped gardet drawings site landsc
ree removagrasses woREF.
Services
arest waterould requirereceived fro
service to P
ng power w250 amps s. For commooster and f
arest sewerf Club. Thee access e
main therefo
7.3: Location
port Cycling Co
sideration ofween the cen beds wi
is to show cape has noals within thuld be distu
r is a 150mme an under om Riverina
Pomingalarn
will be expenper phase.municationsfree Wi-Fi a
r main is ape current seevery 80m or the trenc
of Water and
omplex Feasib
f the REF wcycling facill be plantehow the cyo trees whehe complexurbed and t
m main on bore of the
a Water in Jna Reserve.
nsive as it w This wou
s it is propoaccess.
pproximatelwer connec(3 off). Thehing depth
d Sewer servi
bility Study
will be that,lities, it is ed within tycling facilitere the facx footprint. the impact o
the southee highway. June 2016 .
would requild supply e
osed to utilis
ly 300m to ction estimaere is goodwill not nee
ices near Pom
while the cproposed
the completies fit withiilities are pSome smaof this will n
rn side of thThis has bis that the
ire the instaenough pose mobile te
the east of ate is basedd fall from ed to be sign
mingalarna R
concept drathat native
ex. The man the existi
proposed whall Cypress need to be
he Sturt Higbeen includmain has c
allation of a wer to runechnology.
the site. Thd on using 1Pomingalarnificant.
Reserve.
awings do ne trees andain purposeing landscahich will enPine suckconsidered
ghway. (Figded in the ccapacity to s
power trann the flood
This would
his is the se150mm PVCrna Reserve
Page 53
not show d native e of the ape. The nsure no kers and d as part
gure 7.3) costings. supply a
nsformer lighting
d include
ervice to C with a e to the
Wagga W
7.5
If the Mconsidefinanciaconside
7.5.1 C
The foll
a)
b)
c)
d)
e)
f) g) h)
i)
7.5.2 O
a)
b)
c)
d)
7.5.3 R
Operatinominaseasonfull cost
The bigevent inWagga
Wagga Multisp
Financial
MSCC were ered during al figures prerations hav
apital Cost
owing chan
Remove thmake it toureduced coThe overheMTB tracksThe buildinsmall meetfootprint is Not providelit. Build the BThis could range to thCap the PuLeave the vBuild limiteentrance onNot build aCity Counc
Operations,
Clubs provsurfaces, oResourcingand CouncCouncil alrefrom other Savings wiclose a numconstructed
eturn on In
onal incomal user fee al charges.t recovery.
ggest returnncome andwould be $
port Cycling Co
Variables
to proceedthe detaile
resented in ve been gro
t
nges to the
he crisscrosuch at this lost. ead bridge s rather thanng footprint ting room, based on Be lighting on
Bicycle Educfree the a
is area beloump Track wvelodrome a
ed internal fn Bagley Dr fenced pla
cil’s Playgro
Maintenan
vide in kindorganising ag of operatioil. eady has asources likell be made mber of cycd.
nvestment
me is predicthas been
Charges fo
n on investmd cycling to$11.78M pe
omplex Feasib
s for Futur
d, the followed design a
this feasibouped below
scope of th
ss bridge olocation. Th
on the SWn over. of the amestorage an
Bathurst whin the criteri
cation Area rea up to m
ow the Pumwith compacat Kincaid Sfencing andrive
ayground. Tund Strateg
nce and Re
d resourcend implemeon and mai
renewal ine grants, spfor mainte
cling related
ted to be m applied thor lights pe
ment will beourism it har year.
bility Study
re Conside
wing scope cand costingility study d
w.
e project co
on the critehis would a
W corner of
enities blocnd showersich has a laium track (7
in town; hemove the M
mp Track. cted clay raStreet. d instead ha
This was nogy.
enewal Cos
es for cleanenting minointenance n
nfrastructureponsorship anance and
d facilities w
minimal givehat is comr hour have
e the econas been es
eration
changes an phase to a
do not inclu
ould signific
erium track achieve a si
the BMX tr
k could be s/toilets sim
arge meeting700m circui
ence it wouMTB playgr
ather than a
ave a locke
ot identified
sts
ning of amor building reneeds to be
e back log sand in kind renewal co
when the Po
en the natummensuratee also been
omic beneftimated the
nd operationallow for prde these sc
cantly reduc
near the Mmilar aligne
rack to go
decreasedmilar to Strg room andt) given the
ld not be a round down
sphalt.
d gate adja
as required
menities, repepairs. e shared be
so this may support.
osts as Couomingalarna
re of the si with othe
n included w
fit for Wagge economic
nal issues croject savincope chang
ce the capita
MTB contaied track at
under the
d so there isromlo. The d a kitchen/ke velodrome
cost to then from the
acent the G
d in Wagga
pairs of di
etween user
y have to be
uncil will bea Reserve f
ite and actier sporting which are b
ga Wagga, c benefit to
Page 54
could be ngs. The ges. The
al costs:
ner and a much
Crit and
s only a current
kiosk. e will be
e MSCC. old rifle
Golf Club
a Wagga
rt riding
r groups
e funded
e able to facility is
vities. A groups’
ased on
through Wagga
Wagga W
In addiWagga Econom
Possibland useassist wFederalare:
Under made tocultural (Source
This coParliamMTB W
Loans cwould rto perpe
Businesconsidenatural Signage
Wagga Multisp
tion the ecWagga wo
my.id).
e income ser group fuwith sourcinl Governme
Local Sporthttps://sporSocial HouNational StClub GrantCommunityStronger CRMS and SPublic Rese
the NSW Go release $ infrastructu
e:www.infra
ould be a soment Daryl MWagga.
could be aprequire a roetual mainte
ss sponsorered as largbeauty of t
e Strategy a
port Cycling Co
conomic imould produce
ources for tndraising. Png grants aent run annu
t Grant Progrtandrecreasing Grantstronger Regs Category
y Developmommunities
Service Cluberve Manag
Governmen$300M for reure.
astructure.ns
ource of incMaguire wa
pplied for wbust busineenance.
rship is a ge bill boardthe reserveand Crown
omplex Feasib
mpact of coe boost the
the capital Peak bodiesand possibual program
gram (NSWtion.nsw.go
s given proxgions Fund
3 – Liquor ment Grants s Program bs for the Bgement Fun
nt State Infegional tou
sw.gov.au/m
come for thas briefed o
with Counciess case, a
possibility ds at Pomin
e. Signage wLand policie
bility Study
nstructing ae Wagga W
costs are gs such as Bly providing
ms that coul
W Office of Sov.au/clubs/ximity to As
& Gaming NProgram w
Bicycle Educnd with Crow
frastructure rism and b
media/4296
e MSCC. Inon this proj
l and Crowddressing a
however angalarna Rwould also es on adve
an $8.2M agga City e
grants, loansBMX Austrag resourcesd be a sour
Sport - /grants) hmont and
NSW with Departm
cation Areawn Lands.
Strategy, etween $50
66/inf_j14_8
n preparatioject in Aug
wn Lands. Sasset tenure
advertising Reserve wou
need to cortising.
multisport ceconomy by
s, cash, busalia and Cycs themselverce of grant
Tolland
ment of Infra
recommend00M and $1
871_sis_rep
on, the locaust 2016 b
Sourcing fune and ident
would havuld not be iomply with
cycling comy $14.38M (
siness sponcling Austraes. The Stfunding. Ex
astructure
dations hav1.2B for spo
port_ch09_w
al State Meby the Pres
nding from tify who will
ve to be cin keeping the Sports
Page 55
mplex in (Source:
nsorship alia may tate and xamples
ve been orts and
web.pdf)
ember of sident of
Council commit
carefully with the Ground
Wagga W
7.6
This feidentifie
a) b) c) d) e)
f)
It is rec
That Co
a cobe
b susuCpr
7.7
Based build thelemen
Stage 1there ar
If it is ddesignsready” s
Stage 3
Wagga Multisp
Conclusio
easibility stued that:
There is suThe site topA facility coNo developA Review oAboriginal HThe proposgreater tha
ommended
ouncil,
ontribute $5e undertake
ubject to thuitable, e
Combine Cyroject
Recomme
on the expe MSCC ists.
1 is to carryre any envir
determined s, drawingsstatus and a
3 and beyon
port Cycling Co
on and Re
udy into a
ufficient phypography aould providepment applicof EnvironmHeritage sed facility cn the lifecyc
d:
5,000 in paren for the pr
he Review enter into aycling Clubs
ended Sta
perience of s approxima
y out a Revronmental f
the develops and costiallow for the
nd are flexib
omplex Feasib
ecommend
Multisport
sical spacend soil geol
e the servicecation woul
mental Facto
could providcle costs.
rtnership furoject
of Environa Memorans to partner
aging of W
other Couately 10 yea
view of Envfactors that
pment is apngs. This we bidding fo
ble given the
bility Study
dations
t Cycling C
e at the site.logy is suitae level desild be requirors is requir
de an econ
nding to all
mental Facndum of Ur in the fut
Works
ncils such ars. Table 7
vironmental would proh
ppropriate, would ensu
or capital fun
ey are depe
Complex at
able for the red by on aed. red to asses
omic benef
ow a Revie
ctors determUnderstandiure plannin
as Bathurs7.5 has an o
Factors. Thibit the proj
the secondure the pronds.
endent on fu
t Pomingala
developmeand off-road
ss impacts
fit to the Wa
w of Enviro
mining the ing with thng and imp
st, the expeorder of pri
his is requiect from pro
stage is deoject eleme
unding avai
arna Rese
ent. d cyclists.
on flora, fa
agga Wagg
onmental Fa
Pomingalahe Wagga plementation
ected timefority for the
ired to deteroceeding.
etailed engents are at
ilability.
Page 56
rve has
una and
a that is
actors to
arna site Wagga
n of this
frame to e project
ermine if
ineering “shovel
Wagga W
Table 7.5
Stag
Stage
Stage
Stage
Stage
Stage
Stage
8.0
Wagga Multisp
5 Recommen
e
e 1
e 2
e 3
e 4
e 5
e 6
Referenc
BMX AustraBMX TrackBikes ParksAssociationHume City Council, Vic
port Cycling Co
nded Project P
Item
FeasibilitEnvironm
Detailed
Criteriumand Dirt A
BMX TraPlaygrou
Large Am
Velodrom
ces
alia (2013).k Guide (201s IMBA’s Gn, Boulder, CCouncil (20ctoria Austr
omplex Feasib
Priorities.
ty Study, Prmental Facto
designs an
m track, SmaAccess upg
ck, Jump/Pnd.
menities, Fo
me and Bicy
BMX Austr14). Union Cuide to NewColorado U015) Criteriuralia.
bility Study
roject Adoptors.
d costings.
all Amenitiegraded.
Pump Track
ormal Carpa
ycle Educat
ralia Track Cycliste Intew School Tr
USA. um Cycling
ted by Coun
Funding bi
es, BBQ & s
s, BBQ & S
ark and MTB
ion Area.
Guidelines.ernationalerails (2014).
Facility Fea
ncil and Rev
ds.
helter, Infor
Shelter and
B Playgroun
BMX Aust(UCI)
. Internation
asibility Stud
view of
rmal Carpa
Fenced
nd.
tralia
nal Mountai
dy, Hume C
Page 57
rk
n Biking
City
Multispor
9.0
Append
Append
Append
Append
rt Cycling Com
Appendic
dix 1 Mul
dix 2 Det
dix 3 Life
dix 4 Det
mplex Feasibil
ces List
tisport Cycl
ails On Site
ecycle Costs
ails On Eco
ity Study
ling Comple
e Visits For
s For Each
onomic Impa
ex Survey Q
Benchmark
Cycling Fac
act Calcula
Questions
king
cility
tions
Page A1
Multispor
Appen
Launch
Survey
CyclingcommuCycle Ctogethefacilities
One prcombinmultipurunners
To viewtheme d
Your timoffering
For famcyclists
The Wa
1.
2.
3.
rt Cycling Com
ndix 1
ed by the W
was open f
, in its manity. All WaClub, Moun
er with Wags.
roposal puted cycling frpose and o
s, roller blad
w images odo a Google
me taken tog a $500 luc
milies each and non-cy
agga Comb
Do you par Yes What type o(Please tick
Rec Fam Alte Roa Dow Mou BMX Trac Soc Tria Cyc Oth
Do you thin Yes
mplex Feasibil
Multis
Wagga Com
for four wee
ny differentagga Waggntain Bike
gga Wagga
t forward isfacilities aloopen for usders, bushw
of the typese images se
o completecky draw pri
individual isyclists are e
ined Cyclin
rticipate in c
of cycling ak more thancreationally mily riding toernate transad racing wnhill moununtain BikinX ck Racing
cially with a athlon cling educater (Please
nk that feelin
ity Study
sport Cyc
mbined Cycl
eks, closing
t forms, is a cycling cWagga, BCity Counc
s a multispong with ame by other g
walkers and
s of facilitiesearch on 'cr
this surveyze to some
s encouragencouraged
g Clubs rep
cycling activ
No
ctivities do n one if appfor persona
ogether port to drivi
ntain bikingng
club
tion for childspecify) ___
ng unsafe o
No
cling Com
ing Clubs –
Wednesda
becoming clubs includicycle Wag
cil are cons
port complemenities and
groups, notsmall child
s that occuriterium trac
y will beneeone who co
ged to compd to complet
presentative
vities?
(If no, p
you participropriate) al fitness
ing eg. com
dren _________
on the roads
mplex Sur
– March 18
ay April 15 2
more and ing Wagga gga Waggaidering the
ex that wod car parkingt just the cyren learning
ur at a multcks and mtb
efit the planompletes th
plete their ote the surve
es would lik
roceed to q
pate in?
mmuting to w
__________
s is a deterr
rvey Ques
2015.
2015.
more popuWagga Cy
a and Wagfuture deve
uld be on g. This facil
ycling commg to ride.
tisport comb parks'.
ning proceis survey.
own surveyey.
e to thank y
uestion 3)
work and oth
__________
rent to your
stions
ular to manycling Club, gga Triathloelopment of
a single slity is plann
munity, for e
plex with a
ess. The cl
. Cyclists, p
you for your
her appoint
__________
r cycle expe
Page A2
y in our Tolland
on Club f cycling
site with ed to be
example,
a cycling
lubs are
potential
r time.
tments
_
erience?
Multispor
4.
5.
6.
7.
8.
rt Cycling Com
What typesimproved in(Please tick
BMX Crit Cyc Mou Off On Velo Tria Oth
Other than one site? Yes Comment w If a single swould be b(1 = Highes
Support Fa
Toilets
Change roo
Car parking
Shelters
BBQs
Playground
Spectator f
Bike shop
Coffee sho
Office spac
Meeting roo
Other (plea
Where cou__________________ (One potenSturt Highw
mplex Feasibil
s of cyclinn Wagga Wk more thanX Track erium Track
cling educatuntain Bike road sharedroad cycle odrome
athlon Facilier (please s
the shared
why? _____
site was debeneficial tost priority do
acility
oms
g
d
facilities
p
ce
om
ase specify)
uld this pro____________________
ntial site thaway just on
ity Study
g facilities Wagga? n one if you
k tion area Tracks d paths lanes
ties specify) ___
paths and
No
__________
veloped, who have? Selown to 3 low
Yes
)
posed site ____________________
at has beenthe western
do you be
wish.)
__________
cycle lanes
__________
hich of the ect yes or west priority
s / No
be and co____________________
n previouslyn outskirts o
elieve are
_________
s, should the
_________
following suno. If you sy).
omment wh__________________
y identified of Wagga W
required to
__________
ese facilities
__________
upport faciliselect yes g
Priority
y you sele____________________
is the PomWagga.)
o be develo
__________
s be locate
__________
ities do yougive a priori
ected this lo____________________
ingalarna R
Page A3
oped or
_
d on the
_
u believe ty rating
ocation? _ _
Reserve,
Multispor
9.
Briefly s
10.
11.
12.
13.
These aeligible
Name:
City/Tow
Postcod
Email A
Phone
rt Cycling Com
Do you seeWagga?
Yes
state why?
If the cyclinaffect how
Average r
Average r
Other than provided? _________ Do you hav_________ Contact De
are optionafor the $50
wn:
de:
Address:
Number:
mplex Feasibil
e a multisp
No
ng facilitiesoften on av
ides per we
ides per we
cycling act
__________
ve any othe__________
etails _____
al; however 00 lucky dra
ity Study
port cycling
s you think verage you r
eek NOW
eek after fac
tivities, wha
__________
r comments__________
__________
you need tw prize.
complex b
are necessride per we
cility is prov
at could the
__________
s, questions__________
__________
to at least p
being an as
sary in Wagek?
ided
proposed s
_________
s, or concer_________
__________
put a first n
sset into the
gga were d
Nu
site be used
__________
rns? __________
__________
ame and p
e future for
developed,
umber
d for if facil
__________
__________
__________
phone conta
Page A4
r Wagga
would it
ities are
_
_
_
act to be
Multispor
Appen
Stromlo
Facilitie
a)
b) c) d) e)
f) g) h)
Figure (WaggaVan Aa
rt Cycling Com
ndix 2
o Forest Pa
es
Mountain Bskills playgRoad BikesCross CounEquestrian Support Infroom), playTotal cost $Amenities bThere are p
9.1: Stroma Wagga Calst from A
mplex Feasibil
Detail
ark
Bikes - 50kmround. s – 1.2km cntry RunninTrails – fire
frastructureyground, BB$6 million inbuilding $80power bolla
mlo Visit Cycling CluCT Govern
ity Study
s on Site
m of signed
riterium circng – 2.5km ie trails with – amenitie
BQ, carparknitially, with 00k. It has frds adjacen
July 2015ub), Paul Jnment Terri
es visited
cross coun
cuit. irrigated gradirectional
es block (wk. $2 million c
free 250-ment to event t
5. Ronan BJohanson itory Venue
for Benc
ntry trails, do
ass loop. signage. ith hot show
capital speneg Wi-Fi petransition ar
Burke (MT(MTB Wages and Eve
chmarking
ownhill trac
wers, store
nt since oper month. Hareas.
TB Wagga)gga), Rod Fents Sectio
g
ck, jump trac
room and
ening. as fibre opti
), James Florence a
on
Page A5
ck and a
meeting
c cable.
Vickers and Jeff
Multispor
Genera
a) b)
c) d) e) f) g)
h) i) j) k) l)
m) n) o)
p) q) r)
Mainten
a) b)
c)
d)
e) f) g) h) i) j) k) l)
m)
StromloFigure 9
rt Cycling Com
al Comment
The site is Original coDeCastellaOpening hoThe downhAll MTB traUsers haveDesign errotrack. There are cAbout 20 scThe four cyGroup bookThe site ovelodrome Canberra hStromlo haPlanning isthe NW sidNo campingLittle user gAbout 12 msolo 24-hou
nance
One FTE eMaintenancasset buildTrail inspecday to writeInspection damage, ovAnnual maAnnual capIrrigation wOccasionalGates and Users are qVandalism Entrances by 4WDs. Dumped ca
o Forest Pa9.2 below.
mplex Feasibil
ts
1200 hectaoncept desiga. ours in sumhill track takeails are one e requestedor - runners
counters onchool cross
ycling clubs kings are choriginally pis sufficient
has two BMXs a website
s in motion e of the entg is allowedgroup confli
major eventsur champion
employed byce contracting, horticuctions everye up report. reports incvergrowth, cintenance b
pital budget water supply
l volunteer dtoilets are l
quite vocal ais low. Theare big “thu
ars were a p
ark in Canb
ity Study
res. It has tgn driven b
mer is 6ames about 2.way. Riders lights for ths have to c
n the cross cs country ev
each use tharged $2 pplanned tot to service X tracks. De
e. The Facefor an indo
trance gated except forct except os occur eacnships.
y ACT Govet for MTB tltural, weedy two month
clude trail ncomments, budget of apof $200k.
y is dam pludays for traocked overand keep aamenities a
umping” gat
problem but
berra has
three emergby Canberra
m to 9pm; wi5 minutes fs are to keehe criteriumcross the cr
country trailvents are hehe criteriumper head. Mo have a
Canberra. ecided not tbook site isoor swim ce.
r major evenccasionally
ch year, som
ernment Tetrail inspec
ds and secuhs by Jarro
name, lengtwork need
pproximatel
s bore. Towil maintena
rnight by sen eye on thare alarmedtes worth ab
t due to are
a 1.2km cr
gency phona Off-Road
nter is 6amfor the goodep on desig
m track. riterium trac
ls – about 8eld per yearm track one Meeting room
velodromeRecently hato build one
s used moreentre and b
nts such asy with horsesme at intern
rritory Venuctions, MTBurity. d Rando. 1
th, last upded, and safy $800k.
wn water asnce. Thesecurity contra
hings. d. bout $10k e
ea growth it
riterium cou
es. Cyclists (C
m to 6pm. d riders to gnated trails
ck to get to
80,000 passr. evening pe
m hire is $5. Decided ad $700k spe at Stromloe however. bunk style a
the Scott 2s. ational leve
ues and EveB trail main
.5 days for
ate, conditfety concern
a backup oare poorly
actors.
each. Canno
rarely occu
urse. The l
CORC) and
et down. s.
o the cross
ses per yea
er week. 50.
the Narrapent on it. o.
accommoda
24-hour in O
el such as th
ents. ntenance, c
inspecting
tion, wear, ns.
only. attended.
ot be knock
urs now.
layout is s
Page A6
d Robert
country
r.
abundah
ation on
October.
he world
cleaning,
and 0.5
weather
ked over
hown in
Multispor
Figure 9.
Majura
Majura Pines athese trwas comany o
In earlyTrail Alrecoverhave be
The jumThe jumsteeper
rt Cycling Com
.2: Stromlo F
Pines Rec
Pines is imare some trails were cnstructed a
of the old tra
y 2015 Jindalliance contred existingeen signed,
mp track is ump track rer jumps.
mplex Feasibil
Forest Park C
creation Ar
mproved anhe oldest aclosed for tand extensiails were de
abyne Landtributed aro
g trails, a pu mapped an
used by expequires mor
ity Study
riterium Trac
ea - Canbe
d maintaineand most ftwo years bve thinning
estroyed or v
dscaping weound 1000 ump track and were off
perienced rre maintena
ck.
erra
ed by ‘The famous mobetween 20g of the pinvery well hi
ere engagedhours of v
area and aficially open
riders. The ance than a
Majura Pinuntain bike
012 and 201es was unddden.
d to build 7volunteer w
a high qualited in May 2
pump tracka pump trac
nes Trail Alle trails in C14 whilst thdertaken. D
km of new twork to addty dirt jump2015.
is used by ck because
liance’. TheCanberra. Hhe Majura PDue to thes
trails. Majud 8km of np park. The
y riders of ane it has hig
Page A7
e Majura However Parkway e works
ra Pines new and se trails
ny level. her and
Multispor
Yerrab
a) b)
c)
d) e) f)
Figure 9.
rt Cycling Com
i Dirt Jump
Yerrabi DirtInitiative of Lions Club,Has jumpsriders (up toJumps are UnauthorisWater from
.3: Bathurst B
mplex Feasibil
ps at Yerra
t Jumps waf Canberra O, Rotary Clu
s for beginno 1.8m). closed duried modifica
m Yerrabi Po
Bicycle Park
ity Study
bi Ponds -
as built in 20Off Road Cub, and Dirt ners (up to
ng wet weaation of jumponds Lake is
Canberra
014. Cyclists (COt Art Trail Deo 0.6m), int
ather. ps is strictlys used for m
RC) with suesigners. termediate
y prohibitedmaintenance
upport from
(up to 1.2
. e works.
m ACT Gove
2m), and ad
Page A8
ernment,
dvanced
Multispor
Bathur
Designs
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
rt Cycling Com
rst Bike Par
s of the Bat
Bathurst is are hospitaTotal appro
Velo Ame Inte MTB Ker Bicy Civi Cou Con
All funded visitor numindustry acVelodrome for pavemeDrainage wdraining waCentral aresteward areLesson leauntil the amAmenities bsewer systeBMX track steep slopegranite 100polymer staMTB trails valued at cmake the trCriterium trthe amenitiThe velodrracing) eveRenewal pManagemeThe Bathu(BAD) BMXSite masternow.
mplex Feasibil
rk
thurst Bike P
a growing ality (racing)oximate expodrome $1.enities $0.5
ernational BB Cross Cormesse/Criteycle educatil infrastructuncil staff wntingencies by Bathurs
mbers outsiross the cabudget wa
ent with 50mwas not a bater to the eea of velodeas and staarnt – velodmenities’ bublock budgeem requiredwas half b
e. Built to in0mm thick fabilizer. have been
close to $1Mrails quite inrack not yees building rome and
ents. lanning for
ent Plans. rst Cycling
X Club orgarplan was d
ity Study
Park, BMX
community ), manufactupenditure is 4M
5M, MX track $1
ountry trails erium $1Mion facility $ture $2.0M
wages for de$0.5M. t Council frde of motolendar. s $1.2M. En
mm AC finisbig cost – teast near radrome has anding zonedrome was ilding was fet was $350d because tbuilt. It will nternational finish. The
n constructeM. About 12nteresting tot built. Propand headincriterium tr
the bicycle
Club (Roanised the b
done by Bat
track and v
with a curruring and a$9 million o
1.5M $1M (in kin
$0.1M
esign and pr
rom sub-divor race se
nded up arosh. track and i
ailway line.a 2-coat
e for competbuilt first b
finished. AC0k. Ended uthey were ube huge wstandard wreturn path
ed by the B2km of singlo ride. posed 1500ng south. rack with a
e park has
ad and MTbike park feathurst Coun
velodrome c
rent populatgriculture. Ion the bicyc
nd)
roject mana
vision profitsasons and
ound $1.5M
nternals all
aggregate titors. ut could no
C becoming up around $nable to co
with massivewith 8-perso up the hill
Bicycle Clube trails with
0m track wit
also cater
been incor
TB) along wasibility studncil. They ar
can be seen
tion of 40,0t has three
cle park. Bre
agement (in
s. Part of s thus supp
M. Has 250m
slope to th
seal finish
ot be officiabrittle beca
$550k. Big vnnect into t
e earthworkon wide trac
will be of d
b - MTB ridh numerous
th 50mm A
for Kermes
rporated int
with the Bady. re revising t
n in Figure 9
00. Main inbike shops
eakdown is
n kind) $1M
strategy to iport the ho
mm DGB ro
he centre w
. Will be u
ally used foause of lackvariation watown sewerks on the sck and 5-7mdeco granit
ders. In kins natural fea
AC finish, sta
sse (Frenc
to Bathurst
athurst and
their busine
Page A9
9.3.
ndustries s. :
ncrease ospitality
ad base
with pits
used for
r events k of use. as onsite .
side of a mm deco e with a
d works atures to
arting at
h street
’s Asset
District
ess case
Multispor
Appen
Lifec
Capit
Desig
Lands
Opera
Buildi
Clean
Secur
Electr
Wate
Gas
Sewe
Garba
Insura
Reha
Iron R
Rene
Repla
Repla
Refur
Kiosk
Painti
rt Cycling Com
ndix 3
cycle Co
tal Constru
gn and cons
scaping inc
ational and
ing repairs a
ning (Toilets
rity
ricity
r
er Rates
age Rates
ance
T
abilitation/R
Roof Replac
w vinyl floo
ace gas inst
ace 4 x reve
rbish wet ar
k - replace a
ing internal
mplex Feasibil
Lifecy
osts - MS
uction
struction 31
luding flat c
d Maintena
and mainte
s only. Rest
TOTAL Op
Renewal Co
ce/Upgrade
r coverings
tant hot wat
erse cycle a
reas - mainl
appliances
and extern
A
ity Study
ycle Costs
SCC Ame
m x 14m sim
concreted st
T
ance Costs
nance
t of building
peration and
osts
ter units x 3
air-condition
y tiling (Kitc
al (minimal
TO
Average Re
s For Eac
enities
milar to Bat
taging area
TOTAL Ca
cleaned by
d Maintena
3
ners
chen, toilets
)
OTAL Rene
newal Cos
ch Facility
thurst
pital Costs
y users)
ance Costs
s, showers)
ewal Costs
ts per year
y
Cos20
$636
$30
s $666
Ovey
$177
$63
$270
$129
$5
$20
$20
$24
$75
s $787
Ovey
$20
$46
$6
$49
$60
$17
$119
s $319
r $10
sts in 016 $
6,038
0,197
6,235
er 30 years
A
7,000 $
3,300 $
0,390 $
9,870 $
5,190
0,790
0,880
4,960
5,510 $
7,890 $2
er 30 years
0,089 $2
6,221 $1
6,750 $
9,728 $2
0,000 $6
7,280 $1
9,700 $3
9,768
0,659
Page A10
Annual
$5,900
$2,110
$9,013
$4,329
$173
$693
$696
$832
$2,517
26,263
Each
20,089
18,488
$4,500
24,864
60,000
14,400
39,900
Multispor
Lifec
Capita
Earthw
Starte
Start g
Trans
7mm aconstr
Lightin
Two c
Conne
Opera
Repaisurfac
Crack
Electr
Water
Rehab
Shelte
Repla
Repla
rt Cycling Com
cycle Co
al Construc
works and t
er ramp and
gates
ponder netw
asphalt 30mruct)
ng 8 poles 4
covered stag
ection to Wa
ational and
rs and mainces (half in k
k sealing of a
icity for floo
r for track m
bilitation/R
ers iron roof
cing/re-com
ce asphalt s
mplex Feasibil
sts - BM
ction
track constr
pad
work
mm deep fo
40 lamps 15
ging areas 7
ater
d Maintenan
ntenance inkind from us
asphalt cor
odlight use a
maintenance
TOTAL Op
Renewal Co
f replace/up
mpacting of
surface - pr
A
ity Study
X Track
ruction
r corners (la
500 Watt 2
7m x 5m co
TOTAL
nce Costs
cluding erosers)
ners
and power f
e / preparati
peration an
osts
pgrade
gravel capp
rofile out an
T
Average Re
ay 1 year af
phase meta
olourbond s
L Capital Co
osion repairs
for events
ion
nd Mainten
ping
nd relay
TOTAL Ren
enewal Cos
fter
al halide
helters
onstruction
s of dirt
ance Costs
newal Costs
sts per yea
Cos20
$579
$53
$40
$20
$70
$300
$30
$11
n $1,103
Ovey
$86
$14
$216
$5
s $323
Ovey
$10
$47
$15
s $73
r $2
sts in 016 $
9,046
3,550
0,000
0,000
0,000
0,000
0,000
1,000
3,596
ver 30 years
A
6,400 $
4,700
6,900 $
5,190
3,190 $
ver 30 years
0,173 $
7,040 $4
5,960 $
3,173
2,439
Page A11
Annual
$2,880
$490
$7,230
$173
10,773
Each
10,173
47,040
15,960
Multispor
Lifec
Capita
Desig
Concr
Two c
Lightin
Opera
Generclearin
Electr
Water
Rehab
Shelte
Crack
Repla
Repla
rt Cycling Com
cycle Co
al Construc
n and insta
rete culvert
covered stag
ng of short c
ational and
ral maintenang drains (h
icity for floo
r for track m
bilitation/R
ers Iron Roo
k sealing of a
cing/re-com
ce asphalt s
mplex Feasibil
sts - Crit
ction
llation
underpass
ging areas 7
circuit 700m
d Maintenan
ance includhalf in kind f
odlight use a
maintenance
TOTAL Op
Renewal Co
of Replace/U
asphalt cor
mpacting of
surface - pr
A
ity Study
terium T
7m x 5m co
m on southe
TOTAL
nce Costs
ing erosionfrom users)
and power f
e/preparatio
peration an
osts
Upgrade
ners
gravel capp
rofile out an
T
Average Re
rack
olourbond s
ern end
L Capital Co
n repairs of
for events
on
nd Mainten
ping
nd relay
TOTAL Ren
enewal Cos
helters
onstruction
batters &
ance Costs
newal Costs
sts per yea
Cos20
$505
$84
$30
$202
n $823
Ovey
$86
$216
$5
s $308
Ovey
$10
$14
$275
$435
s $735
r $24
sts in 016 $
5,070
4,840
0,870
2,675
3,455
ver 30 years
A
6,400 $
6,900 $
5,190
8,490 $
ver 30 years
0,173 $
4,700 $
5,040 $27
5,480 $43
5,393
4,513
Page A12
Annual
$2,880
$7,230
$173
10,283
Each
10,173
$4,900
75,040
35,480
Multispor
Lifec
Capita
35 roa
5 traff
360m2
150 m
90 m2
Kerb a
Pallisa
Site es
Opera
Repailights
Electr
Rehab
Shelte
Crack
Renew
Renew
Renew
rt Cycling Com
cycle Co
al Construc
ad signs at $
ic lights at $
2 of Asphalt
m2 of concre
of compact
and gutter e
ade fence 2
stablishmen
ational and
rs and main
icity for traff
bilitation/R
ers iron roof
k sealing of a
w signs
w gravel su
w asphalt su
mplex Feasibil
sts - Bic
ction
$200 each
$6K each. A
t path at $52
te path at $
ted gravel p
each side of
2.1m high an
nt + Bobcat
d Maintenan
ntenance in
fic lights
TOTAL Op
Renewal Co
f replace/up
asphalt
rface
urface
A
ity Study
cycle Edu
installed
Allow 100m
2.27 per m2
$81.93 per m
path at $31
f path 400m
nd 160m lo
t 2 days for
TOTAL
nce Costs
cluding van
peration an
osts
pgrade
T
Average Re
ucation A
trenching f
2
m2
per m2
m total @ $9
ng
site levellin
L Capital Co
ndalism of s
nd Mainten
TOTAL Ren
enewal Cos
Area
for power
99.66/m
ng
onstruction
signs and
ance Costs
newal Costs
sts per yea
Cos20
$7
$31
$18
$12
$2
$39
$33
$6
n $152
Ovey
$260
$30
s $290
Ovey
$10
$14
$3
$8
$18
s $55
r $1
sts in 016 $
7,000
1,400
8,817
2,290
2,790
9,864
3,600
6,920
2,681
ver 30 years
A
0,400 $
0,000 $
0,400 $
ver 30 years
0,173 $
4,700 $
3,500 $
8,370 $
8,817 $
5,560
1,852
Page A13
Annual
$8,680
$1,000
$9,680
Each
10,173
$4,900
$3,500
$2,790
18,817
Multispor
Lifec
Capita
Lands
100mm
1000 m
Allow
Bobca
Opera
Repaisurfac
Water
Rehab
Repla
rt Cycling Com
cycle Co
al Construc
scaping quo
m gravel/cla
m3 metres o
$9 m3cost t
at to finish o
ational and
rs and mainces (half in k
r for track m
bilitation/R
cing/re-com
mplex Feasibil
sts - Jum
ction
ote to constr
ay capping
of fill deliver
to purchase
off and lands
d Maintenan
ntenance inkind from us
maintenance
TOTAL Op
Renewal Co
mpacting of
A
ity Study
mp Track
ruct jump tra
material de
red to site
e fill 1000 m
scaping
TOTAL
nce Costs
cluding erosers)
e/preparatio
peration an
osts
earthen tra
T
Average Re
k
acks
elivered to s
m3 fill
L Capital Co
osion repairs
on
nd Mainten
ck area
TOTAL Ren
enewal Cos
site
onstruction
s of dirt
ance Costs
newal Costs
sts per yea
Cos20
$31
$3
$10
$9
$11
n $64
Ovey
$43
$5
s $48
Ovey
$38
s $38
r $1
sts in 016 $
1,000
3,000
0,000
9,000
1,600
4,600
ver 30 years
A
3,200 $
5,190
8,390 $
ver 30 years
8,400 $3
8,400
1,280
Page A14
Annual
$1,440
$173
$1,613
Each
38,400
Multispor
Lifec
Capita
Pump
600 m
Lands
Opera
Repaisurfac
Water
Rehab
Crack
Repla
rt Cycling Com
cycle Co
al Construc
Track cons
m2 asphalt su
scaping
ational and
rs and mainces
r for track m
bilitation/R
k sealing of a
cing/re-com
mplex Feasibil
sts - Pum
ction
struction
urface capp
d Maintenan
ntenance in
maintenance
TOTAL Op
Renewal Co
asphalt surf
mpacting of
A
ity Study
mp Track
ping AC7mm
TOTAL
nce Costs
cluding ero
e / preparati
peration an
osts
face - 1 cre
gravel batte
T
Average Re
k
m at 40mm
L Capital Co
osion repairs
ion
nd Mainten
ew visit each
ers
TOTAL Ren
enewal Cos
depth
onstruction
s of dirt
ance Costs
h 10 years
newal Costs
sts per yea
Cos20
$90
$15
$10
n $115
Ovey
$43
$5
s $48
Ovey
$14
$21
s $36
r $1
sts in 016 $
0,000
5,600
0,000
5,600
ver 30 years
A
3,200 $
5,190
8,390 $
ver 30 years
4,700 $
1,600 $2
6,300
1,210
Page A15
Annual
$1,440
$173
$1,613
Each
$4,900
21,600
Multispor
Lifec
Capita
Mater
Labou
100mm
500 m
Bobca
TOTA
Opera
Repaisurfac
Repai
Rehab
Repla
Repla
rt Cycling Com
cycle Co
al Construc
ials cost for
ur to build w
m gravel/cla
m3 metres of
at, roller and
AL Capital C
ational and
rs and mainces
rs to PG ele
bilitation/R
cing/re-com
ce and rene
mplex Feasibil
sts - MT
ction
r Stromlo M
wall ride, see
ay capping
f fill moved
d water cart
Constructio
d Maintenan
ntenance in
ements wea
TOTAL Op
Renewal Co
mpacting of
ew playgrou
A
ity Study
B Playgr
TB Playgro
e saws and
material de
t to shape a
on
nce Costs
cluding ero
ar and tear
peration an
osts
gravel conn
und elemen
T
Average Re
round
ound
log rides
elivered to s
and compac
osion repairs
and vandal
nd Mainten
necting path
nts
TOTAL Ren
enewal Cos
site
ct paths
s of dirt
ism
ance Costs
hs
newal Costs
sts per yea
Cos20
$15
$19
$3
$5
$3
$45
Ovey
$43
$172
s $216
Ovey
$11
$68
s $79
r $2
sts in 016 $
5,000
9,200
3,000
5,000
3,200
5,400
ver 30 years
A
3,200 $
2,800 $
6,000 $
ver 30 years
1,200 $
8,400 $3
9,600
2,653
Page A16
Annual
$1,440
$5,760
$7,200
Each
11,200
34,200
Multispor
Lifec
Capita
Const
LightinKincai
Two c
Conne
Opera
Repai(half in
Electr
Water
Rehab
Shelte
Crack
Repla
Avera
rt Cycling Com
cycle Co
al Construc
truct Velodro
ng 400w sinid Street
covered stag
ection to wa
ational and
rs and mainn kind from
icity for floo
r charges
bilitation/R
ers iron roof
k sealing of a
ce asphalt s
age Renewa
mplex Feasibil
sts - Vel
ction
ome earthw
ngle phase
ging areas 7
ater
d Maintenan
ntenance inusers)
odlights for e
TOTAL Op
Renewal Co
f replace/up
asphalt
surface - pr
al Costs pe
ity Study
odrome
works, asph
metal halide
7m x 5m co
TOTAL
nce Costs
cluding swe
events and
peration an
osts
pgrade
rofile out an
T
er year
alt surface
e - 30 poles
olourbond s
L Capital Co
eeping and
training
nd Mainten
nd relay
TOTAL Ren
and fencing
s from
helters
onstruction
vandalism
ance Costs
newal Costs
Cos20
g $482
$204
$20
$11
n $718
Ovey
$86
$216
$5
s $308
Ovey
$10,17
$14
$88
s $113
$3
sts in 016 $
2,923
4,000
0,580
1,000
8,503
ver 30 years
A
6,400 $
6,900 $
5,190
8,490 $
ver 30 years
72.80 $
4,700 $
8,578 $8
3,451
3,782
Page A17
Annual
$2,880
$7,230
$173
10,283
Each
10,173
$4,900
88,578
Multispor
Lifec
Capita
Sound
Carpa
Interna
Site D
Shelte
Closed
Secur
Fence
Servic
Servic
Servic
Servic
Opera
Cleanarea (
Playgr
Rehab
Shelte
Resea
Crack
Re-sh
Repla
Repla
Avera
rt Cycling Com
cycle Co
al Construc
d fit out for a
ark – asphal
al gravel se
Drainage and
ered BBQs x
d Circuit TV
rity gate and
ed junior (ba
ces to site -
ces to site -
ces to site -
ces to site -
ational and
ing of BBQshalf in kind
round inspe
bilitation/R
ers iron roof
aling of acce
sealing of c
eet internal
ce CCTV sy
ce asphalt c
age Renewa
mplex Feasibil
sts - Sup
ction
amenities b
lt and seale
ervice roads
d detention
x 2
V (CCTV) fo
d fencing
alance bikes
communica
power inclu
water
sewer 830m
d Maintenan
s, mowing afrom users
ections and
TOTAL Op
Renewal Co
f replace/up
ess road
carpark - 0.
l gravel serv
ystem
carpark - pr
al Costs pe
ity Study
pport Inf
building and
ed aggregat
s and concre
basin
or security
s) playgrou
ations Wi-F
uding transf
m to neares
TOTAL
nce Costs
and whippe)
repairs
peration an
osts
pgrade
.5 day for se
vice roads
rofile out an
T
er year
frastructu
site genera
te access ro
ete paths
nd with a bi
i or 4G boo
former
st existing li
L Capital Co
er snipping o
nd Mainten
ealing crew
nd relay
TOTAL Ren
ure
ally
oad
ike theme
oster
ine
onstruction
of small
ance Costs
w
newal Costs
Cos20
$21
$783
$154
$428
$86
$91
$97
$53
$30
$263
$20
$159
n $2,186
Ovey
$374
$24
s $398
Ovey
$10
$42
$7
$308
$154
$10
s $533
$17
sts in 016 $
1,500
3,100
4,000
8,100
6,000
1,000
7,500
3,000
0,000
3,000
0,000
9,000
6,200
ver 30 years
A
4,400 $
4,000
8,400 $
ver 30 years
0,173 $
2,480 $
7,350 $
8,000 $15
4,500 $10
0,530 $
3,033
7,768
Page A18
Annual
12,480
$800
13,280
Each
10,173
14,160
$2,450
54,000
03,000
10,530
Multispor
Appen
The proand is espend pto this chave th
Impact
The totComplefrom theand serestimat
There wconsumeconom
The coestimat
Impact
The impevents correspadded w
There consumeconom$431,68
The comaddition
Value-a(GRP). equivale
In summ
rt Cycling Com
ndix 4
oposed Mulestimated toper person complex. Ae following
on Output
tal visitor spex would leae economy rvices acrosed to be an
would be amption effecmy. It is estim
ombination ed rise in o
on Value-a
pact of an aat the M
ponding direwould be ge
would be mption effecmy. It is es88.
mbination on in Value-a
added by inThe impacent to the c
mary, GRP
mplex Feasibil
Detail
tisport Cyclo attract 38per day is
Assuming thpotential im
t
pend of $9,ad to a direwould also
ss related in additional
an additioncts as corremated that
of all direutput of $11
add and GR
additional oMultisport Cect increaseenerated fro
an additiocts as correstimated tha
of all direct, added of $5
ndustry repct on Waggahange in Va
in Wagga W
ity Study
s On Eco
ing Comple8,744 extra $242. This e events w
mpact:
,376,048 atect impact oo lead to anndustry sec$3,489,008
nal contribuespondinglythis would r
ect, industri1,786,778 in
RP
f $9,376,04Cycling Come in Value-aom related i
onal contribespondinglyat this wou
industrial a,754,521 in
presents tha Wagga Calue-added
Wagga City
onomic Im
ex will holdvisitor daysequals a to
will be held
ttributed to on output ofn increase inctors. Thes8 in output.
ution to they more waresult in a fu
ial and conn the Wagg
48 spend tomplex in Wadded of $3intermediate
bution to Wy more wauld result i
and consumn Wagga Wa
e industry ity’s GRP a outlined ab
y is estimate
mpact Ca
events of Ns spent in Wotal visitor sin Wagga W
staging evf $7,500,838n indirect dee indirect in
e Wagga Wges and saurther incre
nsumption ga Wagga C
the local eWagga Wa3,455,413. Ae industries
Wagga Wages and san a further
mption effectagga City e
componenas a result obove.
ed to increas
lculations
National andWagga Wagspend of $9Wagga City
ents at the8. This addemand for industrial im
Wagga City alaries are ase in outp
effects woCity econom
conomy asagga City A further $1s.
agga City alaries are r increase
ts would resconomy.
t of Gross of staging th
se by $5,75
s
d State signgga. Their
9,376,048 ay, it is calcu
e Multisport itional direcintermediat
mpacts (Typ
economy spent in t
put of $796,9
ould result my.
s a result of would lea
1,867,419 in
economy spent in tin Value-a
sult in an es
s Regional his event is
54,521.
Page A19
nificance average ttributed
ulated to
Cycling ct output e goods e 1) are
through he local 932.
in total
running ad to a n Value-
through he local dded of
stimated
Product s directly
Multispor
Impact
The emexampltime wo
The direthe Mucorresprange owould bemploy
This adwages creating
The coestimatWagga
Source
rt Cycling Com
on Employ
mployment ie, an event
ork in total),
ect additionultisport Cyponding direof industriesbe flow on ment equiv
ddition of emand salarie
g a further i
ombination ed increaseCity.
: http://econ
mplex Feasibil
yment (job
impact of at that gener would have
n of $9,376,ycling Comect increases. From thieffects into
alent to 9.4
mployment ies, a proponcrease eq
of all direce of emplo
nomy.id.com
ity Study
bs, 12mth F
an event is ates four we an employ
048 spend mplex in We of employs direct exo other rela annual FT
in the local ortion of whuivalent to 3
ct, industriayment equ
m.au/wagga
FTE)
expressed weeks of full
yment impa
to the localWagga Wayment equivxpansion in ated intermE jobs.
economy which would 3.7 annual
al and consivalent to 3
a-wagga
in Full Timtime work f
act equivale
economy aagga City valent to 18the econom
mediate indu
would lead tbe spent
FTE jobs th
sumption e31.3 annua
me Equivalefor 13 peop
ent to 1.0 an
as a result ois estimat
8.2 annual my it is antustries, crea
to a correspon local go
hrough cons
effects woull FTE jobs
ent (FTE) jople (52 weeknnual FTE jo
of staging eted to leaFTE jobs aticipated thating an ad
ponding incoods and ssumption im
ld result inlocated in
Page A20
obs. For ks of full ob.
events at ad to a across a at there dditional
crease in services, mpacts.
n a total Wagga