Wastewater Treatment Plant Resita, Romania
Strabag SRL, Direction IF Environmental
Service area Contract value Project duration
Wastewater treatment (protected) -
Project description:
ISPA-Project for the complete demolition of the existing WWTP Resita and reconstruc-tion and the extension of the WWTP (~ 125,000 PE) incl.:
• New construction of the mechanical treatment stage
• New construction of the intermediate pumping station
• New construction of the two-stage-acti-vated-sludge process
• New construction of the aeration tanks as cascade denitrification tanks
• New construction of the final sedimenta-tion
• New construction of 2 digesters with 1,550 m³ volume each and a central mixer
• New construction of a combined heat and power plant (CHP) with a total capacity of 1 MWel.
• New construction of the sludge drainage
• Reconstruction of the existing preliminary sedimentation to a stormwater retention tank
Further project data:
• Renovation measures during ongoing operation
• Working language: English
Purpose:
• Modernization of the mechanical treat-ment stage
• Anaerobic sludge treatment and biogas utilization
Our services:
• Basic Design
• Preparation of approval documents ac-cording to Romanian law
• Detail Design
• Planning of structural framework accord-ing to Romanian regulations
• Assistance in start-up
Client benefits:
• General planner
• Modern WWTP with biological treatment (AB technology)