Presentation Outline
Study Background
BTSAC Concept/Process
Study Scope/Steps
Literature Summary/Conclusions
BTSAC Recommendations/Best Management Practices
September, 2014 BTSAC
Study Background Public Statement Referring to Factors Causing or Exacerbating Recent Flood Events.
Red River WatershedManagement Board (MN)
Red River Joint WaterResource District (ND)
ND – MN Joint Drainage CommitteeRed River Basin Commission Drainage Committee
September, 2014 BTSAC
Water Management Questions
What are the impacts of agricultural drainage on peak watershed flows?
How should agricultural drainage systems be designed and managed to maximize benefits while minimizing adverse impacts?
September, 2014 BTSAC
Concept/Process Establish a defendable process to address water management questions.
◦ Dueling Scientists◦ Bias◦ Rhetoric
Basin Technical and Scientific Advisory Committee (BTSAC).◦ Stakeholder Technical Representative.◦ Participation is Exclusive.◦ Stakeholder organizations identified by the International Water Institute.
◦ Goal – Ensure that a given stakeholder’s Interest is REPRESENTED.
Funded by the Red River Watershed Management Board and the Red River Joint Water Resource District.
September, 2014 BTSAC
BTSAC Membership
September, 2014 BTSAC
BTSAC RoleAssemble, Review, and Discuss Relevant Scientific Information
Use Best Professional Judgment
Initiate Studies (if necessary) to Draw Conclusion and Make Water Management Recommendations.
BTSAC did NOT address…Environmental, Social, or Economic Aspects of Surface Drainage
September, 2014 BTSAC
Audience
Red River Watershed Management Board (MN)
Red River Joint Water Resource District (ND)
September, 2014 BTSAC
Study Scope
Determine how to best manage the existing surface drainage system to increase or maintain drainage benefits, reduce flood flows, and decrease downstream flood damages.
Determine best strategies for future surface drainage system improvements and modifications to maintain or improve drainage benefits, reduce flood flows, and decrease downstream flood damages.
September, 2014 BTSAC
Study StepsLiterature search/summary.
Review and (if necessary) refine existing hydrologic/hydraulic models to clarify relationships between ditch design, culvert size, and peak flow/volume.
Review current engineering design practices for agricultural drainage systems being applied in the red river basin (US).
Develop management recommendations and rationale for consideration by local land and water managers.
Develop a final report for distribution.
September, 2014 BTSAC
Literature Summary/Conclusions
Climate is the major hydrology driver, especially during large scale flood events.
Trend analyses of surface drainage effects on flooding in the Red River Basin have failed to conclusively attribute floods to increased surface drainage.
• Trend analyses have indicated that combined climate and land use changes have resulted in larger annualized flow volume.
September, 2014 BTSAC
Literature Summary/Conclusions (cont.)
Reducing floodwater runoff that otherwise would have entered waterways during floods will result in flood peak and volume reduction.
Effects of retention and detention storage will decrease with increasing flood intensity.
• Even small proportion storage may have a beneficial effect at some locations during large flood events.
Increasing drainage conveyance tends to increase flood peaks downstream.
• Unless flow timing at the point of interest is altered to decouple flood peaks.
Best Management Options for Surface DrainageBTSAC
September, 2014 BTSAC
Uniform Surface Drainage Design Guidance Adequacy and Equitable Policy
◦ RRB Landowners have a right to adequate, but not more than adequate, drainage.
◦ Equal distribution of positive and negative effects of drainage throughout the system.
September, 2014 BTSAC
Current Condition(traditional ditch design)
Water is conveyed downstream unrestricted until it reaches a point where inflows exceed outflow capacity and flooding occurs
Long duration of concentrated flooding >48 hours
C.R.
#1
Twp.
R. #
1
C.R.
#2
CSAH
#1
Main Ditch
Twp.
R. #
2
September, 2014 BTSAC
Uniform Surface Drainage Design GuidanceWater is delayed by culvert sizing – storage
Flood duration = 24 hours (storage)
Storage distributed throughout the drainage area
C.R.
#1
Twp.
R. #
1
C.R.
#2
CSAH
#1
Main Ditch
Twp.
R. #
2
September, 2014 BTSAC
Uniform Surface Drainage Design Guidance Recommendation
The design guidance should be considered when permitting and/or improving public and private surface drainage systems.
Every available opportunity should be utilized to retrofit the design guidance on existing drainage systems.
September, 2014 BTSAC
Self Mitigating Uniform Surface Drainage Design Guidance
September, 2014 BTSAC
Self Mitigating Uniform Surface Drainage Design Guidance
September, 2014 BTSAC
Maintain Non-Contributing Areas Discourage drainage of non-contributing areas in watersheds.
Where drainage of non-contributing areas is unavoidable, other strategies to mitigate the additional downstream flow contribution should be implemented.
September, 2014 BTSAC
Floodwater Storage (Retention/Detention)Gated storage is preferred over ungated storage
Strategically located
Sufficient capacity to store floodwaters until they can be released without adding to flood damages
September, 2014 BTSAC
Subsurface Drainage ManagementBTSAC reaffirms the subsurface management recommendations.
Encourage water managers to comprehensively implement measures to install controls and manage subsurface drainage to increase temporary storage during flood events.
Coupling management of subsurface and surface drainage can be a best management practice, but only if the infrastructure to control the release of water is installed and appropriately managed.
September, 2014 BTSAC
Outreach and EducationNo Basin Governance - BTSAC recommendations require voluntary adoption by watershed and water resource districts.Audience:
◦ Local Water Managers◦ Landowners◦ Drainage Engineers◦ Township, County, and State Road Authorities and Engineers◦ Public◦ Media
More Information:
WWW.RRBDIN.ORG
Charles Fritz