KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
We are Proud to Welcome the We are Proud to Welcome the Particpant of the ConferenceParticpant of the Conference
GIS/AM/FM Solution for The GIS/AM/FM Solution for The Complex and Complex and
ComprehensiveComprehensiveElectrical Network ManagementElectrical Network Management
ISMAIL SYED SHAMSUDDIN, TECHNICAL & MARKETING MANAGERISMAIL SYED SHAMSUDDIN, TECHNICAL & MARKETING MANAGER
STAR ME, Saudi ArabiaSTAR ME, Saudi Arabia
www.starme.com.sawww.starme.com.sa
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
TABLE OF CONTENTS
IntroductionChallengesAim & Objectives of the ProjectGoals and Methods AdoptedLevels of ProjectsSystems DevelopedOverview of the SystemsConclusion
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Introduction
In Yesterday topics Lectures of IWPP, KUWAIT for Building Infrastructure in of KUWAIT depends on availability of adequate infrastructure to its sustain growth and tangible benefits depends on the best practices that is adopted to the KUWAIT ENVIORNMENT
My topic will be covering the Utilities Section of the Environment which is influencing the Geographical Locations.
Most AM/FM/GIS electric power studies and analysis applications were developed for electrical distribution systems analysis and design. AM/FM/GIS was used as a component of a full-featured Distribution Automation system Other applications tackled the problem of designing the electrical supply system for new residential development
GIS was also used to rebuild the design of the whole work procedures in electric utilities
GIS and Automated Mapping and Facilities( GIS/AM/FM) are also integrated for mapping and analysis of electric distribution as Enterprise methods.
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Challenges
As modern technologies arise, power utilities are seeking new methods to improve system reliability, power quality and satisfaction in Implementing and Awarding the contractors.
High quality of the power can only be achieved if the system losses are at their minimum level and the voltage level is within an acceptable range.
In order to reach an optimal solution of the problem presented above, it is necessary to perform a large number of scenarios and output analyses for both the economical and the technical grounds.
The system models for this analysis is derived from a large database model. Thus a powerful data management tool with query, analyses and interfaces capabilities is a major necessity for the complete solution of the problem.
Automated Mapping, Facilities Management and Geographic Information System (AM/FM/GIS) provide a real solution to the management of the data required for engineering analyses.
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
AIMS and OBJECTIVES OF THE PROJECT
SAUDI ELECTRICAL COMPANY SAUDI ARABIA, WHICH MANAGES THE ELECTRICAL DISTRIBUTION/TRANSMISSION AND GENERATION NETWORKS FOR THE WHOLE KINGDOM OF SAUDI ARABIA
THE EASTERN REGION HAS IMPLEMENTED THE GIS/AM/FM SOLUTION WITH INTEGRATION OF POWER ANLAYSIS tools FOR BETTER MANAGABILITY
DAY TO DAY OPERATIONAL METHODS ARE AUTOMATED FOR BETTER SERVICES and prompt action
THE APPLICATION AIM TO DRAW AUTOMATED MAPS COVERING COMMON SEQUENCE OF PROCEDURES
( DESIGNING, C REATION, OPERATION AND MAINTEANCE )
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Levels Adopted in the Projects
Level one, designing and creating to help map drawer and to implement various options including connecting electricity to the customers.
Level two, is an application aimed at performing query using various options and displaying different charts in order to analyze the electricity network and print reports.
Level three, using the system through Ethernet and Internet, used by the Eastern Zone Distribution Sector staff which includes the head quarter, Distribution Engineering Department and Electricity Department in Dammam covering Electricity Services Office in Al-Khobar and Qattif.
One of the most important applications is managing electricity network, creating a new network, performing queries on the network, handling base map and creating single line diagram. In addition, performing an estimation cost for the new projects and linking data with PSS/engine. Among the other used application is callout system, Mainteance and Operation which helps company staff determine the location of the customer quickly
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
System Developed
The Application TemplatesProject Management Simulation and updating Locating and Updating the Electrical features or componentsTracingSchematic Generation Accumulation of Load Voltage Drop Switching OrderIntegration of Electrical Analysis Tools
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Object oriented application with a list of specific equipments of the network
For every equipment, specific toolbar to Manage the network.
Overview for GIS Elec Layout Simple User Friendly enviornment
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Project Management
Contractors approval process
Classification of Contractors
Types of Applicable Contracts
Evaluation Systems for Contractors Performance
Safety and health standards and practices
Economic analyses and forecasts
Environmental requirements and opportunities
Risk management
Project management
Management of projects Can be maintained:
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Creating aproject around a features
In the attribute record form, give a name to your project (so that you can easily retrieve it later in the demonstration) : e.g.=”My demo project”
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Project computing
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Generating Work Orders
You HAVE TO generate Works Orders for your project. This is a mandatory operation prior to access to Work Orders functionalities. Click on the “Work Order Generation” button.
Work orders are generated for the different assemblies of your project. Choose a contractor for each work order.
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Print Work Orders
Once a Work Order is selected, you can print one of the following reports - Material issue request Bill (you will have to select a sub-account first) - Work Order Labor - Work Order Labor Contractor - Work Order Labor Bill
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Finding and Locating Substations,
CABLES and others features/ Components
of information
Searching for equipments or customer location (2)
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Searching for equipments or customer location (1)
Identifying the Parcel Information
Note:
It took hours to do manually.
Result:
With GIS we can find the details in less than one
minute
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Searching for equipments or customer location (1)
You can search using any of these criteria
City
Municipality
District
Plan No.
Parcel No.
Parcel Water
Electricity Meter
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Tracing (1)
In the Elec tools menu, select the « Analyses » sub-menu and « Tracing » sub-menu , then « Gridstation to
Substation » command
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Schematic ( SLD ) Diagrams Dynamically Created/Updated
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Accumulate customer load to mini-pillar. This function trace all the meters connected to a mini-pillar, sums the loads of each customer and stores this value in the appropriate attribute of the mini-pillar database record. A diversity factor is applied during the load summation efforts to estimate the mini-pillar loads more accurately…
This function operates for:MINIPILLAR : one single mini-pillar graphically selected on screenAREA : all mini-pillar graphically selected on screenTRANSFORMER : all mini-pillars supplied by a transformer selectedSUBSTATION : all mini-pillar supplied by a substation selectedFEEDER: all mini-pillar supplied by a feeder selected
Accumulation of Accumulation of loadload
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Voltage drop MV calculation. This function calculates the voltage drop on MV cables and lines feeding from a feeder graphically selected on screen. The MV cables voltage drop is calculated by using the length and impedance of the MV cables and the accumulated loads
Voltage dropVoltage drop
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
-- Switching load studies- Switching load studies
- Power flow calculation- Power flow calculation Integration of Electrical Integration of Electrical
Analysis Software'sAnalysis Software's ETAPETAPPTIPTIOTHERSOTHERS
Integrated Electric Network calculation Integrated Electric Network calculation
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 22
Switching Order
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
Conclusion
Sustainable Growth of the Electrical Networks is Maintained by Designing, Installing and Maintaining the Infrastructure more precisely
More Efficient and Effective of services to the Community
Achieving a pragmatic & systematic approach in resolving the challenges .
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010
http://www.starme.com.sahttp://www.starme.com.sa
Any Questions ?Any Questions ?