WHAT’S THE POINT…
why use modular systems?
• schedule sensitive• cost effective• flexible and scalable• sustainable• environmentally responsible
SIMPLE
the most expensive construction item is time…
… modular solutions are installed in less time
THE DECISION…
• reduce design time/cost• reduce construction time/cost• reduce time spent on changes• reduce material waste• reduce occupancy costs• build-in flexibility• build-in scalability• build-in protection
DOLLARS & SENSE
• typical budget for electrical is $12 - $13 / sq.ft.
• final ‘branch’ distribution is conservatively 30% of budget
• $3.60 / sq.ft. for final branch
• a typical modular solution is approx. $2.35 / sq.ft.
• install cost is approx. $0.60 - $0.65 / sq.ft.
• total cost $3.00 / sq.ft.
• install is at least twice as quick as ‘pipe & wire’
• cost effective – schedule sensitive
labor
materials
materials
labor
ICE LAYOUTS
• the power of ICE• real-time, interactive 3D software• working with owners, engineers, and contractors• develop project specific solutions• multiple levels of flexibility
spider + ICE = agility
AGILE FLOORS
• zone distribution box
• extender cable
• splitter
• access floor boxes
AGILE CEILINGS
• ceiling distribution box
• extender cable• splitter• modular wall boxes
AGILE WALLS
• splitter• single-sided• back-to-back• multi-circuit• vertical to the ceiling
AGILE WALLS
existing distribution… ?
• replace the ceiling distribution box with a whip/JB
• economical solution to convert existing building power from ‘hard-wire’ to modular wiring
• available with or without junction box
AGILE FURNITURE
• provide power and data at desktop
• retrofit into office, hospitality and educational environments
• available pre-wired with power cord or empty for on-site wiring
Shadow Mirage
MarqueeConcord
Phantom Open
Phantom Closed
SPIDER SOLUTIONS
• not just modular products, solutions for agility
• cost effective and schedule sensitive
• the power of ICE
• modular wiring systems
• electrical boxes for construction