Page 1: Winter 2011/2012 shutdown On-call service - FSU Future projects AOB 2011-12-02G. Olesen - PH-DT-DI.

G. Olesen - PH-DT-DI

PH-DT-DI

MAGNET CONTROL PROJECTMCP

Winter 2011/2012 shutdownOn-call service - FSU

Future projectsAOB

2011-12-02

Page 2: Winter 2011/2012 shutdown On-call service - FSU Future projects AOB 2011-12-02G. Olesen - PH-DT-DI.

G. Olesen - PH-DT-DI

MCP PROJECTWINTER 2011/2012 SHUTDOWN

• Normal MCP maintenance• No major changes foreseen• Standard verifications according to internal list

• MCS:• Upgrade of PVSS

• MSS:• Battery maintenance done by MCP-FSU (training 28-29-30 November)• Change of MSSB optocouplers (MTBF – 6000 pcs ordered!)• Verification of alarm levels - Functionality

• MDS• New software/hardware if possible

• Vacuum system• Demounting of diffusion pumps for End-Cap opening (detector repair)• Maintenance – oil change – etc.

• Shutdown planning (also FSU)2011-12-02

Page 3: Winter 2011/2012 shutdown On-call service - FSU Future projects AOB 2011-12-02G. Olesen - PH-DT-DI.

G. Olesen - PH-DT-DI

MCP PROJECTON-CALL SERVICE - FSU

• Systems On-call Service - SOS• Running during shutdown• New ATLAS member

• Training has started (Team – Nicolas Bourgeois)• Doing double piquet service

• FSU – PH-02

• 12 persons in unit• 1 extra person from now until end of shutdown• Perhaps 1 engineer for electronics pool

• Many external projects• Flexibility works• Shutdown planning meet week 49

2011-12-02

Page 4: Winter 2011/2012 shutdown On-call service - FSU Future projects AOB 2011-12-02G. Olesen - PH-DT-DI.

G. Olesen - PH-DT-DI

MCP PROJECTFUTURE PROJECTS

• MSS2• Slightly delayed due to involvement in other projects• Software being programmed and tested• Hardware

• Chassis mounted• Interface cards being developed (production time?)• Many details still remains

• Progress meet: Week 49-50

2011-12-02

Page 5: Winter 2011/2012 shutdown On-call service - FSU Future projects AOB 2011-12-02G. Olesen - PH-DT-DI.

G. Olesen - PH-DT-DI

MCP PROJECTFUTURE PROJECTS• M1

• Oldest supraconducting magnet at CERN

• Large aperture• 3 Tesla

• Control – Safety by PH-DT-DI• MSS2 prototype testing – validation• Project leader MCP: Sylvain Ravat

• Hardware: Pascal Blanc• Planning - budget meet: Week 49-50

2011-12-02

Page 6: Winter 2011/2012 shutdown On-call service - FSU Future projects AOB 2011-12-02G. Olesen - PH-DT-DI.

G. Olesen - PH-DT-DI

MCP PROJECTAOB

• Any Other Business:

• Battery Course (Nico, Laurent, Gerard, Houari)

• AEgIS?• ArDM?• Compass?

•And…

2011-12-02

Page 7: Winter 2011/2012 shutdown On-call service - FSU Future projects AOB 2011-12-02G. Olesen - PH-DT-DI.

M.C. 7

PH-DT-DIXmas drink

Apero partyFriday 9/12 – 11:30

Contributions:Funds – PH-DT-DI Project Leaders

Food – Drinks (Mar)Location: MCP workshop in B20/21/168

Music – Christmas Songs (Gert) – Laptop (Mar) – Speakers?Decoration

Background slides – Projector - WallVolunteers…

2011-12-02