Laguna Lake Development AuthorityLaguna Lake Development Authority
Laguna de Bay Institutional Strengthening andLaguna de Bay Institutional Strengthening andCommunity Participation (LISCOP) ProjectCommunity Participation (LISCOP) Project
omponen
-
omponen-
Watershed Development
Watershed Development
.
ADB Water Learning WeekNov. 7, 2011
.
ADB Water Learning WeekNov. 7, 2011
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 2/34
Envisioned to support the sustainable
Envisioned to support the sustainable
With co-financin su ort from theWith co-financin su ort from the
Netherlands GovernmentNetherlands Government
LISCOP :ISCOP :LISCOP :development initiative of LLDA
OF M 2004 A il 2011
LISCOP :development initiative of LLDA
OF M 2004 A il 2011F:May 2004 – April 2011
AF:July 2011 – June 2014
OF:May 2004 – April 2011
AF:July 2011 – June 2014
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 3/34
COMPONENT 1: COMPONENT 1: Co-Managed Investments for Co-Managed Investments for
Improve the environmental
ualit in the re ion b
Improve the environmental
ualit in the re ion b engaging LGUs/stakeholders
engaging LGUs/stakeholders
environmental sub-projects.
environmental sub-projects.
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 4/34
COMPONENT 2: COMPONENT 2: Strengthening Institutions and Strengthening Institutions and
Ensure that Laguna de Bay and
its watershed are mana ed
Ensure that Laguna de Bay and
its watershed are mana ed effectively and in a sustainable effectively and in a sustainable
capacity of institutions in capacity of institutions in
..
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 5/34
Mission No. 1Mission No. 1Situational Analysis
Harness and deepen
stakeholders’ participation in
Harness and deepen
stakeholders’ participation in
micro-watershed
environmental activities
micro-watershed
environmental activities
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 6/34
Mission No. 2
Implement direct and
-
Implement direct and
-
watershed level
interventions that
watershed level
interventions thatwould contribute
towards improvement
would contribute
towards improvement
o e qua y o eLaguna de Bay and itso e qua y o eLaguna de Bay and its
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 7/34
Mission No. 3
Strengthen LGU’s
self-governance and
Strengthen LGU’s
self-governance andreinforce inter-LGU
cooperation in the
reinforce inter-LGU
cooperation in the
environmentalmanagement of
environmentalmanagement of
t e la et e la e
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 8/34
The 33 SubThe 33 Sub--Projects in 21 municipalities generated from 15 out ofProjects in 21 municipalities generated from 15 out of
24 micro24 micro--watersheds through the LEAP processwatersheds through the LEAP process
The 33 SubThe 33 Sub--Projects in 21 municipalities generated from 15 out ofProjects in 21 municipalities generated from 15 out of
24 micro24 micro--watersheds through the LEAP processwatersheds through the LEAP process
= Covered subprojects= Covered subprojects
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 9/34
Original FinancingOriginal Financing
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 10/34
ACCOMPLISHMENTS
==
96% = Financial
96% = Financial
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 11/34
-
30 out of 33 completed subprojects30 out of 33 completed subprojects
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 12/34
55MRF
MRF
EcologicalEnhancement
EcologicalEnhancement
3Flood
3Flood
Rehabilitation
Of Old
Rehabilitation
Of Old2
WWTF2
WWTF
umps eumps e
1Sanitary1Sanitary
Reforestation Reforestation
LandfillLandfill
Operat ional Sub-pro jec t s = 30
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 13/34
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 14/34
osure o umps es anupgrading of 23 out of the
-
osure o umps es anupgrading of 23 out of the
-
in the Laguna de Bay Basin
in the Laguna de Bay Basin
Decrease by 53.22% in
volume of solid wastes
Decrease by 53.22% in
volume of solid wastesumpe n o open areas,
waterways and the lakeumpe n o open areas,
waterways and the lake
of MRF in 17munici alities.of MRF in 17munici alities.
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 15/34
The establishment and operation ofThe establishment and operation ofcomposting facilities in seventeen(17) municipalities have contributedto the reduction of methane
composting facilities in seventeen(17) municipalities have contributedto the reduction of methane
emissionsemissions
The Flood Control SPsin Baras, Tanay and Taytay,The Flood Control SPsin Baras, Tanay and Taytay,
,impact of flooding.,impact of flooding.
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 16/34
The LISCOP Project has paved the way towardsestablishing LGUs’ own identities, therebyThe LISCOP Project has paved the way towardsestablishing LGUs’ own identities, thereby
its constituentsits constituents
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 17/34
The establishment of various LGU sub-projectsThe establishment of various LGU sub-projects
communities including the marginalized sector.About 462 individuals were hired to providecommunities including the marginalized sector.About 462 individuals were hired to provide
services to the various sub-projects.services to the various sub-projects.
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 18/34
The LGU-proponents have establishedThe LGU-proponents have established
laid the groundwork for further collaboration.laid the groundwork for further collaboration.
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 19/34
Propelled LGUs to formulate ordinances inPropelled LGUs to formulate ordinances in
suppor o e e ec ve mp emen a on othe sub-projectsuppor o e e ec ve mp emen a on othe sub-project
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 20/34
The LGUs as well as the LLDA have built upinstitutional capabilities on various aspects ofThe LGUs as well as the LLDA have built upinstitutional capabilities on various aspects of
pro ec prepara on, appra sa , mp emen a on anmanagementpro ec prepara on, appra sa , mp emen a on anmanagement
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 21/34
Reorientation of function from being a regulatory to
collaborating with LGUs to address environmentalmanagement issues
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 22/34
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 23/34
Involvement o f Involvement o f
i s an essent ia li s an essent ia l
successsuccess
e ex s enc e o a pro ec
CHAMPION assures
e ex s enc e o a pro ec
CHAMPION assures
sus ta inab i l i t y
sus ta inab i l i t y
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 24/34
Natural and man-made events canNatural and man-made events can
OrganizationalOrganizational
changechange
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 25/34
Donor‘s fieldDonor‘s field
v
performance,
v
performance,
and issues
and issues
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 26/34
Project implementation requires flexibilityProject implementation requires flexibility
interactions among partners
interactions among partners
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 27/34
•Importance of building inter-agency cooperation
Interplay of diff sectors/organizations,etc
Adoption of appropriate mechanisms/strategies
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 28/34
•Importance of establishing sense of ownership
Projects are supported if the stakeholder’s are consulted and fully understood the project
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 29/34
ADDIT IONAL FINANCING
Pila Ecotourism SPPila Ecotourism SP
Anii : host tree for firefliesAnii : host tree for fireflies
endangeredendangered
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 30/34
TARGET SPS
BASED ON PADYEAR 1
SUB-PROJECTS -
YEAR 1
SUB-PROJECTS -Augus t 2011 – J u ly2014
August 2011 – July 2012August 2011 – July 2012
s
12 MRFs
16 MRFs
7 FCs
8 Ecos
3 FCs
7 Ecos 2 SLs 3 SLs
1 Agro-Forestry1 River Rehabilitation
1 Rehabilitation of Old Dumpsite
1 Agro-Forestry1 River Rehabilitation
1 Rehabilitation of Old Dumpsite
3737 3838
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 31/34
ADDITIONAL FINANCING
With FS/DAED and Bidding Documents:6Subprojects with total project cost of: Php 99 M
1.Paete Landfill n MRF Php 16.5 M
. .
3.Bay Flood Control 8.1 M
. .
5.Rodriguez Ecotourism 50.0M
. .
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 32/34
Upc om ing Pro jec t s
with Letters of Intent (LoI) issued by partner LGUs )
Pagsanjan MRF
Teresa Ecotourism
Lucban River Rehabilitation Nagcarlan Landfill
Angono Flood Control and Ecotourism
Pangil Agroforestry Sta Maria Material Recovery Facility
Liliw Waste Water Treatment Facility
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 33/34
“The effectiveness of the sub-projects can be
“The effectiveness of the sub-projects can be
of the stakeholders which is hoped to increasethrou h time” ……………..
of the stakeholders which is hoped to increasethrou h time” ……………..
Mayor Rodel dela Cruz
Teresa, Rizal
Mayor Rodel dela Cruz
Teresa, Rizal
8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno
http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 34/34
Laguna Lake Development AuthorityLaguna Lake Development Authority
aguna e ay nst tut ona trengt en ng anCommunity Participation (LISCOP) Project
aguna e ay nst tut ona trengt en ng anCommunity Participation (LISCOP) Project
an ouan ouJocelyn Fabian-SiapnoLISCOP Component 1
Co-Management Investments for Watershed Management
Jocelyn Fabian-SiapnoLISCOP Component 1