Page 1
RIVER MESHMAGGIE HU & SIYUN YANG
Page 3
TessellationCellular Tessellation
Page 5
GeometryCanton Tower
Select Outcome
Page 7
Selected Outcome Brief
To design and create a structure
that is able to filter and collect the
floating rubbish from the waters of
Merri Creek without disturbing the
ecosystem.
Page 10
PROJECT INTRODUCTION
Page 11
To design a panelized structure from the grasshopper techniques – geometry, and tessellation and panelization, that we have both explored in Part B.A flexible U-shaped panelized structure is aiming to achieve in the project, which the structure can be expanded or dormant horizontally and vertically, depending on the water level and the amount of rubbish.
Project Concept
Page 14
Site Analysis N
Building
Road
Merri Creek
Merri Creek Trail
Bushland
Page 15
SUN PATH NOISE SPOTS
Page 17
Jogger
Kid
Dog Walking
Family
Biker
Page 23
Location #2N
Building
Road
Merri Creek
Capital City Trail
Bushland
Merri Creek Trail
Dights Falls
Page 24
Location #2
Building
Road
Merri Creek
Capital City Trail
Bushland
Merri Creek Trail
Dights Falls
N
Page 25
Location #3
Building
Road
Merri Creek
Path
Bushland
Merri Creek Trail
N
Page 26
Location #3
Building
Road
Merri Creek
Path
Bushland
Merri Creek Trail
N
Page 30
Water Level v.s. Amount of Rubbish
Page 31
Water Level v.s. Amount of Rubbish
Page 39
CONNECTIONS & DETAILS
Page 43
SILICONE
RIVET
POLYPROPYLENE
Page 48
3D PRINTED JOINT (PLA)
2MM RUBBER BAND
POLYPROPYLENE