1 | P a g e
ABOUT ZTENCO
ZTENCO is a company representing a highly experienced team who have worked in
the power, energy and industrial sector of Bangladesh and overseas.
ZTENCO has been established with eminent, experienced and technical
professionals. The professional team comprises of electrical engineers, electronic
engineers, mechanical engineers, plumbing engineers, electrical safety auditors,
energy auditors, operation and maintenance experts, project management experts,
construction management experts, financial analysts, business development experts,
etc. who are graduated from reputed Universities of Bangladesh i.e., BUET, DU, etc.
ZTENCO also has an active pool of associate consultants and advisers with rich
experience in various fields.
2 | P a g e
WHO WE ARE!!!
ZTENCO is a privately held engineering consultancy and construction company
serving in Bangladesh, whose core capabilities are focused in following service
areas: Electrical Engineering, Mechanical Engineering and Consultancy for Power
Generation and Transmission Projects.
ZTENCO is a uniquely formed company with a strong nucleus of experienced
professionals whose success has been built from over 10 years of experience.
ZTENCO delivers a demonstrated ability to successfully compete with the technical
and managerial breadth of larger organizations, while providing the various small
and medium business services. ZTENCO has gained a growing list of repeat clients,
with a reputation as a "get it done" company.
3 | P a g e
WHAT WE DO!!!
ZTENCO specializes providing the Engineering Consultancy and Construction
Services related to the Engineering and Construction Management, Electrical and
Mechanical Systems Designing, Electrical and Mechanical Systems Installation and
Services, Captive Power Plant and Utility Solutions, Instrumentation & Control,
Switchgear & Protection Services, Commissioning, Inspection and Testing, Energy
Management and Efficiency Solutions, Sustainable Energy & Green Technology
Solutions, Electrical Safety Audit and Energy Audit, Technical Compliance Audit,
Research and Development, Training Facilities, etc. ZTENCO (in general) carries out
the Consultancy Services and EPC (Engineering, Procurement, and Construction)
Services in the Electrical and Electronic Engineering Field as well as Mechanical and
Plumbing Engineering Field in the Power, Energy and Industrial Sectors.
ZTENCO is also providing the Consultancy Services along with renowned National
and International Consulting Firms in the Power and Energy Sectors of Bangladesh
related to the Consultancy for Power Plant Project Development, Technical and
Commercial Consultancy, Feasibility Study, Environmental Assessment, Project
Management, Construction Management, Owner’s Engineering, Independent
Engineering, Commissioning Management, Operation and Maintenance Services,
Technical Due Diligence, etc.
ZTENCO also associates with Manufacturers, Suppliers, Distributors, Trading
Houses, and Selling Agents to provide complete solutions according to the Client’s
requirement.
4 | P a g e
ZTENCO STRUCTURE!!!
ZTENCO STRATEGY!!!
ZTENCO, upon being awarded a contract, organizes and set up an effective
management and supervision team that is structured specifically for each project.
The project team will be drawn from the technical and management resources within
ZTENCO professionals to provide personnel with the necessary skills required for
each stage of the project. The team will produce a strategy for the contract and
identify the critical success for the project.
5 | P a g e
ZTENCO directors’ certification and membership
Certifications: CEA, CESA, EnMS, DMINB, MIEB, ABC License, etc.
Memberships: IEEE, AEE, PMI, ABUETA, LIONS, IBA, etc.
ZTENCO directors’ serviced clients
7 | P a g e
ZTENCO PROJECT LIST directors have carried out
Assignment or Project Duration Location Client or Employer
Main Project Features
Mymensingh 150MW Engine Based Power Plant Project
October 2016 – April, 2017
Shambhuganj, MymensinghBangladesh
Rural Power Company Limited, Bangladesh
Consultancy Services for Detailed Feasibility Study, IEE, EIA & SIA Study
Detailed Feasibility Study of Coal Sourcing and Coal Transportation for 2x660MW Coal Fired (USC) Power Plant Project of Meghna Group of Industries
October 2016 – November 2016
Meghna, Comilla, Bangladesh
Meghna Group of Industries, Bangladesh
Detailed Feasibility Study of Coal Sourcing and Coal Transportation
Gazaria 350 MW Coal Fired Thermal Power Plant Project
February 2016 – April, 2017
Gazaria, Munshiganj, Bangladesh
Rural Power Company Limited, Bangladesh
Consultancy Services for Detailed Feasibility Study, IEE, EIA & SIA Study
POSCO IPP 2x660MW Coal Fired Thermal Power Plant Project at Chittagong
February 2016 – April, 2017
Chittagong, Bangladesh
POSCO E&C, Korea
Sub-Consultancy Services under TATA Consulting Engineers Limited for Feasibility Study and Environmental Assessment.
Ghorashal 365MW Combined Cycle Power Plant Construction Project
July 2015 – April, 2017
Ghorashal, Bangladesh
Bangladesh Power Development
Board
Owner’s Engineering
Bibiyana South 400±10% MW Gas Based Combined Cycle Power Plant Project
October 2015 – April, 2017
Bibiyana, Sylhet, Bangladesh
Bangladesh Power Development Board
Owner’s Engineering
Sirajganj 225 MW Combined Cycle Power Plant Project (Dual Fuel – 3rd Unit)
May 2015 – August 2015
Sirajganj, Bangladesh
North-West Power Generation Company Limited, Bangladesh
Consultancy Services for Feasibility Study
3000 MW LNG Based CCPP Project and FSRU Based LNG Terminal in Chittagong Region
September 2014 – December 2014
Chittagong, Bangladesh
Reliance Power Limited, India
Consultancy Services for Pre-Feasibility Study
Patuakhali 1320 MW Ultra-Supercritical Coal Fired Power Plant Project
February 2014 – June 2014
Dhankhali, Patuakhali, Bangladesh
North-West Power Generation Company Limited, Bangladesh
Consultancy Services for Pre-Feasibility Study and IEE Study
Patuakhali 1320 MW Ultra-Supercritical Coal Fired Power Plant Project (Phase 2)
July 2014 – October 2014
Galachipa, Patuakhali, Bangladesh
North-West Power Generation Company Limited, Bangladesh
Consultancy Services for Pre-Feasibility Study and IEE Study
Munshiganj 600-800 MW Coal Power Generation Plant Project
September 2013 – July 2014
Munshiganj, Bangladesh
Electricity Generation Company of
Bangladesh Limited, Bangladesh
Consulting Services for Pre-feasibility Study and IEE Study
8 | P a g e
Assignment or Project Duration Location Client or Employer
Main Project Features
Environmental Assessment for Repowering of Unit-4 Ghorashal Power Station Project
February 2015 – June 2015 (Intermittent)
Ghorashal, Bangladesh
Bangladesh Power Development Board, engaged by CEGIS, Bangladesh
Sub-Consultancy under CEGIS for Consultancy Services for Environmental Assessment
170MW Gas Fired Combined Cycle Power Plant Project
February 2012 – February 2015 (Intermittent)
Fenchuganj, Sylhet
Kushiara Power Company Limited
Techno-commercial Consulting Services
2×300MW Coal Fired Power Plant Project at Chittagong
February 2012 – February 2015 (Intermittent)
Chittagong, Bangladesh
Beximco Power Company Limited
Techno-commercial Consulting Services
2×225MW Gas Fired Combined Cycle Power Plant
February 2012 – February 2015 (Intermittent)
Fenchuganj, Sylhet
EHII, USA
Techno-commercial Consulting Services
108MW HFO Fired Engine Based Power Plant of ECPV Ltd.
February 2012 – February 2015 (Intermittent)
Chittagong, Bangladesh
IDCOL and IDLC
Lender’s Engineering
52.2 MW Dual Fuel (HFO & Gas) Power Project of Lakdhanavi Bangla Power Limited
February 2012 – February 2015 (Intermittent)
Comilla, Bangladesh
IDCOL
Lender’s Engineering
2nd Social and Environmental Excellence (SEE) Award, 2014
October 2014 – November 2014
Bangladesh
GIZ Walk Through Audit to evaluate Efficiencies: -Fakhruddin Textile Mills Limited -Cosmopolitan Industries Private Limited -Epyllion Fabrics Limited -Vintage Denim Studio Limited
ToT on Energy Efficiency (Organized by GIZ, Bangladesh)
September 2013 – November 2013
Gazipur, Dhaka, Bangladesh
GIZ, Bangladesh
Energy Audit of the following industry: Purbani Fabrics Limited, Karim Textiles Limited and Purbani Yarn Dyeing Limited
Promoting Cleaner Production in the Washing/ Dyeing/ Finishing sector in Bangladesh - (Phase II) under IFC
March 2013 – June 2014 (Intermittent)
Bangladesh IFC Engaged by: SEBA Limited as Short Term Consultant
Cleaner Production Assessment (Energy and Resource Efficiency Audit) for the Textile Industries.
ToT on Electrical Safety Audit (Organized by GIZ, Bangladesh and TUV SUD Bangladesh Private Limited)
May 2013 – July 2013
Bangladesh GIZ, Bangladesh
Electrical Safety Audit of the following industry: Libas Textiles Limited
JBIC – Maldives Tsunami Reconstruction Project – Package 2 (Sewerage Treatment Plant)
January 2010 – July 2010
Sh: Funadhoo, Maldives
Shin Nippon Air Technologies Co., Ltd
Construction of a Sewerage Treatment Plant
9 | P a g e
Assignment or Project Duration Location Client or Employer
Main Project Features
•Abu Dhabi Golf Club Resort Hotel – UAE •Falhumafushi Hotel Project – Maldives •Bandarnayake International Airport Extension Project – Phase II – Sri Lanka •Jebel Ali Airport DEWA Electrical Substation Project – UAE •Transco Substation Project – UAE •Federal Electricity and Water Authority Project – UAE •Gizo Hospital Project – Solomon Island •Vellibel Lanka Project – Sri Lanka •Anuradhapura Teaching Hospital Project – Sri Lanka •Gizo Art Gallery and Open Theatre Project – Solomon Island •The Project for Upgrading and Refurbishment of Viola Hospital (Phase II) in the Kingdom of Tonga •PT Krakatau Daya Listrik Combined Cycle Power Plant Project – Indonesia •SMAG SCO Project Plant – Jurong Project – Maldives •The Project for the rehabilitation of Hospital and Supply of Medical Equipment in the Central Region in Uganda •Vung Ang II 2X600 MW Thermal Power Plant Project ( HVAC and Fire Fighting ) - Vietnam
March 2009 – November 2010
Sri Lanka Shin Nippon Air Technologies Co., Ltd & Shin Nippon Lanka (Private) Limited
Low Voltage and Extra Low Voltage Design and Estimation Works related to Building Services
Shahjibazar 86MW Power Plant June 2008 – December, 2008
Habigonj, Sylhet, Bangladesh
Youth Group Cable Scheduling of whole project, ”Elster A1800 Alpha” Energy Meter programming by software “Metercat”, working with testing & commissioning team of power plant
Doreen Power
July 2008 – November 2008
Tangail, Bangladesh
Doreen Group Implementation, testing & commissioning of 33/11kV substation
GPH Ispat Ltd. February 2009 – May, 2009
Chittagong, Bangladesh
GPH Group Implementation, testing & commissioning of 33/11kV substation
Siddhirgonj Power Plant April 2009 – June, 2009
NarayangonjBangladesh
REB Energy Meter Programming by Metercat Software
Modern Poly Industries July 2009 – August, 2009
Chittagong, Bangladesh
Modern Poly Industries
Implementation, testing & commissioning of 33/11kV substaion
Olympic Cement Ltd. August 2009 – November, 2009
Barisal, Bangladesh
Khansons Group
Implementation of 33/11kV substation
M.I. Cement factory Ltd May 2010 – August 2010
Munsigonj, Bangladesh
Crown Cement Group
Grid Mesh Earthing Design for 132/33kV 28/20MVA substation
Jamuna Future Park September
2010 – December 2010
Bashundhara
R/A, Dhaka, Bangladesh
Jamuna Group Grid Mesh Earthing Design
for 20MVA substation
10 | P a g e
Assignment or Project Duration Location Client or Employer
Main Project Features
Goran chatbari Pump Station February 2011 – June 2011
Ashulia, Dhaka, Bangladesh
BWDB Grid Mesh Earthing Design for 20MVA substation
Holy Family Red Crescent Medical College
January 2011- December 2011
Mogbazar, Dhaka, Bangladesh
Tender preparation, 1000kVA Substation including EAE (Turkey) BBT & F.G. Wilson (UK) Generator Implementation
Project “Ninakabbo”- 15 storied Corporate Building of Epyllion Group
October 2010 – November 2011
Tejgaon, Dhaka, Bangladesh
Epyllion Group Tender preparation, 3.5MVA Substation including EAE (Turkey) BBT, TESAR Dry Type Transformer (Italy), 11kV COOPERS AVR (USA), Energypac By-pass switch & F.G. Wilson(UK) Generator
Dhaka City Corporation(DCC) Unique Complex- 20 storied building
September 2010- January 2012
Banani, Dhaka, Bangladesh
Borak Real Estate Ltd
Tender preparation, 5MVA Substation including EAE (Turkey) BBT, TESAR Dry Type Transformer (Italy), 11kV COOPERS AVR (USA), Energypac By-pass switch & F.G. Wilson(UK) Generator
MIDAS Center- 16 storied building
October 2010- February 2012
Dhanmondi, Dhaka, Bangladesh
MIDAS Financing Ltd
Tender preparation, 1600kVA Substation including EAE (Turkey) BBT, TESAR Dry Type Transformer (Italy), 11kV COOPERS AVR (USA) & F.G. Wilson (UK) Generator
National Credit & Commerce (NCC) Bank Bhaban- 21 storied building
June 2012 – March 2013
Motijheel, Dhaka, Bangladesh
NCC Bank Tender preparation, 2000kVA Substation including EAE(Turkey) BBT, TESAR Dry Type Transformer(Italy), 11kV COOPERS AVR (USA), Energypac By-pass switch & F.G. Wilson(UK) Generator
Kurmitola Golf Club January 2013 – December 2013
Dhaka Cantonment, Bangladesh
Bangladesh Army
Tender preparation, 2X800kVA Substation including EAE(Turkey) BBT, Energypac Oil Type
Transformer, BRB Cable(Bangladesh) & F.G. Wilson(UK) Generator
108MW ECPVL Power Plant December 2013 – March 2014
Chittagong, Bangladesh
Confidence Group
Design, installation, testing & commissioning of 5000A Copper BBT system
Gulshan Center Point- 26 Storied United Group Main Corporate Building & Dhaka North City Corporation Head Office
June, 2013 – March, 2014
Gulshan-2, Dhaka, Bangladesh
United Group Design, installation, testing & commissioning of 5000A Copper BBT & 4 Nos 3200A Aluminium BBT riser system
Berger Paint Ltd January 2014 – April 2014
Chittagong, Bangladesh
Berger Group
Design, installation, testing & commissioning of 6300A Aluminium BBT system
Akij House- Akij Group Main Corporate Building & Akij Flour Mills Ltd
January 2015- April 2015
Tejgaon-Gulshan Link Road, Dhaka
Akij Group Design, installation, testing & commissioning of 8000A & 2500A Aluminium BBT system
11 | P a g e
Assignment or Project Duration Location Client or Employer
Main Project Features
Rangs Babylinia & Rangs RD Center
January 2015-August 2016
Gulshan, Dhaka
Rangs Group Design, installation, testing & commissioning of 2500A, 1600A Aluminium BBT system including separate BBT riser for Distribution & Chiller Panel
Masco Knit Composite Ltd January 2014- May 2014
NarayangonjDhaka
Masco Group Design, installation, testing & commissioning of 600 Meter 1600A Aluminium BBT system
Argon Spinning Mills Ltd July 2015- August 2015
Habigonj, Sylhet
Design, installation, testing & commissioning of 6300A Aluminium BBT system
Eskayef Bangladesh Ltd July 2016- June 2017
Tongi, Gazipur
Transcom Group
Design, installation, testing & commissioning of 350 Meter long 5000A Aluminium BBT system with canopy & Bridge
Fariha Spinning Mills Ltd July 2016- September 2016
NarayangonjBangladesh
Fariha Group Design, installation, testing & commissioning of 2500A Aluminium BBT system
Nasir Glass House August 2016- March 2017
Mirzapur, Tangail
Nasir Group Design, installation, testing & commissioning of 6300A, 4000A, 3200A Aluminium BBT system
Beximco Pharmaceuticals Ltd July 2017- Present
Tongi, Gazipur
Beximco Group Design, installation, testing & commissioning of 3200A Copper BBT system
REB, RRDP Project July, 2016 – June, 2017
Dhaka REB 11 kV & 33 kV Panels design
Hotel Intercontinental electrical renovation work
July, 2016 – June, 2017
Sahbagh, Dhaka
Hotel Intercontinental
415 V & 11 kV Panels design
Walton Microtech and Hi-tech project
July, 2016 –April, 2017
Chandra, Gazipu
Walton Group 415 V & 11 kV Panels design
Internal Beverage Ltd. (Coca Cola) new project electrical works
July 2015 – June 2016
Bhaluka, Mymensingh
Internal Beverage Ltd. (Coca Cola) Bangladesh
415 V, 11 kV & 33 kV Panels design
BPDB Pur-157 Project July, 2014 – June, 2015
Dhaka Bangladesh
Bangladesh Power
Development Board
11 kV & 33 kV Panel design
12 | P a g e
ZTENCO PROJECT LIST current project list
A. Power Generation and Transmission Projects:
Assignment or Project Duration Location Client or Employer
Main Project Features
Consultancy Services for Pre-Feasibility and Feasibility Study of Madhumati 100MW HFO Based Power Plant Project
August 2017 – November 2017
Mollahat, Bagerhat, Bangladesh
NWPGCL Detail Feasibility Study, Site Evaluation, HFO Sourcing and Transportation, Power Evacuation, Technology, Financial Analysis, etc.
Owner’s Engineer Services for Madhumati 100MW HFO Based Power Plant Project
February 2018 – April 2019 (ongoing)
Mollahat, Bagerhat, Bangladesh
NWPGCL Review Design and EPC Contract Document, Project Administration, Quality Assurance Management, Construction Supervision and Management, Work Planning and Schedule Control, Commissioning, Witness Completion and Guarantee Performance Test, etc.
Consultancy Services for Basic Evaluation of Project Sites for Phase II 1500 MW Combined Cycle Power Plant Project in Chittagong, Bangladesh
May 2018 – Present (ongoing)
Chittagong, Bangladesh
Reliance Chittagong Power Company Limited
Basic Evaluation of the Project Sites based on Land Availability, Access to the Site, Land Development and Protection, Geotechnical Aspects, Basic Environmental Aspects, Gas Availability and Transmission to Site, Water Availability, Power Evacuation, Transportation of Heavy Equipment during Construction, Preliminary Cost Estimates, etc.
B. Industrial Projects:
Assignment or Project Duration Location Client or Employer
Main Project Features
Investment Grade Energy Audit at Dekko Readywears Limited
May 2017 – June 2017
Mirpur, Dhaka
Dekko Group Comprehensive and Investment Grade Energy Audit in the Factory
Energy Efficiency Audit at Rahman Chemicals Limited
June 2017 – July 2017
NarayanganjDhaka
Rahman Chemicals Limited
Energy Efficiency Audit for the Gas Fired Boiler and Generator
Design, Testing and Inspection of Electrical Systems of S B Knitting Limited
April 2017 – July 2017
Savar, Dhaka
S B Knitting Limited
Design, Testing and Inspection of Electrical Systems of the Factory
Energy Efficiency Audit at Charu Ceramic Industries Limited
August 2017 – September 2017
Habiganj, Sylhet
Charu Ceramic Industries Limited
Energy Efficiency Audit for the Gas Fired Generator
Electrical Safety Audit at RFL Electronic Limited – DIP Project
September 2017 Danga, Narayanganj Dhaka
PRAN-RFL Group
Electrical Safety Assessment, Inspection and Testing, Design Review, etc.
13 | P a g e
Assignment or Project Duration Location Client or Employer
Main Project Features
Investment Grade Energy Audit at Globus Garments Limited
September 2017 – October 2017
Mouchak, Gazipur, Dhaka
Dekko Group Comprehensive and Investment Grade Energy Audit in the Factory
Energy Efficiency Audit at SARZAN Textile Mills Limited
September 2017 Shyampur, Dhaka
SARZAN Textile Mills Limited
Energy Efficiency Audit for the Boiler and Stenter Machines
Electrical Safety Audit at Arif Knitspin Limited and, NRG Hometex Limited
September 2017 – October 2017
Bhaluka, Mymensingh
NR Group
Electrical Safety Assessment, Inspection and Testing, Design Review, etc.
Investment Grade Energy Audit at Agami Fashions Limited and Agami Washing Limited
November 2017 – December 2017
Chandra, Kaliakoir, Gazipur, Dhaka
Dekko Group Comprehensive and Investment Grade Energy Audit in the Factory
Fire Fighting System Design of Well Spinners Limited
February 2018 – March 2018
Dhaka, Bangladesh
Well Spinners Limited
Preparation of approval drawing from Fire Service and Civil Defense.
C. Commercial and Residential Projects:
Assignment or Project Duration Location Client or Employer
Main Project Features
Electrical System Designing of Rawshan Jahan Eastern Medical college and Hospital
October 2017 – December 2017
Dattapara, Lakshipur, Bangladesh
Rawshan Jahan Group
Electrical Systems Design and Drawings of the Medical and College Buildings
Electrical System Designing of AQ Life Aerosol Filling Station
November 2017 – December 2017
Mirsarai, Chittagong, Bangladesh
AQ Life Electrical Systems Design of Factory Buildings
MEP Design of Sufi Bari Resort February 2018 – March 2018
Bangladesh Roofliners studio of architecture
Preparation of MEP Design of the Project
Electrical Design and Drawings of the Housing Project “Jolshiri Abashon Project”.
May 2018 – January 2019 (ongoing)
Bangladesh HDD, China Preparation of Detailed Design, Drawings and Technical Specifications for Electrical Distribution System;
Electrical Design and Drawings of the 12 Storied Diagnostic & Hospital Building Project at Cumilla
June 2018 – August 2018
Kotwali, Cumilla, Bangladesh
Kalpokriti Sthapati Brinda
Preparation of Detailed Design, Drawings and BOQ for Electrical System;
Electrical Design and Drawings of the RANCON Icon Tower
June 2018 – August 2018
Gulshan, Dhaka
RANCON Developments Limited
Preparation of Detailed Design and Drawings for Electrical System;
14 | P a g e
ZTENCO Contact Information
Cell Phones: +88 01717 128248, +88 01833 102731
Emails: [email protected], [email protected];
Flat # 5A, House # 79, Shah Makhdum Avenue, Sector # 12, Uttara, Dhaka – 1230, Bangladesh
Please visit the Website: www.ztenco.com