×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [aps upgrade project]
Home >
aps upgrade project
SCU Magnetic Measurement System Design and SCU0 Measurement Results Charles L. Doose Engineering Specialist ASD/Magnet Devices DOE Lehman CD-2 Review of.
214 views
SPX - Cavity WBS U1.02.01.02.05, U1.03.03.05, U1.03.03.12 Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade.
219 views
Beam Stability WBS U1.03.02.02 and SPX Diagnostics WBS U1.03.03.08 Glenn Decker Group Leader APS Accelerator System Division Diagnostics DOE Lehman CD-2.
217 views
SPX High Level RF and RF Interlock Systems WBS U1.03.03.01 Doug Horan RF Systems Engineer Accelerator Systems Division/RF Group DOE Lehman CD-2 Review.
219 views
SPX – Timing and Synchronization WBS U1.03.03.03 WBS U1.02.01.03.03 Frank Lenkszus Senior Electronics Engineer AES/Controls DOE Lehman CD-2 Review of APS-Upgrade.
215 views
Benjamin Stillwell Mechanical Engineering Specialist
83 views
Superconducting Undulators WBS: APS-U1.03.04.03
32 views
Long Straight Sections WBS U1.03.02.01
34 views
Beam Stability WBS U 1.03.02.02 and SPX Diagnostics WBS U 1.03.03.08
54 views
Geoff Waldschmidt RF Engineer ASD / RF DOE Lehman CD-2 Review of APS-Upgrade 4-6 Decem ber 2012
30 views
SCU Magnetic Measurement System Design and SCU0 Measurement Results
62 views
SPX - Cavity WBS U1.02.01.02.05, U1.03.03.05, U1.03.03.12
42 views
Next >