×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [beam commissioning]
Home >
beam commissioning
New Particle Searches at the LHC SUSY - Inclusive search - Backgrounds - SUSY parameters Resonances in the Drell-Yan mass distribution Heavy long-lived.
219 views
LHC Status and CERNs future plans Lyn Evans. L. Evans – EDMS document no. 859415 2 Machine layout.
227 views
OUTLINE Introduction LHC Injector complex Conclusion R. Garoby.
213 views
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
219 views
J-PARC PAC ‘07 Imperial College/RAL Dave Wark Status of the T2K Experiment Dave Wark Imperial/RAL J-PARC PAC KEK July 6, 2007.
225 views
Extended LTC 3-3-2008 CERNMassimiliano Ferro-Luzzi 1 Experiments during HWC, beam tests and initial commissioning What are the experiments going to do.
214 views
Leon Mualem — NNN07 The NO A Experiment Status Leon Mualem California Institute of Technology (for the NO A collaboration) Workshop on Next Generation.
214 views
Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans
[email protected]
June 16, 2008 1 LTU/Undulator Commissioning Plans Heinz-Dieter.
218 views
July 7, 2008 SLAC Annual Program Review Page 1 Andrei Seryi, SLAC American Regional Team leader for BDS Deputy of ATF Spokesperson for ATF2 Global Design.
214 views
Drift Tube Linac Andrea Pisent INFN Italy April 21, 2015.
218 views
Lina c4 connection Work to be done and draft planning
18 views
Results from the 2009 Beam Commissioning of the CERN Multi-Turn Extraction
19 views
Next >