×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [collimation team]
Home >
collimation team
2012-04-04 8:30 meetingEBH 11 Tuesday 3.4.2011. 2012-04-04 8:30 meetingEBH 2 asynchronous beam dump in collisions B1H loss map and an asynch beam.
215 views
Hermann Schmickler Frascati 16/11/2012 The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework.
215 views
Status of UA9
44 views
Beam induced heating
22 views
Collimation Meeting 30.07.2012 Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
220 views
Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility
18 views
LSWG day: Impedance and beam induced heating
31 views
LSWG day: Impedance and beam induced heating Nicolas Mounet *, Daria Atapovych, Nicolò Biancacci, Elias Métral, Tatiana Pieloni, Stefano Redaelli, Benoit.
221 views
N. Mounet, B. Salvant and E. M é tral
34 views
First results of the HRMT-09 tests on a LHC TCT collimator in HiRadMat Collimation WG Meeting 21.01.2013 Oliver Aberle on behalf of the Collimation team,
215 views
Results of microphone tests in HiRadMat Collimation WG Meeting 15.10.2012 Daniel Deboy on behalf of the Collimation team, thanks to A. Masi, J. Lendaro,
220 views
Beam stability with separated beams at 6.5 TeV
36 views
Next >