×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [current tracker]
Home >
current tracker
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
213 views
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
215 views
Abraham Gallas SECOND WORKSHOP ON: FLAVOR PHYSICS IN THE LHC ERA Valencia 17-18 December 2012 The LHCb upgrade.
217 views
ATLAS at the Super-LHC
35 views
ATLAS at the Super-LHC Examples of Expected Physics Gains ATLAS Upgrade Requirements Proposed UK Programme Resource Requirements Conclusions Phil Allport.
215 views