×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [hv connectors]
Home >
hv connectors
ABT Consolidation Review Electronics & Controls Etienne Carlier 18-03-2015.
215 views
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
217 views
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
217 views
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
214 views
GEM Panel for LP1
19 views
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
222 views
ISR Work Progress Report
48 views
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006.
214 views
Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp.
28 views
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
213 views
Control System Summary of Changes Since PDR
34 views