×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [jeansbastien graulichslide]
Home >
jeansbastien graulichslide
MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
217 views
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
216 views
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
219 views
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE Muon Ionisation Cooling Experiment What is Ionisation Cooling ? Cooling = Reduction of Beam.
215 views
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
215 views
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
216 views
April 2006Jean-Sébastien GraulichSlide 1 Pmts and Scintillators o Used Material in Geneva - Big Scintillator Slabs + Pmts - XP2972, 1” Pmts + Voltage Divider.
220 views
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
215 views
EMR Status
60 views
MOM Report
76 views
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
214 views
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
214 views
Next >