×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [main magnets]
Home >
main magnets
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
215 views
LHC status and commissioning plans Gianluigi Arduini, CERN, AB/ABP 10 th September 2007 Acknowledgements: R. Bailey, M. Lamont.
214 views
LHC Performance Workshop - Chamonix 2009 3 February 2009 Jim Strait Fermilab Risk Analysis for the Different Consolidation Proposals.
216 views
SPSC116 Summary Lau Gatignon, 14 January 2015. Accelerators Ion preparations are well under way, including de-bunching and recapture. Ion interlock against.
215 views
Second LHC Splice Review
34 views
CSCM Project Status and Prospects Andrzej Siemko on behalf of the CSCM project core team: Mike Koratzinos, Jens Steckert, Hugues Thiessen and Arjan Verweij.
220 views
IEFC 2010 Workshop How to keep the PS operational for the next 25 years.
40 views
QPS R2E Mitigation and Consolidation Strategies for LS1
32 views
CSCM Project Status and Prospects
63 views
Main magnet apertures (baseline) Vacuum chamber geometry for dipoles optimization parameters
32 views
27/9/2011TWEPP 2011 F. Anghinolfi CERN/PH/ESE1 The Electronics System of the ALFA Forward Detector for Luminosity Measurements in ATLAS Presenter : F.
215 views
LHC Machine Protection
26 views
Next >