×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [mc production]
Home >
mc production
Collaboration, Big Data and the search for the Higgs Boson
246 views
LondonGrid Status Duncan Rand. Slide 2 GridPP 21 Swansea LondonGrid Status LondonGrid Five Universities with seven GOC sites –Brunel University –Imperial.
215 views
GridPP Building a UK Computing Grid for Particle Physics A PPARC funded project.
216 views
Benigno Gobbo 1 Incontro con Nando 8 February 2005 More than Four Years of Compute Farm Benigno Gobbo
[email protected]
Info: .
218 views
Benigno Gobbo 1 Consiglio di Sezione 15 marzo 2004 More than Three Years of Compute Farm Benigno Gobbo
[email protected]
Info: .
215 views
Upgrade D0 farm. Reasons for upgrade RedHat 7 needed for D0 software New versions of –ups/upd v4_6 –fbsng v1_3f+p2_1 –sam Use of farm for MC and analysis.
213 views
From DØ To ATLAS Jae Yu ATLAS Grid Test-Bed Workshop Apr. 4-6, 2002, UTA Introduction DØ-Grid & DØRACE DØ Progress UTA DØGrid Activities Conclusions.
216 views
X. Wu, March 2006 1 ATLAS Egamma Trigger Overview Xin Wu University of Geneva.
218 views
IMPACT OF WATER OPTICAL PROPERTIES ON RECONSTRUCTION: HINTS FROM THE OB DATA. A PRELIMINARY STUDY ANTARES Collaboration Meeting CERN, February 07 th -10.
214 views
Sample questions
27 views
UK Computing
26 views
the OO codes for endcap muon trigger simulation
28 views
Next >