×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [readout scheme]
Home >
readout scheme
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory
[email protected]
All Experimenters’ Meeting – Fermilab – May 19, 2014.
215 views
Takeo Higuchi Institute of Particle and Nuclear Studies, KEK on behalf of the COPPER working group Apr.22,2005Super B Factory Workshop Detector (DAQ/Computing)
214 views
Readout scheme for the Baby- MIND detector E. Noah 1, A. Blondel 1, Y. Favre 1, Y. Kudenko 2, O. Mineev 2, R. Tsenov 2 1 University of Geneva, Switzerland.
222 views
An FPGA Based Readout Scheme Using n-XYTER for CBM Experiment.
215 views
Susanta K Pal Variable Energy Cyclotron Centre 1/AF, Bidhan Nagar, Kolkata – 700 064, India MUCH Electronics: Indian Effort Physics with FAIR: Indian Perspective.
215 views
A DIRC for GlueX April 7, 2006 S. Berridge, S. Spanier.
220 views
111 ILD LOI Part-II: Detector Y. Sugimoto KEK for ILD concept group.
246 views
An FPGA Based Readout Scheme Using n-XYTER for CBM Experiment
32 views
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
219 views