×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents tagged [serial powering]
Home >
serial powering
ATLAS STRIPS UPGRADE Mercedes Miñano on behalf of the ATLAS SCT Collaboration 17 September 2009.
219 views
CMS Tracker for the SLHC (A work in progress) Joseph R. Incandela University of California, Santa Barbara 10/10/06 Joseph R. Incandela University of California,
217 views
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
222 views
R&D on Novel Powering Schemes at RWTH Aachen University - Plans and Status Tracker Upgrade Power WG Meeting May 6 th, 2008 Lutz Feld, Rüdiger Jussen, Waclaw.
213 views
ATLAS Phase II Strip Tracker: Electronic Developments ACES, CERN, 19/03/2014 Peter W Phillips On behalf of The ATLAS ITK Strip Community.
222 views
Tracker Power System – Requirements and Studies CMS Upgrade Workshop May 14th, 2009 Katja Klein RWTH Aachen University .
226 views
HEP GROUP MEETING 18.12.07 work on the ATLAS UPGRADE T.J.Fraser.
215 views
R&D at RWTH Aachen towards DC-DC Conversion Powering Schemes for the CMS Tracker at SLHC 2 nd Alliance Detector Workshop Hamburg, April 2 nd, 2009 Katja.
214 views
HEP GROUP MEETING 18.12.07 work on the ATLAS UPGRADE T.J.Fraser
32 views
Vertex Detector and Silicon Tracker Power Delivery and Pulsing Considerations Bill Cooper Fermilab (Layer 5) (Layer 1) VXD.
221 views
The ABCN front end chip for ATLAS Inner Detector Upgrade
61 views
R&D at RWTH Aachen towards DC-DC Conversion Powering Schemes for the CMS Tracker at SLHC
43 views
Next >