2005 07 Japan

Post on 29-Jun-2015

570 views 2 download

Tags:

description

PE Gas Line Renewal With TRIC Tool.

transcript

2005_0707japanese.pdf

Technical Archives

DATE: 7 July 2005

CLIENT: Keiyo Gas, Ltd., Japan

DEMONSTRATION SITE: TRIC Tools, Inc., Alameda, CA

OBJECTIVE: Assess performance of various steel pipe splitting heads with TRIC pullers

PROJECT LOG

2005_0707japanese.pdf 2

Ductile iron experiment.

2005_0707japanese.pdf �

An attentive Mr. Ohara.

2005_0707japanese.pdf �

Pipe and coupling samples from Japan.

2005_0707japanese.pdf 5

Measuring steel pipe expansion and splitting force.

2005_0707japanese.pdf �

Checking hydraulic pressure.

2005_0707japanese.pdf 7

Discussing pipe material and expansion in various potential ground conditions.

2005_0707japanese.pdf �

TRIC 2�-ton ram with McElroy head.

2005_0707japanese.pdf �

Steel splitting with TRIC long profile 6” head and McElroy graduating bladed head.

2005_0707japanese.pdf 10

McElroy head in 4” steel pipe.

2005_0707japanese.pdf 11

Early long profile TRIC 6” head.

2005_0707japanese.pdf 12

TRIC standard 6” head behind McElroy head, upsizing 4” steel pipe.

2005_0707japanese.pdf 1�

An evening at Pac Bell Park.