+ All Categories
Home > Business > 2005 07 Japan

2005 07 Japan

Date post: 29-Jun-2015
Category:
Upload: tric-tools
View: 570 times
Download: 2 times
Share this document with a friend
Description:
PE Gas Line Renewal With TRIC Tool.
Popular Tags:
13
2005_0707japanese.pdf Technical Archives DATE: 7 July 2005 CLIENT: Keiyo Gas, Ltd., Japan DEMONSTRATION SITE: TRIC Tools, Inc., Alameda, CA OBJECTIVE: Assess performance of various steel pipe splitting heads with TRIC pullers PROJECT LOG
Transcript
Page 1: 2005 07 Japan

2005_0707japanese.pdf

Technical Archives

DATE: 7 July 2005

CLIENT: Keiyo Gas, Ltd., Japan

DEMONSTRATION SITE: TRIC Tools, Inc., Alameda, CA

OBJECTIVE: Assess performance of various steel pipe splitting heads with TRIC pullers

PROJECT LOG

Page 2: 2005 07 Japan

2005_0707japanese.pdf 2

Ductile iron experiment.

Page 3: 2005 07 Japan

2005_0707japanese.pdf �

An attentive Mr. Ohara.

Page 4: 2005 07 Japan

2005_0707japanese.pdf �

Pipe and coupling samples from Japan.

Page 5: 2005 07 Japan

2005_0707japanese.pdf 5

Measuring steel pipe expansion and splitting force.

Page 6: 2005 07 Japan

2005_0707japanese.pdf �

Checking hydraulic pressure.

Page 7: 2005 07 Japan

2005_0707japanese.pdf 7

Discussing pipe material and expansion in various potential ground conditions.

Page 8: 2005 07 Japan

2005_0707japanese.pdf �

TRIC 2�-ton ram with McElroy head.

Page 9: 2005 07 Japan

2005_0707japanese.pdf �

Steel splitting with TRIC long profile 6” head and McElroy graduating bladed head.

Page 10: 2005 07 Japan

2005_0707japanese.pdf 10

McElroy head in 4” steel pipe.

Page 11: 2005 07 Japan

2005_0707japanese.pdf 11

Early long profile TRIC 6” head.

Page 12: 2005 07 Japan

2005_0707japanese.pdf 12

TRIC standard 6” head behind McElroy head, upsizing 4” steel pipe.

Page 13: 2005 07 Japan

2005_0707japanese.pdf 1�

An evening at Pac Bell Park.


Recommended