New Sheet Piled retaining wall toaccommodate carriageway widening.Existing bank profile to remain as present

New Sheet Piled retaining wall toaccommodate carriageway widening.Existing bank profile to remain as present

Carriageway widened andapproach lanes extended toincrease capacity at roundabout

Carriageway widening

Carriageway widening to facilitateadditional lane on roundabout

Carriageway widening

Carriageway widened and additionalapproach lane constructed toincrease capacity at roundabout

All Existing pedestrian and cycleroutes (Sustrans routes 42 &45)to remain as existing

Longford Roundabout

A40(T)

N

A40/A417 Roundabout OverviewGloucestershire County Council together with GFirst LEP, are proposing to undertake highway improvement works to the A40 Over Roundabout. The scheme is planned to start early 2018 and will comprise of the following elements:

• A417 Southbound: widening of the southbound approach to the roundabout entry to extend three approach lanes at the junction Give Way line

• A40 Westbound: widening of the westbound approach to the roundabout entry to extend three lanes at the junction Give Way line

• A40 Roundabout Circulatory: the addition of a third circulatory lane