APQPADVANCED PRODUCT QUALITY PLANNING
TRAINING COURSE
&
&
7/24/2019 apqp-140613215749-phpapp01
2/68
KEY OBJE CTIV E TARGE T
7/24/2019 apqp-140613215749-phpapp01
3/68
7/24/2019 apqp-140613215749-phpapp01
4/68
What is APQP ?
A = Advanced
P = Product Mass Products Q = Quality
P = Planning
7/24/2019 apqp-140613215749-phpapp01
5/68
ADVANCED ?
Control Plan
FMEA
SPCMSA
Team Planning 5W 2H + Core Tools Implementation
APQP
Process Flow
7/24/2019 apqp-140613215749-phpapp01
6/68
CSRCustomer Specific Requirements
7/24/2019 apqp-140613215749-phpapp01
7/68
4M1E APQP 4M (APQP Phase 3)
MachineMaterial
MethodsEnvironmentMan
Process Flow Chart
Work Instructions
MSAPFMEA
Control Plan
skill Operator
spec MachineMaterial Handing
Fixture / Tooling Tool life
CustomerRequirements
CustomerSatisfaction
parameters
Check Sheets
SPC
7/24/2019 apqp-140613215749-phpapp01
8/68
7/24/2019 apqp-140613215749-phpapp01
9/68
FAIL TO PLAN IS PLANNING TO FAIL !!!
7/24/2019 apqp-140613215749-phpapp01
10/68
EXERCISE
Brain Storm With Your Group
Strength & Weakness of APQP Activity
7/24/2019 apqp-140613215749-phpapp01
11/68
APQP
Management
Technical
7/24/2019 apqp-140613215749-phpapp01
12/68
/
Time
Problem
7/24/2019 apqp-140613215749-phpapp01
13/68
Core Team
Supporters
Sale
Purchase
Store
HR
Safety Supplier
Customer
Specialist
Engineering Production
QA - QC
Maintenance
Tooling
APQP Team Cross Functional Team
Multidisciplinary Approach
7/24/2019 apqp-140613215749-phpapp01
14/68
RiskAnalysis
ManufacturingFeasibility
7/24/2019 apqp-140613215749-phpapp01
15/68
Example : Mfg. Feasibility & Risk Analysis
7/24/2019 apqp-140613215749-phpapp01
16/68
7/24/2019 apqp-140613215749-phpapp01
17/68
APQP TIMING PLANS
7/24/2019 apqp-140613215749-phpapp01
18/68
APQP Monitoring Report
7/24/2019 apqp-140613215749-phpapp01
19/68
APQP Timing Chart
Plan & DefineProgramme
Product Design &
Development
Verification
Product & ProcessValidation
Feedback Assessment& Corrective Action
Reliability &Quality Goals
Pre PFC
Pre SC of
Product &
Process
ManagementSupport
DFMEADrawing
Eng Spec
Material
Spec
Prototype CP
ManagementSupport
PFC + SCFloor Plant
PFMEA
Ppk Plan
Pre Launch CP
MSA Plan
Packing Std.
Training Plan
ManagementSupport
Training RecordProduction Trial
MSA Result
Ppk Result
Validation Test
Production CP
PPAP
Sign Off
ManagementSupport
CustomerSatisfaction
QCD
Reduction
Variation
Lesson Learned
ManagementSupport
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
7/24/2019 apqp-140613215749-phpapp01
20/68
APQP : Phase 1
Plan and Define Program
7/24/2019 apqp-140613215749-phpapp01
21/68
APQP Timing Chart
Plan & DefineProgramme
Product Design &
Development
Verification
Product & ProcessValidation
Feedback Assessment& Corrective Action
Reliability &
Quality Goals
Pre PFC
Pre SC of
Product &
Process
ManagementSupport
DFMEA
Drawing
Eng Spec
Material
Spec
Prototype CP
ManagementSupport
PFC + SC
Floor Plant
PFMEA
Ppk Plan
Pre Launch CP
MSA Plan
Packing Std.
Training Plan
ManagementSupport
Training Record
Production Trial
MSA Result
Ppk Result
Validation Test
Production CP
PPAP
Sign Off
ManagementSupport
Customer
Satisfaction
QCD
Reduction
Variation
Lesson Learned
ManagementSupport
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
7/24/2019 apqp-140613215749-phpapp01
22/68
EXERCISE
Brain Storm With Your Group
What to Plan on Your APQP Activity
7/24/2019 apqp-140613215749-phpapp01
23/68
PHASE1:
Requirements & Needs
Expectations
Claim Complaint
Quality Defect M/C Capacity
Delivery Performance
Target P-Q-C-D
Performance (2P)
Reliability & Warrantee
Benchmark
7/24/2019 apqp-140613215749-phpapp01
24/68
Phase 1 : Outputs
Cycle Time
Productivity Cost Per Unit
Defect Rate (PPM or DPM)
Process Capability Product Performance
7/24/2019 apqp-140613215749-phpapp01
25/68
APQP : Phase 2
Product Design & Development
7/24/2019 apqp-140613215749-phpapp01
26/68
APQP Timing Chart
Plan & DefineProgramme
Product Design &
DevelopmentVerification
Product & ProcessValidation
Feedback Assessment& Corrective Action
Reliability &
Quality Goals
Pre PFC
Pre SC of
Product &
Process
ManagementSupport
DFMEA
Drawing
Eng Spec
Material
Spec
Prototype CP
ManagementSupport
PFC + SC
Floor Plant
PFMEA
Ppk Plan
Pre Launch CP
MSA Plan
Packing Std.Training Plan
ManagementSupport
Training Record
Production Trial
MSA Result
Ppk Result
Validation Test
Production CP
PPAPSign Off
ManagementSupport
Customer
Satisfaction
QCD
Reduction
Variation
Lesson Learned
ManagementSupport
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
7/24/2019 apqp-140613215749-phpapp01
27/68
APQP : Phase 3
Process Design & Development
7/24/2019 apqp-140613215749-phpapp01
28/68
APQP Timing Chart
Plan & DefineProgramme
Product Design &
DevelopmentVerification
Product & ProcessValidation
Feedback Assessment& Corrective Action
Reliability &
Quality Goals
Pre PFC
Pre SC of
Product &
Process
ManagementSupport
DFMEA
Drawing
Eng Spec
Material
Spec
Prototype CP
ManagementSupport
PFC + SC
Floor Plant
PFMEA
Ppk Plan
Pre Launch CP
MSA Plan
Packing Std.Training Plan
ManagementSupport
Training Record
Production Trial
MSA Result
Ppk Result
Validation Test
Production CP
PPAPSign Off
ManagementSupport
Customer
Satisfaction
QCD
Reduction
Variation
Lesson Learned
ManagementSupport
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
P Fl Ch t PFCP 3 O
7/24/2019 apqp-140613215749-phpapp01
29/68
Process Flow Chart : PFC
FMEA
PHASE 3 : OUTPUTS
7/24/2019 apqp-140613215749-phpapp01
30/68
Floor Plant Layout
PHASE 3 : OUTPUTS
Phase 3 O tp ts
7/24/2019 apqp-140613215749-phpapp01
31/68
Phase 3 : Outputs
7/24/2019 apqp-140613215749-phpapp01
32/68
FMEAFailure Mode & Effect Analysis
7/24/2019 apqp-140613215749-phpapp01
33/68
FMEAFMEAFMEAFMEA
Prioritize()
Identify ()
Reduce ()
Risks !
()
Severity ()
Occurrence ()
Detection ()
Reduce ()
Phase 3 : Outputs
7/24/2019 apqp-140613215749-phpapp01
34/68
FMEA Assessment Method
1
2
3
4
5
(Failure)
Failure
1-10
Failure
1-10
1-10
PFC Steps Failure Severity Occurrence Detection
100%
0%
S O DRPN =
Example : PFMEA
7/24/2019 apqp-140613215749-phpapp01
35/68
Example :PFMEA
(s)
7/24/2019 apqp-140613215749-phpapp01
36/68
S-Severity
7/24/2019 apqp-140613215749-phpapp01
37/68
S Severity
Please see in appendix : A
7/24/2019 apqp-140613215749-phpapp01
38/68
D-DETECTION
7/24/2019 apqp-140613215749-phpapp01
39/68
D DETECTION
D-DETECTION
7/24/2019 apqp-140613215749-phpapp01
40/68
D-DETECTION
7/24/2019 apqp-140613215749-phpapp01
41/68
7/24/2019 apqp-140613215749-phpapp01
42/68
CPControl Plans
Control Plan
7/24/2019 apqp-140613215749-phpapp01
43/68
Prototype Pre-launch Production
Control Plan
prototype
Production ControlPlan
Control Plan
7/24/2019 apqp-140613215749-phpapp01
44/68
Control Plan
Work InstructionsPHASE 3 : OUTPUTS
7/24/2019 apqp-140613215749-phpapp01
45/68
Work InstructionsPHASE 3 : OUTPUTS
Phase 3 : Outputs
7/24/2019 apqp-140613215749-phpapp01
46/68
Phase 3 : Outputs
MSA Control Plan
7/24/2019 apqp-140613215749-phpapp01
47/68
MSA Control Plan
70 WAX
1
B 2+0.5
3
SPC
(X bar-RChart)
/
/
/
MSA
MSA Control Plan
Ph 3 O t t
7/24/2019 apqp-140613215749-phpapp01
48/68
Phase 3 : Outputs
(Ppk Study Plan) (SC) Control Plan , , CSR
7/24/2019 apqp-140613215749-phpapp01
49/68
7/24/2019 apqp-140613215749-phpapp01
50/68
APQP : Phase 4
Product & Process Validation
APQP Timing Chart
7/24/2019 apqp-140613215749-phpapp01
51/68
APQP Timing Chart
Plan & DefineProgramme
Product Design &
DevelopmentVerification
Product & ProcessValidation
Feedback Assessment& Corrective Action
Reliability &
Quality GoalsPre PFC
Pre SC of
Product &
Process
ManagementSupport
DFMEA
DrawingEng Spec
Material
Spec
Prototype CP
ManagementSupport
PFC + SC
Floor PlantPFMEA
Ppk Plan
Pre Launch CP
MSA Plan
Packing Std.Training Plan
ManagementSupport
Training Record
Production TrialMSA Result
Ppk Result
Validation Test
Production CP
PPAP FileSign Off
ManagementSupport
Customer
SatisfactionQCD
Reduction
Variation
Lesson Learned
ManagementSupport
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Phase 4 : Outputs
7/24/2019 apqp-140613215749-phpapp01
52/68
Phase 4 : Outputs
(Significant production run) 4M 1E
Dimension Check Data Performance Test (If require)
Master Sample
Target Cycle Time
( MSA)
Phase 4 : Outputs
7/24/2019 apqp-140613215749-phpapp01
53/68
Phase 4 : Outputs
(MSA)
MSA Selection Procedure
7/24/2019 apqp-140613215749-phpapp01
54/68
DataType
Variable data Attribute data
Focus
Accuracy Precision
Gauge Linearity
Stability Gauge R&R Study Attribute
Agreement Analysis
Bias Study
Attribute R&R
Product Decision :
7/24/2019 apqp-140613215749-phpapp01
55/68
Good Bad
Accept (Type II Error: )
Reject (Type I Error: )
TYPE I ERROR = TYPE II ERROR =
Variation of Measurement System
7/24/2019 apqp-140613215749-phpapp01
56/68
Variation of Measurement System
Man (AV)Machine (EV)
Method Material (PV)
Environment
Product, Process MS
PHASE 4 : OUTPUTS
7/24/2019 apqp-140613215749-phpapp01
57/68
Process Capability Study
23.423.122.822.522.221.921.6
LSL USL
LSL 21.5
Target *USL 23.5
Sample Mean 22.5308
Sample N 125
StDev (Within) 0.184908
StDev (O v erall) 0.188657
Process Data
C p 1.80
C PL 1.86
C PU 1.75
C pk 1.75
Pp 1.77PPL 1.82
PPU 1.71
Ppk 1.71
C pm *
O v erall Capability
Potential (Within) C apability
PPM < LSL 0.00
P PM > U SL 0.00
PPM Total 0.00
O bserved Performance
PPM < LSL 0.01
P PM > U SL 0.08
PPM Total 0.09
Exp. Within Performance
PP M < LSL 0.02
P PM > U SL 0.14
PPM Total 0.16
Exp. Ov erall Performance
Within
Overall
Process Capability of Daimeter
OK ?
7/24/2019 apqp-140613215749-phpapp01
58/68
Ppk > 1.67 Acceptable
Ppk < 1.67 > 1.33 Needs Controls
Ppk < 1.33 100% Check
7/24/2019 apqp-140613215749-phpapp01
59/68
CpkPPM (Part Per Million)
DPM (Defect Per Million)
Cpk PPM
0.67 45,600
1.00 2,700
1.33 64
1.67 1
2.00 0.002
Phase 4 : Outputs
7/24/2019 apqp-140613215749-phpapp01
60/68
(Production Control Plan)
7/24/2019 apqp-140613215749-phpapp01
61/68
Control Plan
(ECR, ECN)
(Process Change) (Unstable) (Uncap ability) , ,
PPAP File
7/24/2019 apqp-140613215749-phpapp01
62/68
PSW: Part Submission Warrant Sample Parts
Dimension Check / Performance Test
Material Performance Test
Engineering Drawing / Design Record
Engineering Change Documents
Check Fixtures / Checking Aids Manual
Process Flow Chart
FMEA
Control Plan
Process Capability Study (Ppk, Cpk) Measurement System Analysis
Lab Accreditation & Scope
7/24/2019 apqp-140613215749-phpapp01
63/68
APQP : Phase 5
Feedback, Assessment & Corrective Action
7/24/2019 apqp-140613215749-phpapp01
64/68
7/24/2019 apqp-140613215749-phpapp01
65/68
7/24/2019 apqp-140613215749-phpapp01
66/68
Q & A
end of presentation
FEEDBACK or CONTACT US
7/24/2019 apqp-140613215749-phpapp01
67/68
7/24/2019 apqp-140613215749-phpapp01
68/68
Thank YouCONTACT US: