    APQPADVANCED PRODUCT QUALITY PLANNING

    TRAINING COURSE

    &

    &

  • 7/24/2019 apqp-140613215749-phpapp01

    2/68

    KEY OBJE CTIV E TARGE T

  • 7/24/2019 apqp-140613215749-phpapp01

    3/68

  • 7/24/2019 apqp-140613215749-phpapp01

    4/68

    What is APQP ?

    A = Advanced

    P = Product Mass Products Q = Quality

    P = Planning

  • 7/24/2019 apqp-140613215749-phpapp01

    5/68

    ADVANCED ?

    Control Plan

    FMEA

    SPCMSA

    Team Planning 5W 2H + Core Tools Implementation

    APQP

    Process Flow

  • 7/24/2019 apqp-140613215749-phpapp01

    6/68

    CSRCustomer Specific Requirements

  • 7/24/2019 apqp-140613215749-phpapp01

    7/68

    4M1E APQP 4M (APQP Phase 3)

    MachineMaterial

    MethodsEnvironmentMan

    Process Flow Chart

    Work Instructions

    MSAPFMEA

    Control Plan

    skill Operator

    spec MachineMaterial Handing

    Fixture / Tooling Tool life

    CustomerRequirements

    CustomerSatisfaction

    parameters

    Check Sheets

    SPC

  • 7/24/2019 apqp-140613215749-phpapp01

    8/68

  • 7/24/2019 apqp-140613215749-phpapp01

    9/68

    FAIL TO PLAN IS PLANNING TO FAIL !!!

  • 7/24/2019 apqp-140613215749-phpapp01

    10/68

    EXERCISE

    Brain Storm With Your Group

    Strength & Weakness of APQP Activity

  • 7/24/2019 apqp-140613215749-phpapp01

    11/68

    APQP

    Management

    Technical

  • 7/24/2019 apqp-140613215749-phpapp01

    12/68

    /

    Time

    Problem

  • 7/24/2019 apqp-140613215749-phpapp01

    13/68

    Core Team

    Supporters

    Sale

    Purchase

    Store

    HR

    Safety Supplier

    Customer

    Specialist

    Engineering Production

    QA - QC

    Maintenance

    Tooling

    APQP Team Cross Functional Team

    Multidisciplinary Approach

  • 7/24/2019 apqp-140613215749-phpapp01

    14/68

    RiskAnalysis

    ManufacturingFeasibility

  • 7/24/2019 apqp-140613215749-phpapp01

    15/68

    Example : Mfg. Feasibility & Risk Analysis

  • 7/24/2019 apqp-140613215749-phpapp01

    16/68

  • 7/24/2019 apqp-140613215749-phpapp01

    17/68

    APQP TIMING PLANS

  • 7/24/2019 apqp-140613215749-phpapp01

    18/68

    APQP Monitoring Report

  • 7/24/2019 apqp-140613215749-phpapp01

    19/68

    APQP Timing Chart

    Plan & DefineProgramme

    Product Design &

    Development

    Verification

    Product & ProcessValidation

    Feedback Assessment& Corrective Action

    Reliability &Quality Goals

    Pre PFC

    Pre SC of

    Product &

    Process

    ManagementSupport

    DFMEADrawing

    Eng Spec

    Material

    Spec

    Prototype CP

    ManagementSupport

    PFC + SCFloor Plant

    PFMEA

    Ppk Plan

    Pre Launch CP

    MSA Plan

    Packing Std.

    Training Plan

    ManagementSupport

    Training RecordProduction Trial

    MSA Result

    Ppk Result

    Validation Test

    Production CP

    PPAP

    Sign Off

    ManagementSupport

    CustomerSatisfaction

    QCD

    Reduction

    Variation

    Lesson Learned

    ManagementSupport

    Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

  • 7/24/2019 apqp-140613215749-phpapp01

    20/68

    APQP : Phase 1

    Plan and Define Program

  • 7/24/2019 apqp-140613215749-phpapp01

    21/68

    APQP Timing Chart

    Plan & DefineProgramme

    Product Design &

    Development

    Verification

    Product & ProcessValidation

    Feedback Assessment& Corrective Action

    Reliability &

    Quality Goals

    Pre PFC

    Pre SC of

    Product &

    Process

    ManagementSupport

    DFMEA

    Drawing

    Eng Spec

    Material

    Spec

    Prototype CP

    ManagementSupport

    PFC + SC

    Floor Plant

    PFMEA

    Ppk Plan

    Pre Launch CP

    MSA Plan

    Packing Std.

    Training Plan

    ManagementSupport

    Training Record

    Production Trial

    MSA Result

    Ppk Result

    Validation Test

    Production CP

    PPAP

    Sign Off

    ManagementSupport

    Customer

    Satisfaction

    QCD

    Reduction

    Variation

    Lesson Learned

    ManagementSupport

    Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

  • 7/24/2019 apqp-140613215749-phpapp01

    22/68

    EXERCISE

    Brain Storm With Your Group

    What to Plan on Your APQP Activity

  • 7/24/2019 apqp-140613215749-phpapp01

    23/68

    PHASE1:

    Requirements & Needs

    Expectations

    Claim Complaint

    Quality Defect M/C Capacity

    Delivery Performance

    Target P-Q-C-D

    Performance (2P)

    Reliability & Warrantee

    Benchmark

  • 7/24/2019 apqp-140613215749-phpapp01

    24/68

    Phase 1 : Outputs

    Cycle Time

    Productivity Cost Per Unit

    Defect Rate (PPM or DPM)

    Process Capability Product Performance

  • 7/24/2019 apqp-140613215749-phpapp01

    25/68

    APQP : Phase 2

    Product Design & Development

  • 7/24/2019 apqp-140613215749-phpapp01

    26/68

    APQP Timing Chart

    Plan & DefineProgramme

    Product Design &

    DevelopmentVerification

    Product & ProcessValidation

    Feedback Assessment& Corrective Action

    Reliability &

    Quality Goals

    Pre PFC

    Pre SC of

    Product &

    Process

    ManagementSupport

    DFMEA

    Drawing

    Eng Spec

    Material

    Spec

    Prototype CP

    ManagementSupport

    PFC + SC

    Floor Plant

    PFMEA

    Ppk Plan

    Pre Launch CP

    MSA Plan

    Packing Std.Training Plan

    ManagementSupport

    Training Record

    Production Trial

    MSA Result

    Ppk Result

    Validation Test

    Production CP

    PPAPSign Off

    ManagementSupport

    Customer

    Satisfaction

    QCD

    Reduction

    Variation

    Lesson Learned

    ManagementSupport

    Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

  • 7/24/2019 apqp-140613215749-phpapp01

    27/68

    APQP : Phase 3

    Process Design & Development

  • 7/24/2019 apqp-140613215749-phpapp01

    28/68

    APQP Timing Chart

    Plan & DefineProgramme

    Product Design &

    DevelopmentVerification

    Product & ProcessValidation

    Feedback Assessment& Corrective Action

    Reliability &

    Quality Goals

    Pre PFC

    Pre SC of

    Product &

    Process

    ManagementSupport

    DFMEA

    Drawing

    Eng Spec

    Material

    Spec

    Prototype CP

    ManagementSupport

    PFC + SC

    Floor Plant

    PFMEA

    Ppk Plan

    Pre Launch CP

    MSA Plan

    Packing Std.Training Plan

    ManagementSupport

    Training Record

    Production Trial

    MSA Result

    Ppk Result

    Validation Test

    Production CP

    PPAPSign Off

    ManagementSupport

    Customer

    Satisfaction

    QCD

    Reduction

    Variation

    Lesson Learned

    ManagementSupport

    Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

    P Fl Ch t PFCP 3 O

  • 7/24/2019 apqp-140613215749-phpapp01

    29/68

    Process Flow Chart : PFC

    FMEA

    PHASE 3 : OUTPUTS

  • 7/24/2019 apqp-140613215749-phpapp01

    30/68

    Floor Plant Layout

    PHASE 3 : OUTPUTS

    Phase 3 O tp ts

  • 7/24/2019 apqp-140613215749-phpapp01

    31/68

    Phase 3 : Outputs

  • 7/24/2019 apqp-140613215749-phpapp01

    32/68

    FMEAFailure Mode & Effect Analysis

  • 7/24/2019 apqp-140613215749-phpapp01

    33/68

    FMEAFMEAFMEAFMEA

    Prioritize()

    Identify ()

    Reduce ()

    Risks !

    ()

    Severity ()

    Occurrence ()

    Detection ()

    Reduce ()

    Phase 3 : Outputs

  • 7/24/2019 apqp-140613215749-phpapp01

    34/68

    FMEA Assessment Method

    1

    2

    3

    4

    5

    (Failure)

    Failure

    1-10

    Failure

    1-10

    1-10

    PFC Steps Failure Severity Occurrence Detection

    100%

    0%

    S O DRPN =

    Example : PFMEA

  • 7/24/2019 apqp-140613215749-phpapp01

    35/68

    Example :PFMEA

    (s)

  • 7/24/2019 apqp-140613215749-phpapp01

    36/68

    S-Severity

  • 7/24/2019 apqp-140613215749-phpapp01

    37/68

    S Severity

    Please see in appendix : A

  • 7/24/2019 apqp-140613215749-phpapp01

    38/68

    D-DETECTION

  • 7/24/2019 apqp-140613215749-phpapp01

    39/68

    D DETECTION

    D-DETECTION

  • 7/24/2019 apqp-140613215749-phpapp01

    40/68

    D-DETECTION

  • 7/24/2019 apqp-140613215749-phpapp01

    41/68

  • 7/24/2019 apqp-140613215749-phpapp01

    42/68

    CPControl Plans

    Control Plan

  • 7/24/2019 apqp-140613215749-phpapp01

    43/68

    Prototype Pre-launch Production

    Control Plan

    prototype

    Production ControlPlan

    Control Plan

  • 7/24/2019 apqp-140613215749-phpapp01

    44/68

    Control Plan

    Work InstructionsPHASE 3 : OUTPUTS

  • 7/24/2019 apqp-140613215749-phpapp01

    45/68

    Work InstructionsPHASE 3 : OUTPUTS

    Phase 3 : Outputs

  • 7/24/2019 apqp-140613215749-phpapp01

    46/68

    Phase 3 : Outputs

    MSA Control Plan

  • 7/24/2019 apqp-140613215749-phpapp01

    47/68

    MSA Control Plan

    70 WAX

    1

    B 2+0.5

    3

    SPC

    (X bar-RChart)

    /

    /

    /

    MSA

    MSA Control Plan

    Ph 3 O t t

  • 7/24/2019 apqp-140613215749-phpapp01

    48/68

    Phase 3 : Outputs

    (Ppk Study Plan) (SC) Control Plan , , CSR

  • 7/24/2019 apqp-140613215749-phpapp01

    49/68

  • 7/24/2019 apqp-140613215749-phpapp01

    50/68

    APQP : Phase 4

    Product & Process Validation

    APQP Timing Chart

  • 7/24/2019 apqp-140613215749-phpapp01

    51/68

    APQP Timing Chart

    Plan & DefineProgramme

    Product Design &

    DevelopmentVerification

    Product & ProcessValidation

    Feedback Assessment& Corrective Action

    Reliability &

    Quality GoalsPre PFC

    Pre SC of

    Product &

    Process

    ManagementSupport

    DFMEA

    DrawingEng Spec

    Material

    Spec

    Prototype CP

    ManagementSupport

    PFC + SC

    Floor PlantPFMEA

    Ppk Plan

    Pre Launch CP

    MSA Plan

    Packing Std.Training Plan

    ManagementSupport

    Training Record

    Production TrialMSA Result

    Ppk Result

    Validation Test

    Production CP

    PPAP FileSign Off

    ManagementSupport

    Customer

    SatisfactionQCD

    Reduction

    Variation

    Lesson Learned

    ManagementSupport

    Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

    Phase 4 : Outputs

  • 7/24/2019 apqp-140613215749-phpapp01

    52/68

    Phase 4 : Outputs

    (Significant production run) 4M 1E

    Dimension Check Data Performance Test (If require)

    Master Sample

    Target Cycle Time

    ( MSA)

    Phase 4 : Outputs

  • 7/24/2019 apqp-140613215749-phpapp01

    53/68

    Phase 4 : Outputs

    (MSA)

    MSA Selection Procedure

  • 7/24/2019 apqp-140613215749-phpapp01

    54/68

    DataType

    Variable data Attribute data

    Focus

    Accuracy Precision

    Gauge Linearity

    Stability Gauge R&R Study Attribute

    Agreement Analysis

    Bias Study

    Attribute R&R

    Product Decision :

  • 7/24/2019 apqp-140613215749-phpapp01

    55/68

    Good Bad

    Accept (Type II Error: )

    Reject (Type I Error: )

    TYPE I ERROR = TYPE II ERROR =

    Variation of Measurement System

  • 7/24/2019 apqp-140613215749-phpapp01

    56/68

    Variation of Measurement System

    Man (AV)Machine (EV)

    Method Material (PV)

    Environment

    Product, Process MS

    PHASE 4 : OUTPUTS

  • 7/24/2019 apqp-140613215749-phpapp01

    57/68

    Process Capability Study

    23.423.122.822.522.221.921.6

    LSL USL

    LSL 21.5

    Target *USL 23.5

    Sample Mean 22.5308

    Sample N 125

    StDev (Within) 0.184908

    StDev (O v erall) 0.188657

    Process Data

    C p 1.80

    C PL 1.86

    C PU 1.75

    C pk 1.75

    Pp 1.77PPL 1.82

    PPU 1.71

    Ppk 1.71

    C pm *

    O v erall Capability

    Potential (Within) C apability

    PPM < LSL 0.00

    P PM > U SL 0.00

    PPM Total 0.00

    O bserved Performance

    PPM < LSL 0.01

    P PM > U SL 0.08

    PPM Total 0.09

    Exp. Within Performance

    PP M < LSL 0.02

    P PM > U SL 0.14

    PPM Total 0.16

    Exp. Ov erall Performance

    Within

    Overall

    Process Capability of Daimeter

    OK ?

  • 7/24/2019 apqp-140613215749-phpapp01

    58/68

    Ppk > 1.67 Acceptable

    Ppk < 1.67 > 1.33 Needs Controls

    Ppk < 1.33 100% Check

  • 7/24/2019 apqp-140613215749-phpapp01

    59/68

    CpkPPM (Part Per Million)

    DPM (Defect Per Million)

    Cpk PPM

    0.67 45,600

    1.00 2,700

    1.33 64

    1.67 1

    2.00 0.002

    Phase 4 : Outputs

  • 7/24/2019 apqp-140613215749-phpapp01

    60/68

    (Production Control Plan)

  • 7/24/2019 apqp-140613215749-phpapp01

    61/68

    Control Plan

    (ECR, ECN)

    (Process Change) (Unstable) (Uncap ability) , ,

    PPAP File

  • 7/24/2019 apqp-140613215749-phpapp01

    62/68

    PSW: Part Submission Warrant Sample Parts

    Dimension Check / Performance Test

    Material Performance Test

    Engineering Drawing / Design Record

    Engineering Change Documents

    Check Fixtures / Checking Aids Manual

    Process Flow Chart

    FMEA

    Control Plan

    Process Capability Study (Ppk, Cpk) Measurement System Analysis

    Lab Accreditation & Scope

  • 7/24/2019 apqp-140613215749-phpapp01

    63/68

    APQP : Phase 5

    Feedback, Assessment & Corrective Action

  • 7/24/2019 apqp-140613215749-phpapp01

    64/68

  • 7/24/2019 apqp-140613215749-phpapp01

    65/68

  • 7/24/2019 apqp-140613215749-phpapp01

    66/68

    Q & A

    end of presentation

    FEEDBACK or CONTACT US

  • 7/24/2019 apqp-140613215749-phpapp01

    67/68

  • 7/24/2019 apqp-140613215749-phpapp01

    68/68