AUTONOMÍAOPEN PIT

BOOST PRODUCTIVITY

IMPROVE EFFICIENCY

REDUCE OVERALL COST

INCREASE PROFITABILITY

SOMETHING FOR EVERY MINE

HAULING

COMMAND APPLICATIONS

TITLE OF PRESENTATION

SUBHEADING HERE

5 // CODELCO DRT RFP   // CONFIDENTIAL & PROPRIETARY

313

31

55

76

110

223

2012 2013 2014 2015 2016 2017 2018

CATERPILLAR AUTONOMOUS TRUCKS

Country Customer Mine Site Model Material Year N° of Trucks

USA BHP BILLITON NAVAJO 793 ---

AUSTRALIA FMG Fortescue SOMOLON 793F Iron Ore 2013 70

AUSTRALIA BHP BILLITON JIMBLEBAR 793F Iron Ore 2013 50

BRASIL XX XXX 793F Iron Ore 2016 XX

CANADA IMPERIAL OIL KEARL 797F Oil Sand 2017 XX

AUSTRALIA FMG Fortescue CHICHESTER793F

930E-4

789D

Iron Ore 2018 100

AUSTRALIA RIO TINTO MARANDOO 793F Iron Ore 2018 19

CANADA XX XX 793F Copper 2018 XX

Differentiation

Safety

Layers of Protection – Field Validated

Capacity▪ Designed for the largest operations

150+ trucks

▪ No design limit on trucks or auxiliary

▪ Distributed processing – smart trucks

▪ All types of operations

Flexibility▪ Work with existing operations

▪ Vehicle following & control zones

▪ Rapid, robust design capability

▪ “No limitations” road network design

Integration People & Process▪ MineStar System

▪ Proven components, thousands of

applications

▪ Common survey, mapping and

planning

▪ Caterpillar expert instructors

▪ First of its kind simulation system

▪ Train Command staff in the environment

▪ Defined Safety and production processes

TITLE OF PRESENTATION

SUBHEADING HERE

9 // CODELCO DRT RFP   // CONFIDENTIAL & PROPRIETARY

Interoperability Brand agnostic

Retrofit strategies

APLICATION & REAL RESULTS

ROAD TO

AUTONOMOUS

MINING

TITLE OF PRESENTATION

SUBHEADING HERESource: Metalytics

China's Iron Ore Supply CFR Costs(including royalties & ocean freight)

Moving down the global cost curve

Strategic del ivery

Culture, continuous

improvement, speed and

flexibility maximise asset

base

Cosistet 165mtpa

Lowering costs to US$13/wmt

Maximising cash flows

Debt repayment

Expect further improvements