AVC COLLEGE OF ENGINEERING. MANNAMPANDAL MAYILADUTHURAI REVIEW 2. STUDY ON REPAIR AND MAINTENANCE OF LPG STORAGE BULLET. PROJECT GUIDES. TEAM MEMBERS. INTERNAL GUIDE Mr.S.KANNAN , M.E., ( Ph.D ), ASSOCIATE PROFESSOR, AVC COLLEGE OF ENGG. EXTERNAL GUIDE Mr.S.DEEPAK,B.Tech , - PowerPoint PPT Presentation

transcript

AVC COLLEGE OF ENGINEERING

MANNAMPANDAL

MAYILADUTHURAI

REVIEW 2

April 21, 20231

STUDY ON REPAIR AND MAINTENANCE OF LPG STORAGE BULLET

PROJECT GUIDES TEAM MEMBERS

INTERNAL GUIDE

Mr.S.KANNAN, M.E., (Ph.D),ASSOCIATE PROFESSOR,

AVC COLLEGE OF ENGG.

EXTERNAL GUIDE

Mr.S.DEEPAK,B.Tech,(MAINT/PLANNING-PROJECTS),

CPCL PANNANGUDI.

M.ANAND (80107144005)

P.SENTHILKUMAR (80107144045)

S.SUDHARSANAN (80107144048)

G.PRABHU (80107144504)FINAL MECHANICAL

April 21, 20232

OBJECTIVE

To study about the Maintenance and Repair of the LPG bullets in Chennai Petroleum Corporation Ltd (CPCL).

To make recommendations for the recurring problem.

April 21, 20233

BULLET

Bullet is a LPG storage unit used in the oil refinery Industries.

It is look like in the shape of diesel or petrol tankers in the lorries.

April 21, 20234

LPG STORAGE BULLET

April 21, 20235

BULLET SPECIFICATIONS

Diameter : 4m

Length : 16m

Wall Thickness : 28 mm to 32 mm

Material : SA 516 Gr70(high quality

carbon steel)

Design code : ASME sec 8 div1-1989

Operating temp : 450c Hydrostatic pressure : 22.5 Kg/cm2April 21, 20236

2D VIEW OF LPG STORAGE BULLET

April 21, 20237

BULLET DIAGRAMS

April 21, 20238

SECTIONAL VIEW OF THE BULLET

April 21, 20239

BULLET MATERIALMATERIAL SA 516 GR 70

It is a high quality carbon steel plate for boiler and pressure vessel.

Carbon : 0.27-0.31% Manganese : 0.79-1.3% Phosphorous : 0.035%max Sulphur : 0.035%max Silicon : 0.13-0.45%

April 21, 202310

Maintenance methodology (Existing)

De commissioning Erection of scaffolding Cleaning inside the bullet for NDT tests Ultrasonic Flaw Detection Testing Ultrasonic thickness measurement Hardness testing Spot Radiography tests Cleaning outside the bullet for NDT tests Nozzle replacement Stress relieving process Hydro testing of bullets Box up the nozzles

April 21, 202311

After studying about the existing maintenance methodology the frequently faced problems were found out.

April 21, 202312

PROBLEMS FACED:

It was observed that shell external, shell nozzles, nozzles flanges were found heavily corroded.

Therefore nozzles and nozzle flanges were replaced with approval from Chief controller of Explosives, Nagpur.

Maintenance cost was increased due to replacement of nozzles.

Downtime is also increased.April 21, 202313

RECOMMENDATION

Insulation to be provided and aluminium sheet to be covered over the insulation (or) to reduce the external corrosion around the bullet every year it should be painted.

April 21, 202314

April 21, 202315

April 21, 202316

April 21, 202317

Existing maintenance cost

For 40 years (the life time of the plant)

Total maintenance action – 8 timesTotal maintenance cost – 2 croresi.e.8times X 25 lakhs = 2 crores.

April 21, 202318

According to our recommendations

Total cost for insulation material with Aluminium cover plate Rs.100000.

Total cost for water sealing compounds with shed arrangement is Rs.20000.

(including labour cost)

April 21, 202319

LIFE TIME OF THE BULLET AND SAVING COST NOZZLES. By providing the insulation with Aluminium cover

plate we can increase the life from 5 years to 8 years.

The capacity of the plant is 40 years.

i.e. for 8 times X 5 years = 2 crores. (25 lakhs per time)

for 5 times X 8 years = 1.25 crores. (25 lakhs per time)

So that the maintenance cost is reduced up to 75 lakhs

April 21, 202320

For providing Aluminium plate covering with insulation

April 21, 202321

By providing the water sealing compounds with the shed type arrangement we can increase the life time of the nozzle form 5 to 6 years.

The capacity of the plant is 40 years.

i.e. for 8 times X 5 years = 2 crores. (25 lakhs per time)

for 7 times X 8 years = 1.75 crores. (25 lakhs per time)

So that the maintenance cost is reduced up to 25 lakhs (approximately.)

April 21, 202322

For providing water sealing compound

April 21, 202323

ADVANTAGES Maintenance cost is reduced. Life time of the nozzle is increased. Downtime is also decreased. It is one of the method to avoid the major LPG

tank accident

April 21, 202324

April 21, 202325