BAB A 100, Spandauer-Damm-Brücke, Berlin, Germany

ClientSenate Department for Urban DevelopmentDepartment Civil EngineeringWürttembergische Straße 6, 10707 Berlin

Contact PersonMr Dipl.- Eng. Detlef Wolber;

Range of activitiesPlanning, Preparation for awarding the contract,Constructive Examination and Equalisation

LocationSpandauer Damm Brücke, Berlin, Germany

Capital expenditure36.000.000 Euro;

Period of realisation2007 - 2010

The Spandauer Damm Bridge is in terms of traffic arather important overpass in Berlin. It crosses the federalmotorway BAB A 100, the main-line railway and therailway of the S-Bahn and needed reconstruction due tomaterial fatigue of the prestressed concretesuperstructure. This superstructure will be replaced by anew construction with two composite steel and concretebridges. The replacement of the complex of slopesleading to the BAB A 100 including slopes Northeast,Northwest and Southeast, the adaptation of slopeSouthwest as well as the construction of two more roadsign bridges is still necessary, due to an altered trafficrouteing in the transportation hub and the existence ofdamage on the structure.

Overview of the range of activities:Demolition concrete: 9,000 m²Reconstruction concrete: 1,200 m²Reconstruction reinforced concrete: 1,900 tonsReconstruction constructional steelwork: 1,300 tonsReconstruction auger piles: 4,400 mReplacement road construction: 15,000 m²

Writing the terms of reference was accompanied with astrict observance of dead lines and a great effort onterms of agreement.

Verification

Planning

Support StructurePlanning Project Management

Energy Efficiency

Building Physics

Fire Protection

Site Management

Expertises

Studies

Competition

HSE

Building Construction

Civil Engineering

Bridge Construction

Special Design

Dynamics