Post on 20-Jun-2020
transcript
Befimmo,
shiftmaker
Presentation Éditions & Séminaires9 octobre 2019
The Belgian specialist in work environments
2
Agile approach in a fast moving environment
3
Proactivemanagement of quality workenvironments withcity centre focus in a Belux network
Offering flexibility, community & services
Future proofdevelopments tocreate value in a low yieldingenvironment
Emergence of new technologies and digital revolution
Talent attraction
Work-life balanceand well-being
Metropolisation
Mobility
Environmental concerns
A dynamic office player
Coworking solution to evolving needs
6
« Office tenants seeflexible coworking concepts no longer as just a way to manage costs, but also as a way to innovate, worktogether with otherentrepreneurs and to attract talent. »
CBRE Netherlands – Rudolf de Boer – Managing Director
Silversquare, Belgian pioneer in coworking
P 8
Louise area
Brussels CBD
Luxembourg city
G-D of Luxembourg
Louise area
Brussels CBD
University area
Brussels decentralized
Leopold area
Brussels CBD
+300Events/year
+1300Members
Companies
Ambitious pipeline to expand the network
P 9
Brussels CBD Brussels CBD Liège Brussels CBD Brussels CBD Brussels CBDBrussels periphery
OpeningSilversquare
Silversquare occupancy: 43%
Silversquare occupancy: 83%
Silversquare occupancy: >90%
Opening food« Les Compagnons »
10
Triomphe, a success story
Brussels North area, a lot of assets
12
Brussels North area, Up4North
13
Up4North was created in 2016 on the initiative of
AG Real Estate & BefimmoWin
Residents and
workers
WinBrussels Region
WinReal-estate owners
Up4North, temporary occupation WTC
14
ZIN, a unique on-site cocreation process
P 15
ZIN | A smooth process
P 16
31.12.2016 31.12.2017 31.12.2018
Lease WTC 2
Befimmo participatingin the public tender of
the “Vlaamse Overheid”October 2017
Permit introduction
July 2018
Temporary occupation WTC 1 andco-creation process
Permit expected2020
Call for projects in order to form a team of
ArchitectsSeptember 2017
70,000 m² preletto the “Vlaamse
Overheid”&
Start of phase 1 of worksQ1 2019
End of lease WTC 231 December 2018
Delivery of ZIN2023
Start of the 18 yearslease with the
“Vlaamse Overheid”
International architecture consultation
December 2016
Founding of Up4NorthOctober 2016
A true multifunctional project
70 000 m² of offices
2023Completion
240 hotel rooms
127 appartments
ZIN, making city
18
ZIN, making city
19
ZIN, a new dimension of multifunctionality
20
ZIN, a new dimension of multifunctionality
21
Office floorAppartments
Hotel
ZIN, spacious office floors
P 22
Office floor of >4,000 m²70,000 m² spread over 14 floors
ZIN, spacious office floors with natural light
23
ZIN, a prototype for circular building
P 27
ZIN, building as material bank
P 28
ZIN, towards real energy neutrality
P 29
30
P 31
08.10.19 / Titre de la présentation (menu "Insertion / En-tête et pied de page") P 32
P 33
P 34
P 35
P 36
08.10.19 / Titre de la présentation (menu "Insertion / En-tête et pied de page") P 37
ZIN | Movie “Living building”
Thank you!
Pictures for illustrative purposes. Permit application in progress.