BIM FOR PROJECT MANAGEMENT

Summary of our Services in different Phase of Project

ENGINEERING* Collaboration & Integration

* Clash Management

CONSTRUCTION* Better supervision on contractor procurement of bulk materials or catalogue items

* Single source of truth

* 4D Analysis & Visualized Report

* Change managements

COMISSIONING* Progressive Hand over & Sooner production

* Better Operation & maintenance

Summary of our service based on deliverables

Integrated 3D Model , based on Engineering data from contractor ,

LOD 300 (max)

Reports :

Clash management , BOM of bulk material, Equipment list,

Document management : Connecting all project document to 3D model by AVEVA NET

Project control :Visualized progress report

Information management system for owner & operators:include : as built model ( if contractor handover required data) and updated AVEVA NET model

Integrated 3D model AVEVA E3D or AUTODESK NAVISWORKS is common platform

IPD (integrated project delivery ) approach

Model is based on received data from EPC contractor

Level of development : maximum 300

300 = Designed and Engineered as to be built – Full dimensions are available and should be followed per design requirements.

Quality of 3D model :

- Structure models without connections , Cable ways, Piping , Ducting, Equipment (simplified mostly indicate reserved space)

Benefits: Reduce design errors arising from 2D design approach, improve collaboration & increase informed decision making by owner

Cost of Engineering Errors

Sample of our past experiences in integrated 3D model

GEG II- GREEN PELLETIZING GEG II- SCREENING AREA

Sample of our experiences for integrated 3D model

GEG II-COMPLETE PROJECT

Sample of our past experiences for integrated 3D model

GEG II-CORE AREA VIEW

Reporting

Clash management

Controlling 3D model of all discipline against each other before start of MEP installation and send report to EPC contractor. This process save time & cost of installations

BOM for bulk material

For control procurement of steel plate & profiles, pipes, fittings, cable trays ,cables, HVAC ducts,etc. it is possible to compare 3D extracted reports with actual purchased material by contractor and reduce risk of unwanted delays during installations

BOM for equipment

For control procurement of catalogue items such as electromotor, pumps, crane & monorails , material handling mechanical equipment, lighting fixtures, ele. panels, valves, etc. it is possible to compare procured items with equipment list report from 3D model and reduce risk of forgotten items and unwanted delays

Sample of a clash detection in E3D

Clash between HVAC duct and wall for substation-II of GEG II

Sample of a clash detection in E3D

Clash between Cable Way and Piping

Sample of BOM from E3D model

Sample of piping BOM based on bore & spec

Sample of BOM from E3D model

Sample of Steel Structure BOM

Project Information managementDocument Centric Approach vs Data Centric Approach

Project Information managementDocument Centric Approach vs Data Centric Approach

Project Information managementDocument Centric Approach vs Data Centric Approach

Project Information management

AVEVA NET technology is used for assigning information (drawing or document) to model

Single source of truth : all users can be sure about the validity of their available information by few clicks

Last revision of all FC documents will be assigned to its relevant component in 3Dmodel

If any change occurred in FC documents, the archive will be updated while preserving the history of previous issues

AVEVA NET dashboard main page

In-built visualization of all project data including 3D modelling and associated document links in HTML format environment

AVEVA NET technology concept

Single source of truth (Example of browsed 2D drawing)

Project control

4D Modeling :

Simulation of construction sequences according to project time schedule and by plugin tools or macros in AVEVA NET environment or NAVISWORKS environment

Visualized and color coded progress report

e.g. for progress of steel structure it is possible to define Green color for installed , Orange color for uninstalled but fabricated, Yellow color for Unfabricated components ( see next page pic)

Project control (color coded progress report )

Project control (4D Modeling & Construction Simulation by NAVISWORKS TIMELINER )

Project control (4D Modeling & Construction Simulation by NAVISWORKS TIMELINER )

Commissioning

Progressive Hand over approache

Minimize pre commissioning period by reducing punch lists and NCRs & Installation reworks

Sooner first production

Full transfer of Project phase data to Operation phase

Information management in operation phase

Helping Client to Extract Maximum Values from Plant Digital Asset by :

Upgrade design model to as-built model based on handed over changes by contractor

Modify assigned information according to last changes

Initiate Information management system for operation phase

Support system during operation & maintenance and preserve model & information update always

Operation

Information management in operation phase

Oman Office

Knowledge Oasis Muscat ،Muscat 135, OmanEmail : Info@sbr3d.comEmail(Marketing) :shahrzad.haghighi@sbr3d.com

Thanks for Your Attentionwww.SBR3D.com