BIM FOR PROJECT MANAGEMENT
Summary of our Services in different Phase of Project
ENGINEERING* Collaboration & Integration
* Clash Management
CONSTRUCTION* Better supervision on contractor procurement of bulk materials or catalogue items
* Single source of truth
* 4D Analysis & Visualized Report
* Change managements
COMISSIONING* Progressive Hand over & Sooner production
* Better Operation & maintenance
Summary of our service based on deliverables
Integrated 3D Model , based on Engineering data from contractor ,
LOD 300 (max)
Reports :
Clash management , BOM of bulk material, Equipment list,
Document management : Connecting all project document to 3D model by AVEVA NET
Project control :Visualized progress report
Information management system for owner & operators:include : as built model ( if contractor handover required data) and updated AVEVA NET model
Integrated 3D model AVEVA E3D or AUTODESK NAVISWORKS is common platform
IPD (integrated project delivery ) approach
Model is based on received data from EPC contractor
Level of development : maximum 300
300 = Designed and Engineered as to be built – Full dimensions are available and should be followed per design requirements.
Quality of 3D model :
- Structure models without connections , Cable ways, Piping , Ducting, Equipment (simplified mostly indicate reserved space)
Benefits: Reduce design errors arising from 2D design approach, improve collaboration & increase informed decision making by owner
Cost of Engineering Errors
Sample of our past experiences in integrated 3D model
GEG II- GREEN PELLETIZING GEG II- SCREENING AREA
Sample of our experiences for integrated 3D model
GEG II-COMPLETE PROJECT
Sample of our past experiences for integrated 3D model
GEG II-CORE AREA VIEW
Reporting
Clash management
Controlling 3D model of all discipline against each other before start of MEP installation and send report to EPC contractor. This process save time & cost of installations
BOM for bulk material
For control procurement of steel plate & profiles, pipes, fittings, cable trays ,cables, HVAC ducts,etc. it is possible to compare 3D extracted reports with actual purchased material by contractor and reduce risk of unwanted delays during installations
BOM for equipment
For control procurement of catalogue items such as electromotor, pumps, crane & monorails , material handling mechanical equipment, lighting fixtures, ele. panels, valves, etc. it is possible to compare procured items with equipment list report from 3D model and reduce risk of forgotten items and unwanted delays
Sample of a clash detection in E3D
Clash between HVAC duct and wall for substation-II of GEG II
Sample of a clash detection in E3D
Clash between Cable Way and Piping
Sample of BOM from E3D model
Sample of piping BOM based on bore & spec
Sample of BOM from E3D model
Sample of Steel Structure BOM
Project Information managementDocument Centric Approach vs Data Centric Approach
Project Information managementDocument Centric Approach vs Data Centric Approach
Project Information managementDocument Centric Approach vs Data Centric Approach
Project Information management
AVEVA NET technology is used for assigning information (drawing or document) to model
Single source of truth : all users can be sure about the validity of their available information by few clicks
Last revision of all FC documents will be assigned to its relevant component in 3Dmodel
If any change occurred in FC documents, the archive will be updated while preserving the history of previous issues
AVEVA NET dashboard main page
In-built visualization of all project data including 3D modelling and associated document links in HTML format environment
AVEVA NET technology concept
Single source of truth (Example of browsed 2D drawing)
Project control
4D Modeling :
Simulation of construction sequences according to project time schedule and by plugin tools or macros in AVEVA NET environment or NAVISWORKS environment
Visualized and color coded progress report
e.g. for progress of steel structure it is possible to define Green color for installed , Orange color for uninstalled but fabricated, Yellow color for Unfabricated components ( see next page pic)
Project control (color coded progress report )
Project control (4D Modeling & Construction Simulation by NAVISWORKS TIMELINER )
Project control (4D Modeling & Construction Simulation by NAVISWORKS TIMELINER )
Commissioning
Progressive Hand over approache
Minimize pre commissioning period by reducing punch lists and NCRs & Installation reworks
Sooner first production
Full transfer of Project phase data to Operation phase
Information management in operation phase
Helping Client to Extract Maximum Values from Plant Digital Asset by :
Upgrade design model to as-built model based on handed over changes by contractor
Modify assigned information according to last changes
Initiate Information management system for operation phase
Support system during operation & maintenance and preserve model & information update always
Operation
Information management in operation phase