Post on 28-Jan-2016
description
transcript
I. Seismicity of Indonesia
II. Task and Function of MGA - Indonesia
III. Existing Resources
IV. Tsunami Early Warning System (Short and Long Term Planning)
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
ShallowIntermediate Dee
p
EPICENTER DISTRIBUTION MAP OF INDONESIA(1973 – 2004)
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
EARTHQUAKE OCCURENCE IN INDONESIA VS ASEANMAGNITUDE > 6.0 RS; PERIOD: 1973 - 2004
10
10 0
23
1 10
12 2
4
2
0
3
0
2 2
4
2
5
23
11
8
6
11
6 6
15
4
2
9
23 3
54
34
6
3
7 76
3
7
45
3
7 78
4
7
15
18
9
1415
14
19
0
2
4
6
8
10
12
14
16
18
20
1973
1975
1977
1979
1981
1983
1985
1987
1989
1991
1993
1995
1997
1999
2001
2003
YEAR
EAR
THQ
UA
KE
NU
MB
ER
INDONESIAASEAN
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
DIAGRAM PERBANDINGAN KEJADIAN GEMPABUMI DI ASEAN DAN INDONESIAPERODE 1973 - 2004 DAN MAGNITUDO > 6.0 SR
INDONESIA 106 KEJADIAN
PRESENTASE 47%
NEGARA ASEAN DI LUAR INDONESIA
121 KEJADIANPRESENTASE 53%
SUMBER DATA : USGS
ASEAN227 KEJADIAN
PRESENTASE 100 %
BMGBMG
EARTHQUAKES EARTHQUAKES IN INDONESIA & ASEAN IN INDONESIA & ASEAN MAGNITUDE MAGNITUDE ≥≥ 6,0 RS; PERIOD 1973 6,0 RS; PERIOD 1973 -- 20042004
ASEAN minus INDONESIAASEAN minus INDONESIA121 EVENT (53 %)121 EVENT (53 %)
INDONESIAINDONESIA106 EVENT106 EVENT
47 %47 %
TOTAL ASEANTOTAL ASEAN227 EVENT227 EVENT
100 %100 %
SOURCE : USGS, MGASOURCE : USGS, MGADEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
II. Task and Function of BMG“Providing accurate, prompt, and qualified services for protection of citizen lives and properties from Natural Disaster”.
BMG (Meteorological and Geophysical Agency ) is an Indonesian national agency responsible for:
policy formulation for standard operational procedures in the fields of meteorology, climatology and geophysics.
implementation of meteorological, climatologically and geophysical observation, data processing-analysis, and information services in the ocean and in the atmosphere.
mandatory in the operational of meteorology, climatology and geophysics.
authority to announce severe weather warnings and alerts.
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
1. Human Resources
2. Facilities
3. Information Dissemination
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
• Phd : 5 persons
• Masters : 200 persons
• Specialists : 78 persons
• Engineers : 400 persons
• Operators : 200 persons
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
I
IIIII
IV V
Indonesia Seismic Monitoring Network (Present)
71 mm/YR
110 mm/YR
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
CCU
TELEMETRY NET
TELEPHONE FAX/ SMS /EMAIL
AIRMAIL
COMPUTER NETWORK
REMOTE COMPUTER
TELEPHONE FAX/SMS
TELEMETRY NET READ BY STAFF
DIAL UP
CENTRAL COMMUNICATON UNIT
THE EXISTING SEISMIC DATA FLOWTHE EXISTING SEISMIC DATA FLOW
STA
TIO
NS
STA
TIO
NS
INPUTINPUT OUTPUTOUTPUT
INTERNET
VSAT
POST
VSAT
VSAT
VSAT
WEB
PUBLIC INFO
SEISMO MESSAGE
DATA BASE * DATA* SIGNAL
EARTQUAKE DATA REPORT
(YEARLY)
MONTHLY BULLETIN
PRELIMINARY DISTRIBUTION EARTHQUAKE
QUICK EARTHQUAKE
DISSEMINATON
EDITINGMANUAL DATA ENTRY
FILE TRANSFER
MANUAL DATA ENTRY
QUICK QUAKE
REVIEW BY “ON DUTY”
SEISMOLOGIST
EMERGENCY / URGENT !
ANALYST REVIEW
ROUTINE !
LAN
LAN
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
-UNDER CONSTRUCTION6CTBT (Comprehensive nuclear Test Ban Treaty)
8
-UNDER CONSTRUCTION3MINI REGIONAL NETWORK (PPI, KSI, PCI)
7
-( +)
1UCSD (University California Of Sandiago) BROADBAND (MAKASAR – SOUTH SULAWESI)
6
-• 4 ( +)• 12 ( 0 )
16ON LINE SEISMIC STATION (RSC - REGIONAL SEISMIC CENTER)
5
On Line at RSC
( +)27ANALOG RADIO SEISMIC STATION(RSC - REGIONAL SEISMIC CENTER)
4
Off Line( +)31SHORT PERIOD SEISMOGRAPH (1 COMPONENT)SHORT PERIOD SEISMOGRAPH (3 COMPONENT)
3
Dial Up( +)2OHP BROADBAND (OCEAN HEMISPHERE PROJECT)
2
Off Line( +)22JISNET BROADBAND, Japan Indonesian Seismic NETwork
1
DATA FLOW
STATUSNUMBER (UNIT)
SEISMIC STATIONSNO
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
THE EXISTING PERMANENT GPS ( 9 )AND TIDE GAUGE STATIONS (60)
GPS Continuous Station (status 2005)Tide Gauge Station (status 2005)Continuous GPS on Tide Gauge(National Plan)
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
RSC I
RSC II
RSC IIIRSC IV
RSC V
REGIONAL SEISMIC CENTER NATIONAL SEISMIC CENTER
Communication via • SSB• Mail• Internet• Phone
RXTX
GPS
VREC3C REC
Analog Radio Telemetry at RSC
SENSOR(ANALOG OR DIGITAL)
• Dial Up• Internet
RSC : REGIONAL SEISMIC CENTERNSC : NATIONAL SEISMIC CENTER
RADIO LINK
TRANSMITTERRECEIVER
GPS
DISPATCHING INTERFACE
INTERFACE
NETWORK
Analog StationsDigital Seismic Stations
Digital Telemetry at NSC
The Existing Telecom SystemThe Existing Telecom System10mm/yr
SATELLITE
NSCNSC
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
INDIVIDUAL MANNED STATION
NSC MESSAGE COMMUNICATION SYSTEM
NA
TIO
NA
L SE
ISM
OLO
GIC
AL
CEN
TER
FAX
SMS
TELEPHONE
USER
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
• Short Term Planning
• Long Term Planning1. The Three Integral Project Components
of Tsunami Early Warning System
2. Grand Design Concept
3. Regionalization of Indonesia
4. Process of Tsunami and Earthquake Warning
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
Short Term Planning • Time Frame : End 2005• Integrated System of All Sensors/ Facilities for
Various Institutions• Additional Facilities from Donor Countries :
15 BB Seismograph and accelerograph (Japan 5; China 5; Germany 5) to be integrated with the Existing Facilities
• Automatization of 5 Regional Center + 1 National Center
• Strengthening of AEIC (will be presented at the next session)
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
Long Term Planning1.The Three Integral Project
Components of Tsunami Early Warning System
2.Grand Design Concept3.Regionalization4.Process of Tsunami and Earthquake
Warning
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
I PROJECT COMPONENT I :TECHNICAL WORKSPROJECT COMPONENT I :TECHNICAL WORKS
II PROJECT COMPONENT II: PROJECT COMPONENT II: ASSESSMENT/ CAPACITY BUILDING
III PROJECT COMPONENT PROJECT COMPONENT III: MITIGATION – REHABILITATION - SHELTER PREPARATION
NATIONAL EFFORT ON REHABILITATION
NATIONAL EFFORT ON SHELTER PREPARATION
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
METEOROLOGICAL AND GEOPHYSICAL AGENCYMALAYSIA, THAILAND, PHILIPINE, SINGAPORE, BRUNEI, LAOS, CAMBODIA, MYANMAR, VIETNAM
etc….
INTERNATIONAL TSUNAMI CENTER
PASIFIC TSUNAMI WARNING CENTERALASKA TSUNAMI WARNING CENTERJAPAN METEOROLOGICAL AGENCY/ EARTHQUAKE TSUNAMI OBS. SYSTEM
ASEAN EARTHQUAKE (& TSUNAMI) INFORMATION CENTER ( ESTABLISHED 1990 )
10 ASEAN MEMBER COUNTRIES
EARTHQUAKEEARTHQUAKESOURCESOURCE
SEIS
MIC
WA
VE (
SEIS
MIC
WA
VE (
~ ~ D
EPTH
OF
SOU
RC
E, T
YPE
DEP
TH O
F SO
UR
CE,
TYP
E O
F C
RU
STA
L LA
YER
6
OF
CR
UST
AL
LAYE
R 6
––8
km/ s
ec)
8 km
/ sec
)
SEA WAVE SEA WAVE OSCILATIOOSCILATIO
NN
10 DART AND10 DART AND50 TIDE GAUGE50 TIDE GAUGE
500 STRONG MOTION500 STRONG MOTIONACCELEROGRAPHACCELEROGRAPH
160 SEISMIC 160 SEISMIC SENSOR SENSOR
( ( ≥≥ 6 UNIT / AREA)6 UNIT / AREA)
• RESEARCH INSTITUSIONS
• UNIVERSITY : ITB, UI, UGM etc.
• R-D CENTER
NATIONAL EXPERT COORD. -BY MINISTRY OF R-T
• LOCAL GOVERNMENT
• ELECTRONIC MEDIA
• BAKORNAS PBP
INDONESIA –METEOROLOGICAL & GEOPHYSICAL AGENCY - BMG
ASSESMENT / CAPACITY BLDG
THE THREE INTEGRAL PROJECT COMPONENTS OF TSUNAMI EARLY WARNING AND MITIGATION SYSTEM
II
INTERACTIVE PROCESSING
DATA PROCESSING
• MAGNITUDE
• LOCATION
• TIME OF OCCURRENCE
• CHARACTERISTICS
• ACCELERATION
SEISMOLOGIST JUGDEMENT
REAL TIME PROCESSING
IDTB & DT ANALYSIS• EARTHQUAKE
PARAMETERS
• HISTORICAL EARTHQUAKE & TSUNAMI SIMULATION
• CHARACTERISTIC OF EARTHQUAKE AND TSUNAMI
RESULT ≤ 5 MIN AFTER MAIN
EARTHQUAKE
1) POTENTIALLY DESTRUCTIVE
“WARNING”2) HARMLESS
REPORT
• TRANSPORTATION
• MOBILIZATION
I. TECHNICAL WORKS
II. ASSESMENT / CAPACITY BUILDING
III. MITIGATION – REHABILITATION SHELTER PREPARATION
III
ALERT DISTRIBUTIO
N
AUTHORIZED
RESOURCES
Automatic Alarm
Automatic Email
Automatic Faximile
BULOG &PUBLIC
WELFARE
• HEALTHY
AND
SANITARY
• TENT
• ACCESS ROAD
• KNOCK DOWN HOUSE
DEPT.
OF
PUBLIC
WORK
• EDUCATION
• FOOD AND
STORAGE
DEPT. OF
HEALTH
DEPT. OF
EDUCATION
NAT’L EFFORT ON
REHABILITATION
NAT’L EFFORT ON SHELTER PREPARATION
NATIONAL DEVELOPMENT
PLANNING AGENCY
AND
DEPT. OF FINANCE
DEPT. OF
COMM.
• SECURITY
AND
SAFETY
DEPT. OF
DEFENSE
• ROAD
• BRIGDE
• SOCIAL BUILDINGS
• PUBLIC BUILDINGS
• SCHOOL BUILDINGS
• TRANSPORTATION
• MOBILIZATION
• HOSPITAL
• LOCAL GOVERNMENT
• ELECTRONIC MEDIA
• LOCAL GOVERNMENT
• ELECTRONIC MEDIA
• ELECTRONIC MEDIA
• BAKORNAS PBP
• ELECTRONIC MEDIA
• ELECTRONIC MEDIA
• LOCAL GOVERNMENT
• LOCAL GOVERNMENT
• LOCAL GOVERNMENT
III
ALERT DISTRIBUTIO
N
AUTHORIZED
RESOURCES
Automatic Alarm
Automatic Email
Automatic Faximile
DEPT. OF
HEALTH
NATIONAL DEVELOPMENT
PLANNING AGENCY
AND
DEPT. OF FINANCE
DEPT. OF
COMM.
• HOSPITAL
• BAKORNAS PBP
• ELECTRONIC MEDIA
• LOCAL GOVERNMENT
III
ALERT DISTRIBUTIO
N
AUTHORIZED
RESOURCES
Automatic Alarm
Automatic Email
Automatic Faximile
DEPT. OF
HEALTH
NATIONAL DEVELOPMENT
PLANNING AGENCY
AND
DEPT. OF FINANCE
• HOSPITAL
• BAKORNAS PBP
• ELECTRONIC MEDIA
• LOCAL GOVERNMENT
III
ALERT DISTRIBUTIO
N
AUTHORIZED
RESOURCES
Automatic Alarm
Automatic Email
Automatic Faximile
DEPT. OF
HEALTH
NATIONAL DEVELOPMENT
PLANNING AGENCY
AND
DEPT. OF FINANCE
• HOSPITAL
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
IPROJECT COMPONENT PROJECT COMPONENT : TECHNICAL WORKS: TECHNICAL WORKS
1. Establishment of Seismograph –Accelerograph - Tide Gauge - DART Buoys -GPS Network
2. Monitoring System3. Data Processing and
Analysis4. Result Dissemination
• BMG, Meteorological and Geophysical Agency
• LIPI, Science Intitute of Indonesia
• BAKOSURTANAL, National Coordinating Agency for Mapping and Survey
• BPPT, Assessment and Application Technology Agency
DEPARTEMENT OF COMMUNICATION
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
IIPROJECT COMPONENT : ASSESSMENT/ CAPACITY BUILDING
1. Modeling 2. Simulation3. Workshop/
Symposium4. Training5. Education
Programme
MINISTRY OF RESEARCH AND TECHNOLOGY• NATIONAL
RESEARCH INSTITUTIONS
• UNIVERSITY (STATE & PRIVATE)
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
III
1. a. Transportation b. Mobilization
2. a. Roadsb. Bridgesc. Social Buildingsd. Public Building
3. School Buildings4. Hospitals
DEPT. OF COMMUNICATION
NAT’L DEV. PLANNING AGENCY
DEPT. OF PUBLIC WORK
DEPT. OF EDUCATION
DEPT. OF HEALTH
NATIONAL EFFORT ON REHABILITATION
PROJECT COMPONENT : MITIGATION/ REHABILITATION –
SHELTER PREPARATION
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
III
1. a. Transportation b. Mobilization
2. a. Access Roadb. Tentc. Knock-Down House
3. Food Storage4. Education5. Healthy and Sanitary6. Security and Safety
DEPT. OF COMMUNICATION
NAT’L DEV. PLANNING AGENCY
DEPT. OF PUBLIC WORK
KEM. KESRA &BULOG
DEPT. OF EDUCATION
DEPT. OF HEALTH
DEPT. OF DEFENSE
NATIONAL EFFORT ON SHELTER PREPARATION
PROJECT COMPONENT : MITIGATION/ REHABILITATION – SHELTER
PREPARATION (Cont.)
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
Grand Design Concept• Standard of Facilities/ Sensors• Number of Sensors
• Justification of Sensor Deployment• Communication System• Data Format• Back Up System for Sensors• Back Up System for Communication
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
Indonesia Regional Earthquake Information and Tsunami Warning Center (REITWC)
-160 Seismic Sensors
- Distance Between Sensors +/- 100 km
- Result ± 5 menit
REG. CENTER 6
REG. CENTER 1
REG. CENTER 2
REG. CENTER 7
REG. CENTER 8
REG. CENTER 9
REG. CENTER 4
REG. CENTER 10
REG. CENTER 5
REG. CENTER 3
NATNAT’’L. L. CENTERCENTER
DEPUTI CHAIRMAN OF DATA AND INFORMATION SYSTEM - BMG
Banda AcehBireun
CalangTakengon
Meulaboh
Sinabang
Tebing Tinggi
TapaktuanTuntungan
Prapat
Singkil
Gunung Sitoli
Tanahbala
Kotapinang
PadangSidempuan Dumai
Mandailing
MEDAN
Lhokseumawe
BMGBMG
REG. CENTER 1REG. CENTER 1
REGION 1REGION 1
NAT’L CENTER
JAKARTAepic
LEGENDA :LEGENDA :
: RSC: RSC
: STA. TO RSC: STA. TO RSC
: DIRECT COM. TO : DIRECT COM. TO
NATIONAL EITWCNATIONAL EITWC: PLAN CHINA: PLAN CHINA
: PLAN JEPANG: PLAN JEPANG
: PLAN JERMAN: PLAN JERMAN
: JISNET: JISNET
: 1 MINUTE SEISMIC : 1 MINUTE SEISMIC WAVE RANGE 400 kmWAVE RANGE 400 km
: 10 MINUTES TSUNAMI : 10 MINUTES TSUNAMI WAVE RANGE 80 kmWAVE RANGE 80 km
Sibolga
RESULTRESULTBMGBMG
AUTOMATIC PROCESSING FACILITIES (PLANNED)AUTOMATIC PROCESSING FACILITIES (PLANNED)AUTOMATIC PROCESSING FACILITIES (PLANNED)
INTERACTIVEINTERACTIVE
DATA BASEDATA BASE
HISTORICALHISTORICALSIMULATIONSIMULATION
WARNINGWARNING
ADVISORYADVISORY
AUTOMATICAUTOMATICDISSEMINATIONDISSEMINATION
-- VSATVSAT-- SMSSMS-- PHONEPHONE-- GTSGTS-- FAXFAX-- INTERNETINTERNET
ADDRESSADDRESS
POLICEPOLICEOFFICEOFFICE
MILITARYMILITARYOFFICEOFFICE
COASTALCOASTALGUARDGUARD
MASSMASSMEDIAMEDIA
DATA DATA ACQUISITIONACQUISITION
PHASE PICKINGPHASE PICKINGANDAND
PROCESSINGPROCESSING
CHINA
GERMANY
JISNET
INTERNET
INDONESIA
S E
I S
M O
G R
A P
HINDONESIA
CHINA
GERMANY
JISNET
INTERNET
• TIDE GAUGE• GPS• ACC
• TIDE GAUGE• GPS• ACC
INDONESIA
GERMANY
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
EarthquakeOccurence
11
22
33
44
55
Real Time Real Time Up DateUp Date
1010
3030
6060
Tsunami Tsunami RecordedRecorded
No Recorded :No Recorded :CancellationCancellation NATIONAL TEWC
•• SeisSeis. At REITWC Record. At REITWC Record
•• Alarm Alarm TrigeredTrigered
•• Automatic Call Automatic Call
ProcessProcess
REGIONAL TEWC
EqEq. Location. LocationMagnitudoMagnitudo
•• Alarm at NEITWCAlarm at NEITWC•• Automatic CallAutomatic Call
TSUNAMI TSUNAMI WARNINGWARNING
For Its regionFor Its region
Interactive Interactive AnalysisAnalysis
DATA BASE• Historical• Simulation
•• PROCESSING/ AUTOMATICPROCESSING/ AUTOMATIC•• INTERACTIVE PROCESSINGINTERACTIVE PROCESSING
DATA BASE• Historical• Simulation
Real Time Real Time Up DateUp Date
•• WARNINGWARNINGfor National Scalefor National Scale
•• WARNINGWARNINGfor Regional Scalefor Regional Scale
Process of Tsunami and Earthquake Information (Planned)
BUOYS BUOYS –– TIDE GAUGES TIDE GAUGES MONITORINGMONITORING
For ConfirmationFor Confirmation
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG
DEPUTI CHAIRMAN FOR DATA AND INFORMATION SYSTEM - BMG