Post on 22-Mar-2019
transcript
Location:
Sewage Farm
Pickett’s Lock
Enfield
London
Project Description:
Protecting a set of 1m pipe work
from future damage by Japanese
Knotweed.
Technical Requirements:
• To protect sewage pipes from
encapsulation by Japanese
Knotweed
• Prevent future damage to
pipe work from the invasive
weed
Contractor:
PGSD Ltd
Fleming Road Harrowbrook Industrial Estate
Hinckley LE10 3DU
Tel. 01455 617 139 sales@geosyn.co.uk
www.geosyn.co.uk
Case Study
KnotBlock®
Andy Lucey - Director - PGSD Ltd
Sewage Farm, Pickett’s Lock
“We were supplied with KnotBlock® membrane and joining tape to encapsulate the pipes protecting them from Japanese Knotweed during construction. KnotBlock® was chosen due to the durability
of the product. Delivery was requested at a specific time due to the amount of deliveries into site, this went without problems. I will be
using this product for future works without hesitation”.
Site preparation pre installation Lining the trench with KnotBlock®
Encasing the pipe work with stone Laying KnotBlock® on the top of the pipework
With Japanese Knotweed being present on the Sewage Farm, PGSD Ltd required a product which would protect their pipework from the invasive weed. Geosynthetics Limited provided KnotBlock® 1.0 mm Geomembrane as a solution.