Post on 31-Mar-2018
transcript
ORWAY MINERAL CONSULTANTS (WA) PTY LTD Level 4, 1 Adelaide Terrace, East Perth WA 6004, A.B.N 40 093 277 126
Tel: +61 8 6210 5601 Fax: +61 8 6210 5555 Email: omc@orway.com.au Web: www.orway.com.au
Scope of Work
OMC worked in conjuction with Hydromet Pty Ltd (Hydromet) and Murray Hill Metallurgical Consultant to produce a Scoping Study for the Marenica Uranium Project.
Flowsheet
Two process options were examined in the Marenica Uranium Scoping Study. The first of these was a heap leach option comprising crushing, screening and partial scrubbing of the ore, belt filtration to dewater slurries, agglomeration, heap leach, resin ion exchange and finally a classical alkali based refinery. The second option incorporated a similar crushing circuit followed by a beneficiation circuit and a concentrate tank leach circuit. The balance of the circuit was similar to the first option.
Outcome
The Marenica Uranium Project scoping study was delivered in Q3 2011.
Case Study – Marenica Uranium Project
Kambalda Mill Survey
Project Category: Scoping Study
Client: Marenica Energy Ltd
Location: Namibia
Capacity: 20Mt/annum ore to produce a uranium tetroxides product
Commodity: Uranium Jacare Project Site
Marenica deposit major mineralogy - Carnotite