01-04-17 © Rothschild Doyno Collaborativeii
BACKGROUNDThe Lawrenceville Corporation was formed in the 1980s in response to neighborhood decline, as a means to advocate for and invest in the community’s interest. After decades of disinvestment Lawrenceville is seeing a resurgence in the housing market and a strengthening of it’s neighborhood commercial core, Butler Street.
Having guided the community from decline to reinvestment, the Lawrenceville Corporation has adjusted it’s focus to ensure that the unique characteristics of the community remain, that existing residents are not displaced, and that new residents of all income levels can continue to purchase a home in the community.
To address the issues facing the community the Lawrenceville Corporation sought to establish Pittsburgh’s first Community Land Trust as a means to preserve affordability in the neighborhood. Through work with foundations, the City of Pittsburgh, and community partners, CLT15201 was established.
All photos in this document were created by Rothschild Doyno Collaborative or Lawrenceville Corporation unless otherwise noted.
PROJECT SUPPORTThis project would not be possible without the generous support of the following organizations:
� The Hillman Foundation � UPMC Health Plan � Anonymous � Bridgeway Capital � Duquesne Light � The Urban Redevelopment Authority of Pittsburgh � PNC Bank � Dollar Bank
PROJECT TEAMLawrenceville Corporation worked with Burlington Associates in Community Planning to provide technical assistance on the econmic and social structure of the Community Land Trust.
Rothschild Doyno Collaborative was engaged to develop the CLT Guidelines and design the initial seven homes as prototypes for future CLT home development. Ecocraft Homes was engaged as the builder for the initial phase of housing.
Open Streets PittsburghLawrenceville Community Garden
© O
pen
Stre
ets
Pitt
sbur
gh
© L
awre
ncev
ille
Gar
dene
rs
ACKNOWLEDGEMENTS
01-04-17 © Rothschild Doyno Collaborative iii
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborativeiv
TABLE OF CONTENTSI. INTRODUCTION 1II. PRESERVING AFFORDABILITY 9III. CLT15201 DEVELOPMENT GUIDELINES 17IV. PHASE 1 HOME DESIGN 33V. ASSURING AFFORDABILITY 51
01-04-17 © Rothschild Doyno Collaborative v
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborativevi
CHAPTER I:
INTRODUCTION
INTRODUCTION
01-04-17 © Rothschild Doyno Collaborative 1
Butler and 45th Streets
© R
alph
McG
ough
View of Butler Street, 1955Doughboy Square, 1937
©Th
e U
nive
rsity
of P
itt D
igita
l Pho
togr
aphi
c Li
brar
y
In the early 1700s, the area now known as Lawrenceville was settled by the Delaware Indians and was an important trading post for both English and French settlers.
In 1814, William Foster, father of the composer Stephen Foster, laid out the town of Lawrenceville and named it in honor of Captain James Lawrence who fought in the struggle against the English during the War of 1812. Lawrenceville was annexed by the City of Pittsburgh in 1868.
Lawrenceville was home to the Allegheny Arsenal, which manufactured munitions for the Civil War. In the early and mid-1800s, Lawrenceville and the Allegheny Arsenal experienced immense growth. Wave after wave of German and Irish
immigrants settled in Lawrenceville to work in the “Cradle of America’s Industry.” Iron and steel production, glass factories, breweries, petroleum industries and other manufacturing all thrived in Lawrenceville during the 1800s and early 1900s.
As industry in Pittsburgh declined, Lawrenceville lost nearly one third of its population, leaving many vacant structures in this dense urban neighborhood. With over 30,000 residents in 1940, Lawrenceville saw its lowest population in 2000 with just over 10,000 residents.
LOCATION Lawrenceville is composed of three neighborhoods: Upper, Central, and Lower Lawrenceville, stretching along the southern banks of the Allegheny River and bounded by the hilltop neighborhoods above.
Butler Street is the main east-to-west thoroughfare that connects all three neighborhoods.
Lower Lawrenceville, or LoLa, extends from 33rd Street to 40th Street / Arsenal School and south to Liberty Avenue. Doughboy Square serves as a highly visible neighborhood gateway.
Central Lawrenceville, home to Arsenal Park, Allegheny Cemetery, and Children’s Hospital of Pittsburgh, has experienced a surge in both residential and business development.
Upper Lawrenceville, known as the 10th Ward by residents, is characterized by its dense urban fabric and an increasing development energy along Butler Street.
A History of Lawrenceville
“THE CRADLE OF AMERICA’S INDUSTRY”CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative2
CENTRAL LAWRENCEVILLE
UPPER LAWRENCEVILLE
HIGHLAND PARK
HIGHLAND PARK
EAST LIBERTY
GARFIELD
BLOOMFIELD
SHADYSIDE
POINTBREEZE
FRICKPARK
SQUIRRELHILL
SCHENLEYPARK
HILLDISTRICT
STRIP DISTRICT
UPTOWN
NORTHSIDE
NORTHPARK
TROYHILL
OAKLAND
SOUTHSIDE FLATS
WEST END
LOWERLAWRENCEVILLE
ALLEGHENY CEMETERY
ALLEGHENY RIV
ER
3 MILES FROM DOWNTOWN
OHIO RIVER
CENTRALBUSINESSDISTRICT
UNIVERSITY OF PITTSBURGH
DUQUESNEUNIVERSITY
CCAC
CHILDREN'S HOSPITAL OF PITTSBURGH OF UPMC
CARNEGIE MELLON
UNIVERSITY
NORTH I-279 TO I-76
(TO OHIO)
EAST I-376 TO I-76
(TO PHILA)SOUTH HILLS
NEIGHBORHOODS
65 NORTH(TO OHIO RIVER
NEIGHBORHOODS )
28 NORTH(TO FOX CHAPEL)
WEST I-376 TO AIRPORT
(21 MILES)
MONONGAHELA RIVER
40TH
31ST
FORT
PITT
LIBER
TY
RiversCasino Heinz
Field3 Rivers Park
Point State Park
PNC ParkCHATHAM
UNIVERSITY
CHATHAM UNIVERSITY
EASTSIDE
BUTLER STREET
City Connections – Locating Lawrenceville in Relationship to Pittsburgh Neighborhoods and Institutions
Allegheny Cemetery
Site of the cottage where Stephen Foster was born
© M
att D
ayak
© M
att D
ayak
INTRODUCTION
01-04-17 © Rothschild Doyno Collaborative 3
2002
L AWRENCEVILLE CORPORATION
The Lawrenceville Corporation was formed in January 2000 as a merger of the Lawrenceville Development Corporation (LDC) and the Lawrenceville Business Association (LBA). Both the LBA and LDC had been in existence since the mid-1980s and were formed in response to neighborhood decline following Pittsburgh’s economic crisis during the 1970s and 1980s.
The merger yielded a new organization with a strong combined board of directors. The organizational mission, membership, and much of the programming trace back to the original two entities. Since the merger, the LC has gained local and national recognition for its innovative niche marketing programs like the 16:62 Design Zone and the
Doughboy branding campaign, recruitment efforts that have yielded numerous destination-type retail and restaurant businesses, and the commercial and residential efforts throughout the neighborhood.
VISIONLawrenceville Corporation’s vision for the community includes the following elements:
� A diverse community that embraces newcomers and long-time residents, homeowners and renters, children and senior citizens, low-income and middle-class families alike.
� A thriving and competitive business district that attracts customers from around the region with unique stores and products, while continuing to
meet the day-to-day needs of community residents.
� A safe, healthy, and clean community free from crime, drugs, prostitution, violence, and litter.
� An attractive neighborhood full of amenities including shopping, restaurants, green space, parks, and recreational facilities.
PRINCIPLESThe Lawrenceville Corporation is guided in its work by five main principles:
� Preserve Authenticity: preserve community diversity and working class heritage; and build on existing architectural assets.
To act as a catalyst and conduit for responsible growth and reinvestment in the Lawrenceville Community
20062003 20072004 20082005 2009 2010
‘02Children’s Hospital of Pittsburgh announces its move to Lawrenceville
‘05Lawrenceville Community Plan is completed
‘06-’08Housing Market Downturn
‘08-’09LoLa Plan
‘10LC begins agressively pursue property through the City of Pittsburgh land recycling program
Lawrenceville Timeline
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative4
(PRINCIPLES CONT.)
To act as a catalyst and conduit for responsible growth and reinvestment in the Lawrenceville Community
� Strategically Target Development Efforts: geographically concentrate development to maximize impact in targeted areas that have been identified as priorities by strategic or community planning processes.
� Market Our Assets: understand the neighborhood’s assets and its potential role in the city or regional marketplace; target regional and local customers that will advance our neighborhood’s revitalization; and develop lines of business that promote the neighborhood’s assets.
� Support High Quality Design: insist on top-notch design standards for all development and projects in the community.
� Engage in Visionary and Participatory Planning: work with local stakeholders to creatively envision the future potential of the neighborhood while keeping an eye on national and regional trends and local opportunities
BOARD OF DIRECTORS
George Arendas Will Bernstein Lauren Byrne Stephen Casey Bernadette Gerbe David Green Joseph Kelly
Owen Lampe Allison McGeary Juliette Murcko Kento Ohmori Brooks Robinson, Jr. David Tobiczyk Tiffany Wilhelm
STAFFMatthew Galluzzo Executive Director
Valerie Fleisher Director of Operations
Ed Nusser Real Estate and Planning Manager
Genevieve Barbee Marketing and Communications Coordinator
2011 20152012 20162013 20172014 Future
‘12New movers study identifies changes in housing market trends for the neighborhood
‘12-’13LC establishes an affordable housing strategy for Upper Lawrenceville
++Board of Directors votes to pursue a community land trust
‘16The City of Pittsburgh Releases the P4 Measures
‘17Seven CLT homes available for sale
‘15LC engages consultants to establish the structure and design of the CLT and the initial homes
FUTUREContinues development of CLT homes and refinement of the CLT structure and processes
‘15Legislation introduced creating the affordable Housing Task Force
‘16Affordable Housing Task Force presents findings
‘16LC establishes a CLT Advisory Board
INTRODUCTION
01-04-17 © Rothschild Doyno Collaborative 5
The Foundry at 41st Arsenal Terminal Redevelopment Doughboy Square Apartments
Lawrenceville is a thriving community undergoing a wave of investment. An increase in population, reinvigorated neighborhood business districts, a rapidly rising real estate market, and convenient access to downtown Pittsburgh and other adjacent employment centers via multiple transportation choices make Lawrenceville an attractive neighborhood.
This growth has brought with it certain development pressures. Median home sale price in Central Lawrenceville increased from $27,000 to $175,000 (648%) over the 15-year period between 2000 and 2015.
The Lawrenceville Corporation, in partnership with other community organizations, has engaged residents in formulating community goals that address issues of development, affordability, and resident displacement.
What’s happening todayNEIGHBORHOOD PLANNINGAs an advocate for community based planning, the Lawrenceville Corporation facilitated several planning processes with its constituents to understand what residents wished to see in their community. As the context in the neighborhood changed between 2005 and 2010, the Lawrenceville Corporation continued planning efforts to keep pace with residents’ goals as the market began to shift around them.
Through the Upper Lawrenceville Community Visioning Plan residents recognized that they did not want to match the pace of development and investment seen in Lower and Central Lawrenceville. Instead, residents wanted to focus on a locally initiated, slower paced development that would reinforce the existing character of the community and maintain affordability.
A GROWING COMMUNIT Y
© S
trada
REGIONAL PLANNINGConcurrent to neighborhood planning efforts, the City focused resources on reconnecting residents to the rivers. Both the Allegheny Riverfront Vision Plan and the Allegheny Riverfront Green Boulevard set forth goals to connect neighborhoods through new riverfront development and amenities.
In 2016 the City put forth a vision of a more livable city for all its residents through the P4 Initiative, with a goal to “make sure that new growth benefits people, enhances a sense of place, contributes to a healthier planet, and achieves the highest levels of financial and social performance.”
Each of these planning efforts set the stage for the development of CLT15201.
© M
att D
ayak
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative6
The LoLa Plan
Allegheny Riverfront Vision Plan, 2011 Allegheny Riverfront Green Boulevard, 2013 Decreased industrial uses present green infrastructure and transpor-tation opportunities for our urban riverfront communities.
Pittsburgh P4 Performance Measures, 2016
LoLa Plan Upper Lawrenceville Community Visioning Plan, 2011 Strategic community planning studies focus on a diverse range of areas in Lawrenceville, from neighborhood areas, corridors, parks, and the riverfront.
Community planning for a diverse and vibrant neighborhood
Lawrenceville Community Plan, 2005
INTRODUCTION
01-04-17 © Rothschild Doyno Collaborative 7
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative8
CHAPTER II
PRESERVING AFFORDABILITY
PRESERVING AFFORDABILITY
01-04-17 © Rothschild Doyno Collaborative 9
The First Community Land Trust in Western Pennsylvania
The Lawrenceville Corporation has established a Community Land Trust (CLT) in response to the changing real estate market in the community.
In areas with large amounts of market rate development, longtime residents face the danger of being priced out of the market. A CLT brings balance to the market by helping to preserve affordability and provide a path for residents to build equity and become homeowners.
In January of 2016, Lawrenceville Corporation assembled the Lawrenceville CLT Advisory Board. This board was tasked with spending the year 2016 to work through the a planning process to answer key questions that every CLT start-up encounters. Questions include:
� How is the resale formula structured and governed?
� What stipulations are enforced in the CLT Ground Lease?
� Who should the CLT focus on serving?
Throughout 2016 the board met monthly to work through the questions above and many others. Throughout the planning process the Board was guided by Michael Brown of Burlington Associates in Community Development.
Dave Breingan Executive Director, Lawrenceville United Lawrenceville Corporation Board Member Sixth Ward Resident
Lauren Connelly Manager, Business Development, Allegheny County Economic Development Lawrenceville Corporation Board Member Tenth Ward Resident
CREATING CLT1520
MISSIONThe Lawrenceville Community Land Trust promotes, expands, and preserves permanently affordable hous-ing opportunities.
VALUES: � Provide high-quality homes
� Embrace sustainable development
� Seamlessly integrate affordable homes into neighborhood fabric
� Balance our neighborhood real estate market
� Utilize participatory and representative governance
PURPOSE OF THIS DOCUMENTBuilding upon previous community planning efforts, this document shares what we have learned in our initial planning and development of CLT projects across sites in Lawrenceville.
The guidelines and prototypes provided in this document will serve as a template for future CLT development within Pittsburgh and adjacent communities.
James Eash Real Estate Development Officer, Action-Housing
Matthew Galluzzo Executive Director, Lawrenceville Corporation
Dave Green Lawrenceville Corporation Board Member Tenth Ward Resident
LAWRENCEVILLE CLT ADVISORY BOARDThe “C” in CLT stands for “Community” and it was important to LC that this board be as broadly representative of the neighborhood as was possible. The founding members of the Lawrenceville CLT Advisory Board Are:
Deirdre Kane Owner, 52Nd Street Market Lawrenceville United Board Member Tenth Ward Resident
Amanda Neatrour Tenth Ward Resident
Ed Nusser Real Estate And Planning Manager, Lawrenceville Corporation
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative10
9Number of affordable rental units produced since 2012
925Number of rental units planned or under construction as of 2016
14.2%Residents who have lived in their current dwelling for at least 35 years
27%Lawrenceville residents that moved into neighborhood in past 5 years
29%Residential properties purchased by LLCs from 2012-2014
Lawrenceville Historic Sales by YearData provided by Lawrenceville Corporation
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
Median Single Family Sales PriceData provided by Lawrenceville Corporation
$68,599 $70,072 $73,004 $83,769
$94,586
$111,509
$142,257
$167,812
$190,062
$214,874 $211,277
116
103
79
94 93 102
131
178
147
164
150
Median sale prices grew by more than 290% between 2008 and 2016
The number of sales has increased bringing new residents to the community
PRESERVING AFFORDABILITY
01-04-17 © Rothschild Doyno Collaborative 11
Household Size
1 5432
50
80
100
$24,950 $38,450$35,600$32,050$28,500
$49,900 $76,900$71,200$64,100$57,000
$39,900 $61,550$56,950$51,300$45,600
CLT15201 STRUCTURE
Named for the zip code it serves, CLT15201 will create permanent affordable housing within Lawrenceville while allowing low and moderate income residents to build equity as homeowners.
With current market conditions, property in Lawrenceville is valued at a premium. The CLT’s ability to own the land and preserve it for affordable housing will take the increase in price associated with location and significantly reduce the cost incurred by the home purchaser. In this way the CLT will retain and maintain economic diversity in the community amid large amounts of market-rate development.
HOW IT WORKSCLT15201 will renovate or develop new homes throughout Lawrenceville. Homes will be sold to qualified home buyers and the CLT will retain ownership of the underlying land.
Long term ground leases with homeowners allow future home buyers to share in the affordability that was initially created and establishes a resale formula for the home that balances affordability with the realization of equity on improvements and the increase in value of the home.
WHO IT WILL SERVEThe CLT will serve households who earn 80% or less of the Area Median Income for their family size. To minimize displacement, home ownership opportunities will be offered first to existing residents in the neighborhood or feeder pattern for the local school. Home buyers must have a minimum credit score of 640 to qualify for a conventional mortgage. CLT15201 hopes to broaden the availability of homes as the program grows.
The Area Median Income is updated annually by the Department of Housing and Urban Development and is based on geographic location and family size. Pittsburgh’s Area Median income is based on data from Allegheny, Butler, Beaver, Westmoreland, Washington, and Fayette Counties.
Creating permanently affordable housing
Greater Pittsburgh Area Median Income for a Family of 4 in 2016
$71,200Area Median Income
$56,95080% Area Median Income
AM
I%
HOUSEHOLD SIZE
The CLT keeps permanent ownership of the land. The home buyer leases the land underneath from the CLT
New resident owns the house
How it works. Who it will serve. Households that earn 80% or less of the AMI for their family size are eligible for CLT Homes.
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative12
427
685
274
212410
603
300
584
257177
598
168
445
421
294
294
171
790
601
357
236
417
452
600
204
747
458
201
541
606
312
106
665
820
161
871201
230
495
295
443
234
232
133
132
653110
281
350
53 363
404
396
645
444429
LegendIncome - # Households in Census Block Group
270
Up to $19,999
$20,000-$44,999
$35,000-$49,999
$50,000-$74,999
$75,000+
Census Block Group Median IncomeUp to $19,999
$20,000 - $34,999
$35,000 - $49,999
$50,000 - $74,999
$75,000+
0 2,000 4,0001,000Feet
°Data sources: City of Pittsburgh GIS; 2009-2013 American Community Survey
Number of Households in the Census Block Group within each income range:
427
685
274
212410
603
300
584
257177
598
168
445
421
294
294
171
790
601
357
236
417
452
600
204
747
458
201
541
606
312
106
665
820
161
871201
230
495
295
443
234
232
133
132
653110
281
350
53 363
404
396
645
444429
LegendIncome - # Households in Census Block Group
270
Up to $19,999
$20,000-$44,999
$35,000-$49,999
$50,000-$74,999
$75,000+
Census Block Group Median IncomeUp to $19,999
$20,000 - $34,999
$35,000 - $49,999
$50,000 - $74,999
$75,000+
0 2,000 4,0001,000Feet
°Data sources: City of Pittsburgh GIS; 2009-2013 American Community Survey
Median Income of the Census Block Group:
KEY:
HOUSEHOLD INCOME DIVERSITY
GIS Base Map: City of Pittsburgh Income Data: 2009-2013 American Community Survey
0' 1600' 3200'Scale 1" = 1600'-0"
400' 800'
Parks/Cemetaries
INCOME INDICATORS
427
685
274
212410
603
300
584
257177
598
168
445
421
294
294
171
790
601
357
236
417
452
600
204
747
458
201
541
606
312
106
665
820
161
871201
230
495
295
443
234
232
133
132
653110
281
350
53 363
404
396
645
444429
LegendIncome - # Households in Census Block Group
270
Up to $19,999
$20,000-$44,999
$35,000-$49,999
$50,000-$74,999
$75,000+
Census Block Group Median IncomeUp to $19,999
$20,000 - $34,999
$35,000 - $49,999
$50,000 - $74,999
$75,000+
0 2,000 4,0001,000Feet
°Data sources: City of Pittsburgh GIS; 2009-2013 American Community Survey
Number of Households in the Census Block Group within each income range:
427
685
274
212410
603
300
584
257177
598
168
445
421
294
294
171
790
601
357
236
417
452
600
204
747
458
201
541
606
312
106
665
820
161
871201
230
495
295
443
234
232
133
132
653110
281
350
53 363
404
396
645
444429
LegendIncome - # Households in Census Block Group
270
Up to $19,999
$20,000-$44,999
$35,000-$49,999
$50,000-$74,999
$75,000+
Census Block Group Median IncomeUp to $19,999
$20,000 - $34,999
$35,000 - $49,999
$50,000 - $74,999
$75,000+
0 2,000 4,0001,000Feet
°Data sources: City of Pittsburgh GIS; 2009-2013 American Community Survey
Median Income of the Census Block Group:
KEY:
HOUSEHOLD INCOME DIVERSITY
GIS Base Map: City of Pittsburgh Income Data: 2009-2013 American Community Survey
0' 1600' 3200'Scale 1" = 1600'-0"
400' 800'
Parks/Cemetaries
INCOME INDICATORS
Lawrenceville Area Median IncomeUpper Lawrenceville, the location of the first phase of CLT homes, has an overall median income between $35,000 – $49,999 for all household sizes combined. The Area Median Income for all household sizes combined is $54,080 for the Pittsburgh metropolitan area.
PRESERVING AFFORDABILITY
01-04-17 © Rothschild Doyno Collaborative 13
JANUARYJULY
Making permanently affordable housing
Lawrenceville Corporation began developing the concept of CLT15201 in the summer of 2015, with a vote from the Board of Directors to create the first Community Land Trust in Western Pennsylvania. Throughout the course of 2015 and 2016 the Lawrenceville Corporation developed the CLT model with input from the community and stakeholders. They held numerous workshops and information sessions to explain the concepts to residents and gather feedback through the design process for the initial phase of homes.
RESIDENT SERVICESCLT15201 seeks to improve the lives of residents not only through home ownership but also through resident services. Initially residents will be connected to services on a case by case basis through partnerships with Lawrenceville United, Neighborworks, and Goodwill Industries.
DECEMBEROCTOBER FEBRUARY APRIL MAY
16LC Board formally votes to pivot real estate business line to create the 1st CLT in Western Pennsylvania
16LC hires Mike Brown of Burlington Associates in Community Development as CLT start-up consultant
8URA Board Approves Predevelopment Grant to Lawrenceville Corporation for CLT Phase 1
23 LC releases RFP for design services for the first phase of CLT Housing
1LC hires Rothschild Doyno Collaborative as project architect
8Anonymous source provides LC with CLT Planning and Predevelopment Grant
5Hillman Family Foundation provides an Opportunity Fund Grant to Lawrenceville CLT
16First CLT Community Meeting with Rothschild Doyno Collaborative
CLT15201 Timeline
20LC closes on 800 McCandless
23LC and LU create and seat the Lawrenceville CLT Advisory Board
2015 2016
7 LC and LU host “State of the Neighborhood” meeting to discuss neighborhood real estate trends
GOVERNANCE
CLT15201 will operate as a program of the Lawrenceville Corporation. A CLT Advisory Board will be formed to handle the general options of the CLT and will be composed of Lawrenceville homeowners, CLT homeowners, and issues experts that bring specific knowledge to guide and inform decision making.
The Lawrenceville Corporation Board of Directors will be responsible for key policy and financial decision making of CLT15201. A position on the Lawrenceville Corporations Board of Directors will be opened for a CLT resident to increase dialog and provide a residents perspective to inform decision making.
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative14
CLT 15201 Community MeetingLawrenceville Walkthrough of the McCandless Street renovation home
SEPTEMBER OCTOBER NOVEMBERJULY DECEMBER
162nd CLT Community Meeting with Rothschild Doyno Collaborative
26 – 30LC staff attends National CLT Conference hosted by Grounded Solutions Network
113rd CLT Community Meeting with Rothschild Doyno Collaborative
25First “CLT 101” Information Session for interested homebuyers
13ZBA Hearing for 5229-31 Poe Way and 52230-32 Duncan Street
27ZBA Hearing for 5230 Lotus Way and 5233 Duncan Street
29Second “CLT 101” Information Session for interested homebuyers
2Lawrenceville CLT is featured in NextCity
12Third “CLT 101” Information Session for interested homebuyers
1Fourth “CLT 101” Information Session for interested homebuyers
15Prospective homebuyer Intake Forms Due to LC
20CLT Informational Meeting with PEP Rally Parents
PRESERVING AFFORDABILITY
01-04-17 © Rothschild Doyno Collaborative 15
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative16
CHAPTER III
CLT15201 DEVELOPMENT GUIDELINES
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative 17
© M
att D
ayak
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative18
INTENT OF THE GUIDELINESThe guidelines establish goals for site and home design with the intention of establishing a framework for future CLT homes as they are developed. The guidelines have been informed by the initial phase of CLT homes planned for Upper Lawrenceville.
As each project moves forward and additional homes are developed, each project should demonstrate its response to the site and home design goals while considering the specific context and location.
P4 ALIGNMENTThe intent of CLT15201 aligns with the principles of the p4 organizing framework focusing on People, Place, Planet, and Performance. CLT15201 has engaged the community through each step of the development process to create long term affordable housing that reinforces the unique characteristics of the Lawrencville neighborhood.
Both the goals outlined here and the subsequent recommendations have taken into account components of the p4 performance measures. Future CLT development projects should consider documentation of the performance metrics to assess, guide, and inform future development efforts.
DESIGN GOALSCLT Guidelines: leading the way to a healthy and contextual built environment
Home design• Build and renovate homes for the next
century of living.
• Incorporate sustainable design principles to reduce energy use, conserve resources, and consider the life cycle cost of design choices.
• Create a range of home sizes and types to suit a range of individuals and families at various stages of life.
• Create homes that blend seamlessly into the neighborhood fabric while being of their own time.
Site design• Respond and relate to surrounding context
to seamlessly blend new and old.
• Promote an active, vibrant streetscape that enhances walkability and livability.
• Incorporate sustainable site design.
• Take advantage of the topography.
GOALS OF THE GUIDELINESA TE SEON N UE LARENEE FO LOTUS AY TO OE AY
REF.
W/D
UP
-
DINING
KITCHEN
BACKYARD
18' X 20'
37'-0" 18'-0"
4'-0"
16'-0"
OPEN TO
BELOW
20'-0"
UP
DN
3'-0"
MASTER
BEDROOM
11' x 14' 8"
BED 2
10' x 14' 8"
BATH
8' 3" x 7' 7"
W/C
5' 1" x 5' 2"
CLOSET
CLOSET
UP
DN
CLOSET
DN
BED 3
UNFINISHED
ATTIC SPACE
10' x 11'
55'-0"
CRAWLSPACE
ENTRY
MECH/
STORAGE
POWDER
RMLI
VING RM
25'-0"
This drawing, including its electronic form, is an Instrument
of Service for use solely with respect to this Project. The
Architect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and other
reserved rights, including copyrights.
DRAWING
TITLE
PRINTED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FOR
CONSTRUCTION
7/6/2016 10:08:11 AM
A101
FLOOR PLANS - STREET
HIGH
LAWRENCEVILLE
CORPORATION
COMMUNITY LAND TRUST
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
REVISIONS
NO.
DESCRIPTION
DATE
REF.
W/D
-
12'-0" 35'-0" 3'-0"
POW
DER
RM
KITC
HEN
LIVI
NG
RM
DIN
ING
RM
4'-0
"16
'-0"
50'-0"
20'-0
"
UP
DN
BATH
7' 2
" x 7
' 8"
CLO
SET
CLO
SET
MAS
TER
BED
RO
OM
14' 8
" x 1
0' 1
"
BED
214
' 8" x
9' 9
"
DN
CEL
LAR
CLO
SET
5' 7
" x 5
' 5"
MEC
H4'
10"
x 5
' 5"
CR
AWLS
PAC
E
BAC
KYAR
D
22'-10"
12' X
20'
15'-8 1/2"
UP
This
dra
win
g, in
clud
ing
its e
lect
roni
c fo
rm, i
s an
Inst
rum
ent
of S
ervi
ce fo
r use
sol
ely
with
resp
ect t
o th
is P
roje
ct. T
heAr
chite
ct is
the
auth
or a
nd s
ole
owne
r of s
aid
Inst
rum
ent
of S
ervi
ce a
nd re
tain
s al
l com
mon
law
, sta
tuto
ry a
nd o
ther
rese
rved
righ
ts, i
nclu
ding
cop
yrig
hts.
DR
AWIN
G
TITL
E
PRINTED
© R
OTH
SCH
ILD
DO
YNO
CO
LLAB
OR
ATIV
E
NO
T FO
RC
ON
STR
UC
TIO
N
7/1/20163:02:51PM
A101
FLO
OR
PLA
NS
- ALL
EYLO
W
141
45TH
STR
EET
PITT
SBU
RG
H, P
A
PRIC
ING
DR
AWIN
GS
MAY
3, 2
016
1/4
" = 1
'-0"
A1012
MAI
N F
LOO
R 1
/4" =
1'-0
"A1
013SE
CO
ND
FLO
OR
1/4
" = 1
'-0"
A1011
BASE
MEN
T
REV
ISIO
NS
NO
.D
ESCR
IPTI
ON
DATE
REF
.
W/D
-
4'-0
"16
'-0"
POW
DER
RM
CLO
SET
DIN
ING
KITC
HEN
LIVI
NG
RM
ENTR
Y
6' x
3'
20'-0
"
UP
DN
40'-0"15'-0"
BED
110
'-5" x
14'
-8"
BED
210
' x 1
4'-8
"
CLO
SET BA
TH8'
2" x
7' 7
"
W/C
5' 7
" x 5
' 2"
CLOSET
UP
DN
MAS
TER
BED
BATH
2
W/C
DN
9'-6
" X 1
4'-8
"
CEL
LAR
15' x
14'
3"
CLO
SET
5' 7
" x 5
' 4"
MEC
H
5' 4
" x 4
' 9"
CR
AWLS
PAC
E
BAC
KYAR
D
20' X
15'
22'-5"3'-0"
UP
40'-0"15'-0"
This
dra
win
g, in
clud
ing
its e
lect
roni
c fo
rm, i
s an
Inst
rum
ent
of S
ervi
ce fo
r use
sol
ely
with
resp
ect t
o th
is P
roje
ct. T
heAr
chite
ct is
the
auth
or a
nd s
ole
owne
r of s
aid
Inst
rum
ent
of S
ervi
ce a
nd re
tain
s al
l com
mon
law
, sta
tuto
ry a
nd o
ther
rese
rved
righ
ts, i
nclu
ding
cop
yrig
hts.
DR
AWIN
G
TITL
E
PRINTED
© R
OTH
SCH
ILD
DO
YNO
CO
LLAB
OR
ATIV
E
NO
T FO
RC
ON
STR
UC
TIO
N
7/6/201610:46:07AM
A101
FLO
OR
PLA
NS
- STR
EET
LOW
LAW
REN
CEV
ILLE
CO
RPO
RAT
ION
CO
MM
UN
ITY
LAN
D T
RU
STPI
TTSB
UR
GH
, PA
PRIC
ING
DR
AWIN
GS
MAY
3, 2
016
1/4
" = 1
'-0"
A1012
MAI
N F
LOO
R 1
/4" =
1'-0
"A1
013SE
CO
ND
FLO
OR
1/4
" = 1
'-0"
A1014
MEZ
ZAN
INE
1/4
" = 1
'-0"
A1011
BASE
MEN
T
REV
ISIO
NS
NO
.D
ESC
RIP
TIO
ND
ATE
REF.
-
W/D
POWDER
RM
6' x 3'
KITCHEN
DINING
RM
ENTRY
BACKYARD
12' X 20'
3'-0" 35'-0" 12'-0"
4'-0"
16'-0"
50'-0"
20'-0"
0"
LIVING RM
MECH
UP
UP
BED 2
14' 8" x 9' 9"
BATH
7' 2" x 7' 8"
CLOSET
CLOSET
MASTER
BEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrument
of Service for use solely with respect to this Project. The
Architect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and other
reserved rights, including copyrights.
DRAWING
TITLE
PRINTED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FOR
CONSTRUCTION
6/22/2016 10:45:38 AM
A101
FLOOR PLANS - ALLEY
HIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"
A101 2
MAIN FLOOR
1/4" = 1'-0"
A101 3
SECOND FLOOR
REVISIONS
NO.
DESCRIPTION
DATE
DUNCAN STLOTUSWAY
POWAY
ALLEYHI
STREETLO
STREETHI
ALLEYLO
SOL PANE
ON-GRADE ME
VIS
VIS TO RIE VALE
OTNITE O SOL GANS & HARETIN
VITALEENTRY
VITALEENTRY
ENTRY AT T STREET
IRD STREETCAEWORN T HE SLOE
- REDUED BAEENT AE- ON-GRADE BAYARD ACES
GREING T AY
GRE SACE AT ERY ME
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative 19
SITE DESIGNPromote an active and vibrant streetscape that enhances walkability and livability
Lawrenceville is a vibrant urban neighborhood. In a dense urban setting with many homes in close proximity, it’s important to create comfortable outdoor spaces that encourage occupancy and interaction among neighbors. Several tools and design considerations to accomplish this are identified below.
StoopsWhere existing homes are directly adjacent to the street, stairs leading to the front entry often encroach into the public right of way. New homes should understand this context as an opportunity to enhance the design of homes with additional gathering space within the right of way.
The design configuration of new stairs should factor in the ability to create a planting zone adjacent to the
street, the ability for the homeowner to sit on the steps or on a chair at the top landing of the stoop, and the opportunities to personalize the entrance.
Porches Where porches form the context of the street, new and renovated porches should match the scale and depth of existing porches. Consider the degree of transparency/opening of the railing to provide privacy while still creating a street connection.
Interior and Exterior ConnectionsActive spaces within the home should overlook the street to enhance visibility and connection between the home and the public realm. When homes are located directly adjacent to the sidewalk, the ground floor should be situated a few feet above the street level to increase the comfort level of the interior spaces. Where
the ground floor of homes are level with the sidewalk to provide an accessible entry, a planting buffer between the sidewalk and the home should be considered.
StreetscapeAs homes are developed, streetscape improvements should be considered. Small planting areas at the front of the homes address stormwater runoff and provide an opportunity to personalize the character of the home. When considering street trees along the sidewalk, consult the Forestry Division or local shade tree commission to determine potential utility conflicts.
Walkability and TransitFuture CLT Homes should be located in proximity to public transit to promote alternative transportation opportunities. Enclosed bike storage should be accommodated within the home.
© M
att D
ayak
© M
att D
ayak
Stoops provide opportunities planting along the sidewalk Porches create connections to the sidewalk and street Decorative ironwork and planting enhance exterior connections
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative20
REF
.
W/D
-
4'-0
"16
'-0"
POW
DER
RM
CLO
SET
DIN
ING
KITC
HEN
LIVI
NG
RM
ENTR
Y
6' x
3'
20'-0
"
UP
DN
40'-0"15'-0"
BED
110
'-5" x
14'
-8"
BED
210
' x 1
4'-8
"
CLO
SET BA
TH8'
2" x
7' 7
"
W/C
5' 7
" x 5
' 2"
CLOSET
UP
DN
MAS
TER
BED
BATH
2
W/C
DN
9'-6
" X 1
4'-8
"
CEL
LAR
15' x
14'
3"
CLO
SET
5' 7
" x 5
' 4"
MEC
H
5' 4
" x 4
' 9"
CR
AWLS
PAC
E
BAC
KYAR
D
20' X
15'
22'-5"3'-0"
UP
40'-0"15'-0"
This
dra
win
g, in
clud
ing
its e
lect
roni
c fo
rm, i
s an
Inst
rum
ent
of S
ervi
ce fo
r use
sol
ely
with
resp
ect t
o th
is P
roje
ct. T
heAr
chite
ct is
the
auth
or a
nd s
ole
owne
r of s
aid
Inst
rum
ent
of S
ervi
ce a
nd re
tain
s al
l com
mon
law
, sta
tuto
ry a
nd o
ther
rese
rved
righ
ts, i
nclu
ding
cop
yrig
hts.
DR
AWIN
G
TITL
E
PRINTED
© R
OTH
SCH
ILD
DO
YNO
CO
LLAB
OR
ATIV
E
NO
T FO
RC
ON
STR
UC
TIO
N
7/6/201610:46:07AM
A101
FLO
OR
PLA
NS
- STR
EET
LOW
LAW
REN
CEV
ILLE
CO
RPO
RAT
ION
CO
MM
UN
ITY
LAN
D T
RU
STPI
TTSB
UR
GH
, PA
PRIC
ING
DR
AWIN
GS
MAY
3, 2
016
1/4
" = 1
'-0"
A1012
MAI
N F
LOO
R 1
/4" =
1'-0
"A1
013SE
CO
ND
FLO
OR
1/4
" = 1
'-0"
A1014
MEZ
ZAN
INE
1/4
" = 1
'-0"
A1011
BASE
MEN
T
REV
ISIO
NS
NO
.D
ESC
RIP
TIO
ND
ATE
REF.
-
W/D
POWDER
RM
6' x 3'
KITCHEN
DINING
RM
ENTRY
BACKYARD
12' X 20'
3'-0" 35'-0" 12'-0"
4'-0"
16'-0"
50'-0"
20'-0"
0"
LIVING RM
MECH
UP
UP
BED 2
14' 8" x 9' 9"
BATH
7' 2" x 7' 8"
CLOSET
CLOSET
MASTER
BEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrument
of Service for use solely with respect to this Project. The
Architect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and other
reserved rights, including copyrights.
DRAWING
TITLE
PRINTED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FOR
CONSTRUCTION
6/22/2016 10:45:38 AM
A101
FLOOR PLANS - ALLEY
HIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"
A101 2
MAIN FLOOR
1/4" = 1'-0"
A101 3
SECOND FLOOR
REVISIONS
NO.
DESCRIPTION
DATE
Respond and relate to the surrounding context to seamlessly blend new and old
The City of Pittsburgh zoning ordinance outlines a series of development standards for new homes within high density residential zoning districts. Often these standards do not match the existing built environment of the historic neighborhood context.
New siting of new homes should address the specific context of their immediate surroundings. This can be accomplished in the following manner:
Contextual SetbacksWhen siting a home on a lot, consider using contextual setbacks to align the structure with nearby homes. Consider providing a zero lot line on one side of the
DUNCAN STREET
LOTUSWAY
building while providing access to the side and rear of the home with a contextual setback on the opposite side.
ParkingConsider the need for off-street parking given the availability of public transit and pursue a parking variance as appropriate. Where off-street parking is provided it should be located in the rear of the property accessed from the alley. New homes should avoid ground level curb cuts and parking with garage doors facing primary streets.
Site Specific Design Home types should be selected based on their
compatibility with the site context and modified as necessary to best relate to the surroundings. As the CLT expands and new prototypes are developed the range of choices will increase.
Street Context and Alley ContextSubdivide lots where feasible to create a presence on both the street side and alley side of a lot. Lawrenceville alley homes offer an unique opportunity for providing shared amenities as identified in the Upper Lawrenceville Community Plan.
ALLEY STREET
FRONT SETBACK: 3’
SIDEYARD SETBACK: 4’ | 0’
REAR YARD SETBACK: 12’
LOT SIZE: 1000 SF LOT SIZE: 1100 SF
REAR YARD SETBACK: 15’
SIDEYARD SETBACK: 4’ | 0’
FRONT SETBACK: 0’
Example of splitting a single lot into two lots: one lot for the alley home and the other lot for the street home.
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative 21
SITE DESIGNIncorporate Sustainable Site Design
WaterUpper Lawrenceville is part of a historic “run” to the river along McCandless Avenue. As identified in the Upper Lawrenceville Community Plan, the community has made stormwater management improvements along this corridor a priority. For new homes along the cross streets to McCandless, the goal is to reduce the amount of surface storm water before it reaches the intersection or catch basins along the way.
Individual lots should consider harvesting stormwater from roofs with rain barrels connected to downspouts. The collected water can be used to irrigate on-site landscaping or adjacent tree plantings within the right-of-way. Additionally, to reduce the amount of impervious surface, each site should consider the incorporation
of planting areas along the street to collect surface stormwater and permeable pavement for on lot sidewalks and patios.
New homes along the hillside, such as those in the initial phase, should incorporate strategies to mitigate stormwater runoff to adjacent downhill lots and provide subsurface drainage measures to prevent moisture related issues on the downhill homes.
HealthNew homes should be constructed with below grade passive radon mitigation systems to prevent any infiltration or air quality issues within homes.
Resources should be available to promote gardening and composting. Outdoor storage should be provided to store necessary tools and equipment.
ConnectivityEnclosed storage should be provided for bikes to promote the use of alternative transportation and encourage an active lifestyle.
District SystemsAs the number of CLT homes increases, opportunities for district based solutions should be considered for stormwater management.
Cen
ter f
or N
eigh
borh
ood
Tech
nolo
gy
Downspouts connected to rain barrels can be used for on site irrigation Planting areas adjacent to sidewalks Permeable patio paving
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative22
Take advantage of the topography
A TE SEON N UE LARENEE FO LOTUS AY TO OE AY
REF.
W/D
UP
-
DINING
KITCHEN
BACKYARD
18' X 20'
37'-0" 18'-0"
4'-0"
16'-0"
OPEN TO
BELOW
20'-0"
UP
DN
3'-0"
MASTER
BEDROOM
11' x 14' 8"
BED 2
10' x 14' 8"
BATH
8' 3" x 7' 7"
W/C
5' 1" x 5' 2"
CLOSET
CLOSET
UP
DN
CLOSET
DN
BED 3
UNFINISHED
ATTIC SPACE
10' x 11'
55'-0"
CRAWLSPACE
ENTRY
MECH/
STORAGE
POWDER
RMLI
VING RM
25'-0"
This drawing, including its electronic form, is an Instrument
of Service for use solely with respect to this Project. The
Architect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and other
reserved rights, including copyrights.
DRAWING
TITLE
PRINTED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FOR
CONSTRUCTION
7/6/2016 10:08:11 AM
A101
FLOOR PLANS - STREET
HIGH
LAWRENCEVILLE
CORPORATION
COMMUNITY LAND TRUST
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
REVISIONS
NO.
DESCRIPTION
DATE
REF.
W/D
-
12'-0" 35'-0" 3'-0"
POW
DER
RM
KITC
HEN
LIVI
NG
RM
DIN
ING
RM
4'-0
"16
'-0"
50'-0"
20'-0
"
UP
DN
BATH
7' 2
" x 7
' 8"
CLO
SET
CLO
SET
MAS
TER
BED
RO
OM
14' 8
" x 1
0' 1
"
BED
214
' 8" x
9' 9
"
DN
CEL
LAR
CLO
SET
5' 7
" x 5
' 5"
MEC
H4'
10"
x 5
' 5"
CR
AWLS
PAC
E
BAC
KYAR
D
22'-10"
12' X
20'
15'-8 1/2"
UP
This
dra
win
g, in
clud
ing
its e
lect
roni
c fo
rm, i
s an
Inst
rum
ent
of S
ervi
ce fo
r use
sol
ely
with
resp
ect t
o th
is P
roje
ct. T
heAr
chite
ct is
the
auth
or a
nd s
ole
owne
r of s
aid
Inst
rum
ent
of S
ervi
ce a
nd re
tain
s al
l com
mon
law
, sta
tuto
ry a
nd o
ther
rese
rved
righ
ts, i
nclu
ding
cop
yrig
hts.
DR
AWIN
G
TITL
E
PRINTED
© R
OTH
SCH
ILD
DO
YNO
CO
LLAB
OR
ATIV
E
NO
T FO
RC
ON
STR
UC
TIO
N
7/1/20163:02:51PM
A101
FLO
OR
PLA
NS
- ALL
EYLO
W
141
45TH
STR
EET
PITT
SBU
RG
H, P
A
PRIC
ING
DR
AWIN
GS
MAY
3, 2
016
1/4
" = 1
'-0"
A1012
MAI
N F
LOO
R 1
/4" =
1'-0
"A1
013SE
CO
ND
FLO
OR
1/4
" = 1
'-0"
A1011
BASE
MEN
T
REV
ISIO
NS
NO
.D
ESC
RIP
TIO
ND
ATE
REF
.
W/D
-
4'-0
"16
'-0"
POW
DER
RM
CLO
SET
DIN
ING
KITC
HEN
LIVI
NG
RM
ENTR
Y
6' x
3'
20'-0
"
UP
DN
40'-0"15'-0"
BED
110
'-5" x
14'
-8"
BED
210
' x 1
4'-8
"
CLO
SET BA
TH8'
2" x
7' 7
"
W/C
5' 7
" x 5
' 2"
CLOSET
UP
DN
MAS
TER
BED
BATH
2
W/C
DN
9'-6
" X 1
4'-8
"
CEL
LAR
15' x
14'
3"
CLO
SET
5' 7
" x 5
' 4"
MEC
H
5' 4
" x 4
' 9"
CR
AWLS
PAC
E
BAC
KYAR
D
20' X
15'
22'-5"3'-0"
UP
40'-0"15'-0"
This
dra
win
g, in
clud
ing
its e
lect
roni
c fo
rm, i
s an
Inst
rum
ent
of S
ervi
ce fo
r use
sol
ely
with
resp
ect t
o th
is P
roje
ct. T
heAr
chite
ct is
the
auth
or a
nd s
ole
owne
r of s
aid
Inst
rum
ent
of S
ervi
ce a
nd re
tain
s al
l com
mon
law
, sta
tuto
ry a
nd o
ther
rese
rved
righ
ts, i
nclu
ding
cop
yrig
hts.
DR
AWIN
G
TITL
E
PRINTED
© R
OTH
SCH
ILD
DO
YNO
CO
LLAB
OR
ATIV
E
NO
T FO
RC
ON
STR
UC
TIO
N
7/6/201610:46:07AM
A101
FLO
OR
PLA
NS
- STR
EET
LOW
LAW
REN
CEV
ILLE
CO
RPO
RAT
ION
CO
MM
UN
ITY
LAN
D T
RU
STPI
TTSB
UR
GH
, PA
PRIC
ING
DR
AWIN
GS
MAY
3, 2
016
1/4
" = 1
'-0"
A1012
MAI
N F
LOO
R 1
/4" =
1'-0
"A1
013SE
CO
ND
FLO
OR
1/4
" = 1
'-0"
A1014
MEZ
ZAN
INE
1/4
" = 1
'-0"
A1011
BASE
MEN
T
REV
ISIO
NS
NO
.D
ESC
RIP
TIO
NDA
TE
REF.
-
W/D
POWDER
RM
6' x 3'
KITCHEN
DINING
RM
ENTRY
BACKYARD
12' X 20'
3'-0" 35'-0" 12'-0"
4'-0"
16'-0"
50'-0"
20'-0"
0"
LIVING RM
MECH
UP
UP
BED 2
14' 8" x 9' 9"
BATH
7' 2" x 7' 8"
CLOSET
CLOSET
MASTER
BEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrument
of Service for use solely with respect to this Project. The
Architect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and other
reserved rights, including copyrights.
DRAWING
TITLE
PRINTED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FOR
CONSTRUCTION
6/22/2016 10:45:38 AM
A101
FLOOR PLANS - ALLEY
HIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"
A101 2
MAIN FLOOR
1/4" = 1'-0"
A101 3
SECOND FLOOR
REVISIONS
NO.
DESCRIPTION
DATE
DUNCAN STLOTUSWAY
POWAY
ALLEYHI
STREETLO
STREETHI
ALLEYLO
SOL PANE
ON-GRADE ME
VIS
VIS TO RIE VALE
OTNITE O SOL GANS & HARETIN
VITALEENTRY
VITALEENTRY
ENTRY AT T STREET
IRD STREETCAEWORN T HE SLOE
- REDUED BAEENT AE- ON-GRADE BAYARD ACES
GREING T AY
GRE SACE AT ERY ME
Section diagram illustrating the topography of Upper Lawrenceville Phase 1 homes. Working with the existing slope provides opportunities for capturing views and additional exterior and interior space.
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative 23
The Lawrenceville community includes both hillside and a riverfront “flats” areas. As CLT homes are established each site should take advantage of the unique opportunities of either a sloped or flat site.
In Upper Lawrenceville the lots slope approximately 20’-0” in elevation from the high side of a street or alley to the low side. The initial phase of home design was strongly influenced by the hillside location and the relationships between the home, the street, and the yard. As future home designs are established these relationships should be taken into account.
Homes on the high side of the street or alley have the opportunity to create a bonus space at the street or alley level that’s open to the second floor in order to preserve connectivity to the street while creating a yard space off one of the primary living levels. Homes on the low side of the street/alley have a bonus space at the lowest level, below the street, that opens out to the back yard.
Site walls or grading establish yard spaces on different levels to increase the privacy from one yard to the adjacent home and offer the optimum connection from the house to the yard.
Homes on the low side of the street should be visitable on the first floor, either from the front, side, or rear entrance that slopes from the street to the home.
EXTERIOR: THE BUILDING ENVELOPENew home construction should meet or exceed high performance standards that will become code minimums in the near future. As such, the model criteria is to be compliant with the latest available International Building Code (IBC) and International Energy Conservation Code (IECC). Long lasting construction methods and promotion of energy conservation metrics will extend the value of the homes into the future.
Air Tight ConstructionReduce air leakage at the homes exterior by including a continuous weather barrier membrane and sealing all framing gaps and through-wall penetrations for venting and utilities.
WindowsInstall new high performance, Energy Star windows and provide flashing and sealant around door and window openings to improve the air tight construction. Locate window openings to optimize solar heat gains and shading conditions as well as promote substantial daylighting in each occupiable area.
Insulation ValuesThe target for insulation values is to meet the most recent available energy code requirements—currently the 2015 IRC energy conservation code—as a baseline minimum. As the program moves into the future, the performance should advance with the latest codes available.
The Phase 1 new homes will incorporate high performance wall cavity insulation and 1” of continuous exterior insulation and new air/moisture barrier around the perimeter of the home. The roof will be a combination of blown-in attic insulation and insulation above the roof decking to accomplish the recommended code R-values.
Siding / Veneer CladdingExterior cladding will be selected from a range of options promoting long lasting, durable, and low maintenance solutions.
RoofingNew roofing materials should be of long lasting materials to extend the value of the home long into the future. “White roofing” strategies to reduce heat gains and urban heat island effect should be integrated for flat roofing scenarios.
Foundation WallsFoundation walls should be insulated to comply with the code standards referenced above. Waterproofing should be included with perimeter drainage where occupiable spaces are below grade.
On Grade Conditions Conditioned basement spaces should have a floor slab and continuous vapor barrier below the floor slab. All penetrations through the vapor barrier should be sealed and taped. Insulation should comply with the referenced code standards above.
Demising WallsIf a new home has a shared wall to an adjacent existing home, and the existing wall does not meet current code requirements for fire ratings and insulation values, the new construction should provide the current code requirements for fire separations and construction methods relating to piping and ductwork in the walls and insulating values.
HOME DESIGNNew home construction for the next century of living
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative24
INTERIOR: BUILDING SYSTEMSNew homes are to meet or exceed latest available ICC energy performance code standards. Integrating sustainable design strategies creates healthy living environments that are sustainable into the future while also extending the value of the homes into the future.
Lighting / DaylightingNew homes should incorporate strategies for optimized daylighting and energy efficient electrical lighting. Window locations should promote natural light to each occupiable space. Lighting should be LED fixtures whenever possible to promote energy conservation. Exterior lighting should be minimized to provide lighting at the entry areas for safe entry and egress and provide a sense of active occupancy on the street at night.
Mechanical SystemsThe goal of the mechanical system design and selection is to promote energy conservation, indoor air quality, and occupant comfort. With each home, design services should be included for an engineer to evaluate and present system options and ultimately provide a system design and equipment schedule. Additionally, programmable thermostats are to be included.
Electrical SystemsNew electrical systems should be installed throughout. If any existing electrical utilities or wiring is to be maintained, a certified electrical inspector should assess the conditions and provide a written report of the findings.
Plumbing SystemsNew homes will have new water utility connections and distribution. New sewer connections will include two lines: one for sewer and one for stormwater extending to the property line. Lines will “Y” together to connect into the existing sewer until new separate utilities are provided at the street. Each home will include site strategies to reduce stormwater runoff and rainwater harvesting.
Plumbing Fixtures & AppliancesEach home will include low flow WaterSense fixtures for toilets, faucets, and showers. Installed appliances will be Energy Star Certified.
Indoor Air QualityNew home design should promote indoor air quality standards. Material selections should include Low and Zero VOC products for all interior finishes including flooring, adhesives and sealants, paints, cabinetry, and other finish materials. Air filtration standards should be at a minimum MERV___. CO2 and carbon monoxide monitors are to be included. All combustion equipment should be ventilated to the exterior including gas cooktop ranges.
Fresh air makeup ventilation should be included with an energy recovery ventilator. Operable windows are required and should be located to promote enhanced ventilation. New homes should be constructed with below grade passive radon mitigation systems to prevent any infiltration or air quality issues within homes.
Sustainable MaterialsIn addition to Low and Zero VOC materials, locally sourced, manufactured, and purchased products should be promoted. Locally crafted products also should be considered for inclusion to promote the sustainability of local businesses.
Fire Protection SystemCurrently, as of 2015, sprinkler systems are not required for single family free standing homes or duplex homes. This requirement and other life safety requirements should be confirmed with each new home renovation as the current standards may change.
Renewable Energy SourcingRenewable energy source strategies are encouraged to improve energy conservation and reduce grid dependency. These strategies assist in moving toward a “net-zero” solution acknowledging the Architecture 2030 challenge target of new construction being at net-zero by 2030. Electrical service connections will be anticipated in all homes for inclusion of solar PV systems at day one or for future home owner hook up. Geothermal and other strategies will be considered as appropriate for each home site and if energy modeling demonstrates an improved performance strategy that exceeds other engineering solutions.
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative 25
HOME DESIGN
EXTERIOR: THE BUILDING ENVELOPEHome renovations should be designed to bring the construction up to or exceed high performance standards that will become code minimums in the near future. As such, the model criteria is to be compliant with the latest available International Building Code (IBC) and International Energy Conservation Code (IECC). Long lasting construction methods and promotion of energy conservation metrics will extend the value of the homes into the future.
Air Tight Construction Reduce air leakage at the homes exterior by including a continuous weather barrier membrane and sealing all framing gaps and through wall penetrations for venting and utilities.
WindowsReplace existing windows with new high performance Energy Star windows and provide flashing and sealant around door and window openings to improve the air tight construction.
Insulation ValuesIt is common in Lawrenceville to find existing load bearing framing walls that are only 2x4 construction. Current energy code requirements will require increasing the framing cavity and/or including exterior insulation outside of the framing wall. The target for insulation values is to meet or exceed the latest available IRC energy conservation code, which is currently the 2015 Edition. As the program moves into the future, the performance would advance with the model codes in effect.
The Phase 1 renovation home will incorporate cellulose blown in framing cavity insulation and 1” of exterior insulation with a new air/moisture barrier continuous around the perimeter of the home. The roof will be a combination of blown in attic insulation and insulation above the roof decking to accomplish the recommended code R-values with the existing roof framing conditions.
Siding / Veneer CladdingIn most cases, the renovation homes have multiple layers of exterior siding added over the years. The renovation program will evaluate the existing conditions for insulation values, air and moisture transfer, and condition of the materials to determine the extent of removal. In many cases, the exterior materials will be removed down to the original layer of siding. This layer will remain as an integral part of the framing conditions unless recommended by a structural engineer to be removed.
A new layer of sheating and air/moisture barrier will be added with additional insulation as needed to accomplish the energy conservation targets. New siding will be selected from a range of options promoting long lasting, durable, and low maintenance solutions. A brick home has not been included in the Phase 1 renovations. An additional strategy will need to be developed where structural brick exterior walls exist.
RoofingThe existing roofing materials should be evaluated for extent of an expected life cycle and water infiltration as well as an integrated solution to the insulation strategy. New roofing materials should be of long lasting materials to extend the value of the home long into the future.
Foundation Walls Existing foundations should be evaluated for structural integrity and moisture migration. Both aspects should be addressed as a priority. Each home will be individually evaluated to understand appropriate performance solutions for insulating and conditioning the existing foundations. Most existing foundations are stone foundations that allow moisture migration to move freely to both sides of the walls. Excavating on the exterior of old foundation walls should be evaluated with a structural engineer before proceeding.
On Grade Conditions Conditioned basement spaces should have a floor slab and continuous vapor barrier below the floor slab. Perimeter drainage should be added if water infiltration exists beyond infiltration that can be addressed with proper roof water collection and grading sloping away from the foundations.
Existing ChimneysOpen chimneys should be blocked off to eliminate the loss of heating. If the chimney is a shared chimney with an existing house, the flue should be insulated and capped off at the roof. A free standing home could have the chimney taken down to below the new roofing.
Demising Walls: Often the shared wall to an adjacent home does not meet current code requirements for fire ratings and insulation values. The existing conditions should be brought up to the current code requirements for fire separations and construction methods relating to piping and duct work in the walls and insulating values.
Renovate homes for the next century of living
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative26
BUILDING SYSTEMS INTERIORHome renovations are to meet or exceed latest available ICC energy performance code standards. Integrating sustainable design strategies creates healthy living environments that are sustainable into the future while also extending the value of the homes into the future.
Lighting / DaylightingRenovation homes should incorporate strategies for improved daylighting and energy efficient electrical lighting. Window locations should promote natural light to each occupiable space. Lighting should be LED fixtures whenever possible to promote energy conservation. Exterior lighting should be minimized to provide lighting at the entry areas for safe entry and egress and provide a sense of active occupancy on the street at night.
Mechanical SystemsThe goal of the mechanical system design and selection is to promote energy conservation, improve indoor air quality, and improve occupant comfort. With each home, design services should be included for an engineer to evaluate and present system options and ultimately provide a system design and equipment schedule. Additionally, programmable thermostats are to be included.
Electrical SystemsNew electrical systems should be installed throughout. If any existing electrical utilities or wiring is to be maintained a certified electrical inspector should assess the conditions and provide a written report of the findings.
Plumbing SystemsExisting homes typically will have new water utility connections and distribution. If existing utility water taps are used the water quality should be tested. New sewer connections will include two lines, one for sewer and one for stormwater extending to the property line. Lines will “Y” together to connect into the existing sewer until new separate utilities are provided at the street. Each home will include site strategies to reduce stormwater runoff and rainwater harvesting.
Plumbing Fixtures & AppliancesEach home will include low flow WaterSense fixtures for toilets, faucets, and showers. Installed appliances will be Energy Star Certified.
Indoor Air QualityRenovations should promote improved indoor air quality standards. Material selections should include Low and Zero VOC products for all interior finishes including flooring, adhesives and sealants, paints, cabinetry, and other finish materials. Air filtration standards should be at a minimum MERV___. CO2 and carbon monoxide monitors are to be included. All combustion equipment should be ventilated to the exterior including gas cooktop ranges.
Fresh air makeup ventilation should be included with an energy recovery ventilator. Operable windows are required and should be located to promote enhanced ventilation.
Sustainable MaterialsIn addition to Low and Zero VOC materials, Locally sourced, manufactured, and purchased products should be promoted. Locally crafted products should also be considered for inclusion to promote the sustainability of local businesses.
Fire Protection SystemMany existing homes do not meet current life safety regulations. Demising walls and exterior walls should meet applicable code requirements. This will often result in improved separations between homes. Currently, as of 2015, sprinkler systems are not required for single family free standing homes or duplex homes. This requirement and other life safety requirements should be confirmed with each new home renovation as the current standards may change.
Safe HomesExisting homes should be evaluated for lead, asbestos, and other toxic materials that could be present. Material testing should be completed before the demolition phase. Proper abatement and/or treatment of known conditions must be addressed.
Renewable Energy SourcingRenewable energy source strategies are encouraged to improve energy conservation and reduce grid dependency. These strategies assist in moving toward a “net-zero” solution acknowledging the Architecture 2030 challenge target of new construction being at net-zero by 2030. Electrical service connections will be anticipated in all homes for inclusion of solar PV systems at day one or for future home owner hook up. Geothermal and other strategies will be considered as appropriate for each home site and if energy modeling demonstrates an improved performance strategy that exceeds other engineering solutions.
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative 27
CLT homes should include a range of homes including renovations that bring new life to the historic structures of the neighborhood. Over the years many homes in the neighborhood have been remodeled in a manner that changes the character of the original design intent. CLT homes should be renovated to restore the original character of the home while updating materials and performance to reflect modern standards.
While the level of renovation may vary based on the condition of the home, the recommendations are based on a substantial building renovation and systems replacement.
New homes will incorporate sustainable design principles and practices. We’ve identified economic, social, and physical sustainability considerations.
EconomicEconomically, the design should consider both first cost and maintenance cost of choices and how this will impact the ongoing cost for low income owners.
Social Socially, the CLT will provide a support structure for new homeowners that will provide resources on financial management and connection to other social service providers.
PhysicallyPhysically, homes will incorporate high performing systems, a tight building envelope, and long lasting durable materials. Additional guidelines and strategies for the physical development are identified on the following pages.
HOME DESIGNIncorporate Sustainable Design Principles
Butler Street townhomes in Lower Lawrenceville Renovated attached home in Central LawrencevilleEcoCraft Home
© M
att D
ayak
© J
eff Z
oet
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative28
• Low flow water sense fixtures a. shower heads b.toilets c. faucets• Landscaping not requiring irrigation• Rain barrels for watering plants
• Small house=Small mech. system• On-site photovoltaic system• Energy Star compliant high-performance
windows• Energy Star appliances• Daylighting design• Solar shading• LED light bulbs• Programmable thermostats• Building envelope a. Increased r-value b. Air tight construction• Energy recovery ventilators
• Low VOC paints• Ventilation• Air quality a.airfiltration• Thermal comfort• Reduced air leakage• Improved acoustics• CO2 and carbon monoxide monitors• Operable windows located for natural
ventilation
• Shade canopy a. street trees• Stormwater management• Urban heat Island• White roof on low sloping roofs• Rain gardens (small) a.collection of roof water into planters• Permeable pavement and swales (where
site permits)• Environmental impact a. Reduced construction noise, dust, and pollution from off-site factory construction
• Durable• Long lasting• Low maintenance• Age gracefully• Locally manufactured materials• Natural renewable materials
MATERIALS WATER
ENERGY EFFICIENT HOMES
INDOORENVIRONMENT
SUSTAINABLE SITES
CODECOMPLIANCE
(2009 IRC +ENERGY CODE)
ENERGY STAR V3
HOMES
LEED FOR HOMES
PASSIVEHOUSE
BUILDING A SUSTAINABLE COMMUNITY • CLT creates affordable home ownership options• Educational programs focused on
sustainability for residents• Area dedicated for recycling bins• Tenant survey feedback program • Published home owner guidelines for sustainable
home improvements and maintenance• Bike storage/access
SUSTAINABILIT Y METRICSINGRAINED SUSTAINABLE DESIGN PRINCIPLES IDENTIFIABLE IN THE ARCHITECTURAL CHARACTER
Sketchbook page showing a range of different sustainabiity metrics and rating systems that may be considered for CLT homes.
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative 29
HOME DESIGNCreate a range of home sizes and types to a diversity of buyers at various stages of life
The initial phase of homes established four new housing types. The types were based on whether the homes faced a street or an alley and whether they were on the high side (uphill) of the street or the low side (downhill) side of the street.
The homes range in size from 1,100 square feet to 1,900 square feet, each with different amenities and configurations to appeal to a broad spectrum of prospective buyers.
The smaller alley homes are two stories with two bedrooms and one and a half bathrooms. The alley home on the low side of the street includes a lower level bonus room that could appeal to a family as a play room or act as a third bedroom for intergenerational families.
The larger street facing homes are three stories with three bedrooms and two and a half baths. Each of these homes has a bonus space, one facing the street and the other facing the yard, which could appeal to larger families.
Lawrenceville Corporation CLT
10-11-16 © Rothschild Doyno Collaborative
UNIT SUMMARY
06-07-16 © Rothschild Doyno Collaborative
ESTABLISHING THE RIGHT MIX/DIVERSITY IN HOME SIZES, AMMENITIES & LOCATIONS
REF
.
W/D
-
12'-0
"35
'-0"
3'-0
"
POWDERRM
KITCHEN
LIVING RM
DININGRM
4'-0" 16'-0"
50'-0
"
20'-0"
UP
DN
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
BED 214' 8" x 9' 9"
DN
CELLAR
CLOSET5' 7" x 5' 5"
MECH4' 10" x 5' 5"
CRAWLSPACE
BACKYARD
22'-1
0"
12' X 20'
15'-8
1/2
"
UP
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/1 /
2016
3:02
:51
PM
A101
FLOOR PLANS - ALLEYLOW
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
Alley Low (2 homes in Phase I) - 2 stories - 2 bedrooms + bonus rm - 1.5 baths - 1,500 sf - On-street parking - Visitable entry level (Improving accessibility)
Alley
Duplex Model ALLEY LOW
REF
.
W/D
UP
-
DINING
KITCHEN
BACKYARD18' X 20'
37'-0
"18
'-0"
4'-0" 16'-0"
OPEN TOBELOW
20'-0"
UP
DN
3'-0
"
MASTERBEDROOM11' x 14' 8"
BED 210' x 14' 8"
BATH8' 3" x 7' 7"
W/C5' 1" x 5' 2"
CLO
SET
CLOSET
UP
DN
CLOSET
DN
BED 3
UNFINISHEDATTIC SPACE
10' x 11'
55'-0
"
CRAWLSPACE
ENTRY
MECH/STORAGE
POWDERRM
LIVING RM
25'-0
"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:0
8:11
AM
A101
FLOOR PLANS - STREETHIGH
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
REVISIONS
NO. DESCRIPTION DATE
Street High (2 homes in Phase I) - 3 stories - 3 bedrooms - 2.5 baths - 1,800 sf - On-street parking
Street
STREETHIGHREF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
Street Low (1 home in Phase I) - 2.5 stories - 3 bedrooms + bonus rm - 2.5 baths - 1,900 sf - On-street parking
Street
STREETLOW
REF
.
-
W/D
POWDERRM
6' x 3'
KITCHEN
DININGRM
ENTRY
BACKYARD
12' X 20'
3'-0
"35
'-0"
12'-0
"
4'-0" 16'-0"
50'-0
"
20'-0" 0"
LIVING RM
MECH
UP
UP
BED 214' 8" x 9' 9"
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
6/2 2
/201
610
:45 :
38AM
A101
FLOOR PLANS - ALLEYHIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
REVISIONS
NO. DESCRIPTION DATE
Alley High (1 home in Phase I) - 2 stories - 2 bedrooms - 1.5 baths - 1,100 sf - On-street parking - Green Space - Sustainable DesignAlley
ALLEY HIGH
The first CLT renovation is a two story, plus basement, two bedroom home with one and a half baths. This home has a larger yard.
As the number of CLT homes grows and new homes are designed, they should consider the breadth of the market and the needs of the households in the targeted income range.
Sketchbook page illustrating the different housing types provided in the initial CLT homes offering.
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative30
Create homes that blend seamlessly into the neighborhood fabric while being of their time
Diverse communities with a blend of affordable and market rate homes side by side are most successful when it is impossible to distinguish or identify affordable homes from market rate homes. This blending removes the stigma associated with affordable housing and creates a community designed for all.
The CLT homes will blend into the neighborhood by respecting the historic architectural patterns while creating homes that take advantage of current technology and building techniques. Each home should be selected or designed based on the context of its location and the character of the surrounding homes.
Key design characteristics are identified below.
Scale and MassingAlign with the scale of the surrounding homes by relating to the number of stories and floor to floor heights. Relate to the massing of existing homes by using familiar roof forms, pitches, and eave lines.Restore the large window and door openings characteristic of older homes in the neighborhood.
Exterior Materials and DetailingCreate homes that fit in with surrounding houses and blend into the neighborhood fabric while being of their
own time. Exterior materials should be a high quality, durable, and long lasting. New homes should not mimic the historic detail of existing homes, but detailing should meet or exceed the level of craft or care of existing detailing while reflecting current standards and practices.
RenovationAs future CLT homes are established through the renovation of existing homes, this will further reinforce existing neighborhood patterns.
Increased daylighting with taller windows
Material accent and detail at entry
Adjacent developments underwayNEIGHBORHOOD PATTERNSTAL STREET & ALLEY HOES N UE LARENEE
L
H
H & o v f t t
H & o v f t t
H
L
Ob Bt
STREET HOE ALLEY HOE
Typical Upper Lawrenceville neighborhood patterns found in street and alley homes Designing new and renovated homes that relate to existing neighborhood fabric
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative 31
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative32
CHAPTER IV
PHASE 1 HOME DESIGN
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 33
PHASE 1 HOMES
The first phase of homes are located between Poe Way and Lotus Way near McCandless Street. Lots between Lotus Way and Duncan Street and Duncan Street and Poe Way will be sub-divided, creating six lots from three existing parcels. The size of the newly created lots are consistent with the historic neighborhood patterns of street-facing homes and alley-facing homes.
The homes will include six newly constructed units and one extensive renovation of an existing structure. A variety of unit sizes and types will create a range of available homes for new buyers.
Home Types for Phase 1
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative34
800 McCandless Ave.1,450 SF Lot
5230 Lotus Way2,100 SF Lot
5231 Duncan Street2,100 SF Lot
5229 Poe Way2,100 SF LotD
A B
C
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 35
Phase 1 Locations: Seven new homes in four sites
52nd Street
McCandless Street
Wick
liff S
treet
Dunca
n Stre
et
Holmes
Street
B
D
C
ALo
tus W
ay
Poe
Way
Map of Upper Lawrenceville showing the four locations for the phase 1 projects.
Homes range in size from 1,100 SF to 1,900 SF to appeal to a wide range of residents and families. Building along the hillside in Upper Lawrenceville offers opportunities to increase the unique aspects of the homes by providing bonus spaces for larger or multigenerational families based on where the homes sit relative to the grade. New homes contain either 2 or 3 bedrooms with a powder room on the ground floor and the primary bath and laundry on the second floor.
New homes are designed to be prefabricated off-site as modular units. This approach minimizes the disturbance to surrounding neighbors during construction. Fabricating the homes in a controlled environment can result in a tighter building envelope and construction efficiencies to help keep costs down.
New homes can be developed as single family detached homes, duplexes, or rowhouses. As the CLT continues into future phases, new home prototypes may be established to respond to the needs of new owners and unique site locations.
HOMES T YPES
REF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
REF
.
W/D
-
12'-0
"35
'-0"
3'-0
"
POWDERRM
KITCHEN
LIVING RM
DININGRM
4'-0" 16'-0"
50'-0
"
20'-0"
UP
DN
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
BED 214' 8" x 9' 9"
DN
CELLAR
CLOSET5' 7" x 5' 5"
MECH4' 10" x 5' 5"
CRAWLSPACE
BACKYARD
22'-1
0"
12' X 20'
15'-8
1/2
"
UP
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/1 /
2016
3:02
:51
PM
A101
FLOOR PLANS - ALLEYLOW
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
UNIT SUMMARY
Street Flat - 2.5 stories - 3 bedrooms - 2.5 baths - 1,600 sf - On-street parking
06-07-16 © Rothschild Doyno Collaborative
Alley Flat - 2 stories - 2 bedrooms - 1.5 baths - 1,100 sf - On-street parking
Alley
Street
ETLSN HE RIT MI/DIET N ME SIZES, AEITIE & LOTION
ALLEY FL AT
STREETFLAT
Home Types for Phase 1
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative36
UNIT SUMMARY
06-07-16 © Rothschild Doyno Collaborative
ETLSN HE RIT MI/DIET N ME SIZES, AEITIE & LOTION
REF
.
W/D
-
12'-0
"35
'-0"
3'-0
"
POWDERRM
KITCHEN
LIVING RM
DININGRM
4'-0" 16'-0"
50'-0
"
20'-0"
UP
DN
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
BED 214' 8" x 9' 9"
DN
CELLAR
CLOSET5' 7" x 5' 5"
MECH4' 10" x 5' 5"
CRAWLSPACE
BACKYARD
22'-1
0"
12' X 20'
15'-8
1/2
"
UP
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/1 /
2016
3:02
:51
PM
A101
FLOOR PLANS - ALLEYLOW
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
Alley Low (2 homes in Phase I) - 2 stories - 2 bedrooms + bonus rm - 1.5 baths - 1,500 sf - On-street parking - Visitable entry level (Improving accessibility)
Alley
Duplex Model ALLEY LOW
REF
.
W/D
UP
-
DINING
KITCHEN
BACKYARD18' X 20'
37'-0
"18
'-0"
4'-0" 16'-0"
OPEN TOBELOW
20'-0"
UP
DN
3'-0
"
MASTERBEDROOM11' x 14' 8"
BED 210' x 14' 8"
BATH8' 3" x 7' 7"
W/C5' 1" x 5' 2"
CLO
SET
CLOSET
UP
DN
CLOSET
DN
BED 3
UNFINISHEDATTIC SPACE
10' x 11'
55'-0
"
CRAWLSPACE
ENTRY
MECH/STORAGE
POWDERRM
LIVING RM
25'-0
"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:0
8:11
AM
A101
FLOOR PLANS - STREETHIGH
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
REVISIONS
NO. DESCRIPTION DATE
Street High (2 homes in Phase I) - 3 stories - 3 bedrooms - 2.5 baths - 1,800 sf - On-street parking
Street
STREETHIGHREF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
Street Low (1 home in Phase I) - 2.5 stories - 3 bedrooms + bonus rm - 2.5 baths - 1,900 sf - On-street parking
Street
STREETLOW
REF
.
-
W/D
POWDERRM
6' x 3'
KITCHEN
DININGRM
ENTRY
BACKYARD
12' X 20'
3'-0
"35
'-0"
12'-0
"
4'-0" 16'-0"
50'-0
"
20'-0" 0"
LIVING RM
MECH
UP
UP
BED 214' 8" x 9' 9"
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
6/2 2
/201
610
:45 :
38AM
A101
FLOOR PLANS - ALLEYHIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
REVISIONS
NO. DESCRIPTION DATE
Alley High (1 home in Phase I) - 2 stories - 2 bedrooms - 1.5 baths - 1,100 sf - On-street parking - Green Space - Sustainable DesignAlley
ALLEY HIGH
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 37
STREET LOW
DESCRIPTION
• 2.5 stories
• 3 Bedrooms + Bonus room
• 2.5 Bathrooms
• 1,940 gsf
• On-street parking
REF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
REF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
REF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
REF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
Floor plan Layout of the Street Low Home
Location Plan
Basement Main Floor Second Floor Mezzanine
Street Low Floor Plan
Cellar Level
Ground steps to rear yard Planting area
16’ x 40’ Street Home Prototype
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative38
Rendering image of a typical street low home.
Conceptual Image of a Street Low Home
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 39
DESCRIPTION
• 3 stories
• 3 Bedrooms
• 2.5 Bathrooms
• 1,835 gsf
• On-street parking
Floor plan Layout of the Street High Home
STREET HIGH
REF
.
W/D
UP
-
DINING
KITCHEN
BACKYARD18' X 20'
37'-0
"18
'-0"
4'-0" 16'-0"
OPEN TOBELOW
20'-0"
UP
DN
3'-0
"
MASTERBEDROOM11' x 14' 8"
BED 210' x 14' 8"
BATH8' 3" x 7' 7"
W/C5' 1" x 5' 2"
CLO
SET
CLOSET
UP
DN
CLOSET
DN
BED 3
UNFINISHEDATTIC SPACE
10' x 11'
55'-0
"
CRAWLSPACE
ENTRY
MECH/STORAGE
POWDERRM
LIVING RM
25'-0
"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:0
8:11
AM
A101
FLOOR PLANS - STREETHIGH
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
REVISIONS
NO. DESCRIPTION DATE
REF
.
W/D
UP
-
DINING
KITCHEN
BACKYARD18' X 20'
37'-0
"18
'-0"
4'-0" 16'-0"
OPEN TOBELOW
20'-0"
UP
DN
3'-0
"
MASTERBEDROOM11' x 14' 8"
BED 210' x 14' 8"
BATH8' 3" x 7' 7"
W/C5' 1" x 5' 2"
CLO
SET
CLOSET
UP
DN
CLOSET
DN
BED 3
UNFINISHEDATTIC SPACE
10' x 11'
55'-0
"
CRAWLSPACE
ENTRY
MECH/STORAGE
POWDERRM
LIVING RM25
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:0
8:11
AM
A101
FLOOR PLANS - STREETHIGH
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
REVISIONS
NO. DESCRIPTION DATE
REF
.
W/D
UP
-
DINING
KITCHEN
BACKYARD18' X 20'
37'-0
"18
'-0"
4'-0" 16'-0"
OPEN TOBELOW
20'-0"
UP
DN
3'-0
"
MASTERBEDROOM11' x 14' 8"
BED 210' x 14' 8"
BATH8' 3" x 7' 7"
W/C5' 1" x 5' 2"
CLO
SET
CLOSET
UP
DN
CLOSET
DN
BED 3
UNFINISHEDATTIC SPACE
10' x 11'
55'-0
"
CRAWLSPACE
ENTRY
MECH/STORAGE
POWDERRM
LIVING RM
25'-0
"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:0
8:11
AM
A101
FLOOR PLANS - STREETHIGH
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
REVISIONS
NO. DESCRIPTION DATE
REF
.
W/D
UP
-
DINING
KITCHEN
BACKYARD18' X 20'
37'-0
"18
'-0"
4'-0" 16'-0"
OPEN TOBELOW
20'-0"
UP
DN
3'-0
"
MASTERBEDROOM11' x 14' 8"
BED 210' x 14' 8"
BATH8' 3" x 7' 7"
W/C5' 1" x 5' 2"
CLO
SET
CLOSET
UP
DN
CLOSET
DN
BED 3
UNFINISHEDATTIC SPACE
10' x 11'
55'-0
"
CRAWLSPACE
ENTRY
MECH/STORAGE
POWDERRM
LIVING RM
25'-0
"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:0
8:11
AM
A101
FLOOR PLANS - STREETHIGH
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
REVISIONS
NO. DESCRIPTION DATE
Basement Main Floor Second Floor Mezzanine
Street High Floor Plan
16' x 40' Street Home Prototype
Location Plan
Rear yard access from main living level
3 1/2 Stories
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative40
Rendering image of a typical street high home.
Conceptual Image of a Street High Home
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 41
DESCRIPTION
• 2 stories
• 2 Bedrooms + Bonus Room
• 1.5 Bathrooms
• 1,475 gsf
• On-street parking
• Visitable entry level
Floor plan Layout of the Alley Low Home
ALLEY LOW
Basement
REF
.
W/D
-
12'-0
"35
'-0"
3'-0
"
POWDERRM
KITCHEN
LIVING RM
DININGRM
4'-0" 16'-0"
50'-0
"
20'-0"
UP
DN
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
BED 214' 8" x 9' 9"
DN
CELLAR
CLOSET5' 7" x 5' 5"
MECH4' 10" x 5' 5"
CRAWLSPACE
BACKYARD
22'-1
0"
12' X 20'
15'-8
1/2
"
UP
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/1 /
2016
3:02
:51
PM
A101
FLOOR PLANS - ALLEYLOW
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
REF
.
W/D
-
12'-0
"35
'-0"
3'-0
"
POWDERRM
KITCHEN
LIVING RM
DININGRM
4'-0" 16'-0"
50'-0
"
20'-0"
UP
DN
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
BED 214' 8" x 9' 9"
DN
CELLAR
CLOSET5' 7" x 5' 5"
MECH4' 10" x 5' 5"
CRAWLSPACE
BACKYARD
22'-1
0"
12' X 20'
15'-8
1/2
"
UP
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/1 /
2016
3:02
:51
PM
A101
FLOOR PLANS - ALLEYLOW
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
REF
.
W/D
-
12'-0
"35
'-0"
3'-0
"
POWDERRM
KITCHEN
LIVING RM
DININGRM
4'-0" 16'-0"
50'-0
"
20'-0"
UP
DN
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
BED 214' 8" x 9' 9"
DN
CELLAR
CLOSET5' 7" x 5' 5"
MECH4' 10" x 5' 5"
CRAWLSPACE
BACKYARD
22'-1
0"
12' X 20'
15'-8
1/2
"
UP
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/1 /
2016
3:02
:51
PM
A101
FLOOR PLANS - ALLEYLOW
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
Location Plan
Main Floor Second Floor
Alley Low Floor Plan
Planting area
Cellar Level
Ground steps to rear yard
16' x 35' Alley Home Prototype
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative42
Rendering image of a typical alley low home.
Conceptual Image of an Alley Low Home
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 43
DESCRIPTION
• 2 stories
• 2 Bedrooms
• 1.5 Bathrooms
• 1,100 gsf
• On-street parking
• Green Space
• Sustainable Design
Floor plan Layout of the Alley High Home
ALLEY HIGH
REF
.
-
W/D
POWDERRM
6' x 3'
KITCHEN
DININGRM
ENTRY
BACKYARD
12' X 20'
3'-0
"35
'-0"
12'-0
"
4'-0" 16'-0"
50'-0
"
20'-0" 0"
LIVING RM
MECH
UP
UP
BED 214' 8" x 9' 9"
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
6/2 2
/201
610
:45 :
38AM
A101
FLOOR PLANS - ALLEYHIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
REVISIONS
NO. DESCRIPTION DATE
REF
.
-
W/D
POWDERRM
6' x 3'
KITCHEN
DININGRM
ENTRY
BACKYARD
12' X 20'
3'-0
"35
'-0"
12'-0
"
4'-0" 16'-0"
50'-0
"
20'-0" 0"
LIVING RM
MECH
UP
UP
BED 214' 8" x 9' 9"
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
6/2 2
/201
610
:45 :
38AM
A101
FLOOR PLANS - ALLEYHIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
REVISIONS
NO. DESCRIPTION DATE
16’ x 35’ Alley Home Prototype
Location Plan
Main Floor Second Floor
Alley High Floor Plan
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative44
Rendering image of a typical alley high home.
Conceptual Image of an Alley High Home
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 45
DESCRIPTION
• 2.5 stories
• 3 Bedrooms + Bonus room
• 2.5 Bathrooms
• 1,580 gsf
*Location not yet established
REF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
REF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
REF.
W/D
-
4'-0" 16'-0"
POWDERRM
CLOSET
DINING
KITCHEN
LIVING RM
ENTRY
6' x 3'
20'-0"
UP
DN
40'-0
"15
'-0"
BED 110'-5" x 14'-8"
BED 210' x 14'-8"
CLOSET
BATH8' 2" x 7' 7"
W/C5' 7" x 5' 2"
CLO
SET
UP
DN
MASTER BED
BATH 2
W/C
DN
9'-6" X 14'-8"
CELLAR15' x 14' 3"
CLOSET5' 7" x 5' 4"
MECH
5' 4" x 4' 9"
CRAWLSPACE
BACKYARD
20' X 15'
22'-5
"3'
-0"
UP
40'-0
"15
'-0"
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
7/6 /
2016
10:4
6:07
AM
A101
FLOOR PLANS - STREETLOW
LAWRENCEVILLECORPORATION
COMMUNITY LAND TRUSTPITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
1/4" = 1'-0"A1014 MEZZANINE
1/4" = 1'-0"A1011 BASEMENT
REVISIONS
NO. DESCRIPTION DATE
Street Flat
Second Floor Mezzanine
Street Flat Floor PlanConceptual Image of a Street Flat Home
Floor plan Layout of a Street Flat Home
FUTURE PHASE: FL AT LOTS
Main Floor
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative46
REF
.
-
W/D
POWDERRM
6' x 3'
KITCHEN
DININGRM
ENTRY
BACKYARD
12' X 20'
3'-0
"35
'-0"
12'-0
"
4'-0" 16'-0"
50'-0
"
20'-0" 0"
LIVING RM
MECH
UP
UP
BED 214' 8" x 9' 9"
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
6/2 2
/201
610
:45 :
38AM
A101
FLOOR PLANS - ALLEYHIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
REVISIONS
NO. DESCRIPTION DATE
REF
.
-
W/D
POWDERRM
6' x 3'
KITCHEN
DININGRM
ENTRY
BACKYARD
12' X 20'
3'-0
"35
'-0"
12'-0
"
4'-0" 16'-0"
50'-0
"
20'-0" 0"
LIVING RM
MECH
UP
UP
BED 214' 8" x 9' 9"
BATH7' 2" x 7' 8"
CLOSET
CLOSET
MASTERBEDROOM
14' 8" x 10' 1"
DN
This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument
of Service and retains all common law, statutory and otherreserved rights, including copyrights.
DRAWING
TITLE
PRIN
TED
© ROTHSCHILD DOYNO COLLABORATIVE
NOT FORCONSTRUCTION
6/2 2
/201
610
:45 :
38AM
A101
FLOOR PLANS - ALLEYHIGH
141 45TH STREET
PITTSBURGH, PA
PRICING DRAWINGS
MAY 3, 2016
1/4" = 1'-0"A1012 MAIN FLOOR
1/4" = 1'-0"A1013 SECOND FLOOR
REVISIONS
NO. DESCRIPTION DATE
Street Flat
Main Floor Second Floor
Alley Flat Floor PlanConceptual Image of an Alley Flat Home
Floor plan Layout of an Alley Flat Home DESCRIPTION
• 2 stories
• 2 Bedrooms
• 1.5 Bathrooms
• 1,120 gsf
• Green Space
• Sustainable Design
*Location not yet established
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 47
Renovation
Basement Main Floor Second Floor Mezzanine
Renovation Floor PlanLocation Plan
800 MCCANDLESS AVE
Location Plan
DESCRIPTION
• 2.5 stories
• 2 Bedrooms
• 1.5 Bathrooms
• 1,410 gsf
• On-street parking
Existing home before the renovation
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative48
Renovation Exterior Design
Elevations of the Renovation Home
PHASE 1 HOME DESIGN
01-04-17 © Rothschild Doyno Collaborative 49
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative50
CHAPTER IV
ASSURING AFFORDABILITY
ASSURING AFFORDABILITY
01-04-17 © Rothschild Doyno Collaborative 51
GROWING CLT 15201
The Lawrenceville Corporation and its community partners have acquired fifteen parcels with the goal of creating eighteen additional CLT homes. Future phases offer some homes clustered together while others are scattered throughout the neighborhood. The development will be pursued in phases as funding is available for renovation and construction.
Natrona NeighborsDevelopment of seven of the parcels, located in the 5200 block Natrona Way, will create a collection of new alley homes, infilling the vacant, overgrown sites. Two of the lots have existing structures that will be evaluated for possible renovation. Three of the lots that connect to Keystone Street can be subdivided, adding three street facing homes.
Lawrenceville LocatedThe remaining parcels are scattered throughout Upper, Central, and Lower Lawrenceville, offering an opportunity to blend CLT homes into different areas of the community.
Future AcquisitionAs the private market continues to grow in Lawrenceville, acquisition of homes through the City’s Land Recycling program may become a challenge. CLT15201 should explore additional acquisition strategies to secure subsequent phases of development. Strategies may include private purchase of homes at market value, negotiations with large property owners within the community, or legacy property donations from longtime Lawrenceville residents.
PHASE 1NATRONA
NEIGHBORS
Phase I parcelsFuture CLT parcelsCemeteriesCity parcelsURA parcels
Upper Lawrenceville property ownership
Future Development Sites
CLT15201 DEVELOPMENT GUIDELINES
01-04-17 © Rothschild Doyno Collaborative52
Lower Lawrenceville property ownership Central Lawrenceville property ownership
Phase I parcelsFuture CLT parcelsCemeteriesCity parcelsURA parcels
Phoenix Apartments under construction
CMU Robotics Center
Arsenal Park
Estelle Campbell Boys and Girls
Club
Sullivan Field
Doughboy Square
Lawrenceville Corporation and Action Housing, low income housing development underway
ASSURING AFFORDABILITY
01-04-17 © Rothschild Doyno Collaborative 53