CPR 263.31 KING STREETHUMBER STATION ROAD

Post on 24-Feb-2022

1 views 0 download

transcript

T

H

E

G

O

R

E

R

O

A

D

KING STREET

H

U

M

B

E

R

S

T

A

T

IO

N

R

O

A

D

H

U

M

B

E

R

S

T

A

T

IO

N

R

O

A

D

C

P

R

CP

R

3143.25

2

9

9

8

.

5

3

2664.39

5

1

3

9

5

0

8

0

5

0

4

5

5

0

0

8

4

9

4

6

.

0

1

4

8

8

5

.

2

1

4

8

3

1

.9

2

4

8

0

0

.

8

1

4

7

4

9

.9

8

4

7

0

1

.4

3

4

6

5

1

.7

5

4

6

0

2

.

0

6

4

5

5

9

.

7

4

4

4

9

2

.

8

5

4

4

6

0

.

5

3

4397.62

4

3

5

9

4

3

0

4

.

2

9

4

2

7

0

.

0

6

4228.93

4207.1

8

4168.6

3

4

1

2

2

.

9

6

4045.6

4

0

0

8

.

8

3

9

6

2

.

0

4

3

8

9

0

.

7

3

8

4

4

.

6

6

3

8

0

5

.

3

5

3

7

6

1

.

6

4

3

7

1

3

.

0

8

3

6

6

2

.

1

7

3

6

0

8

.

2

8

3

5

5

8

.5

9

3

5

0

8

.9

3

4

5

9

.

4

9

3

3

5

9

.8

3

3

3

1

0

.

1

4

3

2

6

0

.

4

6

3210.77

3

1

6

5

.

6

8

3

1

5

5

.

0

5

3152.41

3133.99

3

1

2

9

.

0

4

3

1

1

1

.

3

9

3

0

6

1

.

7

3

0

2

2

.

0

8

3

0

1

1

.

9

3

2

9

3

4

.

0

9

2

9

1

2

.

7

2

2855.23

2813.79

2764.7

2721.34

2678.01

2644.21

2

6

1

4

.5

2564.81

2515.12

2493

2474

2

7

6

.

1

3

2

7

5

.

3

5

2

7

4

.

8

3

2

7

4

.

5

6

2

7

4

.

0

1

2

7

3

.

4

3

2

7

3

.0

7

2

7

2

.

7

8

2

7

2

.5

4

2

7

2

.4

6

2

7

2

.3

1

2

7

2

.

0

9

2

7

1

.

6

4

2

7

0

.

9

0

2

7

1

.

0

9

270.49

2

7

0

.

1

6

2

6

9

.

9

9

2

6

9

.

8

0

269.65

269.6

0

269.3

2

2

7

9

.

0

2

268.72

2

6

8

.

6

3

2

6

8

.

4

8

2

6

8

.

0

8

2

6

7

.

7

4

2

6

7

.

5

1

2

6

7

.

3

0

2

6

7

.

1

4

2

6

6

.

9

4

2

6

6

.

7

6

2

6

6

.5

4

2

6

6

.4

1 2

6

6

.

0

4

2

6

5

.9

6

2

6

5

.

9

5

2

6

5

.

9

5

265.95

2

6

5

.

9

5

2

6

5

.

9

5

265.94

2

6

3

.

6

4

2

6

3

.

8

7

2

6

5

.

0

2

2

6

0

.6

1

2

6

0

.6

1

2

6

0

.6

2

260.63

2

6

0

.8

0

263.31

261.09

263.34

263.34

263.34

263.34

2

6

5

.

0

2

2

6

5

.

0

2

2

6

5

.

0

1

2

6

5

.

0

0

W

H

-

3

7

.

1

2

-

2

CULVERT #HS5

1.35 m DIA CSP

18.9 m LENGTH

W OBV.264.18

E. OBV.264.00

CULVERT #7

0.9 m DIA CSP

13.5 m LENGTH

N INV.264.22

S INV.263.80

CULVERT #E2

1.35 m TWIN DIA CSP

53.3 m LENGTH

W. OBV.264.00 E.

OBV.263.58

W. OBV.263.99 E.

OBV.263.87

CULVERT #E3

2.0 m DIA CSP

29.9 m LENGTH

NE. OBV.260.51

SW.

OBV.260.40

DITCH INLET #1

INLET ELEV. 269.64

TOP OF BOX 270.09

0.4 m CONC PIPE

N. INV.268.28

0.4 m CONC PIPE

S. INV.268.27

CULVERT #K8

1.8 m DIA CSP

23.0 m LENGTH

N. OBV.262.28

S. OBV.262.30

DITCH INLET #2

INLET ELEV. 266.21

TOP OF BOX 266.74

0.45 m PVC PIPE

N. INV.265.01

0.20 m PVC PIPE

E. INV.265.05

0.45 m PVC PIPE

S. INV.265.03

SURVEYED BY: DATE:

DRAWN BY:

SHEET NO.

DESIGNED BY:

CHECKED BY:

DATE:

CHECKED BY:

DRAWING NO.

SCALE:

V.P.

J.D.B.

B.K.

D.Z.

B.K.

JAN. 2021

2020JOB NO. 15-458

T

H

E

G

O

R

E

R

O

A

D

KING STREET

Q

U

E

E

N

S

T

R

E

E

T

K

I

N

G

S

T

R

E

E

T

H

U

M

B

E

R

S

T

A

T

IO

N

R

O

A

D

DOWNTOWN

BOLTON

KEY PLAN

N.T.S.

TOWN OF CALEDON

REGIONAL MUNICIPALITY OF PEEL

MACVILLE SECONDARY PLAN

(BRES OPTION 3 LANDS)

LEGEND:

MACVILLE STUDY AREA LIMIT

(BRES OPTION 3)

EXISTING OVERLAND FLOW

DRAINAGE PATH

EXISTING CULVERT LOCATION

EXISTING CONTOURS

CULVERT #K3

0.9 m WIDTH

BOX CONC.

16.2 m LENGTH

N INV.260.70

S INV.260.71

EXISTING CULVERT

DESCRIPTION

File: P:\Projects\15-458\Reports\FSR\Drawings and Figures\02 - EXISTING CONDITIONS\202-A-B_EXISTING FLOODPLAIN MAPPING.dwg - Revised by <VPAVLOVIC> : Tue, Feb 02 2021 - 1:59pm

EXISTING FLOODPLAIN

MAPPING

WEST HUMBER RIVER TRIBUTARY 6 (WHT6)

202-A

1:3000

WETLAND

CEISMP HEADWATER DRAINAGE

FEATURES (BEACON)

UNEVALUATED CEISMP HEADWATER

DRAINAGE FEATURES (BEACON)

WEST HUMBER WATERSHED

BOUNDARY BASED ON UPDATED

TOPOGRAPHY (URBANTECH);

5139

278.68

HEC-RAS STATION

EXISTING FLOODLINE ELEVATION

EXISTING WEST HUMBER (WHT6)

FLOODPLANE

TOWN OF CALEDONPLANNINGRECEIVED

Feb 11, 2021