8/3/2019 D&B Overview (V2)
1/11
Click to edit Master subtitle
style
D&B FocusJune 2011
8/3/2019 D&B Overview (V2)
2/11
Blast Design
Costs
Drills
Field Controls
QA/QC Planning / Scheduling
Storage
Contracts
CIP _ Continuous Improvement Program
Focus
8/3/2019 D&B Overview (V2)
3/11
Blast Design
PREVIO
US
BLAS
T
P
REVIOU
S
BLAST
PRECONDITIONING
EFFECT
UN-BLASTE
D
Issue:
Shots terminating along the zigzagof the rows tends to precondition theun-blasted area, resulting in oversize.
If the un-blasted area has been drilledout, the adjacent holds have atendency to suffer from dislocation.In the event the un-blasted area hasnot been drilled drilling is difficult.
Remedy:(We now)Terminate shots alongechelons.
Fac
e
Fac
eUN-BLASTE
D
8/3/2019 D&B Overview (V2)
4/11
Blast Design
Blast Block Geometry Areasof Focus:
Terminate along echelonsUniform Faces (unlike Fig 1.)
In addition bring into thedesign proposal/checking Blast Length to Pit WidthRatioBlast Length should be no
less than 3 times the width.Our blasts are commonly 70mts wide therefore ourminimum length should be210 mts. This rule is basedon Burden Relief & preventing
Preconditioning.
H Pit
Fig 1.)
8/3/2019 D&B Overview (V2)
5/11
Blast Design
Note, Holes vary from 4 metres to 70 metresBurden & Spacing (Diameter) as the parameters relate to BenchHeight requires closer attention Blast design checker:
Blast Design Checker (Hole by Hole V1).xlsx
Design parameters influenced by
Bench Height
http://opt/scribd/conversion/tmp/scratch6130/Blast%20Design%20Checker%20(Hole%20by%20Hole%20V1).xlsxhttp://opt/scribd/conversion/tmp/scratch6130/Blast%20Design%20Checker%20(Hole%20by%20Hole%20V1).xlsx8/3/2019 D&B Overview (V2)
6/11
Stemming
Stem higherpercentage of holeswith importedproduct, particularlythose withinSandstone bands.
Drill Cuttings VsGravelEstablish site specificminimum stemheights for each
medium.
Loading stem material to be delivered to
the bench
Gaspressure
Stemming ejection time ms
20 30%No stemming ejec
Stemming ejectio
5 10ms
Blast Design
8/3/2019 D&B Overview (V2)
7/11
Costs
Costs Design Vs Actual:
Design costs generated at the design stage, then overlaid to budget.Later to be overlaid to actual.
8/3/2019 D&B Overview (V2)
8/11
Field ControlsWater
Control:
Planning fora rain event.
Broken
Stock
Bunds preventing waterflow
Blast holes covered by
water
H Pit May 2011
8/3/2019 D&B Overview (V2)
9/11
25Mts.
Field ControlsClean ups:
Performed once,eliminate rework.
T Pit May 2011
8/3/2019 D&B Overview (V2)
10/11
Field ControlsClean ups Summary:
Thiess & Golding's depart mining location not leaving bench in a drillablestate
Timely manner cleans up not performed in sync with drill rigsfinishing/starting new pattern
Allocation of resources weekly meeting does not identify equipmentrequired
Responsible Supervisor - weekly meeting does not identify equipmentrequired
Due date - weekly meeting does not identify equipment required
8/3/2019 D&B Overview (V2)
11/11
Drills
5degrees
Angle Drilling:Vertical holes are not drilledvertical they are drilled at 5degrees from vertical. Theorientation of this angle is dictatedby the driller.
This would mean the toe of a 45metre blast hole would be 3.9 mtsfrom design location, etc..
Drill monitoring systems installedbut not in use on two rigs.
Action Plan:Test units (are they working)Train (2) operators (at first)Engage HPGPSCollect data with focus on rockrecognition