Director/IS&P ED/ Trichy Visit to MRPL Site on 09.07.2014

Post on 23-Feb-2016

36 views 0 download

Tags:

description

Director/IS&P ED/ Trichy Visit to MRPL Site on 09.07.2014. GM/IC Receiving Director. GM/MRPL Site Receiving ED/ Trichy. Project Review. Switch Gear building Lift Inauguration. Control Room. STG Hall. STG Hall. STG-1 Seal Ring issue. Entering UB Area. UB Area. UB Area. - PowerPoint PPT Presentation

transcript

Director/IS&PED/Trichy

Visit to MRPL Siteon

09.07.2014

GM/IC Receiving Director

GM/MRPL Site Receiving ED/Trichy

Project Review

Switch Gear building Lift Inauguration

Control Room

STG Hall

STG Hall

STG-1 Seal Ring issue

Entering UB Area

UB Area

UB Area

GBC Hall Structure fire proofing

Gas Booster Compressor Hall

Thank You