Post on 04-Apr-2018
transcript
7/29/2019 Dust and Steam Adhesive Treatment
1/6
7/29/2019 Dust and Steam Adhesive Treatment
2/6
7/29/2019 Dust and Steam Adhesive Treatment
3/6
9400
6000
4500
4.32
18.10
6150
5700
5700
5700
M
EASUR
ING
POINT
-0.30
CL.INLETOFASHSEPARATOR
2770
3000x2400x5
3240
1400x1600x5
1600x1400x5
2250
2250
133x4
-0.60
43
51
4.00
3150
2850
9400
2850
2850
2850
2850
2850
2850
17100
4000
30000
4000
-0.80
TOPOFWATER-9.55
PRIMARYSLURY
TOPOFFLOOR-14.500
RAININGROOM
FAN
FAN
FRESHAIR
FRESHAIR
INSTITUTE
SHAANXIDAHUAE
LE.POWERDES.&CONS.CO.,LTD
DustandSteamAdhe
siveTreatment
2100MW
COALFIRED
POWERPLANT
ReplacingESPSystem
HaGunTreatmentPlant
7/29/2019 Dust and Steam Adhesive Treatment
4/6
INSTITUTE
SHAANXIDAHUAELE.POWERDES.&CONS.CO.,LTD
DustandSteamAdhesiveTreatment
2100MW
COALFIREDPOWERPLANT
ReplacingESPSystem
HaGunTreatmentPlant
INSTITUTE
SHAANXIDAH
UAELE.POWERDES.&CONS.CO.,LTD
DustandSteamAdhesiveTreatment
2100MWCOALFIR
EDPOWERPLANT
ReplacingESPSyst
em
ABCDEFGHIJK
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
17
18
19
20
21
22
24
23
7/29/2019 Dust and Steam Adhesive Treatment
5/6
HaGunTreatmentPlant
INSTIT
UTE
SHA
ANXIDAH
UAELE.P
OWERDE
S.&
CON
S.C
O.,LTD
Dustan
dSte
amA
dh
esiv
eTre
atmen
t
21
00MWC
OALFIREDP
OWERPLANT
Repla
cin
gE
SP
System
7/29/2019 Dust and Steam Adhesive Treatment
6/6