Post on 02-Aug-2015
transcript
Successful Remote IT: Leveraging Integrated Infrastructure to Reduce Costs and Improve Availability
Presented by Alex Pope
Director, Converged Systems
Emerson Network Power
For more information please contact:
Greg Stover
Software & Solutions Manager
Western US
Greg.stover@emerson.com
949-360-1509
Company Confidential 2
Which is scarier?
Company Confidential 3
“Edge IT”
Hybrid = HQ-Colo-Cloud , The World of Compute & Mgt is Changing A lot of compute is moving to the “Network Edge”
Core Data Center
• Bank & retail branches
• Healthcare
• Education
• Manufacturing sites
• Small Colo, hubs
• Warehouse/Dist.
• Micro Data Centers
• DR Sites
Smart Cabinet
SmartRow
SmartRow AIM
Company Confidential 4
“There are varying degrees of sophistication. Some have more servers than others. Some might just have networking and backup stuff while others have redundant servers if the facility has a higher demand of processing.”
“We were trying to find pods that were all inclusive and just plug everything in. It is definitely a challenge coordinating everything. If there was a simple pod that had all that included it would help our process.”
“It's a huge pain in the ass to manage these remote facilities to be honest. It's always a headache and it's always the last thing to be handled.”
Source
Blue Canyon Research – IT Edge End User interviews
Sponsored by Emerson Network Power
The Pains of Managing the Edge
Company Confidential 5
The “snowflake” problem at the Edge Unmanaged Edge Locations are unique!
Company Confidential 6
Security Breaches Continue to Mount
Infographic from: http://www.appstechnews.com/news/2015/feb/12/2014-data-breaches-by-the-numbers-and-the-impact/
Company Confidential 7
Core Responsibilities throughout the Data Center Footprint
Service Delivery
– Make sure the core business applications are running smoothly
User Experience
– Enable more efficient workflow with superior user experiences
Risk Management
– Minimize risks to your business, reputation and service delivery
Company Confidential 8
Cloning the Snowflake
Minimize input variation… …to minimize outcome variation
Service Delivery
User Experience
Risk Management
• Optimize for
prescribed IT load
• Factory Integrate
• Validate & Test
• Deploy Rapidly
• Maintain Securely
Company Confidential 9
Emerson Network Power SmartSolutions™ Portfolio
Company Confidential 10
Steps to Attain the Desired Outcomes Segment the Edge locations
– Application & connectivity load
– Criticality
– Size, planned growth
– Location
Define the requirements for each segment
– Service Delivery
– User Experience
– Risk Management
Minimize variation in executing to the requirements
• Optimize for
prescribed IT load
• Factory Integrate
• Validate & Test
• Deploy Rapidly
• Maintain Securely
Company Confidential 11
“Edge IT”
Cabinet Example Core Data Center
1, 2, 3, …, n
Company Confidential 12
Define the Requirements Service Delivery
– High availability
– Rapid deployment
User Experience
– Plug & play installation
– Simple management
Risk Management
– Robust physical and virtual security
– Rapid-response on-site emergency service
Company Confidential 13
Facilities • Half-height IT rack
• Online uninterruptible power supply
• Maintenance bypass
IT Access & Control • Advanced console server
Single SKU from one manufacturer, optimized for a prescribed IT Load
• In-rack power distribution
• Physical security – lock, camera, door sensor
• Remote power & environmental monitoring
• Secure remote IT access & control
Services • Onsite emergency service – rapid
response commitment
• Advanced replacement warranty
Emerson Network Power
SmartCabinet™
Pre-configured for “Plug and play” IT
Emerson Network Power SmartCabinet™
Company Confidential 14
Minimizing Variation in Execution to the Requirements
GXT4-1500RT120
• Optimize for
prescribed IT load
• Factory Integrate
• Validate & Test
Emerson Network Power SmartCabinet™
Sample Reference Design
Service Delivery
High availability
Rapid deployment
User Experience
Plug & Play
Simple Management
Risk Management
Physical & Virtual Security
o Rapid on-site support
• Deploy Rapidly
Company Confidential 15
Same Concept as Converged IT
SmartCabinet™ for Dell VRTX Sample
Reference Design
GXT4-3000RT120
ACS6004*
Network Switch
IT Load – VRTX Server
Customer Network
USB Modem *
Company Confidential 16
Use the Right Technologies in the Design
Service Delivery
High availability
o Rapid deployment
User Experience
o Plug & Play
o Simple Management
Risk Management
o Physical & Virtual Security
o Rapid on-site support
• Online Double Conversion
Uninterruptible Power Supply
provides maximum
protection from all common
power quality problems
Company Confidential 17
Architect Remote Management for Trusted Users to Resolve Issues Centrally
Service Delivery
High availability
o Rapid deployment
User Experience
o Plug & Play
Simple Management
Risk Management
Physical & Virtual Security
o Rapid on-site support
• Minimize costly ‘truck rolls’ • Maintain Securely
Company Confidential 18
Onsite Service Coverage to Meet the SLA
1. Equipment
signals anomaly
or Alarm state
2. Status and
diagnostic data
are captured
4. Engineer and parts
dispatched to site –
Warranty / Service
“Advance Replacement”
3. Remote
inspection and
diagnosis
5. Equipment
restored to
Normal state
Remote Monitoring & Onsite Service Support
Service Delivery
High availability
o Rapid deployment
User Experience
o Plug & Play
o Simple Management
Risk Management
Physical & Virtual Security
Rapid on-site support
• Maintain Securely
• Ensure proper service coverage,
warranty terms, response time
• Minimize contractor count
• Vet all contractors
Company Confidential 19
Cabinet Example Recap
Define the requirements to meet the core responsibilities
– Service delivery
– User experience
– Risk management
The process is as important as the products
Company Confidential 20
“Edge IT”
Row Example Core Data Center
1, 2, 3, …, n
Company Confidential 21
Process Principles Remain the Same Segment the Edge locations
– Application & connectivity load
– Criticality
– Size, planned growth
– Location
Define the requirements for each segment
– Service Delivery
– User Experience
– Risk Management
Minimize variation in executing to the requirements
• Optimize for
prescribed IT load
• Factory Integrate
• Validate & Test
• Deploy Rapidly
• Maintain Securely
Company Confidential 22
SmartRow™ Platform
SmartRow DCR SmartRow AIM
• Fully enclosed architecture
• 20kW (N/N+1), 3-6 racks
• 36kW (N), 5-10 racks
• Dry agent fire suppression
• Integrated power distribution
• Backup ventilation
• Open and closed architectures
• Up to 90kW*, 2-10+ racks
•Field expandable without shutdown
• Primary and redundant power and cooling
• Integrated power distribution
• Backup ventilation
*standard offering
Company Confidential 23
SmartRow Delivers:
Rapid deployment: Complete data center infrastructure deployed in weeks
Simpler IT footprint expansion: Pre-packaged design enables easier expansion; enables focus on IT, not a room upgrade
Reduced Capital Cost: No need to undertake expensive upgrades to fire suppression, cooling capacity or flooring
Reduced Energy Cost: Save up to 30% in annual energy costs
Maximum Availability: Automatic backup fans
Enhanced Control: Improve security and control over your IT environment
Company Confidential 24
Normal Operation • Sealed and contained
Back up operation • Room ambient / exhaust
Back up fan operation
SmartRow - Thermal Management
Company Confidential 25
Integrated Fire Suppression & Distribution
Fike SHP PRO fire suppression
system
– Control panel
– ECARO-25 Agent
– Horn / Strobe
– EPO controls – equipment
shutdown; environmental and
UPS
Standard 3PH, 208/120V, 225 AMP
power distribution panel
Company Confidential 26
SmartRow™ Platform
SmartRow DCR SmartRow AIM
• Fully enclosed architecture
• 20kW (N/N+1), 3-6 racks
• 36kW (N), 5-10 racks
• Dry agent fire suppression
• Integrated power distribution
• Backup ventilation
• Fully enclosed architecture
• Up to 90kW*, 2-10+ racks
•Field expandable without shutdown
• Primary and redundant power and cooling
• Integrated power distribution
• Backup ventilation
*standard offering
Company Confidential 27
Backup Ventilation
UPS System
Power Distribution
Primary Cooling
Expansion Channels, Front
Expansion Channels, Rear
Redundant Cooling
Racks
Company Confidential 28
Expansion Channels
ECR = Expansion Channel Rear (hot air)
– Additional space for cable management
ECF = Expansion Channel Front (cold air)
– Ensures only conditioned air reaches IT equipment
ECR
ECF
Emerson EC (Expansion Channels)
– A modular platform that expands the rack enclosure to manage IT equipment airflow.
– Increases energy efficiency
– Reduces emitted sound
– Easily expanded
Rack CRV Rack
Cold Air Side
Hot Air Side
Company Confidential 29
Room Air
Back-Up Ventilation
Automatically activates on primary cooling failure
Louvers removed for clarity
SmartRow AIM Backup Ventilation (single rack shown)
Company Confidential 30
1. Initial installation optimized around current requirements
Backup
Fans
Backup
Fans
Air
1Rack
1
Rack
2
Bus Plug
HD
225A
End
Cover
UPS BDC
Backup
Fans
Backup
Fans
Rack
3
Rack
4
Air
2
225A HD RH 10' BusBus Plug
HD
Bus Plug
HD
Bus Plug
HD
225A
LH
CTB
Bus Plug
HD
225A
End
Cover
225A HD RH 10' BusBus Plug
HD
Bus Plug
HD
Bus Plug
HD
225A
LH
CTBA
B
Expand Without Downtime Dual power distribution busway
– A & B power feeds from bypass distribution cabinet
Backup
Fans
Backup
Fans
Backup
Fans
Backup
Fans
Air
3
Rack
5
Rack
6
Rack
7
Rack
8
Bus Plug
HD
Bus Plug
HD
Bus Plug
HD
Bus Plug
HD
225A
End
Cover 225A HD LH 5' Bus 225A HD RH 2' 225A HD RH 2'225A
End
Cover
Bus Plug
HD
Bus Plug
HD
Bus Plug
HD
Bus Plug
HD
225A
End
Cover
225A
End
Cover 225A HD LH 5' Bus 225A HD RH 2' 225A HD RH 2'225A
End
Cover
Batt
Initial Installation
2. Future expansion
1. Busway-A: de-energize, lengthen & reenergize
2. Busway-B: de-energize, lengthen & reenergize
3. Batteries can be added for additional runtime
Company Confidential 31
Summary You can stay true to the core, at the
Edge
Define the requirements to meet the core responsibilities
– Service delivery
– User experience
– Risk management
The process is as important as the products
– Minimize input variation to minimize output variation
• Optimize for
prescribed IT load
• Factory Integrate
• Validate & Test
• Deploy Rapidly
• Maintain Securely
Company Confidential 32
Thank you